About this file

This is an Amendment to a Solicitation/Modification of Contract issued by the Department of Veterans Affairs, VISN 7 Network Contracting Office for Project 544-22-115, Replace Domestic Water and Fire Piping Loop. Amendment Number 0002 was issued on May 29, 2026, and is effective immediately.

The amendment serves two primary purposes: to publicly announce answers to Requests for Information (RFIs) received before May 26, 2026, and to correct the wage determination documentation by removing an incorrect General Decision Number (SC20260004 01/02/2026, listed as Heavy Dredging) and adding the correct wage determination. The RFI responses address 25 questions from prospective bidders covering technical and administrative matters including project phasing, staffing requirements, specialized experience qualifications, pipe fitting specifications, and permit responsibilities. Key clarifications include: the paving project will be completed prior to project start but the sanitary sewer project will not; as-built drawings are available showing existing conditions; pricing must be submitted as a unit price for all work plus individual pricing for deductive alternates; an NPDES permit with SWPPP is required and is the contractor's responsibility; the CQC system manager position requires a graduate engineering or construction management degree with three years minimum experience; and subcontractor relevant experience may be submitted and considered. The schedule must be submitted with the bid for evaluation purposes. All quotes remain due by 3:00 p.m. on Wednesday, June 10, 2026, and should be submitted to Kenyon.Dulaney@va.gov. The Contracting Officer is Chaz Bowling.

View the file

Other files for this federal contract opportunity

Other files attached to Z2NE--544-22-115 Replace Water and Fire Piping Loop, newest first.
File Type Posted
36C24726R0074 0004.pdf PDF
Copy of 544-22-115 - Bid Sheet.xlsx XLSX spreadsheet
36C24726R0074 0003.pdf PDF
Attachment I - WD Building.pdf PDF
36C24726R0074 0001 Amendment.pdf PDF
Attachment X PPQ .docx DOCX document
Attachment VIII - Compliance with Executive order 13899.pdf PDF
Attachment VI - SF24-23a Bid Bond.pdf PDF
Attachment VII - Class Deviation from the Federal Acquisition Regulation.pdf PDF
36C24726R0074_1 Final Rev.pdf PDF
Attachment I - WD.pdf PDF
Attachment V - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
Attachment VIIII - EMR.docx DOCX document
Attachment II - Bid Docs Drawings.pdf PDF
Attachment IV - Bid Docs Spec Vol 2.pdf PDF
Attachment III - Bid Docs Spec Vol 1.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0002 05-29-2026 544-26-2-5798-0006 544-22-115

36C247

Department of Veterans Affairs VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth GA 30096

36C247

Department of Veterans Affairs VISN 7 Network Contracting Office 3 FL Directors Office 3700 Crestwood Parkway Duluth GA 30096

To all Offerors/Bidders

36C24726R0074

X

X X

544-3660162-5798-854200-3223 23NR2GA52

X 1

The purpose of this amendment is to publicly announce answers to RFI's received before 5/26/2026 for Project# 544-22-115 Replace Water and Fire Piping Loop and to remove the wrong Wage Determination and add the correct one.

All quotes are still due to me(Submit quotes to Kenyon.Dulaney@va.gov) by 3:00pm on Wednesday, June 10th 2026.

Chaz Bowling Contracting Officer

544-22-115 – Replace Domestic Water and Fire Piping Loop

RFI Response

1. Question: The General Decision Number: SC20260004 01/02/2026 is listed as Heavy Dredging. Is this correct? No

2. Are as-built drawings available for the existing domestic water, fire lines, and fire pumps? As built drawings are available, however existing conditions and current configurations are adequately shown on bid drawings with images and demolition details. More details, if required, can be provided after project award.

3. Will the paving project currently on-going be completed prior to this project beginning?

Yes

4. Will the sanitary sewer project currently in progress be completed prior to this project beginning? No

5. Are as-builts available for the EHRM project? No

6. The schedule allows over 600 days. Will the government consider providing escalation? No

7. Please provide clarity on the night and weekend work as outlined in the solicitation. As outline in the solicitation, “Nighttime and weekend work may be required pending hospital operations and contractor scheduling. Coordinate and gain approval with the COR for scheduling work outside normal work hours.”

8. The solicitation lists a unit price for the complete project. GC101 list deductive alternates. Please confirm these are to be included? Pricing is to be outlined as a unit price for all work, then pricing for each deductive alternate individually.

9. Will a City of Columbia Land Disturbance permit be required? If so, who is responsible for submitting this? NPDES permit with SWPPP will be required and is the winning contractors responsibility.

10. Please confirm the roles of Project Superintendent, SSHO, and CQM are to be fulfilled by three individuals. Correct

11. Can the Pre-Bid Site Visit Sign In Sheet please be posted in a future Amendment ? No

12. Where are the Locations for trailers/laydown yard ? Refer to drawings for potential staging areas. Trailer locations and additional alternate laydown areas will be determined at the time of award and available locations due to existing construction activities on site

13. The QC spec section 01 45 00 states the CQC system manager is required to be a graduate engineer or a graduate of construction Management, with a minimum of 3 years construction experience. Can this degree requirement be waived if experience level meets the project requirements or is this degree required? No

14. Please confirm total number of GC site personnel that will be required to fulfill the roles of GC Superintendent, SSHO , and QC officer. 3

15. For the Technical proposal, can subcontractor’s relevant experience and previous projects be used as part of the GC's experience? Subcontractor’s relevant experience may be submitted and considered.

16. For the Technical proposal, can the schedule requirement be submitted after the bid and after VA identifies the low bidder and if the VA doesn't think the GC is capable after the schedule is submitted, they move to the next low bidder. No, schedule must be submitted to evaluate

17. Under the technical proposal the VA is requiring the Staffing and Management Plan to include "Work Assignments for specialized skills and trades". What exactly is the VA looking for here. Is the VA looking for the GC to indicate employees that will be self-performing specialized trades on the job or are we to list the specialized skills and trades for all subcontractors? VA will consider specific staff or subcontractors submitted for specialized skills and trades. If the GC does not intend to self-perform any specialized skills, will the GC be penalized for this. No Last, what does the VA consider to be specialized skills and trades and what type of work is not a specialized skill or trade? VA will consider specific staff or subcontractors submitted for specialized skills and trades.

18. Part of the Technical Proposal requirements states "Provide a brief narrative describing the firms' (primary and sub) specialized experience working in [description of requirement], phasing of work, elevator shutdowns, working within an active hospital, drawings, specifications, and solicitation documents." Is the [ description of requirement ], supposed to be filled in by the VA? Are we to address Elevator Shutdowns as part of this proposal? [description of requirement] should have stated “water distribution systems for domestic and fire protection services including ground mounted tanks”

19. Will GC's who do not have experience replacing entire fire/water loops, but have experience with utility modifications and sitework on VA campuses be considered for this proposal? Relevant experience may be submitted and will be considered.

20. Please confirm whether the project will be executed in multiple phases. If phased construction is anticipated, please provide the following information for each phase:

Limits and locations/areas of work – Refer to drawings and specifications

Working hours per day – Refer to solicitation

Estimated footage - Refer to drawings and specifications

Anticipated period of performance and duration - Refer to solicitation

Transition expectations between phases - Refer to drawings and specifications

Temporary water line routing for the area scheduled for shutdown - Refer to drawings and specifications

Valve installation for water shut down in certain areas - Refer to drawings and specifications

Any operational constraints, shutdown requirements, or access restrictions associated with each phase - Refer to drawings and specifications

Additionally, please provide any available phasing plans, schedules, or milestone requirements applicable to the work. - Refer to drawings and specifications

21. Are gasketed pipe connections approved on straight runs for the domestic water line and fire suppression line? If not please provide approved fitting/connection methods Refer to drawings and specifications

22. What will we be responsible for when shutting down the fire suppression side when removing the pumps? Refer to drawings and specifications

23. What type of fittings are approved for tying back into the irrigation lines? Refer to drawings and specifications

24. What type of fittings are approved for tying into existing water lines in each building?

Refer to drawings and specifications

25. What type of fittings are approved for tying in the fire suppression lines after pump removal? Refer to drawings and specifications