Site Visit Info.docx

DOCX document 19 KB Posted

Attached to
Termite and Pest Control Services Federal contract opportunity
Solicitation number
36C24724Q0392
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

This document outlines requirements for a termite and pest control services contract solicitation. The Tuscaloosa Veterans Affairs Medical Center seeks integrated pest management and termite prevention services for all buildings on its campus. The contractor must provide material and labor for pest control, bed bug treatment, and a termite bond. A proactive approach is required, including yearly termite inspections and installation of a Sentricon pest system. Upon discovery of termite infestation, the contractor must determine the root cause and take corrective action. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7.

View the file

Other files for this federal contract opportunity

Other files attached to Termite and Pest Control Services, newest first.
File Type Posted
Copy of Buildings linear footage.xlsx XLSX spreadsheet
Site Visit Info-updated.docx DOCX document
ANSWERED QUESTIONS- TERMITE AND PEST CONTROL SERVICES.docx DOCX document
S02-36C24724Q0392-Termite and Pest Control Services-Corrected.pdf PDF
S02-36C24724Q0392-Termite and Pest Control Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANSWERED QUESTIONS FOR SOLICITATION # 36C24724Q0392

TERMITE AND PEST CONTROL MAINTENANCE

1. There is a bond requirement per the SOW, are there specifications on the bond i.e., type, amount etc.? A termite bond is simply a verification (letter or certificate) to show that our structures has/have been professionally inspected. We will accept this in any form (email, formal letter, certificate, etc..) for maintaining in our files.

2. Will there be a site visit scheduled or is it up to the contractor to schedule with the COR? March 12th 10-2pm

File details come from the government source that posted it. Updated .