20149_VA Pump Replacement - DWG Final Drawings.pdf

PDF 4 MB Posted

Attached to
J045-- Heating Hot Water Tanks Repair
Solicitation number
36C24726Q0131
Issued by

About this file

These are construction documents for the Charleston VA Medical Center Feedwater and Steam Condensate Pumps Replacement project (VA Project Number: 534-19-916). The project scope involves completely replacing existing steam condensate pumps and boiler feedwater pumps, with a specific requirement to elevate pumps above the flood plane if possible. The project will also replace associated piping, valves, and accessories, and is limited to mechanical and associated electrical work only.

The documents, prepared by DWG Consulting Engineers in August 2024, include detailed mechanical and electrical plans, piping and instrumentation diagrams (P&IDs), and system drawings for the deaerator, condensate, water softener, and steam header systems. Key equipment includes Grundfos feed pumps, a Cleaver Brooks deaerator, Peerless condensate pumps, and a Marlo water softener system. The project is located at 109 Bee St. in Charleston, SC, and follows IBC-2018/ASCE7-16 seismic and wind design requirements with mechanical component importance factors specified.

View the file

Other files

File Type Posted
S06 Amendment 2 36C24726Q0131 0002.pdf PDF
Amendment 36C24726Q0131 0001 Hot Water Tank Repair.pdf PDF
36C24726Q0131_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHARLESTON VA MEDICAL CENTER

BOILER FEEDWATER AND STEAM

CONDENSATE PUMPS REPLACEMENT

VA PROJECT NUMBER: 534-19-916

CONSTRUCTION DOCUMENTS

1009 ANNA KNAPP BLVD, SUITE 200, MOUNT PLEASANT, SC 29464

SCHEDULE OF DRAWINGS

SHEET NO. DESCRIPTION

C001 COVER SHEET

M001 MECHANICAL NOTES, LEGENDS, AND SCHEDULES

M101 MECHANICAL PLANS

M201 BOILER SYSTEMS P&ID SYMBOL LEGEND

M202 DEAERATOR SYSTEM P&ID

M203 CONDENSATE SYSTEM P&ID

M204 WATER SOFTENER SYSTEM P&ID

M205 STEAM HEADER P&ID

M301 STEAM HEADER P&ID

E001 ELECTRICAL NOTES, LEGENDS, AND SCHEDULES

E101 ELECTRICAL PLANS

SCOPE OF WORK

REPLACE EXISTING STEAM CONDENSATE PUMPS AND BOILER FEEDWATER

PUMPS IN ENTIRETY. ELEVATE PUMPS (IF POSSIBLE) SO THAT THE MOTORS ARE

ABOVE THE FLOOD PLANE. REPLACE PIPING, VALVES, AND ACCESSORIES AT

PUMPS. THIS SCOPE OF WORK IS LIMITED TO MECHANICAL AND ASSOCIATED

ELECTRICAL WORK ONLY. ENGINEERING AND WORK BY VA VENDORS ARE NOT

PART OF DWG SCOPE OF WORK.

P

LO

T D

A

TE

A

N N

A K

N A

P P

B

LV

D , S

U

IT

E

, M

O U

N T

P

LE

A S

A N

T, S

C

STAMPS:

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

O

VE

R S

H

EE

T

REV

JOB No.

20149

DATE:

AUGUST 23, 2024

DRAWN BY:

RGB

CHECKED BY:

JMM

SHEET NUMBER

C001

MECHANICAL SYSTEMS

SEISMIC AND WIND REQUIREMENTS

PER IBC-2018/ASCE 7-16

ABBR

MECHANICAL

ABBREVIATIONS

DESCRIPTION

MECHANICAL COMPONENT IMPORTANCE FACTOR (Ip) DESIGNATION

Ip = 1.0 Ip = 1.5

ALL HVAC COMPONENTS.

1.0

SEISMIC DESIGN CATEGORIES D,E,F

COMPONENT IMPORTANCE FACTOR (Ip)

1.5

MECHANICAL CODES & STANDARDS

(WITH ALL SOUTH CAROLINA MODIFICATIONS)

CODE DESCRIPTION

DATE:

DRAWN BY:

AUGUST 23, 2024

RGB

CHECKED BY:

M001

P

LO

T D

A

TE

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

M

EC

H

AN

IC

AL

N

O

TE

S, L

EG

EN

D S, A N

D S

C H

ED

U

LE

S

A N

N A

K N

A P

P B

LV

D

, S U

IT

E

, M O

U N

T P

LE

A

S A

N T, S C

PLOT DATE:

Charleston VA Medical Center Feedwater & Steam Condensate Pumps Replacement

109 Bee St.

Charleston, SC 29401

MECHANICAL PLANS

BASEM

EN

T

AC

C

ESS

BASEM

EN

T

AC

C

ESS

STAM

PS:

BASEM

EN

T

AC

C

ESS

BASEM

EN

T

AC

C

ESS

R

EV

JO

B

N o.

20149

D

ATE:

A U

G U

S T 23, 2024

D R

A W

N

BY:

R G

B

C H

E C

K E

D

BY:

JM

SH

EET

N U

BER

SH

EET

N U

C H

E C

K E

D

BY:

JM

D R

A W

N

BY:

R G

B

D

ATE:

A U

G U

S T 23, 2024

JO

B

N o.

20149

R EV Charleston VA Medical Center

Feedwater & Steam Condensate Pumps Replacement 109 Bee St.

Charleston, SC 29401

STAM

PS:

1009 ANNA KNAPP BLVD, SUITE 200, MOUNT PLEASANT, SC 29464 BOILER SYSTEMS P&ID SYMBOL LEGEND

ED

U

ER

PR

ESSU

R E R

ED

U

C

IN

G

VALVE

STEAM

TR

AP

HV

LOW PRESSURE

CONTINUED FROM

DRAWING 23CSC.8515-PID-5

3/4"

NPT

1/2"

NPT

LCV

ST

2" 2" 1 1/2"

1" 1" 1 1/2"

1 1/2"

PRIMARY

EMERGENCY

MAKE UP WATER

1 1/2" 1" 1"

NEW MUW * FROM RO SYSTEM

SUPPLY NO STATION TO BE TIED INTO

EXISTING DA MUV CONNECTION

TI

HI-LEVEL

PROBE

PT

TT

LAH

LAL

LALL

XA

LC

LT

PI

VAC

BREAK

LI

LAL

PSV

2"

S1

PSV

15 PSI

SET

3"

F.F. FLG.

FC

TTOO

1 1/2" 1 1/2"

PUMPED COND.

RETURN

S

2 1/2"

4"

004 2" NPT

TO

DRAIN

DDRRAAIINN

*P2

PV

DA TANK

BYPASS VALVES

RECIRC.

1"

#2 HEADER

*P1

#1 HEADER

DA

BYPASS

SULFITE CHEM.

INJECTION

PUMPED CONDENSATE TO BYPASS DA TANK

*FROM CONDENSATE PUMPS

*P3

TO BOILER

FEED SYSTEM

TO BOILERS

*DUAL HEADER FEED SYSTEM

EQUIPMENT LEGEND:

NOTES:

S1

DEAERATOR

CLEAVER BROOKS

P1

GRUNDFOS FEED PUMP

CR5-11A-FGJ-A-E-HQQE

P2

GRUNDFOS FEED PUMP

P3

GRUNDFOS FEEDPUMP

CR5-11A-FGJ-A-E-HQQE

ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.

DIAGRAMS DEPICT AS FOUND CONDITIONS.

BM-24-800 SCOPE OF JOB SC-10618 SHOWN BOLD.

FRONTIER TO INSTALL/SUPPLY PRESSURE GAUGES & SUCTION STRAINERS FOR PUMPS 2 & 3.

P

LO

T D

A

TE

RE

CI

RC

RE

CI

RC

A

N N

A K

N A

P P

B

LV

D , S

U

IT

E

, M

O U

N T

P

LE

A S

A N

T, S

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

EA

ER

AT

O

R S

YS

TE

M P

&I

1 AS-BUILT CHANGES 8/23/23

DATE:

AUGUST 23, 2024

DRAWN BY: RGB

CHECKED BY: JMM

M202

FI

CITY WATER

UNKNOWN

*FUTURE RECIRC PIPING TO BYPASS DA TANK

WATER USAGE METER

*BEHIND OFFICE CORNER

DOMESTIC

COLD WATER

1 1/4"

RO WATER

CONDENSATE

FROM WATER

COLD SOFTENER

FS

4" 4"

1/2"

1 1/4"

4" 4"

LT VEGACAP 63

1 1/2" 1 1/2"

1" 1"

2" 2 1/2"

FROM

RO UNIT

LAL

LALL

C1 003

XA

LC

LT

3/4"

LAH

LAL

2 1/2"

HV

HV

TO

SUMP

RECIRC.

2 " HV

CITY

WATER

2 " TT

SECONDARY WATER

SUPPLY TO DA TANK

EMERGENCY CITY WATER

FROM UNDER GROUND

005 1"

*P2

PV HV

2 1/2 "

2 1/2 "

1"

*P1

HV PV

PRIMARY WATER

SUPPLY TO DA TANK

1 1/2" 003 019 HV

004 1 1/2"

SAMPLE

DA

BYPASS

TO INLET SIDE

OF FEED PUMPS

TO BYPASS DA TANK

C1

CONDENSATE TANK

BUCKEYE

P1

CONDENSATE PUMP

PEERLESS M# F1-610AM

P2

CONDENSATE PUMP

PEERLESS M# F1-610AM

H1

BRAZED PLATE HEAT EXCHANGER

BELL & GOSSETT BPX NSF372

ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.

DIAGRAMS DEPICT AS FOUND CONDITIONS.

P# 568603010002

HX

P

LO

T D

A

TE

RE

CI

RC

A

N N

A K

N A

P P

B

LV

D , S

U

IT

E

, M

O U

N T

P

LE

A S

A N

T, S

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

O N

D

EN

SA

TE

S

YS

TE

M

P

DATE:

AUGUST 23, 2024

DRAWN BY: RGB

CHECKED BY: JMM

M203

FI

SOFT WATER

BV

RFI

CFI

SV S3

S4

COND. PH

ALKAPRO 25

TANK

RO TO DA

*NEW DA

MUV LINE

006 FLOOR DRAIN

F

SV

FILTER

OUT

DOM. COLD

S5

DA MUV

RO WATER

TO COND. TANK

CLACK FLOW

METER

X

1.5"

BACKFLOW

PREVENTER

W/M

TANK

*S1

044 HOSE

TO TANK

FLOW

SOFT WATER

TO CARBON FILTER

WELL

TROUGH

FLOOR

S1

MARLO WATER SOFTENER

S2

CARBON FILTER

S3

REVERSE OSMOSIS SYSTEM

S4

PERMEATE STORAGE TANK

S5

PRESSURE TANK

ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.

MAT-60-1 60,000 GRAIN CHEM - AQUA SIZE: 2162 CHEM - AQUA MODEL:CRO-6-4H CHEM - AQUA HYDRO CUMULATOR - MODEL 130 DIAGRAMS DEPICT AS FOUND CONDITIONS.

CAPACITY PER CONTAINER 24" DIA. 125 PSI MAX. PRESSURE

P

LO

T D

A

TE

A

N N

A K

N A

P P

B

LV

D , S

U

IT

E

, M

O U

N T

P

LE

A S

A N

T, S

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

W

AT

ER

S O

FT

EN

ER

S

YS

TE

M P

DATE:

AUGUST 23, 2024

DRAWN BY:

RGB

CHECKED BY:

M204

PRV STATION NO. 1

1-019

LOW PRESSURE

CONTINUED FROM

DRAWING 23CSC.8515-PID-2

1-017

1-018

PRV

1-001

HIGH PRESSURE

1-002

1-003

1-005

1-006

XV

1-007

1/2" 1"

1-004

1-008

1-010

SV ST HV

1 1/4"

1-016

1-002 1-003 1-014 HV

1-009

TO STATION

NO. 4

1-012

SV

1-003

1-011

1-015 HV

1-013

CONDENSATE C

3/4" 3/4"

SPARE

DHW/RTU

DA STEAM OUT

HIGH PRESSURE STEAM

BOILER 4

CONVERTERS

PRV STATION NO. 2

MH/IA STEAM

PRV STATION NO. 3

BOILER 5 BOILER 6

PRV STATION NO. 1

(23CSC.8515-PID-2)

1 1/2"

STEAM VENT

STEAM RESEARCH

PRV STATION NO. 4 CLINICAL MECH. ROOM

6" 6" 4" 4" 4" 4" 6" 6" 6" 4" 4" 4" 4"

PLANT STEAM HEADER

DRIP LEG

PRV STATION NO. 4 PRV STATION NO. 3 PRV STATION NO. 2

MED. PRESSURE

4-001

HIGH PRESSURE

STEAM

MENTAL

HEALTH

HV

3-001

HIGH PRESSURE

STEAM CONV.

2-001

CONVERTERS

2 1/2" 3/4" 2 1/2" 2 1/2" 3/4" 2 1/2" 2 1/2" 3/4" 2 1/2"

HV PV

ST HV

3-002

3-001

3-004

2-002

2-004

4-002 4-001 4-001

4-003 1" 1/2"

3-007

3-006

3-005

2-008

2-006

HV

2-005

4-004 3-003 2-003

4-005

4-002

4-002

4-006

3-008

3-010

2-009

ST

2-003

2-007

2-010

2 1/2"

HV XV

2 1/2" 2 1/2"

HV

HV

4-008 3/4"

HV

4-009

XV

4-002 HV

4-010

4-007 4-001

3/4" 3/4"

4-014

MV

4-015

3-011

3-009

3-003

3-012

3/4"

3-013

3-014

ST

3-003 XV

3-002

3-015

2-011

2-017

2-003

2-012

3/4"

2-013

2-014

2-004

2-002

2-015

3-016 2-016

4-011

4-012

4-003

4-013

FROM STATION

NO. 1

ONLY SIZES SHOWN ARE KNOWN BY C&C BOILER.

DIAGRAMS DEPICT AS FOUND CONDITIONS.

P

LO

T D

A

TE

MH/IA

A

N N

A K

N A

P P

B

LV

D , S

U

IT

E

, M

O U

N T

P

LE

A S

A N

T, S

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

EA

M

H

EA

D

ER

P

DATE:

AUGUST 23, 2024

DRAWN BY: RGB

CHECKED BY:

M205

8 7 6 5 4 3 2 1

D D

56"

56" 56"

RAW WATER INLET CLACK SS FLOW METER ELECTRIC BALL VALVE CLACK SS FLOW METER ELECTRIC BALL VALVE CLACK SS FLOW METER ELECTRIC BALL VALVE

BY-PASS VALVE

(NORMALLY CLOSED)

SOFT WATER OUTLETRAW WATER INLET

SOFT WATER OUTLET RAW WATER INLET

SOFT WATER OUTLET

INLET OUTLET INLET OUTLET INLET OUTLET

ISOLATION VALVE

B

ISOLATION VALVE ISOLATION VALVE ISOLATION VALVE ISOLATION VALVE ISOLATION VALVE

PLC

B

59 3/4"

(REF.)

12"x52"

RESIN TANK

A

12"x52" 18"x40"

RESIN TANK BRINE TANK

12"x52"

RESIN TANK

18"x40"

BRINE TANK

18"x40"

BRINE TANK

REVISIONS

FRAC. ̀

DEC. ̀

1. ALL PIPING, FITTINGS, ETC SHOWN IN DASHED LINES

ARE PROVIDED BY OTHERS.

2. GENERAL PLUMBING CONNECTIONS ARE SHOWN FOR

CLARITY ONLY.

A

THIS DOCUMENT CONTAINS CONFIDENTIAL AND NO.

PROPRIETARY INFORMATION THAT CANNOT BE

REPRODUCED OR DIVULGED, IN WHOLE OR

PART, WITHOUT AUTHORIZATION IN WRITING

DATE BY REMARKS

INCORPORATED

SCALE

DRN.

CHECKED

APP'D.

JLF

MAT-60-1 TR/PRO/NC/XT/PLC

GENERAL ARRANGEMENT

FROM THE MANUFACTURER. C & C BOILER DATE 7/26/2022 DRAWING NO.

REV.

8 7 6 5

SHEET

4 3 2

1 OF 1 EP22-230A-03-01 0

P

LO

T D

A

TE

A

N N

A K

N A

P P

B

LV

D , S

U

IT

E

, M

O U

N T

P

LE

A S

A N

T, S

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

W

AT

ER

S O

FT

EN

ER

S

YS

TE

M V

EN

D

O R

D R

AW

IN

G

DATE:

AUGUST 23, 2024

DRAWN BY: RGB

CHECKED BY:

M301

Charleston VA Medical Center Feedwater & Steam Condensate Pumps Replacement

109 Bee St.

Charleston, SC 29401

ELECTRICAL NOTES, LEGENDS, AND SPECIFICATIONS

STAM

PS:

/2

/2

EV

JO

B

N o.

20149

D

ATE:

A U

G U

S T 23, 2024

D R

A W

N

BY:

C R

V

C H

E C

K E

D

BY:

BSB

SH

EET

N U

E001

BASEMENT

ACCESS

08/23/24

CHILLER ROOM,

2ND FLOOR MEZZ MC22B

BOILER ROOM,

2ND FLOOR MEZZ MC22

DATE:

DRAWN BY:

AUGUST 23, 2024

CRV

CHECKED BY:

BSB

ENTRANCE

CANOPY

E101

P

LO

T D

A

TE

C ha rle st on V

A M ed ic al C en te r Fe ed w at er

S te am

C on de ns at e

Pu m ps R ep la ce m en t

Be e

St

C ha rle st on , S

C

EL

EC

TR

IC

AL

P

LA

N S

A N

N A

K N

A P

P B

LV

D

, S U

IT

E

, M O

U N

T P

LE

A

S A

N T, S C

VA PROJECT NUMBER: 534-19-916 CONSTRUCTION DOCUMENTS
SCHEDULE OF DRAWINGS
MECHANICAL SYSTEMS SEISMIC AND WIND REQUIREMENTS
MECHANICAL ABBREVIATIONS
MECHANICAL CODES & STANDARDS
M001
MECHANICAL PLANS
S5
1.5"
*S1
*S1
*S1
PRV STATION NO. 1
12"x52" RESIN TANK
18"x40" BRINE TANK
12"x52" RESIN TANK
12"x52" RESIN TANK
THIS DOCUMENT CONTAINS CONFIDENTIAL AND NO. PROPRIETARY INFORMATION THAT CANNOT BE REPRODUCED OR DIVULGED, IN WHOLE OR
FROM THE MANUFACTURER.
7/26/2022
8 7 6 5
4 3 2
1
ELECTRICAL NOTES, LEGENDS, AND SPECIFICATIONS
08/23/24

File details come from the government source that posted it. Updated .