This is an electrical testing and maintenance report for the CAVHCS Veteran's Hospital in Tuskegee, Alabama, completed by Suncoast Industrial Testing Services, Inc. in August 2022. The report documents comprehensive tri-annual electrical system testing performed on a three-year cycle since 2004, with the previous report issued in 2019, satisfying NFPA 70B maintenance standards. Testing scope includes high voltage breakers with relay settings and vacuum bottle verification, low voltage breakers with contact resistance and insulation testing, transformer oil analysis including dissolved gas analysis (DGA) and moisture measurements, generator load bank testing at 25%, 50%, and 75% loads, infrared thermal scanning of electrical panels for hot spots exceeding 10 degrees Celsius above ambient, panel inspections, and ground resistance checks at substations and transformers.
Key findings reveal three defective low voltage breakers requiring replacement: Breaker FP4-AL (800/800) in Building 4, Breaker 3A4-NLPA (800/300) in Building 3A, and the Main breaker in Building 68 (800/800), all due to failure to trip on long-time testing. Transformer testing identified eighteen units with normal DGA Status 1 readings, three transformers (B2's T-3, B121's T-2, and B122's T-121) with DGA Status 2 requiring re-sampling within three months, and one critical issue: B50's Transformer T-124 with excessive moisture content of 42 mg/kg exceeding the 35 mg/kg limit, requiring immediate servicing. Additionally, the generator for Building 121#2 shut down after two hours due to ECU PROT warnings and high fuel temperature, requiring repair. Six hot spots were identified during infrared thermal scanning, and multiple ground resistance locations exceeded the NEC requirement of 25 ohms or less. All high voltage breakers in the main 15KV switchgear passed testing, and automatic transfer system functionality was successfully verified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24726Q0469 0005.docx | DOCX document | |
| Appendix E - Drawings 2.pdf | ||
| 36C24726Q0469 0004.docx | DOCX document | |
| Appendix E - Drawings.pdf | ||
| 36C24726Q0469 0003.docx | DOCX document | |
| 36C24726Q0469 0002.docx | DOCX document | |
| Previous Montgomery Electrical Testing Report August 2022.pdf | ||
| 36C24726Q0469 0001.docx | DOCX document | |
| 36C24726Q0469_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL
TESTING
AND
MAINTENANCE
FOR
CAVHCS
VETERAN’S HOSPITAL
TUSKEGEE, ALABAMA
BY
SUNCOAST INDUSTRIAL TESTING SERVICES, INC.
ORANGE PARK, FLORIDA
AUGUST 2022
TABLE OF CONTENTS
I. INTRODUCTION
II. EXECUTIVE SUMMARY
A. SCOPE OF WORK
B. ANALYSIS
1. HIGH VOLTAGE BREAKERS
2. LOW VOLTAGE BREAKERS
3. TRANSFORMERS
4. GENERATORS
5. INFRARED THERMAL SCANS
6. PANEL CHECKS
7. GROUNDING TESTS
C. RECOMMENDATIONS
III. LAYOUT, TABLES & SCREENS
IV. TEST REPORTS
A. HIGH VOLTAGE BREAKERS
B. LOW VOLTAGE BREAKERS
C. TRANSFORMERS
D. GENERATORS
E. INFRARED THERMAL SCANS
F. PANEL CHECKS
G. GROUNDING TESTS
I. INTRODUCTION
This Electrical Testing & Maintenance Report is for the CAVHCS Veteran’s
Hospital in Tuskegee, Alabama. Suncoast has performed this work on an every three year basis since 2004. Therefore, the last report was for 2019. Performing this work on an every three year basis satisfies the requirements of NFPA 70B – Recommended
Practice for Electrical Equipment Maintenance.
The report contains the following sections:
- Executive Summary defining the scope of work, provides analysis and gives recommendations,
- High Voltage Breakers with relay settings, test reports and a review of events for 2022,
- Low Voltage Breakers with test reports,
- Transformers with test reports and oil sample results,
- Generators with load bank testing reports and
- Infrared Thermal Scanning with reports for “Hot” spots.
- Panel checks with inspection reports
- Ground Resistance reports
II. EXECUTIVE SUMMARY
A. SCOPE OF WORK
The Scope of Work performed includes:
1) High Voltage Breakers -
a. The relays for the high voltage breakers are all SEL brand. They are hard wired into the 15KV switchgear. The servicing for these relays involves connecting a laptop computer to their front port and downloading their programming of their settings. These relays also have an “HMI” feature to check their on-line status. In addition, a
Sequence of Event report (SER) is retrieved showing the events that the relay has seen in a chronological order.
b. After cleaning and lubrication, the high voltage breakers were tested with an AC Hipot tester to verify the vacuum bottles condition. A
“Ductor” tester was used to measure the contact resistance of the vacuum bottles. Finally, a high voltage megger was used to verify the insulation quality of the breakers.
2. Low Voltage Breakers –
a. After cleaning and lubrication, the low voltage breakers were tested with a “Ductor” tester to measure the contact resistance. A low voltage megger was used to verify the insulation quality of the breakers.
b. For breaker 400A and larger, a primary current tester was used to verify the operation of the breakers’ trip units. Long-time, Short-time, Instantaneous and Ground-fault functions were tested has available on the trip units.
3. Transformers –
a. The transformers’ oil samples were also sent to a laboratory for a
Dissolved Gas Analysis (DGA) and to measure moisture.
4. Generators –
a. The generators were resistive load bank tested at 25% for 1 hour, 50% for 1 hour and 75% for 2 hours. The % load was determined by the nameplate KW rating.
5. Infrared Thermal Scanning –
a. Electrical panels were scanned looking for “Hot” spots. A “Hot” spot is considered to be a measurement of 10 degree C above ambient.
6. Panel Checks –
a. The distribution panels were checked for problems.
7. Grounding Resistance Checks –
a. The Substations, Main Panels and Transformers were checked for resistances.
B. ANALYSIS
1. High Voltage Breakers –
a. Attached is Layout 1 which shows which breaker is in which compartment in the 15KV switchgear. This switchgear was installed in
2017. The Primary Main breaker MPF-1 is fed by a dedicated utility circuit and is normally closed. The Tie breaker is normally closed. The
Alternate Main breaker MPF-2 is fed by a utility circuit with other customers and is normally open. Therefore, the facility’s entire load is on the Primary Main breaker MPF-1. The switchgear has an automatic transfer scheme whereby upon a loss of voltage on the primary circuit will cause the Primary MPF-1 breaker to open after 30 seconds and then close the Alternate MPF-2 breaker. This scheme was tested on
July 20, 2019 and the successful test is outlined on the bottom of
Layout 1.
b. All of the relays in the 15KV switchgear are SEL type. Table 1 provides the settings for these relays. These relays not only serve as protection devices, but also as control and monitoring devices. The automatic transfer scheme is controlled by the program in the relays for the main breakers. The relays also store the events seen by the relays.
The programs of all of the relays were downloaded and are provided with electronic copy of this report.
c. The high voltage breakers were cleaned and lubricated. Then they were tested with an AC Hipot tester and high voltage megger. They were also ductored to verify contact resistance. All breakers passed testing.
d. There is a capacitor bank connected to the PF-CCD breaker.
2. Low Voltage Breakers –
a. After the low voltage breakers were cleaned and lubricated, they were tested with a “Ductor” tester to measure the contact resistance.
A low voltage megger was used to verify the insulation quality of the breakers.
b. For breaker 400A and larger, a primary current tester was used to verify the operation of the breakers’ trip units. Long-time, Short-time, Instantaneous and Ground-fault functions were tested has available on the trip units.
c. The results for the testing of these breakers are given on the enclosed test reports. Table 2 lists the three defective breakers. They are:
Breaker FP4-Al (800/800), Breaker 3A4-NLPA (800/300) and
Breaker B68 Main (800/800).
3. Transformers –
a. The 21 transformers’ oil samples were sent to a laboratory for a
Dissolved Gas Analysis (DGA) and to measure moisture.
b. Table 3 lists the results of the DGA and moisture tests. The Test
Reports are also enclosed.
c. The DGA has established limits to indicate the status of the oil.
“Status 1” indicates normal gas levels and no indication of gassing.
The transformer is ready for normal operation. Routine DGA sampling is recommended within 1 year.
“Status 2” indicates elevated gas levels and/ or possible gassing.
Increase surveillance and re-sampling within 3 months is recommended.
d. Eighteen (18) transformers as listed on Table 3 are shown as DGA
“Status 1” - ready for normal operation.
e. Three (3) transformers on Table 3 are shown as DGA “Status 2” :
B2’s T-3, B121’s T-2 and B122’s T-121. These 3 transformers should be surveilled, and their oil re-sampled in 3 months.
f. B50’s T-124 shows a high moisture content of 42 mg/kg. The Lab states that moisture above 35 mg/kg exceeds the limit for in-service oil. Immediate servicing is recommended for this transformer.
4. Generator Load Bank Testing –
a. The generators were resistive load bank tested at 25% for 1 hour, 50% for 1 hour and 75% for 2 hours. The % load was determined by the nameplate KW rating.
b. The generator for Building 121#2 was shutdown after 2 hours due to generator alarms – ECU PROT warning and high fuel temperature.
c. Enclosed are test reports for the generator load bank testing.
5. Infrared Thermal Scanning –
a. Electrical panels were scanned looking for “Hot” spots. A “Hot” spot is considered to be a measurement of 10 degree C above ambient.
b. Enclosed is an inventory list of all of the scanned equipment.
c. Six (6) “Hot” spots were recorded. The “Hot” spots are noted on the IR Inventory List.
d. Individual IR report are given for each of the six (6) “Hot” spots.
e. Each “Hot” spot should be checked, and issues resolved.
6. PANEL CHECKS -
a. The distribution panels were inspected for problems.
b. The attached Panel Check List details any problems found.
c. The problems should be checked and resolved.
7. GROUND RESISTANCE CHECKS -
a. The Ground Resistance report list the ground resistances at various points in each building and transformers.
b. There are many over the NEC requirement of 25 ohms or less.
C. RECOMMENDATIONS
1. Low Voltage Breakers
a. It is recommended that breaker FP4-AL (800/800) in Building 4 be replaced because it would not trip on Long-Time testing.
b. It is recommended that breaker 3A4-NLPA (800/300) in
Building 3A4 be replaced because it would not trip on
Long-Time testing.
c. It is recommended that the Main breaker in B68 (800/800) be replaced because it would not trip.
2. Transformers
a. It is recommended the three (3) transformers on Table 3 that are shown as DGA “Status 2” be surveilled, and their oil re-sampled in
3 months. They are: B2’s T-3, B121’s T-2 and B122’s T-121.
b. It is recommended that B50’s Transformer T-124 be serviced immediately to lower its moisture content. Its moisture was measured at 42 mg/kg. The Lab states that the in-service moisture limit is 35 mg.kg. The probability of failure is increased with this condition.
3. Generators
a. It is recommended that the generator B121 #2 be repaired.
4. Infrared Thermal Scans
a. It is recommended that the six (6) “Hot” spots noted in the report be checked and any issues be resolved.
5. PANEL CHECKS -
a. It is recommended that the distribution panels have their issues resolved.
b. The attached individual Panel Check reports details problem areas.
6. GROUND RESISTANCE CHECKS -
a. It is recommended that the issues listed on the Ground Resistance report be investigated and resolved at various points in the buildings and transformers.
b. There are many over the NEC requirement of 25 ohms or less.
Submitted by: Daniel L. Wehby, P.E.
III. LAYOUTS, TABLES & SCREENS
A. LAYOUT 1 – Main 15KV Switchgear
B. TABLE 1 – Main 15KV Relay Settings
C. TABLE 2 – Low Voltage Defective Breakers
D. TABLE 3 – Transformer Oil Testing Results
IV. TEST REPORTS
A. HIGH VOLTAGE BREAKERS
B. LOW VOLTAGE BREAKERS
C. TRANSFORMERS
D. GENERATORS
E. INFRARED THERMAL SCANS
F. PANEL CHECKS
G. GROUND RESISTANCE CHECKS
8/31/2022
VA TUSKEGEE 15KV SWITCHGEAR
1 2 3 4 5 6 7 8
A
CPT/ VT PF-F SPARE VOLTAGE
TRANSFORMER
VOLTAGE
TRANSFORMER
PF-CCD PF-C CPT/ VT
B
MAIN
MPF-2
ALT
N.O.
PF-E PF-D TIE
N.C.
CPT
TRANSFORMER
PF-B PF-A MAIN
MPF-1
PRIMARY
N.C.
TESTING PROCEDURE FOR AUTOMATIC TRANSFER SYSTEM (PERFORMED AUGUST 27, 2022)
A. CONFIGURATIONS
1. MPF-1 (PRIMARY) & TIE = NORMALLY CLOSED; MPF-2 (ALTERNATE) = NORMALLY OPEN
1. MPF-2 (ALTERNATE) & TIE = NORMALLY CLOSED; MPF-1 (PRIMARY) = NORMALLY OPEN
B. MPF-1 (PRIMARY) - LOSS-OF-VOLTAGE (MODE SWITCH = PRIMARY)
1. PULLED VT FUSES ON PRIMARY SOURCE; AFTER 5 SECONDS - MPF-1 OPENED
2. WHEN MPF-1 OPENED, AFTER 2 SECONDS - MPF-2 CLOSED.
3. RESTORED FUSES ON PRIMARY SOURCE; AFTER 10 MINUTES - MPF-2 OPENED.
4. WHEN MPF-2 OPENED, AFTER 2 SECONDS - MPF-1 CLOSED.
5. SYSTEM BACK TO NORMAL CONFIGURATION.
C. MPF-2 (ALTERNATE) - LOSS-OF-VOLTAGE (MODE SWITCH = ALTERNATE)
1. PULLED VT FUSES ON ALTERNATE SOURCE; AFTER 5 SECONDS - MPF-2 OPENED
2. WHEN MPF-2 OPENED, AFTER 2 SECONDS - MPF-1 CLOSED.
3. RESTORED FUSES ON ALTERNATE SOURCE; AFTER 10 MINUTES - MPF-1 OPENED.
4. WHEN MPF-1 OPENED, AFTER 2 SECONDS - MPF-2 CLOSED.
5. SYSTEM BACK TO NORMAL CONFIGURATION.
LAYOUT 1
SUNCOAST INDUSTRIAL TESTING SERVICES, INC. 31-Aug-22
VA TUSKEGEE, AL
MAIN SUBSTATION RELAYS - CURRENT SETTINGS
BREAKER CT (P) CT (N) PT 51P1P 51P1C 51P1D 51G1P 51G1C 51G1TD
MPF-1 (NORM) 240 240 104 WYE 1.9 (456A) U3 2.95 0.6 (144A) U3 3.4
MPF-2 (ALT) 240 240 104 WYE 1.9 (456A) U3 2.95 0.6 (144A) U3 3.4
TIE 240 240 104 WYE 1.9 (456A) U3 2.95 0.6 (144A) U3 3.4
PF-A 60 10 104 WYE 3.7 (222A) U4 2.65 0.8 (48A) U4 2.4
PF-B 60 10 104 WYE 5.0 (300A) U4 2.3 0.7 (42A) U4 2.4
PF-C 60 10 104 WYE 4.8 (288A) U4 2.25 0.9 (54A) U4 2.3
PF-D 60 10 104 WYE 5.0 (300A) U4 2.3 0.65 (39A) U4 2.4
PF-E 60 10 104 WYE 4.9 (294A) U4 2.3 0.65 (39A) U4 2.4
PF-F 60 10 104 WYE 3.4 (204A) U4 2.7 0.5 (30A) U4 2.4
PF-CCD 60 10 104 WYE 2.9 (174A) U4 2.8 0.6 (36A) U4 2.3
SPARE 120 120 104 WYE 6 (720A) U3 3 0.5 (60A) U3 0.5
in CCD 160 60
MAIN SUBSTATION RELAYS - VOLTAGE SETTINGS
BREAKER 27P1P 27P1D 27P2P 27P2D 59P1P 59P1D 25VLO 25VHI 25RCF
MPF-1 (NORM) 0.2 (2.5KV) 0 0.5 (6.2KV) 5 sec.s 0.75 (9.4KV) 0.5 58 96 1
MPF-2 (ALT) 0.2 (2.5KV) 0 0.5 (6.2KV) 5 sec.s 0.75 (9.4KV) 0.5 58 96 1
PF-CCD 0.02 (250V) 0 0.02(250V) 0 0.75 (9.4KV) 0.5
NOTES: 1. ALL RELAYS ARE SEL-751A, EXCEPT RELAY IN CAP BANK IS SEL-487V.
2. ALL 50'S ARE DISABLED.
3. MPF-1 & MPF-2 SYNC CHECK - 25SF = 0.2, 25ANG1 = 25, 25ANG2 = 40, TCLOSD = 50.
4. ALL RELAYS' FRONT PORT = 19.2K BAUD RATE.
5. ROTATION = ACB.
TABLE 1
22-Aug-22
VA TUSKEGEE, AL
LOW VOLTAGE DEFECTIVE BREAKERS
SEQ. PANEL CIRCUIT LOCATION MANUF./ TYPE FRAME TRIP DEFECT RECOMMENDATION
1 FP4-AL FP4-AL BLDG. 4 ITE /
HN3B800
800 800 NO LONG-TIME TRIP REPLACE BREAKER
2 3A4 NLPA BLDG. 3A ITE / HNSF800 800 300 NO LONG-TIME TRIP REPLACE BREAKER
3 MAIN MAIN BLDG. 68 SQ. D / MAL 800 800 NO TRIP REPLACE BREAKER
4 GEN BLDG. 120
MOST SETTINGS
ARE AT MINIMUM
PERFORM COORD.
STUDY
TABLE 2
SUNCOAST INDUSTRIAL TESTING SERVICES, INC. 22-Aug-22
VA TUSKEGEE, AL
TRANSFORMER OIL SAMPLES
SEQ. LOCATION TRANSF. # S/N MOIST. STATUS 1 STATUS 2 RECOMMENDATIONS
5 B4A T-4L 20111765970 9 X NORMAL OP./ RESAMPLE 1 YR
7 B5 T-5 38322190-005-01 11 X NORMAL OP./ RESAMPLE 1 YR
8 B14,15 T-15 20111765960 15 X NORMAL OP./ RESAMPLE 1 YR
11 B13 T-13 20111765961 20 X NORMAL OP./ RESAMPLE 1 YR
12 B90 T-90 2250002819 64 (FR3) X NORMAL OP./ RESAMPLE 1 YR
13 B124 T-123 20111765967 18 X NORMAL OP./ RESAMPLE 1 YR
14 B120 T-120 WG081759000694 11 X NORMAL OP./ RESAMPLE 1 YR
15 B2 T-3 20111765965 11 X NORMAL OP./ RESAMPLE 1 YR
16 B129 T-129 20111765972 15 X NORMAL OP./ RESAMPLE 1 YR
17 CNG T-CNG 12JC597320001 19 X NORMAL OP./ RESAMPLE 1 YR
18 B88 T-88 38322190-007-01 16 X POSSIBLE GASSING, RESAMPLE
19 TPB Tuskegee T-TPB 1150012905 10 X NORMAL OP./ RESAMPLE 1 YR
20 B4A T-4R 20111765971 16 X NORMAL OP./ RESAMPLE 1 YR
21 B50 T-124 83V2250 42 X HIGH MOIST. IMMEDIATE SERVICING
22 B93 T-93 20111765963 12 X NORMAL OP./ RESAMPLE 1 YR
25 B1 T-1 20111765962 16 X NORMAL OP./ RESAMPLE 1 YR
27 B65 T-65 20111765966 23 X NORMAL OP./ RESAMPLE 1 YR
28 B68 T-68 20111765964 8 X NORMAL OP./ RESAMPLE 1 YR
29 B121 T-2 38322190-006-01 13 X POSSIBLE GASSING, RESAMPLE
30 B122 T-121 20111765969 12 X POSSIBLE GASSING, RESAMPLE
34 B97 T-97 2150008926 45 (FR3) X NORMAL OP./ RESAMPLE 1 YR
NOTES: 1. MOISTURE: MINERAL OIL -MAX 35 = ACCEPTABLE; FR3 OIL - MAX 400 = ACCEPTABLE.
2. WHEN MINERAL OIL MOISTURE IS OVER 35, IMMEDIATE SERVICING IS RECOMMENDED.
3. STATUS 1 = NORMAL GAS LEVELS. CONTINUE NORMAL OPERATION.
4. STATUS 2 = ELEVATED GAS LEVELS AND/ OR POSSIBLE GASSING.
5. STATUS 2 = RECOMMEND INCREASE SURVEILLANCE AND RE-SAMPLE WITHIN 3 MONTHS.
TABLE 3
Orange Park, Florida 32073
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794036 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: FEEDER C VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 234 G A-A 222 G A-GR 89 G A PHASE 26
A-C 200 G B-B 241 G B-GR 76 G B PHASE 27
B-C 251 G C-C 227 G C-GR 73 G C PHASE 26
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
TEST WITNESS: TEST TECHNICIAN: Timothy Marsh
REMARKS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794041 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: PFCCB VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 234 G A-A 212 G A-GR 84 G A PHASE 28
A-C 247 G B-B 218 G B-GR 89 G B PHASE 27
B-C 222 G C-C 208 G C-GR 83 G C PHASE 26
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794044 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: MAIN ALT VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 203 G A-A 220 G A-GR 90 G A PHASE 25
A-C 209 G B-B 230 G B-GR 91 G B PHASE 25
B-C 221 G C-C 215 G C-GR 93 G C PHASE 22
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794045 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: SPARE VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 385 G A-A 179 G A-GR 32 G A PHASE 24
A-C 478 G B-B 140 G B-GR 24 G B PHASE 24
B-C 489 G C-C 189 G C-GR 25 G C PHASE 25
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1734042 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: FEEDER F VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 104 G A-A 101 G A-GR 23 G A PHASE 29
A-C 140 G B-B 132 G B-GR 26 G B PHASE 25
B-C 116 G C-C 115 G C-GR 26 G C PHASE 25
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794043 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: FEEDER D VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 212 G A-A 123 G A-GR 72 G A PHASE 27
A-C 223 G B-B 132 G B-GR 81 G B PHASE 28
B-C 239 G C-C 141 G C-GR 66 G C PHASE 29
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794040 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: FEEDER E VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 99 G A-A 122 G A-GR 89 G A PHASE 26
A-C 97 G B-B 132 G B-GR 91 G B PHASE 26
B-C 100 G C-C 133 G C-GR 99 G C PHASE 24
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794046 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: FEEDER A VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 132 G A-A 120 G A-GR 91 G A PHASE 25
A-C 133 G B-B 134 G B-GR 87 G B PHASE 26
B-C 138 G C-C 122 G C-GR 93 G C PHASE 29
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794039 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: FEEDER B VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 175 G A-A 221 G A-GR 82 G A PHASE 26
A-C 175 G B-B 231 G B-GR 81 G B PHASE 26
B-C 190 G C-C 206 G C-GR 86 G C PHASE 25
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794037 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: TIE VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 227 G A-A 181 G A-GR 65 G A PHASE 29
A-C 212 G B-B 160 G B-GR 63 G B PHASE 29
B-C 216 G C-C 133 G C-GR 66 G C PHASE 28
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8-27-22
EQUIPMENT: MAIN SWITCH GEAR MFG: SQ-D
MOD #: VSD6133Y000 SER #: 1794038 TYPE: V-12
LOCATION: MAIN SUB CIRCUIT: MAIN PRIMAR VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS X GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM X GOOD
RACKING DEVICE X GOOD
CUBICLE CLEANED X GOOD
ELECTRICAL CONNECTIONS X GOOD
INSULATORS X GOOD
BUSHINGS X GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 194 G A-A 175 G A-GR 91 G A PHASE 26
A-C 199 G B-B 182 G B-GR 100 G B PHASE 22
B-C 201 G C-C 190 G C-GR 94 G C PHASE 27
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 3 KV 30 A PH 1.0 B PH 1.0 C PH 1.0 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8/22/21
EQUIPMENT: 120 Switchgear MFG: SIEMENS
MOD #: 3006243329 SER #: 300624339-100- TYPE: 15-GMSG
LOCATION: BLD 120 CIRCUIT: MAIN-2 VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS OK GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM OK GOOD
RACKING DEVICE OK GOOD
CUBICLE CLEANED OK GOOD
ELECTRICAL CONNECTIONS OK GOOD
INSULATORS OK GOOD
BUSHINGS OK GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 564 G A-A 389 G A-GR 31.1 G A PHASE 22
A-C 582 G B-B 401 G B-GR 33.7 G B PHASE 23
B-C 513 G C-C 410 G C-GR 38.1 G C PHASE 22
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 1 KV 15 A PH 1.1 B PH 1.1 C PH 1.1 PASS
Phone 904-272-2273 Fax 904-272-8438
HIGH VOLTAGE SWITCH/OCB TEST REPORT
CUSTOMER: CAVHCS TUSKEGEE DATE: 8/22/21
EQUIPMENT: 120 Switchgear MFG: SIEMENS
MOD #: 3006243329 SER #: 300624339-100- TYPE: 15-GMSG
LOCATION: BLD 120 CIRCUIT: MAIN-1 VOLTAGE: 15 KV
DESCRIPTION CHECKED CONDITION REMARKS
CONTACTS OK GOOD
N/A ARC CHUTES
MECHANICAL MECHANISM OK GOOD
RACKING DEVICE OK GOOD
CUBICLE CLEANED OK GOOD
ELECTRICAL CONNECTIONS OK GOOD
INSULATORS OK GOOD
BUSHINGS OK GOOD
MEGGER TEST RESULTS (MEG-OHMS)
CLOSED OPEN TO GROUND
DUCTOR TEST RESULTS
(MICRO-OHMS)
A-B 535 G A-A 432 G A-GR 44.1 G A PHASE 26
A-C 542 G B-B 412 G B-GR 39.2 G B PHASE 21
B-C 555 G C-C 430 G C-GR 31.1 G C PHASE 26
A/C VACUUM BOTTLE TEST RESULT
TEST TIME TEST VOLT LEAKAGE M/AMPS REMARKS
MIN 1 KV 15 A PH 1.1 B PH 1.1 C PH 1.1 PASS
SUNCOAST INDUSTRIAL TESTING SERVICES INC.
LOW VOLTAGE CIRCUIT BREAKER TEST RECORD (Less than 600 volts)
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PPBP,PP4-3P SER#
BREAKER-INFORMATION
TYPE: HJ3MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
400 N/A LOW-HI N/A
400 LOW
CONTACT RESISTANCE: A 220 B 222 C 241
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 40 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 41 3X 42
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY4 6X 4 6X 3
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
ORANGE PARK, FL 32065-7746
PHONE (904) 272-2273 FAX (904) 272-8438
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 3A
CIRCUIT DESIGNATION: MB-3A SER#
BREAKER-INFORMATION
TYPE: HNS F800MAKE: ITE FRAME: 2000
TRIP DEVICE: T/M COIL RATING: 1600 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
800 N/A LOW TO HI N/A
800 LOW
CONTACT RESISTANCE: A 90 B 90 C 94
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
1600 AMPS AMPS AMPS1600 1600
3X AMPS 77 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 77 3X 77
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS5X CY2 5X 2 5X 3
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 3A
CIRCUIT DESIGNATION: 3A4-NLPA SER#
BREAKER-INFORMATION
TYPE: HNS F800MAKE: ITE FRAME: 800
TRIP DEVICE: T/M COIL RATING: 300 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
300 LO TOHI
300 HI
CONTACT RESISTANCE: A 82 B 79 C 78
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
300 AMPS AMPS AMPS300 300
3X AMPS SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 3X
AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 2
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
Replace Breaker No long time trip
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 3A
CIRCUIT DESIGNATION: MAIN SER#
BREAKER-INFORMATION
TYPE: POWER BREMAKE: G/E FRAME: 2000
TRIP DEVICE: MultI Tap COIL RATING: 1600 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5 TO 1.0 2 TO 7 3 TO8 N/A
.8 4 7
CONTACT RESISTANCE: A 71 B 70 C 74
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
1600 AMPS AMPS AMPS1600 1600
3X AMPS 44 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 44 3X 42
3X .48 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
3X .48 3X .48
AMPS4X CY3 4X 3 4X 2
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 62
CIRCUIT DESIGNATION: #6 SER#
BREAKER-INFORMATION
TYPE: LJ3F400MAKE: ITE FRAME: 400
TRIP DEVICE: THERMAL/MA COIL RATING: 250 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
250 N/A LOW TO HI N/A
250 N/A LOW
CONTACT RESISTANCE: A 459 B 477 C 510
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
250 AMPS AMPS AMPS250 250
3X AMPS 56 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 56 3X 56
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS1300 CY4 1320 3 1330 3
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: MAIN M-2 SER# V51163
BREAKER-INFORMATION
TYPE: THSS66205MAKE: G/E FRAME: 2000
TRIP DEVICE: VERSA TRIP COIL RATING: 2000 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5 TO 1.0 2 TO 7 3 TO 8 N/A
1.0 DEL INT 2X DEL INT 6
CONTACT RESISTANCE: A 71 B 68 C 69
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
2000 AMPS AMPS AMPS2000 2000
3X AMPS 32 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 32 3X 32
1.5X .30 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .31 1.5X .30
AMPS6X CY3 6X 3 6X 4
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PP4 XR SER#
BREAKER-INFORMATION
TYPE: THSS26043MAKE: GENERAL ELECTRIC FRAME: 400
TRIP DEVICE: VERSA TRIP COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 8X 3X TO 10X N/A
.8X DEL MIN 2X DEL MIN 3X
CONTACT RESISTANCE: A 64 B 64 C 60
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
320 AMPS AMPS AMPS320 320
3X AMPS 44 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 44 3X 44
1.5X .30 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .30 1.5X .31
AMPS3X CY3 3X 3 3X 4
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: MAIN M2 SER# V51163
BREAKER-INFORMATION
TYPE: THSS66205MAKE: GENERAL ELECTRIC FRAME: 2000
TRIP DEVICE: VERSA TRIP COIL RATING: 2000 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 7X 3X TO 8X N/A
1.0X DEL INT 2X DEL INT 6X
CONTACT RESISTANCE: A 66 B 67 C 69
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
2000 AMPS AMPS AMPS2000 2000
3X AMPS 54 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 54 3X 54
1.5X .36 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .36 1.5X .36
AMPS6X CY3 6X 4 6X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: FP4-AL SER#
BREAKER-INFORMATION
TYPE: HN3B800MAKE: ITE FRAME: 800
TRIP DEVICE: THERMAL/MA COIL RATING: 800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
800 N/A LOW TO HI N/A
800 N/A HI
CONTACT RESISTANCE: A 304 B 330 C 325
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
800 AMPS AMPS AMPS800 800
3X AMPS 117 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 117 3X 117
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS3X CY3 3X 3 3X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PP4A SER#
BREAKER-INFORMATION
TYPE: HJ3MAKE: ITE FRAME: 400
TRIP DEVICE: THERMAL/MA COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
400 N/A LOW TO HI N/A
400 N/A LOW
CONTACT RESISTANCE: A 489 B 502 C 500
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 61 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 61 3X 62
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS3X CY3 3X 3 3X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PP4 SER#
BREAKER-INFORMATION
TYPE: HJ3MAKE: ITE FRAME: 400
TRIP DEVICE: THERMAL/MA COIL RATING: 350 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
350 N/A LOW TO HI N/A
350 N/A LOW
CONTACT RESISTANCE: A 299 B 298 C 321
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
350 AMPS AMPS AMPS350 350
3X AMPS 38 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 39 3X 38
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS1120 CY3 1140 3 1030 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: P4/4A SER#
BREAKER-INFORMATION
TYPE: HJ3MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
400 N/A LOW TO HI N/A
400 N/A LOW
CONTACT RESISTANCE: A 244 B 257 C 256
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 44 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 44 3X 46
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 4 6X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4A
CIRCUIT DESIGNATION: LP4A-3LA-3LB SER#
BREAKER-INFORMATION
TYPE: JL3F400MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 225 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
225 N/A LOW TO HI N/A
225 N/A LOW
CONTACT RESISTANCE: A 355 B 364 C 366
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 74 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 74 3X 74
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 4
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4A
CIRCUIT DESIGNATION: CCTV SER#
BREAKER-INFORMATION
TYPE: JL3F400MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 225 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
225 N/A LOW TO HI N/A
225 N/A LOW
CONTACT RESISTANCE: A 312 B 300 C 321
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 68 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 68 3X 68
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PP4-XR SER#
BREAKER-INFORMATION
TYPE: THSS-2604MAKE: G/E FRAME: 400
TRIP DEVICE: VERSA TRIP COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5 TO 1.0 2 TO 8 3 TO 10 N/A
.8 2 3
CONTACT RESISTANCE: A 66 B 62 C 64
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
320 AMPS AMPS AMPS320 320
3X AMPS 28 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 30 3X 30
1.5X .30 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .29 1.5X .29
AMPS3X CY3 3X 5 3X 2
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PPBP,PP4-3P SER#
BREAKER-INFORMATION
TYPE: HJ3MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
400 N/A LOW-HI N/A
400 LOW
CONTACT RESISTANCE: A 223 B 231 C 244
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 46 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 46 3X 46
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 3
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: PP4A SER#
BREAKER-INFORMATION
TYPE: HJ3MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
400 N/A LOW-HI N/A
400 LOW
CONTACT RESISTANCE: A 244 B 228 C 237
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 42 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 44 3X 42
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS5X CY3 5X 3 5X 4
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4
CIRCUIT DESIGNATION: FP4-AL SER#
BREAKER-INFORMATION
TYPE: HN3 B-800MAKE: ITE FRAME: 800
TRIP DEVICE: T/M COIL RATING: 800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
800 LOW TO HI
800 HI
CONTACT RESISTANCE: A 250 B 241 C 255
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
800 AMPS AMPS AMPS800 800
3X AMPS SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 3X
AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 3
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
Replace Breaker No long time trip
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4A
CIRCUIT DESIGNATION: LP4A-2LA SER#
BREAKER-INFORMATION
TYPE: JL3F400MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 225 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
225 N/A LOW TO HI N/A
225 N/A LOW
CONTACT RESISTANCE: A 300 B 289 C 301
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 77 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 77 3X 77
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 4
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4A
CIRCUIT DESIGNATION: LP4A-BL SER#
BREAKER-INFORMATION
TYPE: JL3F400MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 225 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
225 N/A LOW TO HI N/A
225 N/A LOW
CONTACT RESISTANCE: A 344 B 354 C 322
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 82 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 82 3X 82
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 4A
CIRCUIT DESIGNATION: LP4A-1LA SER#
BREAKER-INFORMATION
TYPE: JL3F400MAKE: ITE FRAME: 400
TRIP DEVICE: T/M COIL RATING: 225 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
225 N/A LOW TO HI N/A
225 N/A LOW
CONTACT RESISTANCE: A 377 B 381 C 354
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 88 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 88 3X 88
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS6X CY3 6X 3 6X 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-26-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5 Room G-20
CIRCUIT DESIGNATION: AVTEC SER#
BREAKER-INFORMATION
TYPE: MAGNRTICMAKE: SIEMENS FRAME: 450
TRIP DEVICE: T/M COIL RATING: 450 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
450 N/A 3250 TO 6500 N/A
450 N/A 3250
CONTACT RESISTANCE: A 213 B 231 C 218
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
450 AMPS AMPS AMPS450 450
3X AMPS 103 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 103 3X 103
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS3250 CY3 3250 4 3250 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5 Room G-20
CIRCUIT DESIGNATION: P5F SER#
BREAKER-INFORMATION
TYPE: MAGNETICMAKE: SIEMENS FRAME: 400
TRIP DEVICE: T/M COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
400 N/A 2000 TO 4000 N/A
400 N/A 2400
CONTACT RESISTANCE: A 233 B 254 C 243
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 70 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 70 3X 70
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS2400 CY3 2400 4 2400 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5 Room G-20
CIRCUIT DESIGNATION: PSKIT SER#
BREAKER-INFORMATION
TYPE: MAGNETICMAKE: SIEMEMS FRAME: 800
TRIP DEVICE: T/M COIL RATING: 800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
800 N/A 3250 TO 6500 N/A
800 N/A 3250
CONTACT RESISTANCE: A 266 B 248 C 234
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
800 AMPS AMPS AMPS800 800
3X AMPS 79 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 79 3X 79
AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS3250 CY3 3250 4 3250 3
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5 Room G-20
CIRCUIT DESIGNATION: MAIN SER#
BREAKER-INFORMATION
TYPE: RXD 63B18MAKE: SIEMENS FRAME: 1800
TRIP DEVICE: T/M COIL RATING: 1800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
1800 N/A 5000 TO 10000 N/A
1800 N/A 5000
CONTACT RESISTANCE: A 100 B 97 C 99
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
1800 AMPS AMPS AMPS1800 1800
3X AMPS 122 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 122 3X 122
N/A AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS5000 CY3 5000 2 5000 3
N/A AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5
CIRCUIT DESIGNATION: MAIN SER#
BREAKER-INFORMATION
TYPE: SPECTRA RMAKE: GE FRAME: 1200
TRIP DEVICE: VERSA TRIP COIL RATING: 1200 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 10X 2X TO 10X .2X TO .7X
1.0X DEL .2 2X DEL .2 10X .2 DEL .2
CONTACT RESISTANCE: A 86 B 89 C 92
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
1200 AMPS AMPS AMPS1200 1200
3X AMPS 34 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 34 3X 34
1.5X .29 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .29 1.5X .29
AMPS2200 CY3 2100 3 2200 3
240 AMPS SEC AMPS SEC.23 240 .23 AMPS SEC240 .23
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5
CIRCUIT DESIGNATION: PANEL B SER#
BREAKER-INFORMATION
TYPE: SPECTRA RMAKE: GE FRAME: 400
TRIP DEVICE: VERSA TRIP COIL RATING: 250 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 10X 2X TO 10X .2X TO .7X
.9X DEL .2 4X DEL.2 10X .2 DEL .2
CONTACT RESISTANCE: A 201 B 293 C 199
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 41 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 41 3X 41
1.5X .30 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .30 1.5X .30
AMPS2500 CY3 2500 3 2500 2
50 AMPS SEC AMPS SEC.23 50 .23 AMPS SEC50 .23
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5
CIRCUIT DESIGNATION: P5R SER#
BREAKER-INFORMATION
TYPE: SPECTRA RMAKE: GE FRAME: 400
TRIP DEVICE: VERSA TRIP COIL RATING: 225 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 10X 2X TO 10X .2X TO .7X
1.0X DEL .2 4X DEL.2 5X .2 DEL .1
CONTACT RESISTANCE: A 212 B 220 C 214
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
225 AMPS AMPS AMPS225 225
3X AMPS 30 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 30 3X 30
1.5X .23 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .23 1.5X .23
AMPS1125 CY3 1125 4 1125 4
50 AMPS SEC AMPS SEC.18 50 .18 AMPS SEC50 .18
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5
CIRCUIT DESIGNATION: P5W SER#
BREAKER-INFORMATION
TYPE: SPECTRA RMAKE: GE FRAME: 800
TRIP DEVICE: VERSA TRIP COIL RATING: 800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 10X 2X TO 10X .2X TO .7X
.95X DEL .2 4X DEL.2 5X .2 DEL .
CONTACT RESISTANCE: A 166 B 145 C 122
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
760 AMPS AMPS AMPS760 760
3X AMPS 33 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 33 3X 33
1.5X .31 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .31 1.5X .31
AMPS2500 CY2 2500 3 2500 3
50 AMPS SEC AMPS SEC.12 50 .12 AMPS SEC50 .12
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 5
CIRCUIT DESIGNATION: P5V SER#
BREAKER-INFORMATION
TYPE: SPECTRA RMAKE: GE FRAME: 800
TRIP DEVICE: VERSA TRIP COIL RATING: 800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
.5X TO 1.0X 2X TO 10X 2X TO 10X .2X TO .7X
.95X DEL .2 4X DEL.2 5X .2 DEL .
CONTACT RESISTANCE: A 155 B 143 C 144
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
760 AMPS AMPS AMPS760 760
3X AMPS 32 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 32 3X 32
1.5X .31 AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SEC
1.5X .31 1.5X .31
AMPS2500 CY3 2500 3 2500 3
50 AMPS SEC AMPS SEC.12 50 .12 AMPS SEC50 .12
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): Timothy Marsh DATE: 8-25-22
1033 BLANDING BLVD STE 301
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 65
CIRCUIT DESIGNATION: MAIN SER#
BREAKER-INFORMATION
TYPE: LG-400MAKE: SQ-D FRAME: 400
TRIP DEVICE: Micrologic COIL RATING: 400 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
125 to 400 1.5 to 12
400 del .5 1.5
CONTACT RESISTANCE: A 61 B 64 C 62
MEGGER: A-B 2k B-C 2k C-A 2k A-GR 2k B-GR 2k C-GR 2k
MEGGER TEST OPEN: A-A 2k B-B 2k C-C 2k
TRIP-UNITS-TEST
MIN PICK UP
A PHASE B PHASE C PHASE
LONG TIME
SHORT TIME
INST
GROUND
400 AMPS AMPS AMPS400 400
3X AMPS 1 SEC
AMPS
AMPSAMPS
SEC
SECSEC3X 1 3X 1
AMPS
AMPS
SEC
CY
AMPS
AMPS
SEC
SECAMPS3X CY4 3X 4 3X 4
AMPS SEC AMPS SEC AMPS SEC
REMARKS: MEGGER READINGS IN MEG-OHMS DUCTOR IN MICRO-OHMS
ANALYST (NAME): TIM MARSH DATE: 8-27-22
80-6A Industrial Loop North
ORANGE PARK, FL 32073
SCHEDULED: X NEW INSTALLATION: SPECIAL:
FIELD OFFICE: CAVHCS TUSKEGEE
BUILDING AND LOCATION: BLDG 68
CIRCUIT DESIGNATION: MAIN SER#
BREAKER-INFORMATION
TYPE: MALMAKE: SQ D FRAME: 800
TRIP DEVICE: THERMAL/MA COIL RATING: 800 CURVE NO:
LONG TIME SHORT TIME INST GROUND
RANGE
SETTING
800 N/A LOW-HI N/A
800 LOW
CONTACT RESISTANCE: A 332 B 366 C 382
MEGGER: A-B 2K B-C 2K C-A 2K A-GR 2K B-GR 2K C-GR 2K
MEGGER TEST OPEN: A-A 2K B-B 2K C-C 2K
TRIP-UNITS-TEST
MIN PICK UP
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .