36C24723Q0344.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C24723Q0344
About this file
This document is a combined synopsis/solicitation notice for a federal contract opportunity to furnish a new permanent fire pump for the Department of Veterans Affairs. The contractor will provide a self-framing prefabricated building with a two-hour fire-rated enclosure housing a centrifugal fire pump driven by a diesel engine and equipped with a 24-hour fuel storage tank, fire pump accessories, a multistage pressure maintenance pump, hose connections, and fire alarm and electrical components. The contractor must test and commission the fire pump assembly at the manufacturer's plant and at the site. The response deadline is March 15, 2023 at 12:00pm Eastern Time. The contractor must meet the specification requirements for divisions 1, 21, 26 and 28 and provide testing certificates per NFPA 20.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S01-RFQ 36C24723Q0344_1 02-24-2023-.docx | DOCX document | |
| S01-RFQ 36C24723Q03441-02-23-2023---.docx | DOCX document | |
| 20220505 - BLDG 10 - PermPumpPack - Specifications - Combined.pdf | ||
| 20220503 - BLDG 10 - PermPumpPack - Drawings - Combined.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice
| SUBJECT* |
| 544-23-2-5089-0629/REPLACES CONTRACT 36C24722P1257/FIRE PUMP (VA-23-00043141) |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 30901 |
| SOLICITATION NUMBER* |
| 36C24723Q0344 |
| RESPONSE DATE/TIME/ZONE |
| 03-15-2023 12:00pm EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| 1290 |
| NAICS CODE* |
| 333996 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VISN 7 Network Contracting Activity 700 19th S.
Augusta GA 30901
POINT OF CONTACT*
Contract Specialist Derrell Calhoun derrell.calhoun@va.gov derrell.calhoun@va.gov
PLACE OF PERFORMANCE
| ADDRESS |
| 6439 Garners Ferry Rd, |
Columbia SC
| POSTAL CODE |
| 29209 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
STATEMENT OF WORK.
NARRIATIVE FOR VA PURCHASE OF PERMANENT FIRE PUMP
Furnish new Permanent Fire Pump The design, materials, equipment, installation, inspection, and testing of the fire pump assembly complete shall be in accordance with the required provisions of NFPA 20, NFPA 37, and NFPA 70.
Seismic Protection: Seismically brace all fire pump piping systems in accordance with NFPA 13 and NFPA 20.
The manufacturer of the fire pump prefabricated house and diesel driven fire pump shall include:
1. The building shall be self-framing design using the roof and walls as the primary structural support system. A two-hour rated construction shall be provided for the enclosure meeting NFPA 1, UL Listed / FM Approved Centrifugal Fire Pump.
2. Diesel engine.
3. 24-hour capacity fuel oil storge tank.
4. Fire-pump accessories and specialties.
5. A Vertical, Multistage Pressure-maintenance pump.
6. Hose header supply per NFPA 20.
7. Fire Department connection with ball-drip check valve.
8. A UL Listed Fire Alarm Terminal Cabinet, listed electric gong, bell speaker-strobe.
9. Controllers, accessories, and specialties to include:
a. Controller for diesel-drive fire pump
b. Controllers for pressure-maintenance pumps
c. NEMA 4 Enclosures
d. 208V/1 phase and 208V/3phase electrical panels.
10. Contractor supplied equipment shall be designed to be maintained in place, if possible, with minimum disassembly of surrounding equipment and minimum usage of temporary scaffolding and handling equipment.
Contractor must refer and comply to Contract Documents, Division 01, 21, 26 and 28 specifications requirements in whole, no exceptions will be accepted. Below is a listing for reference to the contractor of the specification to be used for this scope of work:
1. 01 00 00 General Requirements
2. 01 19 00 General Commissioning Requirements
3. 01 33 23 Shop Drawings, Produce Data, and Samples
4. 01 35 26 Safety Requirements
5. 21 08 00 Commissioning of Fire Suppression Systems
6. 21 13 13 Wet Pipe Sprinkler Systems
7. 21 13 165 Dry Pipe Sprinkler Systems
8. 21 30 16 Diesel Driven Fire Pump with House
9. 26 05 11Requirements for Electrical Installations
10. 26 05 19 Low-Voltage Electrical Power Conductors and Cables
11. 26 05 33 Raceway and Boxes for Electrical Systems
12. 26 08 00 Commissioning for Electrical Systems
13. 26 24 16 Panelboards
14. 26 27 26 Wiring Devices
15. 26 29 21 Enclosed Switches and Circuit Breakers
16. 28 05 00 Common Work Results for Electronic Safety and Security
17. 28 05 13 Conductors and Cables for Electronic Safety and Security
18. 28 05 28.33 Grounding and Bonding for Electronic Safety and Security
19. 28 08 00 Commissioning of Electronic Safety and Security
20. 28 31 00 Fire Detection and Alarm
Provide testing and commissioning of the Fire Pump Assembly at the Manufacturers Assembly Plant and at the Site to include meeting the Division 01, Division 21, Division 26, and Division 28 Specifications requirements noted above and provide the site with completed Contractor’s Material and Test Certificate for Aboveground Piping, meeting NFPA 20, Figure A.14.1.3(a).
Contractor must advise in writing to the VA COR and the Engineer of Record of the Testing of the Fire Pump Assembly complete in the Manufacturer’s Assembly Plant with a minimum of ten (10) days advanced notice so that the VA and the Engineer of Record can be at the plant during testing of the fire pump assembly complete.
| *= Required Field |
| Combined Synopsis/Solicitation Notice |
Combined Synopsis/Solicitation Notice
File details come from the government source that posted it. Updated .