36C24726Q0337 0003 Questions and Answers response.docx
DOCX document 143 KB Posted
- Solicitation number
- 36C24726Q0337
About this file
This is a Questions and Answers (Q&A) amendment document for solicitation 36C24726Q0337, issued by the Department of Veterans Affairs VISN 7 Network Contracting Office for relocation and reconfiguration services at the Atlanta VA Health Care System. The amendment extends the proposal due date to April 17, 2026, at 7:00 AM EST and updates contract terms including revised period of performance dates and FAR clauses 52.216-18 (Ordering), 52.216-19 (Order Limitations), and 52.216-22 (Indefinite Quantity).
This is a single-award indefinite-quantity (IDIQ) contract with firm-fixed unit rates for each contract line item (CLIN). The contract requires receiving, delivery, installation, and reconfiguration services for furniture, equipment, and property across the Atlanta VAMC and its outpatient clinics and leased spaces within the 50-mile local service radius and beyond for non-local work. Services include workload hours (estimated 8,320 hours annually), local truck trips (90 estimated), non-local truck trips (12 estimated), ergonomic workstation setup (100 estimated), and ergonomic workstation disconnection (100 estimated). The base period runs May 1, 2026, through April 30, 2027, with four one-year option periods through April 30, 2032. The contract has a guaranteed minimum of $2,500.00 annually and a maximum of $80,000.00 per individual task order. Offerors must provide minimum two past performance references for similar services within the last two years and standard commercial liability, workers compensation, and auto insurance. Work will be ordered primarily through the LEAF system with contracting officer authorization required for binding task orders. Labor is billed hourly under the workload CLIN in addition to applicable unit CLINs, with truck trip pricing covering vehicle-related costs only and ergonomic services priced separately for labor and materials. No permanent warehouse or storage facility is required; temporary staging during transport only is authorized. Certified manufacturer letters are required for warranty-sensitive items from specified manufacturers (Teknion, Global Furniture Group, Versteel, Krug, and Amcase).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24726Q0337 0003_1.docx | DOCX document | |
| 36C24726Q0337 0002 EXTENSION 041726.docx | DOCX document | |
| 36C24726Q0337 0002_1.docx | DOCX document | |
| 36C24726Q0337 0001_1.docx | DOCX document | |
| 36C24726Q0337 0001.docx | DOCX document | |
| 36C24726Q0337_1.docx | DOCX document | |
| 36C24726Q0337 Provide Relocation and Reconfiguration Services 26.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
04-16-2026
508-26-1-536-0001
Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084
Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084 To all Offerors/Bidders
36C24726Q0337
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-23-2026 11AM EDT See CONTINUATION Page
Amend solicitation#36C24726Q0337, for questions and answers:
1) Questions and answers are attached.
2) Attached is updated FAR clause, 52.216-18 Ordering; 52.216-19 Order Limitations; and52.216-22 Indefinite Quantity. .
3) Attached is updated Price/Cost Schedule Sheet changing period of performance dates.
Contracting Officer
The guaranteed minimum under this contract is $2,500.00, for the initial fiscal year in which this contract was awarded.”
And “The contract’s stated maximum is $80,000.00 per individual task order.”
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 8,320.00 |
| HR |
| __________________ |
| __________________ |
Workload: Contractor shall provide workload services to include receiving, delivery, install services for furniture, equipment, and other property of the Atlanta VA Health Care System (AVAHCS) and (CBOC and Leased space, (See list of locations at the end of this document) furnishings from multiple campuses to off campus and back and at other off campus locations. This service shall include service to outlying Outpatient Clinics on a less frequent but periodic basis. The selected contractor must provide a clean receiving facility with some usable area that is temperature and humidity controlled.
Contract Period: Base POP Begin: 05-01-2026 POP End: 04-30-2027
| 90.00 |
| EA |
| __________________ |
| __________________ |
LOCAL TRUCK TRIP
| 12.00 |
| EA |
| __________________ |
| __________________ |
NON-LOCAL TRUCK TRIP:
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION SETUP
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION DISCONNECTION:
| 8,320.00 |
| HR |
| __________________ |
| __________________ |
WORKLOAD
Contract Period: Option 1 POP Begin: 05-01-2027 POP End: 04-30-2028
| 90.00 |
| EA |
| __________________ |
| __________________ |
LOCAL TRUCK TRIP
| 12.00 |
| EA |
| __________________ |
| __________________ |
NON-LOCAL TRUCK TRIP:
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION SETUP
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION DISCONNECTION:
| 8,320.00 |
| HR |
| __________________ |
| __________________ |
Workload: Contractor shall provide workload services to include receiving, delivery, install services for furniture, equipment, and other property of the Atlanta VA Health Care System (AVAHCS) and (CBOC and Leased space, (See list of locations at the end of this document) furnishings from multiple campuses to off campus and back and at other off campus locations. This service shall include service to outlying Outpatient Clinics on a less frequent but periodic basis. The selected contractor must provide a clean receiving facility with some usable area that is temperature and humidity controlled.
Contract Period: Option 2 POP Begin: 05-01-2028 POP End: 04-30-2029
| 90.00 |
| EA |
| __________________ |
| __________________ |
LOCAL TRUCK TRIP
| 12.00 |
| EA |
| __________________ |
| __________________ |
NON-LOCAL TRUCK TRIP:
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION SETUP
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION DISCONNECTION:
| 8,320.00 |
| HR |
| __________________ |
| __________________ |
Workload: Contractor shall provide workload services to include receiving, delivery, install services for furniture, equipment, and other property of the Atlanta VA Health Care System (AVAHCS) and (CBOC and Leased space, (See list of locations at the end of this document) furnishings from multiple campuses to off campus and back and at other off campus locations. This service shall include service to outlying Outpatient Clinics on a less frequent but periodic basis. The selected contractor must provide a clean receiving facility with some usable area that is temperature and humidity controlled.
Contract Period: Option 3 POP Begin: 05-01-2029 POP End: 04-30-2030
| 90.00 |
| EA |
| __________________ |
| __________________ |
LOCAL TRUCK TRIP
| 12.00 |
| EA |
| __________________ |
| __________________ |
NON-LOCAL TRUCK TRIP:
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION SETUP
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION DISCONNECTION:
| 8,320.00 |
| HR |
| __________________ |
| __________________ |
Workload: Contractor shall provide workload services to include receiving, delivery, install services for furniture, equipment, and other property of the Atlanta VA Health Care System (AVAHCS) and (CBOC and Leased space, (See list of locations at the end of this document) furnishings from multiple campuses to off campus and back and at other off campus locations. This service shall include service to outlying Outpatient Clinics on a less frequent but periodic basis. The selected contractor must provide a clean receiving facility with some usable area that is temperature and humidity controlled.
Contract Period: Option 4 POP Begin: 05-01-2030 POP End: 04-30-2031
| 90.00 |
| EA |
| __________________ |
| __________________ |
LOCAL TRUCK TRIP
| 12.00 |
| EA |
| __________________ |
| __________________ |
NON-LOCAL TRUCK TRIP:
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION SETUP
| 100.00 |
| EA |
| __________________ |
| __________________ |
ERGONOMIC WORKSTATION DISCONNECTION:
| GRAND TOTAL |
| __________________ |
A.2 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| VAMC ATLANTA |
1670 CLAIRMONT ROAD
DECATUR, GA 30033
US
| 8,320.00 |
| See price/cost schedule sheet for contract POP. |
| MARK FOR: |
| Kenneth Scott |
(404) 321-6111 x3142 Kenneth.Scott6@va.gov
90.00
12.00
100.00
100.00
8,320.00
90.00
12.00
100.00
100.00
8,320.00
90.00
12.00
100.00
100.00
8,320.00
90.00
12.00
100.00
100.00
8,320.00
90.00
12.00
100.00
100.00
CONTINUATION PAGE
A.3 52.216-18 ORDERING (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from May 1, 2027 through April 30, 2031.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor’s fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor’s email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of Clause)
A.4 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of $80,000.00, per individual task order;
(2) Any order for a combination of items in excess of $1,600,000.00; or
(3) A series of orders from the same ordering office within 3 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 7 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
A.5 52.216-22 INDEFINITE QUANTITY (NOV 2025) (DEVIATION)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the ordering period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order, which may include order options to be exercised after the ordering period of this contract but before the end of the period of performance of the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order, including options exercised, to the same extent as if the order were completed during the contract's ordering period; provided, that the Contractor shall not be required to make any deliveries under this contract after April 30, 2031.
(End of Clause)
36C24726Q0337 Questions and Answers response
36C24726Q0337
Relocation and Reconfiguration Services questions and answer response.
| Question Reference No. |
| Question(s) |
| Response |
| 1 |
| We are performing independent research on the Combined Synopsis/Solicitation (36C24726Q0337). We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? |
| This is a new requirement. |
| 2 |
| Please confirm the final quote due date and time. The SAM notice reflects March 31, 2026, at 11:00 AM Eastern, while the RFQ addendum and SF 1449 reflect March 30, 2026, at 11:00 AM Eastern. |
The new response date is 4/17/2026, at 7AM.
| 3 |
| Please confirm the correct base and option year periods, since the PWS, price schedule, and ordering language do not fully align. |
| Base Year | |
| April 10, 2026 – April 9, 2027 |
| Option Year 1 |
| April 10, 2027 – April 9, 2028 |
| Option Year 2 |
| April 10, 2028 – April 9, 2029 |
| Option Year 3 |
| April 10, 2030 – April 9, 2031 |
| Option Year 4 |
| April 10, 2031 – April 9, 2032 |
Will change to read:
May 1 , 2026 – April 30, 2027
May 1, 2027 – April 30, 2028
May 1, 2028 – April 30, 2029
May 1, 2030 – April 30, 2031
May 1, 2031 – April 30, 2032
| 4 |
| Please confirm the intended contract type. Is this a single-award IDIQ with firm-fixed unit rates for each CLIN? |
| Yes, single-award IDIQ with firm-fixed unit rates for each CLIN. |
| 5 |
| Please clarify how past performance will be treated for this acquisition. The solicitation identifies past performance in the evaluation framework, while the addendum also states offerors are to provide two similar references from the last two years and then states past performance will be reviewed as part of the responsibility determination only. Please confirm the exact submission requirements and how past performance will be assessed for award. |
| Past Performance: The offeror is required to provide a minimum of two (2) past performance |
references for similar services within the last two (2) years, either Governmental or Commercial entity, in response to this solicitation, to include place, size, and years of service performed. If no past performance is available; you must address this in your offer. Past performance will be reviewed as part of responsibility determination only.
| 6 |
| Please identify which wage determination applies to each listed performance location, or confirm whether multiple wage determinations apply by county. |
Multiple wage determinations apply to this solicitation. Please read the solicitation and its entirety for “Delivery and pickup locations for Atlanta VA Health Care System”.
| 7 |
| Please define “local truck trip” and “non-local truck trip,” including whether the unit is one-way or round-trip, per truck, per crew, or per task order, and whether travel labor is included in the hourly workload CLIN, the trip CLIN, or both. |
| Local: Within 50-mile radius of Atlanta VAMC. |
Non-local: Beyond 50-mile radius.
Pricing is per trip (round trip), per truck. Labor billed under workload CLIN.
| 8 |
| Please clarify the receiving facility requirement, including whether there is a minimum storage size, security requirement, or approval standard, and whether use of a subcontracted or third-party facility is acceptable. |
| No permanent receiving/storage facility required. |
Temporary staging during transport only. Third-party facilities not required.
| 9 |
| Please clarify what is meant by “product specification sheet” for this services requirement. |
| Provided manufacturer cut sheets or descriptions for any materials/equipment used. |
| 10 |
| Please confirm whether ergonomic workstation services are limited to physical disconnect and reconnect only, or whether the contractor is expected to perform any IT-related connection, access, or support involving VA equipment or systems. |
| Limited to physical setup, disconnect, and reconnect. |
No IT/network/system access permitted.
| 11 |
| Please confirm whether the occasional removal and replacement of flooring and base is incidental work included within the workload CLIN, or whether the Government anticipates separate pricing or separate trade support for that effort |
| No separate trade required. |
| 12 |
| Please clarify who is authorized to issue binding task orders or other binding contractual direction under this requirement, since PWS references both warranted Contracting Officers and the COR. |
| The Contracting Officer is the only person that can bind the Government contractually. However, the COR can place task order against the contract, only after the task order has been fully executed and signed by a Contracting Officer to initiate work. |
| 13 |
| Please confirm whether the “same supervisory and workload crew” requirement applies on a per-task-order basis, rather than across the full contract term |
| Applies per task order to ensure continuity and efficiency. |
| 14 |
| Please clarify the site visit scope. The solicitation references the Atlanta VA Medical Center and additional sites, while also stating there will be only one site visit. Will non-local sites be included, or will the Government provide sample task orders, photos, or floor plans for pricing purposes? |
| All sites require the same type of work. |
| 15 |
| Please confirm which performance standard governs for response and delivery timing, since the PWS and QASP appear to state different standards. |
| PWS governs execution (24–72 hrs. typical). |
QASP used for performance monitoring.
| 16 |
| Please confirm whether the QASP is intended to apply as issued, including the references to Charlie Norwood VA Medical Center, Kenneth Scott as contractor program manager, and the placeholder text in the performance matrix. |
| It is meant for Atlanta VAMC not Charlie Norwood VA Medical Center. |
| 17 |
| Please confirm the required insurance types and minimum coverage limits for this requirement. |
| Standard commercial liability, workers comp, and auto insurance required. |
Coverage must meet federal/VA minimums prior to award.
| 18 |
| Please confirm the invoicing process, including whether invoices are expected per task order, per completed move, or on another basis, and whether OB-10/Tungsten is the required submission platform for payment. |
| Invoicing is per each awarded task order processed through the OB-10/Tungsten website @( https://www.fsc.va.gov/einvoice.asp) is the required submission platform for payment. |
| 19 |
| IDIQ Ceiling Clarification: Please confirm whether the stated IDIQ maximum value of $80,000 represents the total ordering ceiling for the full contract term, an annual ordering ceiling, a limitation per individual task order, or an initial funding limitation that may be increased through contract modification. |
| IDIQ contract Minimum $2,500.00 |
IDIQ contract Maximum $80,000 per individual task order
| 20 |
| Estimated Quantity Assumptions |
Are the estimated quantities listed under CLIN 0001 intended to represent the Government’s anticipated annual ordering volume for relocation workload services?
Yes
| 21 |
| Workload Hours vs. Unit CLIN Billing |
Should workload hours under CLIN 0001 be billed in addition to applicable unit CLINs such as local and non-local truck trips (CLINs 0002 and 0003) or ergonomic workstation services (CLINs 0004 and 0005)?
Workload hours (CLIN 0001) billed in addition to applicable unit CLINs.
| 22 |
| Truck Trip CLIN Pricing Scope |
If workload hours are billed separately, should pricing for truck trip CLINs 0002 and 0003 include only vehicle-related costs (e.g., fuel, mileage, maintenance), or should it also account for crew labor time associated with travel, loading, and unloading?
Covers vehicle-related costs only.
Labor billed separately under workload hours.
| 23 |
| Ergonomic Service CLIN Structure: |
If workload hours are billed separately, are ergonomic workstation service CLINs intended to represent incremental material/equipment costs only, or should they include segregated labor time specific to those activities?
Segregated labor time specific to those activities.
| 24 |
| Warehouse and Receiving Scope Clarification |
During the site walkthrough, it was mentioned that warehousing and receiving requirements may potentially be omitted from the scope. Could the Government please confirm whether contractor-provided receiving and storage capability is required under this solicitation?
Not required. This has been excluded from the Statement of Work (SOW).
| 25 |
| If warehouse support remains within scope, we would appreciate clarification on the following: |
Should warehouse receiving and storage activities be billed under workload hours?
| o | What is the typical duration that furniture remains in storage prior to redistribution? |
| o | Can the Government provide historical information regarding average storage volume (e.g., pallet count or square footage)? |
| Warehouse support is not required; storage area is only authorized in transporting items. |
Warehouse support is not required nor authorized.
Storage is not authorized for other than transporting items to the required location.
| 26 |
| Scope Clarification – Warehousing and Inventory Management |
During the site visit on Friday, Government personnel indicated that the contractor provided warehouse/receiving function and formal inventory management system (including photo documentation and Excel based inventory tracking) described in the PWS are no longer required under this contract.
Can the Government please confirm in writing whether these requirements will be formally removed or revised via amendment, and whether the contractor should therefore exclude warehouse/receiving and formal inventory management services from its proposed scope (except for any limited, task specific support that may be directed by the COR under individual task orders)?
Warehouse support is not required; storage area is only authorized in transporting items. This Amendment will be provided to remove warehouse information.
| 27 |
| Work Order / Intake Process |
Will all service requests be issued through the LEAF system, or will the Government use a combination of LEAF, COR directed email requests, or other internal systems? Additionally, who is the authorized ordering official for issuing task requests Primary system: LEAF.
Supplemented by COR direction.
Only CO-authorized task orders are binding.
| 28 |
| Staffing and Continuity – Dedicated Personnel |
The PWS states that personnel assigned to the contract may not have any other assignments during the work. Can the Government clarify whether this requirement applies only during active task performance or for the full period of performance?
Applies during active task performance only.
| 30 |
| Staffing and Continuity – Backup Personnel |
Is the contractor permitted to propose backup personnel who can be pre-approved for badging and used in the event of illness, leave, or surge workload?
Allowed. Must be pre-approved and badged
| 31 |
| Response Time and Scheduling Expectations |
The solicitation references both a 4-hour response and a 24-hour delivery standard in the QASP, as well as a 24–72-hour execution window in the PWS. Can the Government confirm how these timelines apply across different task types and whether contractors should expect primarily short notice tasking or periodic advance scheduling of work orders?
Mix of scheduled and short-notice tasks.
Standard: 24–72 hrs.
Urgent: within 4 hrs. when required.
| 32 |
| Geographic Coverage |
Can the Government clarify how local versus nonlocal trips should be scheduled within the required response window, particularly for locations at the outer edge of the 50-mile radius or beyond?
Must support full Atlanta VA network.
All sites have the same requirement.
| 33 |
| CLIN / Pricing Structure |
Can the Government confirm whether pricing for labor should be proposed on a per labor hour basis (per person per hour), with transportation broken out by local versus non local CLINs, and whether vehicles, equipment, and materials should be included in the proposed hourly rates or priced separately if allowed by the CLIN structure?
Labor: per hour (per person) Include standard tools/equipment in labor rates Transportation: separate CLINs.
| 34 |
| Administrative Clarifications – Proposal Due Date |
The solicitation documents appear to contain conflicting proposal due dates (one reference to 30 March and another to 31 March). Can the Government please confirm the official proposal submission deadline and time so we can align our submission accordingly?
The response date has been extended to April 17, 2026, at 7 AM EST.
| 35 |
| Administrative Clarifications – Option Year 3 |
Can the Government confirm the correct period of performance for Option Year 3 due to an apparent typographical inconsistency?
April 10, 2030 – April 9, 2031, Base plus options dates have changed. See question 3.
| 36 |
| What is the total square footage of the VA facilities that this contract will include in work orders? Will there be any large installations/moves in this contract that will require a 2–4-person crew? Is this contract primarily for work order facility move work, with a simple scope of2–4-person |
| Varies by task order. |
Typical crew: 2–4 personnel.
| 37 |
| Please confirm whether the Government intends to make a single award or reserves the right to make multiple awards under this solicitation. |
| This is a single award. |
| 38 |
| The PWS references local and non-local services. Please confirm whether local performance for workload hours and truck trips is defined as within a specific radius or county list, and whether any separate requirements apply to non-local work |
| Local: ≤50 miles from Atlanta VAMC. |
Non-local: >50 miles.
| 39 |
| Please confirm whether offerors must maintain a physical operating location or warehouse within a defined radius of the main Atlanta VA campus by the time of award, or whether a documented implementation plan that establishes such a location after award will suffice. |
| No warehouse is required. |
Contractor must demonstrate ability to support within service area.
| 40 |
| Please confirm whether any mandatory security features are required for the receiving facility, such as fenced yards, cameras, or controlled access, beyond what is described in the PWS. |
| No additional facility security required due to no warehouse requirement. |
| 41 |
| The PWS references an Excel inventory of excess furnishings. Please confirm whether the contractor is responsible only for inventory and staging of excess items awaiting VA disposition or whether the contractor is also expected to manage removal and disposal under this contract. |
| Limited to handling/moving items. |
No long-term inventory management or disposal required.
| 42 |
| Please confirm whether the 15-page quote limit applies only to the technical narrative, or whether it also includes required attachments such as the VAAR 852.219-75 certificate, proof of liability insurance, and manufacturer installer letters. If attachments do not count toward the 15 pages, please confirm that they may be submitted as separate files or as appendices to the main PDF. |
| The 15-page limit is removed, for submission to submit your response as many pages as it is required to submit. |
| 43 |
| On CLIN 1, the labor states “Receive and Deliver product,” which would indicate product being shipped to our warehouse. What is the inventory plan for products we receive, and what is expected in terms of storage once we receive the items? |
| Apply to direct receipt and delivery only. |
No storage or inventory holding is required beyond transport.
| 44 |
| Can the certified manufacturer-letter be a requirement as a quotation-submission requirement. Clarify whether acceptable evidence may include manufacturer letters, dealer authorizations, installer certifications, subcontractor-backed authorizations, or equivalent documentation. |
Clarify exactly which manufacturers and product lines require manufacturer authorization and whether all listed manufacturers are mandatory for quotation compliance.
Yes, per the Statement of Work (SOW) the Certified manufacturer-letter must accompany the quotation-submission; and yes, it can be provided by the subcontractor with your submission. This is required for warranty items.
Certified Manufacture Letters Installer only for warranty-sensitive items/equipment installation or reconfiguration tasks.(Certified Manufacture Letter confirming the ability to be certified installer for the following Teknion, Global Furniture Group, Versteel, Krug, and Amcase).