36C24724Q0046 0002.pdf

PDF 139 KB Posted

Attached to
Fire Alarm Services Federal contract opportunity
Solicitation number
36C24724Q0046
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7

About this file

This document contains an amendment to a solicitation for fire alarm services. The Department of Veterans Affairs VISN 7 Network Contracting Activity is seeking these services for an 11-floor building located at 501 Greene Street in Augusta, GA. Annual inspections are due by March 31, 2024 with a 30-day grace period. Services include inspection and testing of two wet sprinkler systems, two PIVs, 11 wet standpipes, and an EST3 fire alarm panel network with 21 total panels and 5 node panels. Bidders must acknowledge receipt of this amendment by the specified date. The amendment provides answers to questions from bidders to clarify requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Alarm Services, newest first.
File Type Posted
36C24724Q0046 0001.pdf PDF
36C24724Q0046.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

36C247

Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901

36C247

Department of Veterans Affairs VISN 7 Network Contracting Activity 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901

To all Offerors/Bidders

36C24724Q0046

11-30-2023

X

X X

The purpose of this Amendment is to:

1. Post Questions and Answers received

2. Drawings are available upon indivdual request. Email request to jacob.tackett@va.gov. Due to size, not able to post with RFQ.

3. All other terms and conditions shall remain unchanged.

Jacob A. Tackett Contracting Officer

CONTINUATION PAGE

Questions and Answers – 36C24724Q0046

1. Can we get a layout of the building, the number of floors, and the system so that we can see the layout and how that will affect our inspection process? If we cannot get files, can we get a description of square footage per floor?

The building is 11 floors, including 1 ground floor, 9 clinical/administrative floors, and 1 mechanical floor.

2. The contract does not address monitoring. Will we be responsible for monitoring? Who is the current monitoring service?

Monitoring is not a part of the SOW or requirement for this contract.

3. What month is the annual inspection for the sprinklers, fire pumps, standpipes, and fire alarm due?

3/31/24 +/- 30 days

4. Will we be provided with the last annual inspection reports?

These can be provided to the awardee.

5. Are there currently any deficiencies in any of the systems?

Yes, there is currently one deficiency.

6. On page 15 of the solicitation, it states that ‘’Subcontractor will not be used under this contract unless authorized and approved by the CO.’’, could you please let us know how we can get the authorization?

Subcontractors should be approved by the COR.

7. Are you wanting reports specifically designed for TJC, DNV etc.?

Reports should be designed for TJC.

8. How many buildings are involved?

One.

9. Do you have current inspection reports that we can review?

Yes – these can be provided to the awardee.

10. How many wet sprinkler systems?

2 systems: 1 pump in the sub-basement and 1 pump behind the BRC elevators on the ground floor.

11. How many PIVs are included?

2 PIVs currently chained and locked in lieu of fire alarm monitoring.

12. Standpipes, wet or dry or combination?

11 wet standpipes

13. 21 Fire Panels, are these networked or standalone?

The list of 21 is misleading, as the EST3 panel we use counts every Annunciator display as a panel. They are all networked, but of the 21 panels, only 5 are nodes with cards that distribute to devices.

14. Do you want these monitored or are they already?

Monitoring is not a part of the SOW or requirement for this contract.

15. What kind of access issues are present? Time of day, lift or ladder required.

A 6 ft ladder should be required of any visiting testing agent, other ladders to be provided by facility. Active alarm testing of annunciation devise and door release need to be tested after-hours.

16. Elevator Recall Functional Testing?

Elevator Recall Functional Testing is not a part of the SOW or requirement.

17. Will you coordinate Elevator, HVAC companies if needed?

Our shop coordinates with Facilities Engineering to arrange elevator technicians to be on site, BUT we need 1 week lead time on when the testing agent wishes to test elevators.

18. You have listed a few repair or replace items, we don’t usually price these as part of an inspection.

Okay.

19. Are the dry / pre action systems due for 3-year full trip testing?

I do not know. That said, any testing with a periodicity in excess of 1 year (such as the 5-year stand pipe testing) is handled outside of the scope of this contract, so that this contract remains consistent from year to year.

20. Do your fire pumps have test headers to allow for full flow testing?

Yes for both pumps.

21. Due Dates Available by System and Building?

3/31/24 +/- 30 days