J045-- Heating Hot Water Tanks Repair
Solicitation number
36C24726Q0131
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Hot Water Heating Repair project issued by the Department of Veterans Affairs (VA) Veterans Health Administration Network Contracting Office (NCO) 7 in Atlanta, GA. The amendment, numbered 0002 and effective 12-16-2025, formally closes the questions and answers (Q&A) period for Solicitation 36C24726Q0131.

The attached Q&A document reveals key details about the project, including the requirement to install approximately 100 linear feet of 2-inch stainless steel water piping, with potential additional 40-60 feet of 1½-inch black iron piping replacement. Vendors inquired about piping specifications, connection methods (with 316 welded stainless steel recommended for 2" and over), project start date, and access points for equipment removal and installation. The VA indicates that access to the job site will be through the Boiler Plant courtyard, and post-award scheduling will be discussed with the Contracting Officer Representative (COR).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0002 12-16-2025

534-26-2-5088-0014

None

508A

DEPARTMENT OF VETERANS AFFAIRS

VETERANS HEALTH ADMINISTRATION

Network Contracting Office (NCO) 7 2957 CLAIRMONT ROAD NE, Suite 1200 Atlanta GA 30329

508A

DEPARTMENT OF VETERANS AFFAIRS

VETERANS HEALTH ADMINISTRATION

Network Contracting Office (NCO) 7 2957 CLAIRMONT ROAD NE, Suite 1200 Atlanta GA 30329

To all Offerors/Bidders

36C24726Q0131

X

X X x 1

The purpose of this amendmentment is to respond to vendor questions recieved regarding the repair of hot water heater tanks solicitation and to formally close the question and answer (Q&A) period.

Questions and answers-All vendors questions reviewed Government have been reviewed and answered. (See attachement)

Questions and Answers period is offically closed. No additional questions will be accepted. Vendors shall submit the required documents in accordance with the soliciation and all amendments issued.

The solicitation closing date remains unchanged.

All other terms and conditions of the solicitation remain unchanged.

Jessica Cummings Contracting Officer

Questions

Hot Water Heating Repair, Solicitation 36C24726Q0131

1. Can we acquire a set of prints for the piping of the heat exchangers and the re-piping of the black iron pipe to stainless on the condensate lines? See attachment

2. The expected or anticipated start date for this scope of work, or any scheduling windows we should be aware of. After the award we would like work to be scheduled and it can be discussed with the COR for a start and end time.

3. The Performance of Work statement specifies the installation of 100 linear feet of 2-inch stainless steel water piping. During the site visit this morning, VA staff mentioned an additional 40–60 feet of 1½-inch black iron piping that appears to be expected for replacement with stainless steel as well. The primary line is right before the control valve where the stainless ends and goes to the top of the D/A tank replacing the black iron with stainless. Including the bypass line. The secondary line piping being replaced is the black iron pipe from the T connection from the condensate tank piping after the pumps and goes all the way to the top of the D/A tank with the bypass line included by the control valve for flow going into the D/A tank.

4. Should the existing 40–60 feet of 1½-inch piping also be replaced with stainless steel, in addition to the 100 feet of 2-inch stainless steel water piping? The request was for approx. 100 feet. It is more than 100 feet. To cover the Primary and secondary lines with the bypass lines included.

5. There was no mention of how the stainless-steel piping should be connected. Can the VA clarify if they would prefer welded, threaded or mega-press connections? All piping at 2” or over will be 316 welded stainless steel.

6. What points of access/egress will we be allowed to use when rigging old equipment out and new equipment in? We would work with you. Access to the job site would be through the Boiler Plant courtyard.