36C24725R0044_RFP.pdf
PDF 838 KB Posted
- Attached to
- Y1DA--679-21-102 | Correct Failing Sanitary Sewer, Water Main, and Fire Protection Deficiencies
- Solicitation number
- 36C24725R0044
About this file
This is a Request for Proposal (RFP) issued by the Department of Veterans Affairs VISN 7 Network Contracting Office for Project 679-21-102 to correct failing sanitary sewer, water main, and fire protection deficiencies at the Tuscaloosa VA Medical Center in Alabama. The project involves repair/replacement, upgrade, and improvement of existing domestic water main, sanitary, storm, and fire piping systems throughout the campus, including interior and exterior work. The magnitude of construction is between $5-10 million.
This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses under NAICS code 237110 with a $45 million size standard. An organized site visit is scheduled for February 11, 2025 at 9:00 AM CT. Proposals are due March 5, 2025 at 1:00 PM EST, with Requests for Information due February 14, 2027. The period of performance is 365 calendar days after notice to proceed. A bid guarantee of 20% (not to exceed $3 million) is required, as well as performance and payment bonds. The contractor must submit past performance information for up to three similar projects completed within the past 5 years. Award will be based on best value with past performance being significantly more important than price.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________
(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24725R0044 X
02-03-2025
679-25-1-5645-0001 679-21-102
36C247
Department of Veterans Affairs
VISN 7 Network Contracting Office
3701 Loop Rd East, Room 223
Tuscaloosa, AL 35404
Email only. Send to contract specialist:
gregory.snyder@va.gov and CC: joyce.powers1@va.gov
No physical documents will be accepted.
Gregory Snyder 762-333-4273
Project No./Title: 679-21-102, Correct Failing Sanitary Sewer, Water Main, and Fire Protection Deficiencies
Project Location: Tuscaloosa, AL Veterans Affairs Medical Center(VAMC)-3701 Loop Rd East, Room 223, Tuscaloosa, AL 35404
This acquisition is 100% Set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBs) only.
The SDVOSB must be 51% or more owned and controlled by one or more service-connected veterans.
The offeror is required to complete VAAR 852.219-75 - Limitation on Subcontracting (See Attachment 2).
MAGNITUDE OF CONSTRUCTION: Between $5,000,000.00 and $10,000,000.00
NAICS Code: 237110; Small Business Standard: $45 Million
To be eligible for award, the offeror shall be registered at the following websites: System for Award Management at sam.gov with completed electronic annual representations certifications, VetCert at veterans.certify.sba.gov and comply with VETS 4212, Federal Contractor Veterans Employment Report. Offerors MUST ensure registration in these websites are accurate, complete, and have not expired prior to proposal due date or thereafter.
Offerors who have not done business with VA must complete VA10091 to register in financial database (see Attachment 6).
Site Visit: An organized site visit is scheduled for 2/11/2025 at 9:00 AM CT at the Bldg. 5, 2nd floor Conference Room.
Information provided at the site visit shall not alter the terms and conditions of the solicitation and terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Offerors are required to submit all questions in writing to the Contracting Officer following the site visit.
Requests for Information (RFIs) - Due Date: 2/14/2027 at 1:00 pm ET via email to contacts listed in block 8 above.
Late RFIs may not be accepted and offerors are responsible of ensuring questions are received on time.
Responses will be provided in question and answer form via a posted amendment at sam.gov.
Offer guarantees will be accepted via email only if received before the date/time specified in block 13a below to the
Email specified in block 8 above. Hand-delivered and/or mailed offer guarantees will not be accepted.
30 365 x x 52.211-10
X
1 electronic 1:00pm EST
03-05-2025
X
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your
Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Complete Price Offer Schedule
36C247
Department of Veterans Affairs
VISN 7 Network Contracting Office
3701 Loop Rd East, Room 223
Tuscaloosa, AL 35404
Austin Payment Center
Department of Veteran Affairs
PO Box 149971
Austin TX 78714-8971
(877) 353-9791 (512) 460-5545
Joyce Powers
VA-VHA-RPOE-2023-0023
(To be completed by Government)
36C24725R0044
Table of Contents
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 PRICE OFFER SCHEDULE
2.2 STATEMENT OF WORK
2.3 PROPOSAL PREPARATION AND EVALUATION INFORMATION
2.4 GENERAL SOLICITATION INFORMATION
2.5 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
2.6 52.216-1 TYPE OF CONTRACT (APR 1984)
2.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK
(MAY 2014)
2.8 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.9 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023)
2.10 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.11 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
2.12 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
2.13 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
2.14 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED
SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.15 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) .. 25
2.16 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.17 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR
2019)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION
(NOV 2021)
GENERAL CONDITIONS
4.1 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
ALTERNATE I (APR 1984)
4.3 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (FEB 2024)
4.4 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2024)
4.5 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.6 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
ALTERNATE I (JUL 1995)
4.7 52.223-20 AEROSOLS (MAY 2024)
4.8 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II
(APR 1984)
4.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.10 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
4.11 52.223-21 FOAMS (MAY 2024)
4.12 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS
(NOV 2023) ALTERNATE I (NOV 2023)
4.13 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)
4.14 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
4.15 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY
2020)
4.16 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023)
4.17 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
4.18 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED
VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)
4.19 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF
COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)
4.20 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)
4.21 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.22 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT
NAS– CPM) (NOV 2018)
4.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
4.24 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)
4.25 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.26 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I
(APR 2019)
4.27 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY
(FEB 2023)
4.28 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT
2020)
4.29 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)
4.30 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)
4.31 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE
(JAN 2008)
4.32 MANDATORY WRITTEN DISCLOSURES
4.33 List of Attachments
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 PRICE OFFER SCHEDULE
Description U/I QTY UNIT PRICE TOTAL PRICE
A. ITEM 1, GENERAL CONSTRUCTION: Contractor shall supply all materials, supervision, and labor to complete Project
679-21-102 Correct Failing Sanitary Sewer, Water Main, and Fire Protection Deficiencies, per contract drawings, specifications, and the SOW. Work includes the repair/replace, upgrade, or improve existing domestic water main, sanitary, storm, and fire piping and piping components throughout the campus, interior of buildings, and exterior of buildings. This work will include all trades necessary to provide a finished work environment including but not limited to plumbing, electrical, general construction, fire piping, HVAC, and other tasks.
Completion Time: 365 days from Notice to Proceed (NTP)
JB
B. ITEM 2, DEDUCTIVE ALTERNATE #1: Seeding, Mulch, &
Fertilizer in lieu of sodding.
C. ITEM 3, DEDUCTIVE ALTERNATE #2: Water meters and auto meter reading system.
A single award will be made on line items for which funds are available. Items are listed in order of priority to the Government. Refer to VAAR Provision 852.236-92, Notice to Bidders-Additive or Deductive Bid Line
Items. Bidders shall price each item. Bidders who do not bid each item may be determined non-responsive.
The Period of Performance includes submittal phase and the completion of all punch list items.
ATTACH YOUR ITEMIZED COST BREAKDOWN: Offerors are to include a construction price/cost breakdown using Attachment 4.
2.2 STATEMENT OF WORK
OVERVIEW:
• Contractor shall supply all materials, supervision, and labor to complete Project 679-21-102
Correct Failing Sanitary Sewer, Water Main, and Fire Protection Deficiencies, per contract drawings and specifications. Work includes the repair/replace, upgrade, or improve existing domestic water main, sanitary, storm, and fire piping and piping components throughout the campus, interior of buildings, and exterior of buildings. This work will include all trades necessary to provide a finished work environment including but not limited to plumbing, electrical, general construction, fire piping, HVAC, and other tasks.
• In addition to the above requirements, the Contractor shall abide by all VA safety rules and regulations, and ensure work is compliant with applicable NFPA, EPA, and NEC codes.
• A/E completion date: FY23
COMPLETION TIME:
365 calendar days from Notice to Proceed.
SITE VISITS:
Site visits will be determined by the Contracting Officer. Please contact the COR with any questions during the site visit.
POC:, Monteal Wiggins, COR 2, Healthcare Engineer
Engineering Service
Phone: 205-554-2000, ext. 6490
Email: Monteal.Wiggins@va.gov
SAFETY:
Contractor shall provide proof that all employees have tested negative for Tuberculosis prior to arriving on campus. Contractor shall provide proof that the Supervisor has completed the 30-hour OSHA course and proof that all subcontractors have completed the 10-hour OSHA course prior to arriving on campus.
IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:
The Contractor’s Field Service Engineer (FSE) shall always wear visible identification while on the premises of the Tuscaloosa VA Medical Center. Contractor shall only park in the appropriate designated parking areas. Information on parking is available from the Tuscaloosa VA Medical Center Police Section.
Tuscaloosa VA Medical Center will not invalidate or make reimbursements for parking violations of the contractor under any conditions. Smoking is prohibited inside and outside any buildings at Tuscaloosa VA
Medical Center. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States
(Federal) District Court, not a local district, state, or municipal court.
OBTAINING VA IDENTIFICATION BADGE:
mailto:Monteal.Wiggins@va.gov
Contractor shall contact the Contracting Officer’s Representative (COR), upon contract award, to receive instructions on how to obtain a VA Identification Badge during the performance of this contract.
SECURITY:
The Contractor shall ensure compliance by its employees with the security regulations of the Veterans
Administration where work is performed under this Contract. Contracted employees shall self-register at https://www.tms.va.gov/SecureAuth35/. Once registered, enroll in class VA10176 VA Privacy and
Information Security Awareness and Rules of Behavior. Contractors shall provide signed certifications of completion to the Contracting Officer’s Representative (COR) prior to starting work on this contract.
Photography or Video on medical center premises is strictly prohibited. Additionally, pursuant to 38 CFR
1.218(b) (23): Use of recording devices of any kind to record patients or employees is strictly prohibited.
VA-designated employee shall provide escort in sensitive areas (e.g. patient areas, Mid Atlantic
Consolidated Patients Accounts Center (MACPAC), Health Administrative Services (HAS), or any areas where sensitive information is kept) and in (Office of Information Technology) OIT areas.
The contractor shall be required to obtain security screenings and ID badges for employees through VA prior to the start of any work.
Contractor Responsibilities:
a. The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation and are able to read, write, speak, and understand the English language.
b. Within three business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the Public Access Link (PAL) template artifact. The Contractor Staff Roster shall contain the Contractor’s Full Name, Date of Birth, Place of Birth, individual background investigation level requirement, etc. The Contractor shall submit full Social Security Numbers within the Contractor Staff Roster or under separate cover to the COR. The Contractor Staff
Roster shall be updated and provided to VA within 1 day of any changes in employee status, training certification completion status, Background Investigation level status, additions/removal of employees, etc., throughout the Period of Performance. The Contractor
Staff Roster shall remain a historical document indicating all past information, and the
Contractor shall indicate in the Comment field, employees no longer supporting this contract.
The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods that comply with FIPS
140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.
c. Only electronic fingerprints are authorized. The Contractor shall bring their completed
Security and Investigations Center (SIC) Fingerprint request form with them (see paragraph d.4. below) when getting fingerprints taken.
https://www.tms.va.gov/SecureAuth35/
d. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:
1) Optional Form 306
2) Self-Certification of Continuous Service
3) VA Form 0710
4) Completed SIC Fingerprint Request Form
e. The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the
Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations
Processing (e-QIP) after receiving an email notification from the Security and Investigation
Center (SIC).
f. The Contractor employee shall certify and release the e-QIP document, print and sign the signature pages, and send them encrypted to the COR for electronic submission to the SIC.
These documents shall be submitted to the COR within 3 business days of receipt of the e-QIP notification email. (Note: OPM is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via e-QIP).
g. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
h. A Contractor may be granted unescorted access to VA facility and/or access to VA Information
Technology resources (network and/or protected data) with a favorably adjudicated Special
Agreement Check (SAC), completed training delineated in VA Handbook 6500.6 (Appendix C, Section 9), signed “Contractor Rules of Behavior,” and with a valid, operational PIV credential for PIV-only logical access to VA’s network. A PIV card credential can be issued once your SAC has been favorably adjudicated and your background investigation has been scheduled by
OPM. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of OPM.
i. The Contractor, when notified of an unfavorably adjudicated background investigation on a
Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
j. Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to the VA Facility and systems by Contractor and
Subcontractor employees and/or termination of the contract for default.
k. Identity Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.
RECORDS AND INFORMATION MANAGEMENT
Upon completion or termination of the applicable contract(s) or agreement(s), return and/or destroy, at
Covered Entity’s option, VA information gathered, created, received, or processed during the performance of the contract(s) or agreement(s). No data will be retained by Business Associate, or contractor, subcontractor, or other agent of Business Associate, unless retention is required by law and specifically permitted by Covered Entity. As deemed appropriate by and under the direction of Covered
Entity, Business Associate shall provide written assurance that all VA information has been returned to
Covered Entity or destroyed by Business Associate. If immediate return or destruction of all data is not possible, Business Associate shall notify Covered Entity and assure that all VA information retained will be safeguarded to prevent unauthorized Uses or Disclosures.
Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration
(NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its
Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA
Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.
2.3 PROPOSAL PREPARATION AND EVALUATION INFORMATION
I. Proposal Submission
This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under Federal Acquisition Regulation (FAR) Subpart 15.1 using the tradeoff process and evaluated in accordance with FAR Subpart 15.3, Source Selection. This section describes the method for evaluating and selecting offers for this procurement.
A. Proposal Submission:
1. Submit one (1) Electronic Proposal to the email addresses indicated on page 1, block 8 of the
Standard Form 1442. The Subject Line of the email should include “Company Name, RFP number, Project Title.”
2. The size of your file shall not exceed 10 MB. If you have multiple documents, please submit them as separate emails. Emails larger than this may be rejected by the network servers and will be considered non-responsive.
3. Interested firms are responsible for ensuring electronic submission delivery by the time and the date specified. It is highly recommended that interested firms confirm that the Contracting
Officer has received electronic submissions. Failure to provide a proposal in its entirety before the deadline will render the proposal non-compliant.
B. Proposal Preparation and Format Instructions:
Offerors must provide all requested information for each factor. Proposals must separately address each element of each factor as applicable to be considered responsive to this RFP. Factor headings should be highlighted in yellow or typed in bold text for identification. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the provided information is clearly understood and free of ambiguities.
Offerors proposals should consist of past performance and price proposals, as described below.
1. TAB A: General Information:
(1) Cover Page with Solicitation Number, Project Title
(2) Table of Contents
(3) Signed offer/Acknowledgement of Amendments (SF1442)
(4) Copy of current VetCert SDVOSB certification
(5) SAM UEI Number
(6) Offer Guarantee Bond (DO NOT SEND HARD COPY) Electronic copy acceptable and should be emailed to Point of Contact(s) listed on page 1, block 8.
(7) Safety or Environmental Violations and Experience Modification (EMR) Rate file:///C:/Users/VHAATGGoodmE/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/5W1DJMQ7/veterans.certify.sba.gov
*Submit information regarding current experience modification rate form (See
Attachment 1). An EMR of greater than 1.0 may disqualify the bidder/offeror.
(8) 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for
Services and Construction (Jan 2023) (Deviation), (See Attachment 2).
(9) Provide evidence of VETS-4212 Reporting (if applicable).
2. TAB B: Past Performance
(1) Offeror must submit a minimum of one (1) but no more than three (3) references utilizing page one of Attachment 3 for projects similar in scope, size, and complexity within the past five (5) years from the date of the posting of this solicitation to SAM.gov. Completed
Past Performance Questionnaires (PPQs) must be received directly from the client/customer for which the construction project was performed. If a CPARS is available for any of the projects submitted, they should also be submitted.
(2) The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references unwillingness to provide the information requested may affect the
Government’s evaluation of this factor.
(3) PPQs should be emailed to the construction contract administrator of the entity
(Government or civilian) for which the construction was completed and emailed to
Gregory Snyder, at email gregory.snyder@va.gov, and CC: joyce.powers1@va.gov.
3. TAB C: Price Proposal
(1) Complete the price offer schedule in section 2.1.
(2) Price shall be addressed using the attached price breakdown worksheet, which is included in Attachment 4.
(3) Provide supporting documentation showing quotes/price breakdowns for both prime and subcontractors.
NOTE: Price breakdown shall be indicative of showing at least 25% percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns in accordance with VAAR 852.219-73(d)(4).
II. EVALUATION CRITERIA/OVERVIEW
The evaluation is subjective based on the information provided in response to the information requested in the evaluation factors. The two (2) factors to be evaluated include past performance and price. Offerors proposal shall address the following:
A. FACTOR 1 - PAST PERFORMANCE:
mailto:gregory.snyder@va.gov mailto:joyce.powers1@va.gov
Past Performance will be evaluated to assess recency and relevancy, resulting in a performance confidence assessment rating. For evaluation purposes, past performance will be significantly more important than price.
1. Past Performance: The basis of the evaluation will be the degree to which past performance evaluations and all other past performance information reviewed by the Government reflect a trend of satisfactory performance considering 1) compliance with the contract requirements, 2) effectiveness of the Offeror's on-site management; 3) use of appropriate personnel for contract requirements); 4) timeliness in the submission of schedules, reports, and submittals; 5) adherence to the construction schedule; 6) coordination and control of subcontractors; 7) ability to effectively deal with the customer and other Government personnel; 8) cooperativeness in solving problems and negotiating changes; 9) response to warranty notifications, and other pertinent information obtained from past performance evaluations that have affected the overall performance of previous or ongoing projects.
2. The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources, including sources outside of the Government. Other sources may include but are not limited to past performance information retrieved through the (CPARS), for Contractors who are part of a partnership or joint venture identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
3. In evaluating past performance, the government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming.
4. Relevant performance is defined as work, as a prime contractor, to include correction of failing sanitary sewer, water main, and fire protection deficiencies. This relevant work can be a portion of a larger requirement, which was issued by the VA, Federal, State, Local
Government agencies, and/or commercial facilities.
5. Recent is defined as performance within the last five (5) years, to include ongoing projects.
Table 1. Past Performance Relevancy Ratings
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat
Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
6. Past performance evaluation will allow the government to assess the offeror’s ability to perform the effort described in this solicitation based on the offeror’s demonstrated present and past performance. The assessment process will result in an overall performance confidence assessment of Substantial Confidence, Satisfactory Confidence, Limited
Confidence, No Confidence or Neutral/Unknown Confidence.
Table 2. Performance Confidence Assessments
Rating Description
Substantial
Confidence
Based on the offeror’s recent/relevant performance record, the
Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory
Confidence
Based on the offeror’s recent/relevant performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the
Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the
Government has no expectation that the offeror will be able to successfully perform the required effort.
Neutral/Unknown
Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
7. Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.
B. FACTOR 2 - PRICE PROPOSAL:
The government may use various price analysis techniques and procedures to determine price reasonableness. Price will be evaluated for Price Reasonableness. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described in
FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a performance and price standpoint. The Government will evaluate price based on the total price.
III. EVALUATION AND BASIS FOR AWARD:
A. FAR 15.101-1 shall apply to the government’s evaluation of proposals. The factors that shall be used to evaluate offers are Past Performance and Price. Past Performance is significantly more important than Price.
B. Discussions: The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Offerors should not automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. Communications conducted to resolve minor or clerical errors would not constitute discussions. The Government reserves the right to conduct discussions if the Contracting Officer later determines them necessary.
C. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, past performance, and price considered. The proposals must conform to the RFP's requirements and evaluated to represent the Best Value to the Government. The Best Value is the most advantageous offer, consistent with the Government's stated importance of evaluation criteria.
This may result in award being made to a high-rated, higher-priced offeror where the Contracting
Officer determines that it is worth the price premium to do so.
D. Offerors must provide all requested information for each factor. Proposals must separately address each of the factors as applicable to be considered responsive to this RFP. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format the provided information is clearly understood and free of ambiguities (Reference Proposal Preparation and
Format Instruction).
E. In order to determine which proposal represents the best overall value, the Government will conduct a tradeoff analysis, comparing the strengths and weaknesses of the competing proposals to determine which proposal represents the best value to the Government and thus shall receive contract award.
F. The Government reserves the right to accept other than the lowest priced offer. The right is also reserved to reject any and all offers. The basis of award will be a conforming offer, the price or cost of which may or may not be the lowest. If other than the lowest offer, it must be sufficiently more advantageous than the lowest offer to justify the payment of additional amounts.
G. Award will result in a firm-fixed-price contract. It is the Offeror’s responsibility to ensure the submitted price proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein. The Offeror assumes all risk for omissions in prime and/or subcontractor proposals.
H. The Government evaluation team will consider all information provided in the proposal individually. Once these individual analyses are completed, the team will meet and determine a rating by consensus decision.
I. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.
J. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation and for subsequent award.
K. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. Information obtained from government and commercial systems, will be used to determine responsibility. Any information received by the Government that would be cause for an adverse Determination of Responsibility will make the offeror ineligible for award.
SDVOSB Verification: The Government will review SBA certification database
(veterans.certify.sba.gov) to confirm Service-Disabled Veteran-owned Small Business (SDVOSB) status certification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB certification status will be performed for the apparent award. For a Joint Venture to be considered eligible as an SDVOSB if the joint venture 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph 852.219-73(d) of the clause will be performed by the aggregate of the joint venture participants. Failure of a prospective SDVOSB to meet these certification requirements by the SBA shall result in elimination from consideration. Joint Venture -- Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture:
1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR
§ 128.402; and
2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.
L. Limitations on Subcontracting Certificate. VAAR 852.219-75 – VA Notice of Limitations on
Subcontracting—Certificate of Compliance for Services and Construction: The formal certification required by VAAR 852.219-75 must be completed, signed, and returned with the offeror’s proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Thus, offerors must properly complete and return all pages of Attachment 2 to the
Solicitation.
M. To be eligible for an award, if applicable, offerors must have submitted the required Federal
Contractor Veterans’ Employment Report (VETS-4212 Report) with respect to the preceding https://veterans.certify.sba.gov/ fiscal year if the contractor was subject to the reporting requirements in accordance with 52.222-
37.
N. Safety or Environmental Violations and Experience Modification Rate (EMR):
1. Offerors shall submit information pertaining to their past Safety and Environmental record.
The information must contain a certification that the bidder/offeror has no more than three
(3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
2. Offerors shall submit information regarding their current Experience Modification Rate
(EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, the Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.
3. Self-insured contractors or other contractors who cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation
Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
4. If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, the
Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.
5. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
6. This requirement applies to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.”
2.4 GENERAL SOLICITATION INFORMATION
I. GENERAL PROPOSAL INFORMATION
A. PROPOSAL MATERIALS
Proposal materials consisting of drawings, specifications, contract forms, and any issued
Amendments will be posted at www.sam.gov. This is the only official location where these documents can be obtained, and updates are posted. No ‘hard copy’ proposal materials are available.
B. WAGE DETERMINATION:
Wages for all contractors and subcontractors must comply with Construction Wage Rate
Requirements (Reference 52.222-6 for further information). The current determination is General
Decision AL20250098 on 1/3/2025, Attachment 5. Be advised the determination that is current at the time of the contract award is the determination that will apply to the contract. Current determinations are always available at https://sam.gov.
II. DATABASE REGISTRATION INFORMATION
A. SYSTEM FOR AWARD MANAGEMENT REGISTRATION
The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online
Representations and Certifications Application (ORCA), and the Excluded Parties List System
(EPLS). Federal Acquisition Registrations require that federal contractors register in SAM at www.sam.gov and enter all mandatory information into the system.
B. THE EXCLUDED PARTIES LIST SYSTEM (EPLS)
To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System
(EPLS) located at www.sam.gov for each person or business providing services under this contract.
During the performance of this contract, the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
C. VETS-4212 REPORTING REQUIREMENT
Contractors are required to submit a required annual Form VETS-4212, Federal Contractor
Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year. Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to http://www.sam.gov/ https://sam.gov/ http://www.sam.gov/ http://www.sam.gov/ the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C.
4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, visit https://www.dol.gov/agencies/vets/programs/vets4212. See
FAR provision 52.222-38 (JUN 2020), Compliance with Veterans' Employment Reporting
Requirements (FEB 2016) under the Representations, Certifications and Other Statements of
Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (JUN 2020) under the
General Conditions.
III. BONDING INFORMATION
A. BID GUARANTEE
A bid guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount by the proposal submission date and time shall require rejection in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using
Standard Form 24 (see FAR 28.106-1), and the form must be a scanned copy of an original (no whiteouts, clear signatures, seals must be evident and visible) and contain the proper solicitation number, proposal due date, and be from a corporate surety listed in Department of Treasury
Circular 570. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety.
B. PERFORMANCE AND PAYMENT BONDS
In accordance with Contract Clause 52.228-15 and FAR 28.102, Contractors are reminded that any amount awarded between $35,000.00 to $150,000 shall require a Payment Bond (SF 25A) and awards exceeding $150,000.00 shall require both Payment (SF 25A) and Performance Bonds (SF
25). Payment and Performance bonds are due no later than 10 days after notification of award as instructed by the contracting officer. The bonds shall contain no whiteouts or other corrections.
Payment and Performance bonds are required in the penal sum of 100% of the contract's price.
IV. SECURITY/BADGING
A. Contractor employee (s) may be required to obtain security screenings and/or ID badges for employees through VA prior to the start of any work on site depending upon length of work time on site. The contractor must coordinate badge requests with the respective Contracting Officer
Representative (COR). Any PIV Badging requires two (2) trips to a VA facility and the time required to complete the necessary paperwork. One trip is for completing the electronic fingerprinting, and the other to pick up the PIV Badge.
http://www.dol.gov/agencies/vets/programs/vets4212
B. ROSTER: Within three days after award or as agreed to with the Contracting Officer, the
Contractor should provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigation.
C. FORMS: Contractor personnel will need to complete the forms listed below depending upon the length of facility access needed:
a. Employee access for less than 6 months: Fingerprint request form (PIV Office Fingerprint
Request Form (Updated 3-1-2020)) and SAC form (SAC FORM (NEW)) Any VA PIV facility can take fingerprints; not necessarily where the work is to be performed.
b. Employee access for les greater than 6 months: Fingerprint request form, SAC form, Contractor Background Investigation Request (Contractor Background Investigation
Request Form 06-03-2021), OPM optional form 306 (of306) Personnel shall submit all required information related to their background investigations utilizing the Office of
Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing
(e-QIP) after receiving an email notification from the Security and Investigation Center
(SIC). Emails will be sent to employees requiring completion.
D. BADGING STEPS: After completing forms, the following steps need to be followed to obtain a badge.
1) Fingerprints: Need to schedule fingerprinting in coordination PIV Office. Fingerprint request form and SAC form must be brought to the PIV office along with two forms of valid ID when
Contractor gets fingerprinted. Contractor informs COR of employees that have been fingerprinted and sends COR all the required forms. Only electronic fingerprints are authorized.
2) Adjudication: COR submits the paperwork to the required office for adjudication. COR receives confirmation that the Contractor is favorably adjudicated, or contractor answers follow up questions. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
3) Sponsor: COR will let the Contractor know when they have been sponsored.
4) Badging: Contractor schedules an appointment using portal.usaccess.gsa.gov/scheduler.
Note: This link is best used in Google Chrome. Contractor personnel must bring two forms of valid ID when picking up a badge.
C. COMPLIANCE: Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to the VA Facility and systems by
Contractor and Subcontractor employees. Employees must follow all HSPD-12 policies and https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fportal.usaccess.gsa.gov%2Fscheduler&data=05%7C02%7C%7Ce36d9f33ce144b6c603b08dd131b1f72%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638687729419852310%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=UymXGgaOPR20eif3lR%2FO4vYKb1afhgI%2FRc8tWiLs%2FQw%3D&reserved=0 procedures and use and protect their assigned identity…