About this file

This document is an amendment to a Request for Quote (RFQ) for the replacement of two Data Aire condensing coils with Liebert condensing coils in the IT server room at the VA Medical Center.

The key details are:

  • The requirement is to remove and replace two Data Aire condensing coils with compatible Liebert condensing coils in the IT server room (LA108). All work must be completed with the systems fully operational.
  • The contractor must be escorted by engineering personnel when performing work in the IT server room.
  • The RFQ number is 36C24725Q0053 and the project name is "J045-- LA108 AC Coil Replacements", issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7.

View the file

Other files for this federal contract opportunity

Other files attached to J045-- LA108 AC Coil Replacements, newest first.
File Type Posted
Final SOW 1.docx DOCX document
RFQ Amendment 2 36C24725Q0053 0002.docx DOCX document
SOW Final.docx DOCX document
RFQ Amendment Solicitation 36C24725Q0053 0001.docx DOCX document
Attachment VA Campus.png PNG image
36C24725Q0053_2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question from Vendor:

Question # 2 states:

1. Due to Data, Aire is no longer in business. Can we bid on a condenser change if we cannot find a coil replacement? Unfortunately, not at this time we only need the coils to be replaced.

The SoW in Paragraph 5 states:

1. Remove and Replace Two Data Aire Condensing Units with Liebert Units.

Could you please provide clarification to what the requirement is to replace?

2. We are still confused about the use of the terminology "coil." Are you referring to the entire Outdoor Condensing Unit as a "coil", or are you referring to the specific coil part inside the unit? We are asking this because we understand that Leibert coils (the parts) are not compatible inside DataAire Condensing Units. Additionally, if you are not requesting replacement of the Outdoor Condensing Unit the need for a crane does not exist as the internal coils are not heavy enough to require a crane lift.

Please provide clarification of the terminology "coil."

Answer from Service Line:

Sow updated from and added.

Remove and Replace Two Data Aire Condensing coils with Liebert coils.

Remove Two Data Aire Condensing coils and dispose of off-campus.

Replace Aire Condensing coils with new compatible coils.

All systems worked on must be fully operational once work is completed.

All contractors must be escorted by engineering personnel when performing work in the IT server room (LA108).