This document appears to be an Exhibit R Room Data Matrix that provides detailed specifications for various room types and spaces in a federal facility. It includes information on required interior finishes, doors and hardware, mechanical systems, electrical requirements, and other technical details. The matrix covers a wide range of room types such as exam rooms, labs, procedure rooms, imaging suites, pharmacy areas, and support spaces. Key details include required flooring, wall, and ceiling finishes; HVAC parameters; lighting and power specifications; room size; and other pertinent information to guide the design and construction of the facility. This appears to be a technical reference document rather than a solicitation or contract, and does not contain any information about a specific federal contract opportunity.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RDM Org
| ROOM DATA MATRIX | INTERIOR CONSTRUCTION | DOORS AND HARDWARE | MECHANICAL | ELECTRICAL | IT | |||||||||||||||||||||
| ROOM IDENTIFICATION | FLOOR | WALLS | CEILING | NOTES | Note: Use parameters within FGI Guidelines for the noted FGI Equivalent category, unless noted otherwise. | POWER | LIGHTING | |||||||||||||||||||
| Functional Area | DEPARTMENT | ROOM NAME | ROOM NAMES (VA) | FGI EQUIVALENT FOR ASHRAE 170 | FGI EQUIVALENT FOR TABLE 1.2-5 Minimum Sound Isolation | Floor Finish | Base | Wall Finish | Wainscot Material | Wainscot Height | STC | Ceiling Finish | Height | Notes | Size (Width) | Type | Material | Glazing | Rating | Hardware Group | Hardware Notes | Indoor Temperature | ||||
| Cooling F | Indoor Temperature | |||||||||||||||||||||||||
| Heating F | Indoor Relative Humidity | |||||||||||||||||||||||||
| % RH Max | Indoor Relative Humidity | |||||||||||||||||||||||||
| % RH Min | Minimum Total ACH | Minimum OA ACH | Room Air Return | |||||||||||||||||||||||
| Gen. Exh G Spec Exh S | Maximum Noise | |||||||||||||||||||||||||
| Level NC | Room Air Balance | HVAC Notes | # Duplex Receptacles | # Quad Receptacles | Power - Notes | Fixture Type | Controls | Lighting - Special Requirements | Lighting - Notes | # Data Outlets (standard density WAO) | IT - |
Special Requirements 0 General Rooms/Spaces Exam Room PACT Exam EXAM EXAMINATION RFT RB P -- -- SEE FGI AT 9'-0" 10 3'-0"
| 3'-6" | Flush | Wood | _ | _ | 12 SE | 3 | 8 | 1 | Multilevel Switching, Dimming & Occupancy | Multi-level switching or manual dimming | N/A | 3 | |||||||||||||||||||||||||
| 0 | General Rooms/Spaces | Exam Room | Exam Room - Multi-Specialty, Exam / Treatment, Exam - Consult, Consult Room - PACT, Exam/Consult Room (Mental Health/Social Work), Exam Room EMG/EEG, Exam Room-Cardiology, Exam/Consult, Nurse Practitioner, Women's Health Exam, Tele-Health Exam, Optometry Exam Treatment Room, Eye Lane, Tele-Retinal, TECHS, Applicance Fitting Room, Fitting Room, Physical Therapy Room, Occupational Treatment Room | EXAM | EXAMINATION | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 10 | 3'-6" | Flush | Wood | _ | _ | 12 S | 8 | 1 | Multilevel Switching, Dimming & Occupancy | Multi-level switching or manual dimming | N/A | 3 | |||||||||||
| 0 | General Rooms/Spaces | Consult Room | Consult Room, Audiology Rehabilitation Counceling Room, Dental Consult Room | CONSULTATION | CPT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | _ | 75 | 70 | 60 | - | 4 | 2 | Return | 40 | NR | 6 | Multilevel Switching, Dimming & Occupancy | Multi-level switching or manual dimming | N/A | 1 | |||
| 0 | General Rooms/Spaces | Procedure Room | Procedure Room, General, Urology, Gynecology, Specialty Care, Multi-Specialty Care, Cast Room | PROCEDURE | TREATMENT | WSF | WSF | EP | RWC | 4'-0" | SEE FGI | AT | 9'-0" | 3 | 3'-0" |
| 3'-6" | Flush | Wood | -- | -- | 12 SE | 3 | 7 | P13 | Multilevel Switching, Dimming & Occupancy | Wall mounted exam light | N/A | 2 | |||||||||||||||||||||||||||||
| 0 | General Rooms/Spaces | Laboratory | Laboratory (Typical) | LABORATORY WORKROOM | __ | WSF | WSF | EP | -- | -- | 40 | AT-SP | 9'-0" | 3 | 3'-0" | Flush | Wood | _ | _ | 15 AG | 4 | 6 | P3, P4 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 5 | ||||||||||||||
| 0 | General Rooms/Spaces | Conference Room | Conference Room, Multi-Purpose Room, Group Room, Shared Medical Appointment Room, Education Room, Staff Training Room, Classroom | __ | CPT | RB | P | RWC | 4'-0" | 40 | AT | 9'-0" | 17 | 3'-6" | Flush | Wood | _ | _ | 15 S | _ | M2 | 8 | P14 | Multilevel Switching, Dimming & Occupancy | Provide 4 scene preset dimmable lighting for a variety of tasks. Consider placement and optics to mitigate glare and ceiling reflections. | N/A | 4 | Floor data for table | |||||||||||||
| 0 | General Rooms/Spaces | TOILET | General Toilet, Patient - Toilet, Toilet - Police, Toilet - Family, Toilet - Female Staff, Toilet - Male Staff, Toilet - Procedure Room, Toilet - Public, Toilet - RF Patient, Toilet - Women's Health, Toilet - Female, Toilet - Family Assist, Specimen Collection Toilet | TOILET ROOM | TOILET ROOM | PT | PT | P | CT | 7'-0" | SEE FGI | AT | 9'-0" | 1,2 | 3'-6" | Flush | Wood | _ | _ | 11 | _ | 1 | Downlights/Mirror or vanity | Occupancy Sensor | N/A | N/A | |||||||||||||||
| 0 | General Rooms/Spaces | OFFICE | Any Office | -- | CONSULTATION | CPT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 CS | 4 | 1 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | ||||||||||||||||
| 0 | General Rooms/Spaces | WAITING | Waiting - Family - PACT, Waiting - PACT 3, Waiting - General - 20 People, Waiting - General - 10 People, Waiting - General - 6 People, Waiting-General | EXAM - PUBLIC SPACE | CPT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 10, 17 | M4 | -- | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||||||||||
| 0 | General Rooms/Spaces | RECEPTION | Reception, Information Desk, Travel Window, Reception - Accessible | -- | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0" | -- | 3'-0" | Flush w/ narrow vision | Wood | _ | _ | 12 CG | 3 | M4 | 1 | 1 | Downlights, pendants, decorative, and accent | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 10 | Data/phone feeds to systems furniture | |||||||||||
| 0 | General Rooms/Spaces | COPY ALCOVE | Copy Alcove, Copier - Workroom, Copy / Office Supply Room, Copy Room | -- | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0" | 6 | _ | _ | _ | _ | _ | _ | 6 | 3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 3 | |||||||||||||||
| 0 | General Rooms/Spaces | CLEAN UTILITY | Clean Utility, Clean Supply, Clean Workroom, Clean Linen, Sterile Storage, CBOC Steril Supply Storage Room, Clean Scope, Dental Clean Cart, Central Sterile | -- | -- | RFT | RB | P | RWC | 4'-0" | -- | AT | 9'-0" | -- | 3'-0" | Flush | Wood | -- | 45 MIN | 121 AG | _ | 66 | 75 | 55 | 30 | 4 | (+) | 1 | Occupancy Sensor | N/A | N/A | ||||||||||
| 0 | General Rooms/Spaces | SOILED UTILITY | Soiled Utility Room, Recycled Material, Soiled Holding, Soiled Linen, Soiled Workroom, Soiled Supply, Soiled Cart | SOILED HOLDING / SOILED WORK ROOM | -- | WSF | WSF | P | RWC | 4'-0" | -- | AT | 9'-0" | 3 | 3'-0" | Flush | Wood | -- | 45 MIN | 121 AG | _ | 2 | -- | Occupancy Sensor | N/A | N/A | -- | ||||||||||||||
| 0 | General Rooms/Spaces | STORAGE | Storage - Medical Equipment, Storage - Shared Medical Appointments, DME - Prosthetics Storage, Storage - Homeless, EMS Storage, Storage - Bistro/Coffee Bar, Storage - Patient Clothing and Luggage, Laundry / Storage, Tray Cart Storage Area, Buld Storage, General Storage, Secure Storage, | CLEAN WORKROOM/CLEAN SUPPLY | RFT | RB | P | -- | -- | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 35 AG | 1 per wall, not to exceed 12' spacing | -- | Surface or chain mounted 1' x 4' | Occupancy Sensor | N/A | N/A | |||||||||||||||||
| 0 | General Rooms/Spaces | JANITOR'S CLOSET | Housekeeping Aides Closet (HAC) | ENVIRONMENTAL SERVICES ROOM | -- | CS | RB | P | FRP | 4'-0" | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 34 A | _ | 1 | -- | Occupancy Sensor | N/A | N/A | -- | |||||||||||||||
| 0 | General Rooms/Spaces | KITCHENETTE | Social Activities Space/ Kitchen | -- | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0" | 17 | 3'-0" | Flush | Wood | -- | -- | 15 A | _ | 4 | -- | Multilevel switching/dimming/occupancy | N/A | N/A | -- | ||||||||||||||
| 0 | General Rooms/Spaces | EQUIPMENT ALCOVE | AED Alcove, Height and Weight Alcove, Scale Alcove, Stretcher Alcove, Med Alcove, Portable Patient Lift Alcove, Wheelchair Alcove, My Health eVet, Kiosk, | -- | -- | Match Adjacent | Match Adjacent | Match Adjacent | RWC | 4'-0" | -- | AT | Match Adjacent | 3 | -- | -- | -- | -- | -- | 6 | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | |||||||||||||||
| 0 | General Rooms/Spaces | STAFF LOUNGE | Staff Lounge | -- | -- | RSF | RB | P | -- | -- | 40 | AT | 9'-0" | 4 | 3'-0" | Flush w/ narrow vision | Wood | -- | -- | 13 | _ | Exh. (G) | (-) | 8 | -- | P7 | |||||||||||||||
| Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | ||||||||||||||||||||||||||||||||||||||
| 0 | General Rooms/Spaces | MEDICATION ROOM | Medication Room | MEDICATION ROOM | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 34 | 5 | 1 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||||||||||
| 0 | General Rooms/Spaces | LACTATION ROOM | Employee Wellness, Lactation Room, Quiet Room | -- | -- | RFT | RB | P | -- | -- | 50 | AT | 9'-0" | 10 | 3'-0" | Flush | Wood | -- | -- | 12 CS | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||||
| 0 | General Rooms/Spaces | LOCKER ROOM | Locker Room, Locker Room (Male/ Female) Locker - Staff Personal Property, Locker Room - Staff | -- | -- | RFT | RB | P | -- | -- | 40 | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | Push/Pull | Exh. (G) | (-) | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | ||||||||||||||
| 0 | General Rooms/Spaces | OFFICE, CUBICLE, Open Office | Cubicle - Administrative, Data Processing, Workstation - Extended Team, Homeless, Workstation - MICHM, Workstation - Suicide Prevention, Workstation - VOC Rehab, Workstation - Rad Tech, Workstation - Shipping / Receiving, Workstation, Administration (MSA MH; Rad, LPN), Workstation-Sleep Tech, Work Station, Call Center (MSA), Workstation-Cart Case Dispatch, Workstation-Clerical, | -- | -- | CPT | RB | P | -- | -- | -- | AT | 9'-0" | 2 per workstation | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||||||||||||||||
| 0 | General Rooms/Spaces | SUB-WAITING | Sub-Waiting, MRI Sub-Waiting, CT Sub-Waiting, Mammo Sub-Waiting, Sub-Waiting - Diagnostic Patient, Sub-Waiting - Dilation Patient, CT Vestibule, Waiting, Waiting-Zone 1, Sub-Waiting-Zone 2 | -- | -- | CPT | RB | P | -- | -- | -- | AT | 9'-0" | 10, 17 | -- | -- | -- | -- | -- | - | 6 | M4 | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | |||||||||||||
| 0 | General Rooms/Spaces | VENDING | Vending Machine Area | RFT | RB | P | -- | -- | -- | AT | 9'-0" | -- | -- | -- | -- | -- | -- | 6 | M4 | 8 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | ||||||||||||||||
| 0 | General Rooms/Spaces | TOILET/SHOWER ROOM | Toilet/Shower-Staff, Toilet/Shower-Patient, Toilet/Shower-Female Staff, Toilet/Shower-Male Staff | TOILET ROOM | TOILET ROOM | PT | PT | CT | -- | -- | SEE FGI | GWB/P | 9'-0" | 2, 19 | 3'-6" | Flush | Wood | -- | -- | 11 G | 2 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | ||||||||||||||||
| 0 | General Rooms/Spaces | CHANGING ROOM | Dressing room | RFT | RB | P | -- | -- | 40 | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 11 K | 75 | 70 | 60 | - | 4 | 2 | Return | NR | NR | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | ||||||||||
| 2 | Primary Care, Specialty Care, PACT | PACT TEAM WORK SPACE | PACT Team Work Space, Team Work Area- Home Based Primary Care | -- | CPT | RB | P | -- | AT | 9'-0" | -- | _ | _ | _ | _ | _ | 14 MP | 6 | M3 | 2 per workstation | -- | Multilevel Switching, Dimming & Occupancy | Provide dimming and switching to provide various light levels. Provide switching in refraction desk to control overhead lighting. | N/A | 1 per workstation | ||||||||||||||||
| 2 | Primary Care, Specialty Care, PACT | EXAM ROOM, AIRBORNE INFECTION ISOLATION | Exam, Isolation, Negative Pressure | AII Room | EXAMINATION | WSF | WSF | P | -- | -- | SEE FGI | GWB:P | 9'-0" | 3,7 | 3'-6" | Flush | Wood | -- | -- | 12 S | 6 | -- | Multilevel Switching, Dimming & Occupancy | Sealed fixture, flat lens surface on exterior | N/A | 1 | |||||||||||||||
| 5 | Audiology and SLP | AUDIOLOGY HEARING AID TESTING | Hearing Aid Lab, Hearing Aid Processing, Hearing Aid Repair | -- | RFT | RB | P | -- | -- | 40 | AT | 9'-0" | -- | 3'-0" | Flush | Wood | _ | _ | 15 S | _ | 75 | 70 | 60 | - | Exh. (G) | (-) | 7 | 0 | P4 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | ||||||||
| 5 | Audiology and SLP | AUDIOLOGY HEARING AID FITTING | Audiology Programming / Fitting, Hearing Aid Fitting Room, Cerumen Management Room, Speech Language Pathology Assistive Technology Romm, Speech Language Pathology Voice Treatment Room | EXAM | -- | CPT | RB | P | -- | -- | 60 | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | _ | 6 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||||||||||||
| 5 | Audiology and SLP | AUDIOMETRIC EXAM BOOTH | Audiometric Exam Suite, Exam - Audiometric Booth, Aud: Suite - Audiometric Exam, Hearing/Diagnostics, Booth, 1-Person | EXAM | -- | Pre-Fab | Pre-Fab | Pre-Fab | -- | -- | SEE EQUIP LIST |
tc={DA07BD7C-343C-4CA6-BD5F-166A5EACAEF6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
find out how booths are specified and what is the min requirement for VA. Pre-Fab 8'-0" -- 3'-0"
| 3'-6" | Pre-Fab | Pre-Fab | _ | _ | 1 | 2,4 | 9 | P1 | Typically pre-packaged unit including lighting and switching | N/A | L1 | 5 | ||||||||||||||||||||||||||
| 5 | Audiology and SLP | ELECTROPHYSIOLOGY | Electrophysiology, Posturography, Vestibulography | EXAM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | _ | 6 | P2, P3, P14 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 3 | |||||||||||
| 6 | Dental Service | SPECIALTY EQUIPMENT MECHANICAL ROOM | Dental Equipment Mech. Room, Mechanical Rooms - Electrical | -- | -- | CS | -- | P | -- | -- | 60 | EXP | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 14 S | Exh. (G) | (-) | 2 | -- | P3 | Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | 1 | |||||||||
| 6 | Dental Service | DENTAL PROSTHETICS LABORATORY | Laboratory, Dental Prosthetics | -- | WSF | WSF | P | -- | -- | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 15 AG | 75 | 70 | 60 | 20 | 6 | 2 | Return |
Exh. (G)
| 45 | (-) | M13 | 7 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 5 | ||||||||||||||||||||||||||||||||
| 6 | Dental Service | DENTAL TREATMENT ROOM | Dental Treatment Room (DTR), Multi-Functional (4/Hygiene), Special Needs Patient, Bariatric | EXAM | TREATMENT | WSF | WSF | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 CS | (+) | 7 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||||||||
| 6 | Dental Service | DENTAL X-RAY ROOM | X-Ray Room, Panoramic / Cephalometric (Cone Beam) | CLASS 1 IMAGING ROOM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 5 | 3'-6" | Flush | Wood | -- | LEAD LINED | 17 AGL | 8 | 7 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||||||
| 7 | Optometry | FITTING & DISPENSING, EYEGLASSES | Fitting & Dispensing, Eyeglasses | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | 6 | 75 | 70 | 60 | - | 4 | 2 | Return | 40 | NR | 2 | Downlights and accent/display | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||
| 7 | Optometry | LOW VISION EXAM/ THERAPY/ TRAINING | Low Vision Exam/ Therapy/ Training | EXAM | EXAMINATION | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | _ | 6 | Multilevel Switching, Dimming & Occupancy | Provide dimming and switching to provide various light levels. Provide switching in refraction desk to control overhead lighting. | N/A | 3 | ||||||||||||||
| 7 | Optometry | PRE-TESTING/ INTAKE | Pre-Testing/ Intake | EXAM | EXAMINATION | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | _ | 6 | 1 | Multilevel Switching, Dimming & Occupancy | Provide dimming and switching to provide various light levels. Provide switching in refraction desk to control overhead lighting. | N/A | 2 | |||||||||||||
| 7 | Optometry | VISUAL FIELDS ROOM | Visual Fields Room, Photography Room, Ultrasound Room, Tomography Room, Imaging Room, OCT Laser | EXAM | EXAMINATION | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | -- | 3'-6" | Flush | Wood | _ | _ | 12 S | _ | 7 | Multilevel Switching, Dimming & Occupancy | Provide dimming and switching to provide various light levels. Provide switching in refraction desk to control overhead lighting. | N/A | 2 | ||||||||||||||
| 8 | Mental Health | QUIET ROOM | Quiet Room for Patients | EXAM | TREATMENT | CPT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 35 S | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||||
| 8 | Mental Health | BIOFEEDBACK TREATMENT ROOM | Biofeedback Treatment Room | EXAM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 15 S | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||||||||||||
| 9 | Specialty Care Services | PULMONARY FUNCTION ROOM | Pulmonary Function - Analysis | EXAM | TREATMENT | WSF | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 G | 6 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||||||||||||
| 9 | Specialty Care Services | TREADMILL ROOM | Treadmill Room | EXAM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 MS | 6 | -- | P9 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | ||||||||||||||
| 9 | Specialty Care Services | EKG TESTING ROOM | EKG Testing Room | EXAM | EXAMINATION | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0 | 3'-6" | Flush | Wood | -- | -- | 12 S | One per wall | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||||||||||||
| 9 | Recreation Therapy | GROUP THERAPY ROOM, MUSIC | Creative Arts - Group Therapy Room - Music | -- | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 CG | 8 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||||
| 9 | Recreation Therapy | GROUP THERAPY ROOM, ART | Creative Arts - Group Therapy Room - Large | -- | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 CG | 8 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||||
| 9 | Recreation Therapy | WEIGHT ROOM, SMALL | Recreation Therapy Exercise / Weight Room - Small | -- | TREATMENT | RF | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 34 AG | 12 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | |||||||||||||||
| 10 | PHYSICAL THERAPY | PHYSICAL THERAPY GYM | Treatment Exercise Area (includes workstations therapists) | EXAM | TREATMENT | RF | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 14 S | 14 | -- | P14 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | ||||||||||||||
| 10 | PHYSICAL THERAPY | Activities Daily Living (ADL) Training | ADL Evaluation and Training Center, Toilet, Tub, Bed, Kitchen, Laundry | EXAM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0 | 3'-6" | Flush | Wood | -- | -- | 15 S | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | ||||||||||||||||
| 13 | Imaging Services | RADIOLOGY | Radiology, ES: General Purpose Radiology Room | CLASS 1 IMAGING ROOM | TREATMENT | WSF | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 5 | 4'-0" | Flush | Wood | -- | LEAD LINED | 15 LS | 8 | 5 | P3, P13 | Fully dimmable, occupancy sensor | N/A | L2 | 2 | |||||||||||||
| 13 | Imaging Services | C.T. CONTROL ROOM | CT Control Area, X-Ray - Computed Tomography - Control | TREATMENT | WSF | WSF | P | -- | -- | SEE FGI | AT | 9'-0" | 5 | 3'-0" | Flush | Wood | -- | LEAD LINED | 12 LS | 45 | M14 | 6 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | ||||||||||||
| 13 | Imaging Services | C.T. EQUIPMENT ROOM | CT Equipment Room, X-Ray - Computed Tomography - Indep View Console | -- | WSF | WSF | P | -- | -- | -- | AT | 9'-0" | 5 | 6'-0" | Flush | Wood | -- | -- | 45 AG | 7 | 50 | M14 | 7 | -- | P3, P13 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||||||||
| 13 | Imaging Services | C.T. SCAN ROOM | CT Scanning Room (Ceiling Lift), X-Ray - Computed Tomography - Scanner | CLASS 1 IMAGING ROOM | TREATMENT | WSF | WSF | P | -- | -- | SEE FGI | AT | 9'-0" | 5 | 4'-0" | Flush | Wood | -- | LEAD LINED | 15 ALG | 7 | -- | P3, P13 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||
| 13 | Imaging Services | MAMMOGRAPHY SCAN ROOM | Mammo - X-ray, Mammography Room | CLASS 1 IMAGING ROOM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 5 | 3'-6" | Flush | Wood | -- | LEAD LINED | 12 LS | 7 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||
| 13 | Imaging Services | RADIOGRAPHIC / FLOURO SCAN ROOM | Radiographic / Fluoroscopic (R/F) Room | CLASS 1 IMAGING ROOM | TREATMENT | WSF | WSF | P | - | - | SEE FGI | AT | 9'-0" | 5 | 3'-6" | Flush | Wood | -- | LEAD LINED | 15 AGL | 7 | -- | P3, P13 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||||||||||
| 13 | Imaging Services | ULTRASOUND SCAN ROOM | Ultrasound Room | CLASS 1 IMAGING ROOM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 12 S | |||||||||||||||||||||
| 7 | -- | P3, P13 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||||||||||||||||||||||||||||
| 13 | Imaging Services | PACS SERVER ROOM | X-Ray - Storage - Digital Files, Viewing Room - Picture Archiving and Communication System (PACS) | -- | RFT | RB | P | - | - | - | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 15 GK | 50 | 4 | -- | P3, P13 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | ||||||||||||||
| 13 | Imaging Services | MRI CONTROL ROOM | MRI Control Room, X-Ray - Magnetic Resonance - Control, MRI Zone 3 | CLASS 1 IMAGING ROOM | EXAM - MRI | RFT | RB | P | -- | -- | 40 | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 12 GS | 45 | M14 | 6 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | ||||||||||||
| 13 | Imaging Services | MRI EQUIPMENT ROOM | MRI System Component Room, X-Ray - Magnetic Resonance - System Component | TREATMENT | RFT | RB | P | RWC | 4'-0" | AT | 9'-0" | 11 | 4'-0" | Flush | Wood | -- | -- | 35 AG | 40 | 50 | M14 | 7 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||||||
| 13 | Imaging Services | MRI FERROMAGNETIC DETECTION | X-Ray - Magnetic Resonance - Ferromagnetic Detection, MRI Zone 2, MRI Viewing Room | EXAM - MRI | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 11, 16 | 4'-0" | Flush | Wood | -- | -- | 15 G | 75 | 70 | 60 | 40 | 12 | 2 | Return | 40 | NR | 1 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | |||||
| 13 | Imaging Services | MRI SCAN ROOM | MRI Scanning, X-Ray - Magnetic Resonance - Scanner, | EXAM - MRI | WSF | RB | P | -- | -- | SEE FGI | AT | VARIES | 11,13,16 | 4'-0" | Flush | Wood | -- | R/F Shielded | 1 | 75 | 70 | 60 | 40 | 12 | 2 | Return | ||||||||||||||
| Exh. (S) | 50 | NR | M17 | 2 | -- | P3 | Multilevel Switching, Dimming & Occupancy | MRI rated fixtures | N/A | 1 | ||||||||||||||||||||||||||||||
| 13 | Imaging Services | READING ROOM | MRI Viewing Room, X-Ray - Magnetic Resonance - Viewing | -- | CPT | RB | P | -- | -- | 40 | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 12 GS | 40 | 6 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 6 | ||||||||||||||
| 13 | Imaging Services | BONE DENSITOMETRY | Bone Densitometer | EXAM | TREATMENT | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 35 S | 7 | -- | P3 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | ||||||||||||||
| 14 | Pathology and Laboratory Medicine | SPECIMEN COLLECTION | Blood Specimen Collection, Alcove - Specimen Collection Point of Care (also for Substance Abuse plus Coumadin), Blood Draw Alcove, Support Area, Laboratory-Satellite, Laboratory-Venipuncture, Blood Draw | EXAM | __ | WSF | WSF | EP | -- | -- | -- | AT | 9'-0" | 3 | -- | _ | _ | _ | _ | _ | 6 | 4 | Multilevel Switching, Dimming & Occupancy | Multi-level switching or manual dimming | N/A | 2 | ||||||||||||||
| 14 | Pathology and Laboratory Medicine | SPECIMEN ACCESSIONING, PROCESSING & DISTRIBUTION ROOM | Specimen Accessioning, Processing & Distribution Room | LABORATORY WORK ROOM | -- | WSF | WSF | EP | -- | -- | -- | GYP/EP or AT-SP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Wood | Narrow Vision | -- | 15 AG | One per wall, 6' spacing, one adjacent to sink | One at each workstation | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | One at each workstation | ||||||||||||||
| 15 | Pharmacy Service | PHARMACY | Pharmacy, Pharmacy, PACT 3 (Controlled Substance) (w/3 AutoDispensing) | PHARMACY | -- | RF | RB | P | -- | -- | -- | AT | 9'-0" | -- | 6'-0" | Flush | Metal | - | - | 200 AS | 7 | 15 | P5 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 9 | |||||||||||||
| 15 | Pharmacy Service | PHARMACY DISPENSING WINDOW | Dispense/Consult Window, Workroom, Pharmacist | PHARMACY | -- | RF | RB | P | -- | -- | -- | AT | 9'-0" | -- | - | - | - | - | - | - | OPEN | 12 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 5 | ||||||||||||||
| 15 | Pharmacy Service | CLEAN ROOM, COMPOUNDING | Pharmacy - Clean Room - Chemotherapy Compounding | -- | -- | RF | RF | P | -- | -- | -- | GWB:P | 9'-0" | 3 | 7'-0" | Single Slide Auto Sliding Door | Aluminum/ Glass | Yes | -- | 850 | 68 | 68 | 60 | 20 | 30 | 2 | Exh. (S) | 55 | (-) | M12 | 14 | -- | P10 | |||||||
| Multilevel Switching, Dimming & Occupancy | Sealed fixture, flat lens surface on exterior | N/A | 5 | |||||||||||||||||||||||||||||||||||||
| 15 | Pharmacy Service | IV ADMIXTURE | Pharmacy - IV Admixture - Low Volume | -- | -- | RF | RF | P | -- | -- | -- | GWB:P | 9'-0" | 3 | 7'-0" | Single Slide Auto Sliding Door | Aluminum/ Glass | Yes | -- | 850 | 68 | 68 | 60 | 20 | 30 | 2 | Return | 55 | (++) | M12 | 14 | -- | P10 | |||||||
| Multilevel Switching, Dimming & Occupancy | Sealed fixture, flat lens surface on exterior | N/A | 5 | |||||||||||||||||||||||||||||||||||||
| 15 | Pharmacy Service | PRESCRIPTION DISPENSING AREA | Prescription Dispensing Area - OmniCell Station | -- | -- | RF | RF | P | -- | -- | -- | AT | 9'-0" | 3 | -- | -- | -- | -- | -- | - | 6 | 8 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 2 | |||||||||||||
| 15 | Pharmacy Service | SECURE STORAGE VAULT | Secure Storage, Vault | CLEAN WORK ROOM/ CLEAN SUPPLY | -- | RFT | RB | P | RWC | 4'-0" | -- | GWB:P | 9'-0" | 3'-0" | Flush | Hollow Metal | -- | -- | 1 | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | |||||||||||||||
| 15 | Pharmacy Service | ANTEROOM | Anteroom, Compound Sterile Preparation | -- | WSF | WSF | EP | -- | -- | -- | GWB:SP | 9'-0" | 3 | 7'-0" | Single Slide Auto Sliding Door | Aluminum/ Glass | Yes | -- | 850 | 68 | 68 | 60 | 20 | 30 | 2 | Return | 55 | (+) | M12 | 2 | -- | Multilevel Switching, Dimming & Occupancy | Sealed fixture, flat lens surface on exterior | N/A | -- | |||||
| 17 | Business Office | SECURE CASH ROOM | Secure Money Handling Room | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0 | 3'-0" | Flush w/ 1-Way Viewer | Steel | -- | -- | 200 GV | 4 | -- | Multilevel switching/dimming/occupancy | N/A | N/A | 1 | ||||||||||||||||
| 18 | Engineering | BIOMED. REPAIR SHOP | Repair Shop, Biomedical Eng. | -- | -- | RF | RB | P | -- | -- | -- | AT | 9'-0" | 3'-6" | Flush | Wood | -- | -- | 35 AG | Exh. (G) | (-) | M7 | 10 | -- | P4, P6 | Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | 2 | ||||||||||
| 19 | Logistics | LOADING DOCK | Receiving/ Shipping Dock | -- | -- | CS | RB | EP | -- | -- | -- | EXP. | -- | 8 | 6'-0" | Flush | Wood | -- | -- | 44 APW | 7 | - | 60 | - | - | Exh. (G) | (+) | M5 | 2 | -- | Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | 2 | |||||
| 19 | Logistics | MAIL ROOM | Support: Mail Room and Dist. Center, Mailing Room - Prosthetic Appliances | -- | -- | RF | RB | P | RWC | 4'-0" | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 15 G | 4 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | |||||||||||||||
| 19 | Logistics | GAS CYLINDER STORAGE | Storage - Gas Cylinders - MRI, Storage - Gas Cylinders - Interior | -- | -- | WSF | RB | P | RWC | 4'-0" | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | 45 MIN | 34 G | Exh. (S) | ||||||||||||||||||||
| (-) | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | ||||||||||||||||||||||||||||||||||
| 19 | Logistics | BIO-HAZARD STORAGE | Storage - Bio Hazardous Material, Storage - Hazardous Material, Infectious / Hazardous Waste | REGULATED WASTE | -- | WSF | WSF | EP | RWC | 4'-0" | -- | GWB:SP | 9'-0" | 3 | 3'-6" | Flush | Hollow Metal | -- | -- | 34 G | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | -- | ||||||||||||||
| 19 | Logistics | STORAGE WAREHOUSE | Bulk Storage, General Storage, Warehouse | CLEAN WORKROOM/CLEAN SUPPLY | CS | RB | P | -- | -- | -- | Exp | 10'-0" | 6'-0" | Flush | Wood | -- | -- | 45 AG | minimum, 1 per wall, not to exceed 12' spacing | -- | Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | ||||||||||||||||
| 19 | Logistics | BREAK DOWN | Break Down | CLEAN WORKROOM/CLEAN SUPPLY | RPT | RB | EP | -- | -- | -- | AT | 9'-0" | 8 | 4'-0" | Flush | Wood | -- | -- | 34 AG | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | ||||||||||||||||
| 20 | Police Service | POLICE HOLDING ROOM | Holding Room | -- | -- | CS | RB | P | -- | -- | -- | GWB-PT | 9'-0" | 3,15 | 3'-6" | Flush | Hollow Metal | Half Glass w/ Laminated Glass | 18 P | 0 | -- | Multilevel Switching, Dimming & Occupancy | Tamperproof fixture design | N/A | -- | |||||||||||||||
| 20 | Police Service | OPERATIONS ROOM | Operations Room | RFT | RB | P | -- | -- | 40 | AT | 9'-0" | 3'-6" | Flush | Hollow Metal | -- | -- | 200 APS | M15 | 0 | 8 | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 4 | ||||||||||||||||
| 20 | Police Service | SECURE STORAGE | Small Arms Armory, Storage - Secure | RFT | RB | P | -- | -- | -- | AT | 9'-0" | 3'-0" | Flush | Hollow Metal | -- | -- | 200 P | 75 | 70 | 60 | - | 4 | 2 | Return | NR | NR | 1 | -- | Multilevel Switching, Dimming & Occupancy | N/A | N/A | 1 | ||||||||
| 21 | VCS | RETAIL AREA | Retail Area | EXAM - PUBLIC SPACE | RFT | RB | P | -- | -- | SEE FGI | AT | 9'-0 | 17 | 6'-0" | Flush w/ Full Vision | Wood | Full Vision | 47 KM | 7, 9 | M4 | One per wall, 6' spacing | -- | Multilevel Switching, Dimming & Occupancy | Track or adjustable accent lighting for retail displays. | L5 | 3 | ||||||||||||||
| 23 | OI&T | TELECOMM. | Telecommunications Room/ Closet, IT Telecommunications Room | -- | -- | RFT | RB | P | -- | -- | -- | EXP. | 12'-0" | 3'-6" | Flush | Wood | -- | -- | 34 AS | 64 | 75 | 55 | 30 | - | - | - | - | NR | 6 | -- | P15 | Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | -- | ||||
| 23 | OI&T | SERVER ROOM | Central Server Room | -- | -- | RFT | RB | P | -- | -- | -- | EXP. | 12'-0" | 3'-6" | Flush | Wood | -- | -- | 34 AS | 72 | 81 | 60 | 6 | M8 | 10 | -- | P15 | Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | -- | ||||||||
| 23 | OI&T | I.T. WORKROOM | IT Workroom, Equip. Configuration/ Repair | -- | -- | RFT | RB | P | -- | -- | -- | AT | 9'-0" | 3'-0" | Flush | Wood | -- | -- | 35 AG | 10 | -- | P4, P6 | ||||||||||||||||||
| Surface or chain mounted 1' x 4' | Occupancy/vacancy | N/A | N/A | 8 | ||||||||||||||||||||||||||||||||||||
| 24 | SPS | ANTEROOM, SOILED TRANSITION | Anteroom, Soiled Transition/Drop-Off | DECONTAM | ||||||||||||||||||||||||||||||||||||
| ROOM | -- | RES | RES | EP | -- | -- | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 66 | 72 | 60 | 30 | 10 | 10 | Exhaust (G) | 40 | (-) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 2 | ||||||||
| 24 | SPS | DECONTAMINATION ROOM | Decontamination Work Room, Scope Decontamination Room | DECONTAM | ||||||||||||||||||||||||||||||||||||
| ROOM | -- | RES | RES | EP | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 66 | 72 | 60 | 30 | 6 | 6 | Exhaust (G) | 40 | (--) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 4 | ||||||||||
| 24 | SPS | Cart Wash | Cart Wash | -- | RES | RES | CT | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 70 | 75 | 10 | 10 | Exhaust (S) | 40 | (-) | M18, M19 | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | |||||||||
| 24 | SPS | Water Treatment Storage Room | Water Treatment Storage Room | -- | RES | RES | EP | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush | Steel | -- | 15 AG | 70 | 75 | 10 | 10 | Exhaust (G) | 40 | (-) | M18, M19 | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 1 | |||||||||
| 24 | SPS | REPROCESSING ROOM, SCOPE | Reprocessing Room, Scope | -- | RES | RES | EP | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 66 | 72 | 60 | 30 | 6 | 6 | Exhaust (G) | 40 | (-) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 2 | |||||||
| 24 | SPS | Instrument Assembly | Instrument Assembly | -- | WSF | WSF | EP | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 66 | 72 | 60 | 30 | 4 | 4 | Exhaust (G) | 40 | (++) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 4 | |||||||
| 24 | SPS | Sterilization Area | Steam Sterilization Area, Low Temp Sterilization Area | -- | RES | RES | EP | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 66 | 75 | 60 | 30 | 10 | 10 | Exhaust (G) | 40 | (++) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 2 | |||||||
| 24 | SPS | Cooling Area | Cooling Area | -- | RES | RES | EP | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Steel | Narrow Vision | -- | 15 AG | 66 | 75 | 60 | 30 | 10 | 10 | Exhaust (G) | 40 | (++) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 1 | |||||||
| 24 | SPS | Equipment Room, Steam Generator | Equipment Room, Steam Generator | -- | RFT | RB | EP | -- | ACT-SP | 9'-0 | 3, 7 | 3'-6" | Flush | Steel | -- | 15 AG | 85 | 10 | 10 | Exhaust (G) | 45 | (-) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | -- | |||||||||||
| 24 | SPS | Clean Dispatch | Clean Dispatch | -- | RFT | RB | EP | -- | ACT-SP | 9'-0 | 3, 7 | 70 | 75 | 60 | 30 | 4 | 4 | Exhaust (G) | 40 | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | 1 | ||||||||||||||
| 24 | SPS | STORAGE, CLEAN SCOPE | Storage, Clean Scope | CLEAN SUPPLY | -- | RES | RES | EP | RWC | 4'-0" | -- | GYP-EP | 9'-0 | 3, 7 | 3'-6" | Flush w/ Narrow Vision | Wood | Narrow Vision | -- | 15 AG | 66 | 75 | 55 | 30 | 4 | (+) | One per wall | -- | 2 X 2 recessed lensed | Multilevel Switching, Dimming & Occupancy | Gyp ceiling - lights to be sealed type/flange mounted | N/A | -- |
Interior Finishes Notes Interior Finishes Notes
| General Notes | |
| A. | Hollow metal frames and doors to be painted. |
| B. | Window sills to be solid surface fabrication. |
| C. | Resilient base to be 4", unless otherwise noted. |
| D. | Provide painted finishes only on inside of exterior walls (no wall covering). |
| E. | Floor material transitions to occur at centerline of door, unless otherwise noted. |
| F. | Wall brackets, grills, fire extinguisher cabinets, fin tube radiation, etc. to be painted to match adjacent wall color. |
| G. | Interior stairwell treads to be concrete with rubber nosings and RFT, LVT or RF landings. Stair nosings to be a contrasting color for safety. |
| H. | Coordinate height of wall protection with wall-mounted devices. |
| I. | Gypsum board soffits may be substituted for ACT above locations such as nurse stations, patient transaction/consultation desks, reception desks and |
| lobby/waiting areas. | |
| J. | Soffit above upper cabinets to be gypsum board. |
| K. | Refer to FGI recommendations regarding indoor air quality, sustainability and life cycle of materials. |
| L. | Solid surface countertops to have sides and backsplash at walls. |
| Schedule Notes | |
| 1. | CT tile to 7'-0" on plumbing and adjacent wall(s) with paint above to ceiling. |
| 2. | Tile base to be coved. |
| 3. | Integral coved base 6" high tightly sealed to walls. |
| 4. | If sink is present, use hard suface flooring as noted. |
| 5. | Lead lined walls and control area view window. |
| 6. | Flooring and base to match adjacent area flooring material and base. |
| 7. | Use gasketed, clip down ACT/grid system |
| 8. | Use slip-retardant finish on floor material |
| 9. | Public and exposed open stairways to be treated similar to adjacent spaces using CT/PT/RF on treads. Stair nosings to be a contrasting color for safety. |
| 10. | Note that if wall saver designed chairs are used, no wall protection is required. |
| 11. | Extend all room partitions to structural deck. |
| 12. | CT above countertop on wall. |
| 13. | Ceiling height as required to acommodate equipment. |
| 14. | Cove QT base, 6" high. |
| 15. | No separate trim at top of base, use alternate method to seal to wall. |
| 16. | Ceiling suspension system should be fabricated from nonferromagnetic material. |
| 17. | Aesthetic specialty materials may be used as accents where the design and budget permits. |
| 18. | Ceiling tile to meet USDA regulations. |
| 19. | Floors to be slip-resistant and meet ANSI 326.3 for measuring dynamic coefficient of friction for hard surfaces |
| 20. | Wall base on gyp board but not needed on any exterior materials such as brick, metal, or stone walls. |
| 21. | Wall CT and ceiling to meet building code light reflectancy standards. |
| 22. | Space may be room or area within a room. Coordinate finishes with adjacent spaces. |
| 23. | Provide 3/4" painted plywood where required by Telecommunications. |
| Finish Codes | |
| AT | Acoustical Ceiling Tile |
| AT-SP | Acoustical Scrubbable Ceiling Tile (with sprayed plastic finish) |
| CPT | Carpet Tile |
| CS | Concrete, Sealed |
| CT | Ceramic Tile (Wall) |
| EP | Epoxy Paint |
| EXP | Exposed Ceiling |
| MAT | Modular Carpet Walk Off Mat |
| P | Paint |
| PT | Porcelain Tile |
| QT | Quarry Tile |
| RB | Resilient Base |
| RES | Resinous Flooring and Base |
| RF | Rubber Flooring |
| RFT | Resilient Floor Tile |
| RSF | Resilient Sheet Flooring - Heterogeneous |
| RWC | Rigid Wall Covering (Wall Protection) |
| SD | Static Dissipative Tile |
| S | Solid Surface Fabrication |
| WSF | Welded Seam Sheet Flooring - Homogeneous |
Doors and Hardware Notes Doors and Hardware Notes
| General Notes | |
| A. | Refer to Lease Design Narrative (LDN) Appendix for Hardware Groups and Modifiers which are added to numeric hardware group assignments to indicate a variation to |
| the group. | |
| B. | All doors to be 7'-0" high, unless otherwise noted. |
| C. | Coordinate acoustical requirements for doors with required wall acoustical ratings as shown in Room Data Matrix - Interior Finishes in Appendix. |
| Schedule Notes | |
| 1. | Hollow metal frame cased opening |
| 2. | Two door (in swing and swing out) acoustical door and frame assembly. |
| 3. | Two doors required at this room/space. |
| 4. | Narrow lite optional. Use insulated or laminated glass to meet acoustical criteria. |
| 5. | Provide STC 50 rated acoustical door. |
| 6. | No door in this room/space. |
| 7. | Equal leaf pair of doors. |
| 8. | Lead lined door and hardware. |
| 9. | Space may be a room or area within another room. Omit door if space is not a separate room. |
Electrical Notes
ELECTRICAL NOTES
POWER NOTES LIGHTING NOTES
| P1. | Multiple receptacles above and below desk for device charging, receptacles provided with Pre-Fab system. | L1. | EMI/RFI emissions to be controlled |
| P2. | Receptacles on all walls | L2. | Dimmable to 5 fc |
| P3. | Coordinate electrical connections with equipment to be installed. Receptacles on all walls. | L3. | May not have ceiling - then use industrial fixture type |
| P4. | Plug strip at 44" above counters | L4. | May not have ceiling. If no ceiling, use industrial fixture type |
| P5. | Multiple receptacles above and below desk for device charging | L5. | Treat like a store. Adjustable lighting, General lighting. |
| P6. | Cord reel(s) for freestanding workbenches | L6. | No ceiling in these rooms. No prescription for lighting. |
| P7. | All outlets on dedicated circuits. |
| P8. | Cord reel(s) for freestanding workbenches |
| P9. | Treadmill on dedicated circuit |
| P10. | Each hood on dedicated circuit |
| P11. | Provide receptacles per equipment plan |
| P12. | Electrical to review redundancy requirements with OIT guidelines. |
| P13. | Receptacle above ceiling for overhead lift |
| P14. | Recessed power quad floor box |
| P15. | L21-20R receptical above each rack |
| P16. |
Mechanical Notes
MECHANICAL HVAC NOTES
| M1. | Intentioanlly Left Blank |
| M2. | Per ASHRAE 62 for ventilation, and FGI Guidelines for NC |
| M3. | General Open Office area |
| M4. | General Open/Public area |
| M5. | Per ASHRAE 62 for ventilation if interior enclosed space. |
| M6. | Comply with ASHRAE 15 if Special Refrigeration Systems are used |
| M7. | If chemicals are used, provide specialized exhaust |
| M8. | Data Center |
| M9. | Transfer air to Food Prep Kitchen |
| M10. | Intentioanlly Left Blank |
| M11. | MEP Room |
| M12. | See USP-797 and -800 |
| M13. | Counter-height specialized exhaust system required |
| M14. | Provide air conditioning and ventilation per imaging manufacturer recommendations |
| M15. | General Office Area |
| M16. | Verify specific vendor/manufacturer requirements. |
| M17. | Non-ferrous construction |
| M18. | Provide cooling only air terminal unit to serve the manual equipment wash room. |
| M19. | Provide a dedicated wet exhaust system |