20149_VA Pump Replacement - DWG Final Drawings.pdf
PDF 4 MB Posted
- Attached to
- J045-- Heating Hot Water Tanks Repair
- Solicitation number
- 36C24726Q0131
About this file
These are construction documents for the Charleston VA Medical Center Feedwater and Steam Condensate Pumps Replacement project (VA Project Number: 534-19-916). The project scope involves completely replacing existing steam condensate pumps and boiler feedwater pumps, with a specific requirement to elevate pumps above the flood plane if possible. The project will also replace associated piping, valves, and accessories, and is limited to mechanical and associated electrical work only.
The documents, prepared by DWG Consulting Engineers in August 2024, include detailed mechanical and electrical plans, piping and instrumentation diagrams (P&IDs), and system drawings for the deaerator, condensate, water softener, and steam header systems. Key equipment includes Grundfos feed pumps, a Cleaver Brooks deaerator, Peerless condensate pumps, and a Marlo water softener system. The project is located at 109 Bee St. in Charleston, SC, and follows IBC-2018/ASCE7-16 seismic and wind design requirements with mechanical component importance factors specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Amendment 2 36C24726Q0131 0002.pdf | ||
| Amendment 36C24726Q0131 0001 Hot Water Tank Repair.pdf | ||
| 36C24726Q0131_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHARLESTON VA MEDICAL CENTER
BOILER FEEDWATER AND STEAM
CONDENSATE PUMPS REPLACEMENT
VA PROJECT NUMBER: 534-19-916
CONSTRUCTION DOCUMENTS
1009 ANNA KNAPP BLVD, SUITE 200, MOUNT PLEASANT, SC 29464
SCHEDULE OF DRAWINGS
SHEET NO. DESCRIPTION
C001 COVER SHEET
M001 MECHANICAL NOTES, LEGENDS, AND SCHEDULES
M101 MECHANICAL PLANS
M201 BOILER SYSTEMS P&ID SYMBOL LEGEND
M202 DEAERATOR SYSTEM P&ID
M203 CONDENSATE SYSTEM P&ID
M204 WATER SOFTENER SYSTEM P&ID
M205 STEAM HEADER P&ID
M301 STEAM HEADER P&ID
E001 ELECTRICAL NOTES, LEGENDS, AND SCHEDULES
E101 ELECTRICAL PLANS
SCOPE OF WORK
REPLACE EXISTING STEAM CONDENSATE PUMPS AND BOILER FEEDWATER
PUMPS IN ENTIRETY. ELEVATE PUMPS (IF POSSIBLE) SO THAT THE MOTORS ARE
ABOVE THE FLOOD PLANE. REPLACE PIPING, VALVES, AND ACCESSORIES AT
PUMPS. THIS SCOPE OF WORK IS LIMITED TO MECHANICAL AND ASSOCIATED
ELECTRICAL WORK ONLY. ENGINEERING AND WORK BY VA VENDORS ARE NOT
PART OF DWG SCOPE OF WORK.
P
LO
T D
A
TE
A
N N
A K
N A
P P
B
LV
D , S
U
IT
E
, M
O U
N T
P
LE
A S
A N
T, S
C
STAMPS:
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
O
VE
R S
H
EE
T
REV
JOB No.
20149
DATE:
AUGUST 23, 2024
DRAWN BY:
RGB
CHECKED BY:
JMM
SHEET NUMBER
C001
MECHANICAL SYSTEMS
SEISMIC AND WIND REQUIREMENTS
PER IBC-2018/ASCE 7-16
ABBR
MECHANICAL
ABBREVIATIONS
DESCRIPTION
MECHANICAL COMPONENT IMPORTANCE FACTOR (Ip) DESIGNATION
Ip = 1.0 Ip = 1.5
ALL HVAC COMPONENTS.
1.0
SEISMIC DESIGN CATEGORIES D,E,F
COMPONENT IMPORTANCE FACTOR (Ip)
1.5
MECHANICAL CODES & STANDARDS
(WITH ALL SOUTH CAROLINA MODIFICATIONS)
CODE DESCRIPTION
DATE:
DRAWN BY:
AUGUST 23, 2024
RGB
CHECKED BY:
M001
P
LO
T D
A
TE
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
M
EC
H
AN
IC
AL
N
O
TE
S, L
EG
EN
D S, A N
D S
C H
ED
U
LE
S
A N
N A
K N
A P
P B
LV
D
, S U
IT
E
, M O
U N
T P
LE
A
S A
N T, S C
PLOT DATE:
Charleston VA Medical Center Feedwater & Steam Condensate Pumps Replacement
109 Bee St.
Charleston, SC 29401
MECHANICAL PLANS
BASEM
EN
T
AC
C
ESS
BASEM
EN
T
AC
C
ESS
STAM
PS:
BASEM
EN
T
AC
C
ESS
BASEM
EN
T
AC
C
ESS
R
EV
JO
B
N o.
20149
D
ATE:
A U
G U
S T 23, 2024
D R
A W
N
BY:
R G
B
C H
E C
K E
D
BY:
JM
SH
EET
N U
BER
SH
EET
N U
C H
E C
K E
D
BY:
JM
D R
A W
N
BY:
R G
B
D
ATE:
A U
G U
S T 23, 2024
JO
B
N o.
20149
R EV Charleston VA Medical Center
Feedwater & Steam Condensate Pumps Replacement 109 Bee St.
Charleston, SC 29401
STAM
PS:
1009 ANNA KNAPP BLVD, SUITE 200, MOUNT PLEASANT, SC 29464 BOILER SYSTEMS P&ID SYMBOL LEGEND
ED
U
ER
PR
ESSU
R E R
ED
U
C
IN
G
VALVE
STEAM
TR
AP
HV
LOW PRESSURE
CONTINUED FROM
DRAWING 23CSC.8515-PID-5
3/4"
NPT
1/2"
NPT
LCV
ST
2" 2" 1 1/2"
1" 1" 1 1/2"
1 1/2"
PRIMARY
EMERGENCY
MAKE UP WATER
1 1/2" 1" 1"
NEW MUW * FROM RO SYSTEM
SUPPLY NO STATION TO BE TIED INTO
EXISTING DA MUV CONNECTION
TI
HI-LEVEL
PROBE
PT
TT
LAH
LAL
LALL
XA
LC
LT
PI
VAC
BREAK
LI
LAL
PSV
2"
S1
PSV
15 PSI
SET
3"
F.F. FLG.
FC
TTOO
1 1/2" 1 1/2"
PUMPED COND.
RETURN
S
2 1/2"
4"
004 2" NPT
TO
DRAIN
DDRRAAIINN
*P2
PV
DA TANK
BYPASS VALVES
RECIRC.
1"
#2 HEADER
*P1
#1 HEADER
DA
BYPASS
SULFITE CHEM.
INJECTION
PUMPED CONDENSATE TO BYPASS DA TANK
*FROM CONDENSATE PUMPS
*P3
TO BOILER
FEED SYSTEM
TO BOILERS
*DUAL HEADER FEED SYSTEM
EQUIPMENT LEGEND:
NOTES:
S1
DEAERATOR
CLEAVER BROOKS
P1
GRUNDFOS FEED PUMP
CR5-11A-FGJ-A-E-HQQE
P2
GRUNDFOS FEED PUMP
P3
GRUNDFOS FEEDPUMP
CR5-11A-FGJ-A-E-HQQE
ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.
DIAGRAMS DEPICT AS FOUND CONDITIONS.
BM-24-800 SCOPE OF JOB SC-10618 SHOWN BOLD.
FRONTIER TO INSTALL/SUPPLY PRESSURE GAUGES & SUCTION STRAINERS FOR PUMPS 2 & 3.
P
LO
T D
A
TE
RE
CI
RC
RE
CI
RC
A
N N
A K
N A
P P
B
LV
D , S
U
IT
E
, M
O U
N T
P
LE
A S
A N
T, S
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
EA
ER
AT
O
R S
YS
TE
M P
&I
1 AS-BUILT CHANGES 8/23/23
DATE:
AUGUST 23, 2024
DRAWN BY: RGB
CHECKED BY: JMM
M202
FI
CITY WATER
UNKNOWN
*FUTURE RECIRC PIPING TO BYPASS DA TANK
WATER USAGE METER
*BEHIND OFFICE CORNER
DOMESTIC
COLD WATER
1 1/4"
RO WATER
CONDENSATE
FROM WATER
COLD SOFTENER
FS
4" 4"
1/2"
1 1/4"
4" 4"
LT VEGACAP 63
1 1/2" 1 1/2"
1" 1"
2" 2 1/2"
FROM
RO UNIT
LAL
LALL
C1 003
XA
LC
LT
3/4"
LAH
LAL
2 1/2"
HV
HV
TO
SUMP
RECIRC.
2 " HV
CITY
WATER
2 " TT
SECONDARY WATER
SUPPLY TO DA TANK
EMERGENCY CITY WATER
FROM UNDER GROUND
005 1"
*P2
PV HV
2 1/2 "
2 1/2 "
1"
*P1
HV PV
PRIMARY WATER
SUPPLY TO DA TANK
1 1/2" 003 019 HV
004 1 1/2"
SAMPLE
DA
BYPASS
TO INLET SIDE
OF FEED PUMPS
TO BYPASS DA TANK
C1
CONDENSATE TANK
BUCKEYE
P1
CONDENSATE PUMP
PEERLESS M# F1-610AM
P2
CONDENSATE PUMP
PEERLESS M# F1-610AM
H1
BRAZED PLATE HEAT EXCHANGER
BELL & GOSSETT BPX NSF372
ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.
DIAGRAMS DEPICT AS FOUND CONDITIONS.
P# 568603010002
HX
P
LO
T D
A
TE
RE
CI
RC
A
N N
A K
N A
P P
B
LV
D , S
U
IT
E
, M
O U
N T
P
LE
A S
A N
T, S
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
O N
D
EN
SA
TE
S
YS
TE
M
P
DATE:
AUGUST 23, 2024
DRAWN BY: RGB
CHECKED BY: JMM
M203
FI
SOFT WATER
BV
RFI
CFI
SV S3
S4
COND. PH
ALKAPRO 25
TANK
RO TO DA
*NEW DA
MUV LINE
006 FLOOR DRAIN
F
SV
FILTER
OUT
DOM. COLD
S5
DA MUV
RO WATER
TO COND. TANK
CLACK FLOW
METER
X
1.5"
BACKFLOW
PREVENTER
W/M
TANK
*S1
044 HOSE
TO TANK
FLOW
SOFT WATER
TO CARBON FILTER
WELL
TROUGH
FLOOR
S1
MARLO WATER SOFTENER
S2
CARBON FILTER
S3
REVERSE OSMOSIS SYSTEM
S4
PERMEATE STORAGE TANK
S5
PRESSURE TANK
ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.
MAT-60-1 60,000 GRAIN CHEM - AQUA SIZE: 2162 CHEM - AQUA MODEL:CRO-6-4H CHEM - AQUA HYDRO CUMULATOR - MODEL 130 DIAGRAMS DEPICT AS FOUND CONDITIONS.
CAPACITY PER CONTAINER 24" DIA. 125 PSI MAX. PRESSURE
P
LO
T D
A
TE
A
N N
A K
N A
P P
B
LV
D , S
U
IT
E
, M
O U
N T
P
LE
A S
A N
T, S
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
W
AT
ER
S O
FT
EN
ER
S
YS
TE
M P
DATE:
AUGUST 23, 2024
DRAWN BY:
RGB
CHECKED BY:
M204
PRV STATION NO. 1
1-019
LOW PRESSURE
CONTINUED FROM
DRAWING 23CSC.8515-PID-2
1-017
1-018
PRV
1-001
HIGH PRESSURE
1-002
1-003
1-005
1-006
XV
1-007
1/2" 1"
1-004
1-008
1-010
SV ST HV
1 1/4"
1-016
1-002 1-003 1-014 HV
1-009
TO STATION
NO. 4
1-012
SV
1-003
1-011
1-015 HV
1-013
CONDENSATE C
3/4" 3/4"
SPARE
DHW/RTU
DA STEAM OUT
HIGH PRESSURE STEAM
BOILER 4
CONVERTERS
PRV STATION NO. 2
MH/IA STEAM
PRV STATION NO. 3
BOILER 5 BOILER 6
PRV STATION NO. 1
(23CSC.8515-PID-2)
1 1/2"
STEAM VENT
STEAM RESEARCH
PRV STATION NO. 4 CLINICAL MECH. ROOM
6" 6" 4" 4" 4" 4" 6" 6" 6" 4" 4" 4" 4"
PLANT STEAM HEADER
DRIP LEG
PRV STATION NO. 4 PRV STATION NO. 3 PRV STATION NO. 2
MED. PRESSURE
4-001
HIGH PRESSURE
STEAM
MENTAL
HEALTH
HV
3-001
HIGH PRESSURE
STEAM CONV.
2-001
CONVERTERS
2 1/2" 3/4" 2 1/2" 2 1/2" 3/4" 2 1/2" 2 1/2" 3/4" 2 1/2"
HV PV
ST HV
3-002
3-001
3-004
2-002
2-004
4-002 4-001 4-001
4-003 1" 1/2"
3-007
3-006
3-005
2-008
2-006
HV
2-005
4-004 3-003 2-003
4-005
4-002
4-002
4-006
3-008
3-010
2-009
ST
2-003
2-007
2-010
2 1/2"
HV XV
2 1/2" 2 1/2"
HV
HV
4-008 3/4"
HV
4-009
XV
4-002 HV
4-010
4-007 4-001
3/4" 3/4"
4-014
MV
4-015
3-011
3-009
3-003
3-012
3/4"
3-013
3-014
ST
3-003 XV
3-002
3-015
2-011
2-017
2-003
2-012
3/4"
2-013
2-014
2-004
2-002
2-015
3-016 2-016
4-011
4-012
4-003
4-013
FROM STATION
NO. 1
ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.
DIAGRAMS DEPICT AS FOUND CONDITIONS.
P
LO
T D
A
TE
MH/IA
A
N N
A K
N A
P P
B
LV
D , S
U
IT
E
, M
O U
N T
P
LE
A S
A N
T, S
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
EA
M
H
EA
D
ER
P
DATE:
AUGUST 23, 2024
DRAWN BY: RGB
CHECKED BY:
M205
8 7 6 5 4 3 2 1
D D
56"
56" 56"
RAW WATER INLET CLACK SS FLOW METER ELECTRIC BALL VALVE CLACK SS FLOW METER ELECTRIC BALL VALVE CLACK SS FLOW METER ELECTRIC BALL VALVE
BY-PASS VALVE
(NORMALLY CLOSED)
SOFT WATER OUTLETRAW WATER INLET
SOFT WATER OUTLET RAW WATER INLET
SOFT WATER OUTLET
INLET OUTLET INLET OUTLET INLET OUTLET
ISOLATION VALVE
B
ISOLATION VALVE ISOLATION VALVE ISOLATION VALVE ISOLATION VALVE ISOLATION VALVE
PLC
B
59 3/4"
(REF.)
12"x52"
RESIN TANK
A
12"x52" 18"x40"
RESIN TANK BRINE TANK
12"x52"
RESIN TANK
18"x40"
BRINE TANK
18"x40"
BRINE TANK
REVISIONS
FRAC. ̀
DEC. ̀
1. ALL PIPING, FITTINGS, ETC SHOWN IN DASHED LINES
ARE PROVIDED BY OTHERS.
2. GENERAL PLUMBING CONNECTIONS ARE SHOWN FOR
CLARITY ONLY.
A
THIS DOCUMENT CONTAINS CONFIDENTIAL AND NO.
PROPRIETARY INFORMATION THAT CANNOT BE
REPRODUCED OR DIVULGED, IN WHOLE OR
PART, WITHOUT AUTHORIZATION IN WRITING
DATE BY REMARKS
INCORPORATED
SCALE
DRN.
CHECKED
APP'D.
JLF
MAT-60-1 TR/PRO/NC/XT/PLC
GENERAL ARRANGEMENT
FROM THE MANUFACTURER. C & C BOILER DATE 7/26/2022 DRAWING NO.
REV.
8 7 6 5
SHEET
4 3 2
1 OF 1 EP22-230A-03-01 0
P
LO
T D
A
TE
A
N N
A K
N A
P P
B
LV
D , S
U
IT
E
, M
O U
N T
P
LE
A S
A N
T, S
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
W
AT
ER
S O
FT
EN
ER
S
YS
TE
M V
EN
D
O R
D R
AW
IN
G
DATE:
AUGUST 23, 2024
DRAWN BY: RGB
CHECKED BY:
M301
Charleston VA Medical Center Feedwater & Steam Condensate Pumps Replacement
109 Bee St.
Charleston, SC 29401
ELECTRICAL NOTES, LEGENDS, AND SPECIFICATIONS
STAM
PS:
/2
/2
EV
JO
B
N o.
20149
D
ATE:
A U
G U
S T 23, 2024
D R
A W
N
BY:
C R
V
C H
E C
K E
D
BY:
BSB
SH
EET
N U
E001
BASEMENT
ACCESS
08/23/24
CHILLER ROOM,
2ND FLOOR MEZZ MC22B
BOILER ROOM,
2ND FLOOR MEZZ MC22
DATE:
DRAWN BY:
AUGUST 23, 2024
CRV
CHECKED BY:
BSB
ENTRANCE
CANOPY
E101
P
LO
T D
A
TE
C ha rle st on V
A M ed ic al C en te r Fe ed w at er
S te am
C on de ns at e
Pu m ps R ep la ce m en t
Be e
St
C ha rle st on , S
C
EL
EC
TR
IC
AL
P
LA
N S
A N
N A
K N
A P
P B
LV
D
, S U
IT
E
, M O
U N
T P
LE
A
S A
N T, S C
| VA PROJECT NUMBER: 534-19-916 CONSTRUCTION DOCUMENTS |
| SCHEDULE OF DRAWINGS |
| MECHANICAL SYSTEMS SEISMIC AND WIND REQUIREMENTS |
| MECHANICAL ABBREVIATIONS |
| MECHANICAL CODES & STANDARDS |
| M001 |
| MECHANICAL PLANS |
| S5 |
| 1.5" |
| *S1 |
| *S1 |
| *S1 |
| PRV STATION NO. 1 |
| 12"x52" RESIN TANK |
| 18"x40" BRINE TANK |
| 12"x52" RESIN TANK |
| 12"x52" RESIN TANK |
| THIS DOCUMENT CONTAINS CONFIDENTIAL AND NO. PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR |
| FROM THE MANUFACTURER. |
| 7/26/2022 |
| 8 7 6 5 |
| 4 3 2 |
| 1 |
| ELECTRICAL NOTES, LEGENDS, AND SPECIFICATIONS |
| 08/23/24 |
File details come from the government source that posted it. Updated .