This is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the Department of Veterans Affairs, VISN 7 Network Contracting Office in Tucker, Georgia for solicitation 36C24726Q0179. The amendment extends the deadline for receipt of offers to March 30, 2026 at 12:00 AM EDT and posts 28 questions and answers received from offerors regarding the project scope.

The project involves flooring renovation work at a VA hospital on Level 4, requiring installation of sheet vinyl (Mannington Biospec MD or equivalent) in designated areas and epoxy flooring (Duraquartz Fallen Log specification) in other areas. Key project details clarified in the Q&A include: the entire floor will be renovated in one phase with no phasing required; work hours are Monday through Friday 0700-2300 hours excluding federal holidays with no overtime approval; the VA will handle all furniture and equipment moving and storage; the contractor has 120 days after award for project completion; sheet vinyl seams must be heat welded to create one complete piece; transitions and cove bases must match existing conditions; and no asbestos abatement is required as the current floor was installed in the mid-2010s. Additional clarifications address scalable plan requirements, weldrod specifications, transition details, wall base locations, product specifications, and staffing facility requirements. A floor plan document (DC000905_CB-100 MAIN HOSPITAL-Sheet - LS03B04) is attached as reference material.

View the file

Other files for this federal contract opportunity

Other files attached to 4 EAST FLOORREPLACMENT CORRECTION, newest first.
File Type Posted
36C24726Q0179 0001.pdf PDF
36C24726Q0179 0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0002 01-21-2026

Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084

Department of Veterans Affairs VISN 7 Network Contracting Office LaVista Business Park - Bldg A 2008 Weems Road Tucker GA 30084

To all Offerors/Bidders

36C24726Q0179

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 03-30-2026 12AM EDT

X 1

This amendment/modification is issued to:

1. Post questions and answers received regarding solicitation.

Joseph E. Horn Contract Officer

This amendment is to Post Questions and Answers:

Questions and Answers:

1. Can we get a scalable plan ? This plan looks to be a full-size plan shrunk down to 8.5" x 11" paper. Attached

2. Is all Sheet Vinyl (1-4) to get Weldrod or just SV-1 ? Where ever a seem is present

3. Can we get a specification on the Epoxy Flooring ? Duraquartz Fallen Log

4. Can we get a specification on the Sheet Vinyl to Epoxy Transition? I have no specs on transitions, match existing or better

5. Can we get a specification on the Sheet Vinyl to Sheet Vinyl Transition ? I have no specs on transitions, match existing or better

6. In the solicitation, there is a note about Wall bases (4”) with cove molding in designated areas.

What areas? Not shown on Plan. Match existing: everywhere there is cove base, match what is currently there.

7. In the solicitation, there is a note about Mannington Biospec MD and Realities III sheet vinyl (color to be determined post-award) - Is there specific colors that need to be priced or a range of prices ? Facility is looking for Mannington Biospec MD or equivalent. Once contract is awarded, the contractor should give exact Maker and Model. Facility will then take up to 5 days to provide colors.

8. Will the entire floor be turned over at one time or will it be phased? The plan is to turn over entire wing.

9. If phased, how many phases will there be? How will this work be phased? The plan is to turn over entire wing.

10. Will more than on mobilization / demobilization be required?? How many mobilizations should we anticipate? Floor will be closed down and work will be done in one phase.

11. Has the floor been tested for asbestos, and if so, is there a report that can be forwarded. The current floor was installed in the mid 2010’s, no asbestos.

12. Who is responsible for the moving of the equipment and furniture? VA will move furniture.

13. Where will it be stored? The VA will take care of the furniture.

14. Existing epoxy looks to be Duraquartz Fallen Log. Is the customer looking for the same exact finish, texture, and color? Yes. Which manufacturer’s products were used for existing flooring and is there a specific brand required? Unknown. Is it suitable to profile existing coating and recoat or is a full demo of resinous floor and base required? It is suitable for recoat, however the installation would have to be guaranteed to last at least a year after installation.

15. Should Staff Toilet 4C-143 be SV-1 or epoxy? Match existing.

16. Will the SV-1 in rooms 4C-150, 4C-148, and 4C-141 need to have the integral (flash coved) base? If so, would 4C-160 Soiled Utility need to be flash coved as well? Match existing.

17. How will this work be phased? How many mobilizations should we anticipate? The plan is to turn over entire wing.

18. Is there a specific product called out or required for the epoxy in the restrooms? No specific product for restroom epoxy.

19. Where did they figure the Schonox RF to be used? They had approximately 17 bags on specific task list. Quoted vendor estimated 17 bags. This is the only count we have on record.

20. Will the demoed flooring require abatement? No

21. Is there an actual architectural finish plan with specs that you can share for this project? There is not.

22. Is the new Sheet Vinyl to be flashed up the wall? If yes, how high? If not, is Cove Base to be used and what height? Match existing.

23. Are the Sheet Vinyl seams to be Heat Welded? Facility is requiring that flooring be one complete piece when finished.

24. Will this project be occupied during the construction (phased install schedule) or all empty?

Empty

25. Will the work be performed during Daytime/Weekday hours, or Evenings/Weekends? Work can be performed Monday – Friday 0700-2300. Excluding Federal Holidays. No overtime will be approved.

26. Who will move the furniture and medical equipment? (best if medical personnel move the equipment) The VA will move and store all equipment.

27. When will the project start and what is the projected completion date? Contractor would have 120 days after award.

28. Has there been Asbestos Testing and what are the results? No testing necessary.

See attached document: DC000905_CB-100 MAIN HOSPITAL-Sheet - LS03B04 - EXIT

AND OCCUPANCY FLOOR PLAN - LEVEL 04.

2026-01-21T11:33:01-0500
JOSEPH HORN

File details come from the government source that posted it. Updated .