This document is an Amendment to a Solicitation/Modification of Contract for a MedGas system renovation project at a Department of Veterans Affairs (VA) facility. The amendment includes a detailed Questions and Answers section addressing project-specific requirements. Key project details include work to be performed in the Emergency Department and on the First and Third Floors, with work hours set for Monday – Friday, 7am – 5pm, with potential evening and weekend work. The project involves relocating and installing new zone control boxes, demolishing and capping unused medical gas ports, and following specific Infection Control Risk Assessment (ICRA) levels (Level III for First Floor, Level II for Third Floor). The VA will provide an asbestos survey and current MedGas system drawings to support the renovation work. The contractor must implement a containment wall and proper signage during construction, with all work to be completed within the specified period of performance.

View the file

Other files for this federal contract opportunity

Other files attached to Medical Gas Repairs, newest first.
File Type Posted
36C24726Q0114 0004.pdf PDF
36C24726Q0114 0003.pdf PDF
AHU-14 Service Areas 2022.pdf PDF
MGCombined.pdf PDF
MG1B Layout2.pdf PDF
Consolidated ACM Drawings.pdf PDF
CH-CHA.pdf PDF
Consolidated ACM Data Table.xlsx XLSX spreadsheet
36C24726Q0114 0001.pdf PDF
36C24726Q0114 RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0002 12-08-2025

36C247

Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901

Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901

To all Offerors/Bidders

36C24726Q0114

X

X X

The purpose of this Amendment is to publish submitted questions and answers along with supporting documents.

All other terms and conditions shall remain unchanged.

Jacob A. Tackett Contracting Officer

CONTINUATION PAGE

Questions and Answers

1. Installation Schedule requirements ?

All work should be completed during the period of performance.

2. Expected work hours and any limitations due to the facility being fully operational?

The Emergency Department is open 24/7 The work hours will be Monday – Friday 7am

– 5pm. Some evening and weekend work may be required.

3. Any specific logistical constraints, access coordination, or shutdown procedures the contractor must plan for?

None other pre-construction risk assessment and infection control risk assessment. The understanding is a containment wall will be built to isolate the work being conducted and proper signage will be displayed.

4. Question regarding the layout: Instead of installing individual valves for the ED outside each room, would it be possible to relocate the existing zone valves to a more centralized or accessible location?

The plan is to discontinue the existing box and install a new box inside of the emergency department on the wall near room CC136.

5. Also, since the ports in the waiting room and offices for A301 through A306 (excluding A304) are not being used, can we confirm whether they can be demoed as part of the revised plan?

The plan is to demo them from the wall location and cap them inside of the wall.

6. What ICRA Level will be required on the First Floor? Third Floor?

First Floor Level III. Third Floor Level II.

7. Is a current asbestos survey available for the areas in which wall cuts will be required?

Yes, survey is available.

8. Can VA provide current drawings of the MedGas system as currently installed?

Yes, it will be provided.

9. Can VA provide clarification on the SoW for the following areas:

1. First Floor - It is not currently industry standard to place a Zone Control Box in line with another Zone Control Box. Is the intention to run new piping to each ED Room from the main riser with its own Zone Control Box and abandon the box in the hallway?

The plan is to discontinue the existing box and install a new box inside of the emergency department on the wall near room CC136.

2. Third Floor - The outlets currently located in the Third-Floor rooms are obsolete.

Is it the VA's intention to relocate those outlets (with current connections) to the hallway or cap and abandon them in place?

10. Being able to just cap the lines in wall for those ports on the 3rd floor that are no longer in service?