This federal solicitation is for the procurement of a permanent fire pump for the W.J.B. Dorn VA Medical Center in Columbia, South Carolina. Key requirements include furnishing a new diesel-driven fire pump, prefabricated house, day tank, and all necessary accessories. The fire pump must be UL listed and FM approved and meet NFPA 20, NFPA 37, NFPA 70, and seismic protection standards. The contractor must test and commission the system at the manufacturer's facility and on site, and advise the VA of testing dates with 10 days' notice. Related specifications cover general requirements, commissioning, wet and dry pipe sprinkler systems, diesel fire pumps, low-voltage power, raceways, fire detection and alarms, and grounding and bonding. The contractor must comply fully with all specification sections.

View the file

Other files

File Type Posted
S01-RFQ 36C24723Q0344_1 02-24-2023-.docx DOCX document
S01-RFQ 36C24723Q03441-02-23-2023---.docx DOCX document
20220505 - BLDG 10 - PermPumpPack - Specifications - Combined.pdf PDF
36C24723Q0344.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Architects/Engineers/Planners

KMG

1201 Main Street, Suite 2100

Columbia, South Carolina 29201 tel. 803-256-0000 fax 803-255-7243

A S S O C I A T E S, I N C.

Prepared by:

W.J.B. DORN VA MEDICAL CENTER

COLUMBIA, SOUTH CAROLINA

DEPARTMENT OF VETERAN'S AFFAIRS

DRAWING INDEX

CIVIL (NOT USED)

ARCHITECTURAL (NOT USED)

FIRE PROTECTION

MECHANICAL (NOT USED)

ELECTRICAL

STRUCTURAL (NOT USED)

PLUMBING (NOT USED)

VA PROJECT #544-21-119

05/03/2022

ISSUED FOR

BID SET

B10 Permanent Pump Acquisition Package

FA001 FIRE DETECTION - LEGEND, NOTES, AND DRAWING INDEX

FA002 FIRE DETECTION DETAILS

FA003 FIRE DETECTION - FIRESTOP DETAILS

FA004 FIRE DETECTION - RISER DIAGRAMS AND I/O MATRIX

FA201 FIRE DETECTION - FIRST FLOOR - FIRE PUMP

FA202 FIRE DETECTION - FIRE PUMP LOCATIONS EXISTING CONDITIONS

FX001 PERMNANENT FIRE SUPPRESSION - LEGENDS, NOTES AND DRAWING INDEX

FX002 PERMNANENT FIRE SUPPRESSION - FIRESTOP DETAILS

FX003 PERMNANENT FIRE SUPPRESSION - DETAILS

FX005 PERMNANENT FIRE SUPPRESSION - FIRE, JOCKEY PUMP SCHEDULE

FX201 PERMNANENT FIRE SUPPRESSION - FIRE PUMP HOUSE PLAN

FX202 PERMNANENT FIRE SUPPRESSION - EXISITING CONDITIONS

(NOT USED)

FIRE EXTINGUISHER SCHEDULE

FIRE EXTINGUISHER MUST BE ENGAUGE ENABLED INTELLIGENT

FIRE EXTINGUISHER WITH MONITORING CAPABILITY. THE FIRE

EXTINGUISHER WILL BE A 20 LB (120B:C) DRY CHEMICAL FOR

USE AT THE FIRE PUMP HOUSE FOR EXTINGUISHMENT OF

ELECTRICAL AND FLAMMABLE LIQUID INCIPIENT FIRES.

FE3

DESIGN CODES, STANDARDS & PARTIES OF REFERENCE

THE FOLLOWING PUBLICATIONS AND AUTHORITIES HAVING JURISDICTION SHALL BE

REFERENCED FOR THE DESIGN OF THE FIRE PROTECTION SYSTEM ON THIS PROJECT:

1. ANSI, A117.1 STANDARD, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES. 2017

EDITION

2. ASCE 7 - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2022

EDITION

3. ASME A17.1 - SAFETY CODE FOR ELEVATORS AND ESCALATORS INCLUDES

REQUIREMENTS FOR ELEVATORS, ESCALATORS, DUMBWAITERS, MOVING WALKS,

MATERIAL LIFTS AND DUMBWAITERS WITH AUTOMATIC TRANSFER SWITCHES, 2019

EDITION

4. INTERNATIONAL BUILDING CODE 2021 EDITION

5. NFPA 1 - FIRE CODE, 2021 EDITION

6. NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION

7. NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2022 EDITION

8. NFPA 20- STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2022 EDITION

9. NFPA 70 - NATIONAL ELECTRIC CODE, 2020 EDITION

10. NFPA 72 - NATIONAL FIRE ALARM & SIGNALING CODE, 2022 EDITION

11. NFPA 101 - LIFE SAFETY CODE. 2021 EDITION

12. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERNATION AND

DEMOLITION OPERATIONS, 2019 EDITION

13. VA FIRE PROTECTION DESIGN MANUAL, JUNE 1, 2021 EDITION

14. VA SEISMIC DESIGN REQUIREMENTS, REVISED MAY 1, 2020 EDITION

15. VA FIRE SAFETY

16. ALL AUTHORITIES HAVING JURISDICTION

TS

FIRE ALARM SYMBOLS

FIRE SUPPRESSION TAMPER SWITCH TO

SPRINKLER SYSTEM; FIRE ALARM INTERFACE

REQUIRED

FIRE EXTINGUISHER, DRY CHEMICAL FOR ALL TYPES OF FIRES

(EXCEPT METALS) ABC TYPE

WF FIRE SUPPRESSION WATER FLOW SWITCH TO

SPRINKLER SYSTEM; FIRE ALARM INTERFACE

REQUIRED

COMBINATION SPEAKER / VISIBLE - CEILING MOUNT.

CD = CANDELA RATING/ SETTING

FIRE ALARM TERMINAL CABINET

FIRE EXTINGUISHER STATION MODULE

M

CD

EVM

1. THE CONTRACTOR WILL BE HELD RESPONSIBLE TO HAVE EXAMINED THE EXISTING SITE

CONDITIONS FOR THE WORK INCLUDED UNDER THIS CONTRACT. NO ALLOWANCE WILL BE MADE

SUBSEQUENTLY IN THIS CONNECTION ON BEHALF OF THE CONTRACTOR FOR ANY ERROR OR

NEGLIGENCE ON THEIR PART.

2. NO FIRE ALARM DOCUMENTS/PLANS SHALL BE USED FOR DEMOLITION AND INSTALLATION OF

THIS SYSTEM UNLESS THEY CONTAIN A REVIEW AND APPROVAL STAMP FROM THE VA FIRE

SAFETY AND A COMPLETED REVIEW BY THE ARCHITECT/ENGINEER. THE VA FIRE SAFETY OR

ARCHITECT/ENGINEER HAS THE AUTHORITY TO STOP ANY WORK UNTIL SUCH PLANS ARE ON

SITE AND IN USE.

3. ALL FIRE ALARM DEVICE LOCATIONS SHALL BE COORDINATED WITH PLUMBING PIPING,

MECHANICAL PIPING, MECHANICAL EQUIPMENT, SIGNS, AND OTHER MEP TRADES PRIOR TO

CONSTRUCTION.

4. THE FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DESIGN OF THE

LAYOUTS, DEVICES COUNTS, CONDUCTOR TYPES, WIRING DIAGRAMS, I/O MATRIX, RISER

DIAGRAMS, AND BATTERY CALCULATIONS SHALL BE SEALED BY AN PROFESSIONAL ENGINEER

REGISTERED IN THE STATE OF SOUTH CAROLINA OR A NICET LEVEL III OR LEVEL IV FIRE ALARM

DESIGNER.

5. FLOOR/WALL PENETRATIONS THROUGH RATED SEPARATIONS SHALL BE SEALED WITH AN FM

APPROVED FIRE RATED MATERIAL AND METHODS.

6. WALL PENETRATIONS THROUGH NON-RATED PARTITIONS SHALL BE PROVIDED WITH A NON-

SHRINKING GROUT OR CAULKING MATERIAL AND APPROVED ASSEMBLY.

7. THE FIRE ALARM PLANS ARE FOR COORDINATION AND BIDDING PURPOSES ONLY. THE FIRE

ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DESIGN.

8. THE FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF

WALLS AND CEILING REQUIRED FOR THE INSTALLATION OF THE NEW FIRE SUPPRESSION

SYSTEM.

9. THE CIRCUIT WIRING SHALL BE SIZED AS FOLLOWS:

A. NOTIFICATION APPLIANCE CIRCUITS SHALL BE A MINIMUM OF #14 AWG.

10. B. SIGNAL LINE CIRCUITS SHALL BE MINIMUM OF #18 AWG AND MAXIMUM OF #14 AWG.

11. THE FIRE ALARM SYSTEM SHALL BE AN ADDRESSABLE SYSTEM INCLUDING INDIVIDUALLY

ADDRESSED DEVICES.

12. THE FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING

CONDITIONS PRIOR TO CONSTRUCTION. THE EXISTING FIRE ALARM EQUIPMENT AT BUILDING

B10, PROTECTED PREMISE FIRE ALARM CONTROL PANEL AND THE MAIN FIRE ALARM CONTROL

PANEL AT BUILDING 100, EMERGENCY COMMUNICATION CENTER NEEDS TO BE FIELD VERIFIED

TO DETERMINE INTERFACE POINTS AND IF EXISTING TWO FIRE ALARM CONTROL PANEL(S)

REQUIRES TO BE EXPANDED DUE TO THIS BUILDING CONSTRUCTION. THIS CONTRACTOR SHALL

INCLUDE EXPANSION AND UPGRADE OF BATTERIES, IF EXISTING CONDITIONS WILL NOT MEET

NFPA 72 WITH THE NEW ADDITION INTO THIS SCOPE OF WORK.

13. FURNISH AND INSTALL END-OF-LINE RESISTORS AND CLEARLY MARK THE LOCATION OF THIS

DEVICE.

14. ALL FIRE ALARM SYSTEM COMPONENTS SHALL BE UL LISTED.

15. FIRE ALARM SYSTEM SHALL INTERFACE WITH THE FIRE SUPPRESSION SYSTEM WHERE ZONING

SHALL BE ON A PER FLOOR BASIS (E.G., ONE ZONE PER FLOOR).

16. NATIONALLY RECOGNIZED CODES, AND THE VA DESIGN MANUAL REQUIREMENTS MUST USE

THE REQUIREMENTS OF NFPA FOR CONFLICTS AND NOT THE MOST STRINGENT CODE OR VA

DESIGN MANUALS.

17. FOLLOWING THE FIRE ALARM SYSTEM INSTALLATION, A 100% FIRE ALARM SYSTEM ACCEPTANCE

TEST SHALL BE CONDUCTED BY THE FIRE ALARM CONTRACTOR FOR THE SCOPE OF WORK

SHOWN ON THESE DOCUMENTS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT, ENGINEER,

OWNER AND ALL AUTHORITIES HAVING JURISDICTION WITHIN FOUR(4) WORKING DAYS OF THE

TEST FOR SCHEDULING.

18. ALL FIRE ALARM DEVICES SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 20, NFPA 70, NFPA

72, NFPA 101, VA FIRE PROTECTION DESIGN MANUAL AND PROJECT SPECIFICATION

REQUIREMENTS.

19. ALL INSTALLED FIRE ALARM DEVICES SHALL BE UL LISTED AND APPROVED FOR INSTALLATION

WITH THE EXISTING TWO FIRE ALARM CONTROL PANELS, E.G., ONE IN THE FIRST FLOOR

VESTIBULE AREA OF BUILDING B10 AND THE OTHER MAIN FIRE ALARM CONTROL PANEL IS

LOCATED IN THE EMERGENCY COMMUNICATION CENTER OF BUILDING 100.

20. ALL FIRE ALARM DEVICES SHALL BE ACCESSIBLE FOR PERIODIC INSPECTIONS, MAINTENANCE

AND TESTING PURPOSES.

21. ALL FIRE ALARM DEVICES SUBJECT TO MECHANICAL DAMAGE SHALL BE PROTECTED BY A

MANUFACTURER'S APPROVED PROTECTIVE COVER/GUARD.

22. THE FIRE ALARM CONTRACTOR SHALL PREPARE AS-BUILT DRAWINGS DURING THE

INSTALLATION OF THE FIRE ALARM SYSTEM.

23. A FIRE ALARM SYSTEM RECORD OF COMPLETION SHALL BE PRESENTED TO THE ARCHITECT, ENGINEER, AND VA FIRE SAFETY AT THE CONCLUSION OF THIS FIRE ALARM SYSTEM

INSTALLATION.

24. THE CONTRACTOR SHALL PROVIDE THE VA REPRESENTATIVE WITH OPERATING, TESTING,

MAINTENANCE INSTRUCTION, SITE SPECIFIC SOFTWARE CHANGES/ADDITIONS, AND AS-BUILT

DRAWINGS AT THE CONCLUSION OF THIS FIRE ALARM INSTALLATION.

25. THE CONTRACTOR SHALL PROVIDE THE VA REPRESENTATIVE WITH MAINTENANCE AND

TESTING SCHEDULE FOR ALL EQUIPMENT FURNISH/INSTALLED UNDER THIS SCOPE OF WORK IN

ACCORDANCE WITH NFPA 72 GUIDELINES.

26. ALL FIRE ALARM CABLE SHALL BE INSTALLED WITHIN A CONDUIT AND PER NFPA 70

REQUIREMENT.

27. ALL FIRE ALARM CABLE SHALL BE MONITORED FOR INTEGRITY IN ACCORDANCE WITH NFPA 70

AND NFPA 72 REQUIREMENTS.

28. NATIONALLY RECOGNIZED CODES, AND THE VA DESIGN MANUAL REQUIREMENTS MUST USE

THE REQUIREMENTS OF NFPA FOR CONFLICTS AND NOT THE MOST STRINGENT CODE OR VA

DESIGN MANUALS.

29. ALL FIRE ALARM CIRCUITS SHALL BE DURABLY MARKED AND LABELED WHERE THE

IDENTIFICATION SHALL BE CLEARLY VISIBLE.

30. ALL FIRE ALARM CABLE SHALL BE INSTALLED IN A CONDUIT IN A NEAT, WORKMAN LIKE MANNER.

31. ALL FIRE ALARM CABLES SHALL BE INSTALLED IN A CONDUIT OR METALIC RACEWAY AND BE

INDEPENDENTLY SUPPORTED FROM THE BUILDING STRUCTURE. FIRE ALARM CABLE SHALL NOT

BE STRAPPED, TAPED OR ATTACHED BY ANY MEANS TO THE EXTERIOR OF ANY CONDUCTOR

OTHER RACEWAY AS A MEANS OF SUPPORT.

32. ALL FIRE ALARM CABLE INSTALLED IN A CONDUIT SHALL BE SUPPORTED BY STRAPS, HANGERS

OR SIMILAR FITTING DESIGNED AND INSTALLED SO AS NOT TO DAMAGE THE CABLE.

33. ALL FIRE ALARM CABLES INSTALLED IN A CONDUIT SHALL BE ACCESSIBLE; WHERE, BUILDING FEATURES DO NOT PROVIDE ACCESSIBILITY, OR THE FIRE ALARM CABLE SHALL BE INSTALLED IN

AN APPROVED CONDUIT/METAL RACEWAY.

34. ALL WIRING SHALL BE SECURED TO THE STRUCTURE AS SPECIFIED IN NFPA 70.

35. ALL CONDUIT/RACEWAY SHALL BE SECURED TO THE STRUCTURE AS SPECIFIED IN NFPA 70.

36. THE FIRE ALARM SYSTEM SHALL BE TEST FREE OF GROUNDS.

37. THE FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR DETERMINING CABLE FILL/CONDUIT SIZING PER NFPA 70 REQUIREMENTS (ALL FIRE ALARM CONDUIT SHALL BE A MINIMUM SIZE OF 3/4 -

INCH).

38. A VOLTAGE DROP CALCULATION SHALL BE PERFORMED AND SUBMITTED BY THE FIRE ALARM

CONTRACTOR FOR POWER CONSUMING CIRCUITS; IN ORDER TO VALIDATE THAT THE SYSTEM

HAS BEEN DESIGNED WITHIN NFPA TOLERABLE LIMITS. NOTIFICATION APPLIANCE DEVICE

CIRCUITS VOLTAGE DROP CALCULATIONS SHALL HAVE A MAXIMUM VOLTAGE DROP OF 15%

AND A PREFERRED VOLTAGE DROP OF 10% MEETING NFPA 72, SECTION 10.3.5.

FIRE ALARM GENERAL NOTES FIRE ALARM AND DETECTION NOTE

FIRE ALARM AND DETECTION PLANS ARE SHOWN FOR BIDDING PURPOSES. FIRE

ALARM AND DETECTION CONTRACTOR IS TO SUBMIT SHOP DRAWING. FIRE ALARM

CALCULATIONS MEETING NFPA 72 AND VA FIRE PROTECTION DESIGN MANUAL, ALL

SHOP DRAWINGS AND CALCULATION ARE TO BE SIGNED. STAMPED AND SEALED BY

EITHER A LICENSED FIRE PROTECTION ENGINEER IN THE STATE WHERE WORK WILL

BE PERFORMED OR A NICET LEVEL III OR IV CERTIFICATION IN FIRE ALARM SYSTEM

LAYOUT. ALL WORK IS TO BE DONE IN ACCORDANCE WITH THE VA REQUIREMENTS

AND APPLICABLE CODES.

39. ALL FIRE ALARM WIRING SHALL BE INSTALLED IN A CONDUIT/RACEWAYS SEPARATE FROM

ALL OTHER SYSTEMS.

40. MAINTAINABILITY:

1. EXTERNAL AND INTERNAL PARTS SHALL BE ARRANGED SO THAT, WHEN INSTALLED,

ALL PARTS REQUIRING MANIPULATION, OBSERVATION, AND/OR MAINTENANCE ARE

READILY ACCESSIBLE AND SAFE FOR OPERATION AND MAINTENANCE PERSONNEL.

SPECIFY ANY MAINTENANCE ENVELOPES AND CLEARANCES AROUND INSTALLED

EQUIPMENT. WHEREVER PRACTICAL, VALVES AND INSTRUMENTS SHALL BE

LOCATED SUCH THAT THEY CAN BE OPERATED AND EASILY ACCESSED FROM

GRADE LEVEL.

2. MAINTAINABILITY SHALL BE INCORPORATED INTO THE DESIGN OF ALL CONTRACTOR

SUPPLIED EQUIPMENT. THE PRIMARY MAINTAINABILITY OBJECTIVE SHALL BE TO

MINIMIZE THE COMPLEXITY AND TIME REQUIRED FOR MAINTENANCE. THE

FOLLOWING GENERAL CRITERIA SHALL BE OF A LOW MAINTENANCE DESIGN AND

SHALL BE EASILY MAINTAINABLE.

A. CONTRACTOR SUPPLIED EQUIPMENT SHALL BE OF LOW MAINTENANCE

DESIGN AND SHALL BE EASILY MAINTAINABLE.

B. CONTRACTOR SUPPLIED EQUIPMENT SHALL BE DESIGNED TO BE

MAINTAINED IN PLACE, IF POSSIBLE, WITH MINIMUM DISASSEMBLY OF

SURROUNDING EQUIPMENT AND MINIMUM USAGE OF TEMPORARY

SCAFFOLDING AND HANDLING EQUIPMENT.

41. WIRING INSTALLED IN METAL RACEWAYS WITHIN BUILDINGS THAT ARE PROTECTED WITH

100% COMPLETE SPRINKLER COVERAGE SHALL BE CONSIDERED TO MEET THE

REQUIREMENTS FOR PATHWAY SURVIVABILITY LEVEL 2 IN ACCORDANCE WITH NFPA 72 AS

A 2-HOUR PERFORMANCE ALTERNATIVE THAT HAS BEEN APPROVED BY THE AUTHORITY

HAVING JURISDICTION AND SHALL BE PERMITTED FOR VOICE COMMUNICATION SYSTEMS IN

VA FACILITIES.

42. WIRING FOR BUILDING FIRE ALARM SYSTEMS SHALL BE SPECIFIED AS DEFINED IN NFPA 72

AND AS FOLLOWS:

1. SIGNALING LINE CIRCUITS (SLC): CLASS B.

2. INITIATING DEVICE CIRCUITS (IDC): CLASS B

3. COMMUNICATION BETWEEN BUILDING FIRE ALARM CONTROL UNITS (E.G.., SUCH AS

BETWEEN THE FIRE PUMP HOUSE AND BUILDING B10 LOCAL FIRE ALARM CONTROL

PANEL: CLASS X

1. WHERE SIGNALING LINE CIRCUITS ARE RUN BETWEEN FIRE ALARM

CONTROL UNITS IN SEPARATE BUILDING, FIBER OPTIC CIRCUITS SHALL BE

FURNISHED/INSTALLEd.

2. WHERE CLASS X COPPER CIRCUITS ARE INSTALLED, PROVIDE ISOLATION

MODULES THAT WILL ENSURE THAT ONLY ONE BUILDING, E.G., THE FIRE

PUMP HOUSE, BUILDING B10 OR BUILDING 100 WILL BE LOST (E.G., WILL NOT

RESPOND) DURING ANY TYPE OF FAULT. IT IS REQUIRED THAT THE

INSTALLATION OF CLASS X CIRCUITS BE RUN IN SEPARATE CONDUITS FROM

EACH OTHER.

43. COORDINATE FIRE ALARM ZONES WITH THE SPRINKLER ZONES ON A PER FLOOR BASIS..

44. THE FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH OTHER TRADES

TO ELIMINATE CONFLICT WITH OTHER TRADES. ANY WORK INSTALLED BY THIS

CONTRACTOR THAT RESULTS IN CONFLICT, DUE TO LACK OF COORDINATION BETWEEN

TRADES, SHALL BE CHANGED AS DIRECTED BY THE ARCHITECT/ENGINEER WITHOUT

ADDITIONAL COMPENSATION TO THE CONTRACTOR.

45. THE FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR PROVIDING DESIGN SHOP DRAWINGS,

CALCULATIONS, ETC., INCLUDING BUT NOT LIMITED TO ALL ITEMS WHICH APPLY AS

OUTLINED IN NFPA 72 SECTIONS 7.2, 7.4 AND 7.5, TITLED, "MINIMUM REQUIRED

DOCUMENTATION", "SHOP DRAWINGS (INSTALLATION DOCUMENTATION)," AND

"COMPLETION DOCUMENTATION".

46. ALL FIRE ALARM POWER CIRCUITS SHALL BE FED TO/FROM A LIFE SAFETY PANEL MEETING

THE REQUIREMENTS OF NFPA 70 SECTION 517.45(B) AND SECTION 517.32(C) WHERE A

DEDICATED LIFE SAFETY BRANCH CIRCUIT SHALL SUPPLY POWER FOR FIRE ALARM

PANELS, EXTENDER PANELS, ETC. FIRE ALARM SYSTEM SHALL NOT BE FED FROM A

NORMAL POWER PANEL.

47. THE FIRE ALARM CIRCUIT BREAKER IDENTIFICATION AND ACCESSIBILITY SHALL MEET THE

REQUIREMENTS OF NFPA 72, SECTION 10.6.5.2 AND FIRE ALARM CIRCUIT BREAKER LOCK

REQUIREMENTS STATED IN SECTION 10.6.5.4 & 10.6.5.5.

48. ALL ALARM, SUPERVISORY, AND DETECTION SYSTEMS SHALL BE CONNECTED TO THE

EXISTING BUILDING B10 PROTECTED PREMISE FIRE ALARM CONTROL PANEL AND

INTERFACED WITH THE MAIN FIRE ALARM CONTROL PANEL LOCATED IN BUILDING 100,

EMERGENCY COMMUNICATION CENTER. ALL INTERFACES BETWEEN BUILDING B10 AND

BUILDING 100 ARE EXISTING.

49. 12 MULTIMODE FOR FIRE ALARM SYSTEM COMMUNICATIONS, TYPE OM1 ONLY.

50. DISRUPTIONS TO FIRE ALARM AND SPRINKLER SYSTEMS SHALL BE KEPT TO A MINIMUM OR

AVOIDED. DELINEATE PHASING OF CONSTRUCTION TO ENSURE THAT INSTALLATIONS OF

NEW SYSTEMS ARE EXPEDITED, AND EXISTING SYSTEMS ARE KEPT IN SERVICE UNTIL THE

REPLACEMENT SYSTEM IS OPERATIONAL. IF FIRE PROTECTION SYSTEMS ARE TO BE

DISRUPTED, PROCEDURES SHALL BE INCORPORATED INTO THE DESIGN TO MAINTAIN

EQUIVALENT LEVELS OF FIRE PROTECTION AND PROVIDE FORMAL NOTIFICATION TO THE

FACILITY WHILE SYSTEMS ARE DOWN. FOR EXAMPLE, THE PROVISION OF A 24 HOUR FIRE

WATCH BY QUALIFIED INDIVIDUALS PROVIDED BY THE CONTRACTOR MAY PROVIDE AN

EQUIVALENT LEVEL OF FIRE PROTECTION DURING SYSTEM DISRUPTION IN SOME

CIRCUMSTANCES.

51. ACTIVATE FIRE PROTECTION AS IT IS INSTALLED .

52. FIRE ALARM SYSTEM INSTALLATION SHOULD BE COORDINATED AND PLACED IN SERVICE

PRIOR TO FINAL INSPECTION.

53. MEANS OF NOTIFICATION REQUIRED THROUGHOUT CONSTRUCTION AREAS (NFPA 241

REQUIREMENT)

54. TEMPORARY SYSTEM MAY BE DESIRED IF NEW SYSTEM CANNOT BE INSTALLED AS

CONSTRUCTION PROGRESSES ONCE INSTALLED, SYSTEM SHOULD BE ON EVEN IF PENDING

ACCEPTANCE.

55. EXISTING FA SYSTEM SHOULD ALWAYS STAY ONLINE FOR DURATION OF PROJECT UNLESS:

1. TEMP FA SYSTEM INSTALLED

2. FIRE WATCH IMPLEMENTED THIS ALLOWS BUILDING TO BE PROTECTED WHILE NEW

SYSTEM, DEVICES, WIRING, CONDUIT AND ALARM PANEL, ETC., IS INSTALLED.

56. FIRE ALARM LIFE SAFETY SYSTEM TO BE FURNISHED/INSTALLED BY THIS CONTRACTOR

SHALL BE MAINTAINED AS SOON AS REASONABLY PRACTICAL. COORDINATION WITH VA

FIRE MARSHAL IS REQUIRED.

FIRE ALARM GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ACQUISITION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT

GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Name Address City, State Zip Phone number Contact

W.J.B. Dorn VA Medical Center B10

Permanent Diesel Fire Pump

Acquisition Package

B

IM

/B

O w n e r

R e q u e s te d C h a n g e s /4

C E

C e n tr a l M o d e l.

rv t

/3 /2

:0

:4

P M

FA-001

FIRE DETECTION - LEGEND,

NOTES, AND DWG. INDEX

COLUMBIA, SC

544-22-130

BUILDING 10

05/03/22 JRC

BID SET

GAT

FIRE DETECTION - DRAWING INDEX

SHEET

NUMBER SHEET NAME

FA-001 FIRE DETECTION - LEGEND, NOTES, AND DWG. INDEX

FA-002 FIRE DETECTION - FIRE DETECTION DETAILS

FA-003 FIRE DETECTION - FIRESTOP DETAILS

FA-004 FIRE DETECTION - RISER DIAGRAMS AND I/O MATRIX

FA-200 FIRE DETECTION - BASEMENT SPACE RENOVATION PLAN

FA-201 FIRE DETECTION - FIRST FLOOR / FIRE PUMP

FA-202 FIRE DETECTION - FIRE PUMP LOCATION EXISTING CONDITIONS

FA-203 FIRE DETECTION - FIRST, SECOND AND THIRD FLOOR PART PLANS

Rev. No. Revisions: Date:

NTS

TO

NEXT

DEVICE

FROM

FCP

OR

PREVIOUS

DEVICE

DATA

OUT(+)

DATA

OUT(-)

DAT

A

IN(+)

DAT

A

IN(-)

34 2 1

ALARM/

ACTIVE

NORMAL

RED

LED

GRN

LED

SIGA-CT1

TB2

TB1

TYP.N.O.

INITIATING

DEVICE

EOL

47K

OHM

NTS

ALARM

HORN

JUNCTION

BOX

MOUNTING

PLATE

XENON

STROBE

ALARM LAMP

SINGLE INPUT MODULE 2

FIRE ALARM HORN/STROBE LIGHT

MOUNTING DETAIL 3

STANDARD C-CLAMP PIPE HANGER 5

NTS

DESIGN DATA FOR C-CLAMP HANGER

A

C R

1-1/8" or Bar Joist

6. Steel Beam

Ring

5. Adjustable Hanger

4. Hanger Rod

3. Lock Nut

2. Set Screw

1. C-Clamp

Components:

1/2-69 1/48

1/2-4 1/27 3/46

1/2-3 3/46 3/45

3/8-364

3/8-2 1/25 1/23

3/8-2 1/452 1/2

3/8-1 3/44 1/42

3/8-1 1/241 1/2

3/8-1 1/23 3/41 1/4

3/8-1 1/43 1/21

3/8-1 1/43 1/23/4

3/8-1 1/43 1/21/2

Diameter

Rod

Takeout

Hanger

A Dimension

Minimum

Size

Pipe

Nominal inchesinchesinches

NTS

MOUNTING

BASE

ASSY.

ADAPTER

STRAP

(PART OF BASE ASSY.)

4"X 4"X 2-1/8"

JUNCTION

BOX

NTS

6" MIN

80" MIN

AND

96" MAX

FINISHED FLOOR

CEILING

MANUAL FIRE

ALARM

STATION

5'-0" MAX

TYPICAL EXIT DOORWAY

48" MAX

42" MAX

4" MIN

12" MAX

20" MAX

WALL MOUNTED

HEAT

DETECTOR

WALL MOUNTED

SMOKE DETECTOR

TYPICAL SMOKE DETECTOR MOUNTING DETAIL 4

1MOUNTING HEIGHTS OF DEVICES

GENERAL DETAIL NOTES:

A. PARTICULAR ATTENTION SHALL BE GIVEN TO THE ALIGNMENT OF

DEVICES. WHEREVER DEVICES, ON THIS SHEET OR OTHER SHEETS,

ARE SHOWN AT GIVEN LOCATION WITH DIFFERENT MOUNTING HEIGHTS

THEY SHALL BE ALIGNED VERTICALLY (TO THE CENTER LINE). IF THEY

ARE SHOWN AT THE SAME MOUNTING HEIGHT THEY SHALL BE ALIGNED

HORIZONTALLY (TO THE TOP OF COVERPLATE). REFER TO THE

ARCHITECTURAL PLANS, ELEVATIONS AND DETAILS. COORDINATE

WITH ARCHITECT PRIOR TO ROUGH-IN.

B. ALL DIMENSIONS ARE TO THE CENTER LINE OF DEVICE UNLESS

INDICATED OTHERWISE.

C. MOUNTING HEIGHTS SHOWN HERE ARE TYPICAL. PRIOR TO ROUGH-IN,

COORDINATE WITH ARCHITECTURAL PLANS, ELEVATIONS, AND DETAILS.

IF A CONFLICT OCCURS, REQUEST CLARIFICATION FROM ARCHITECT/

ENGINEER PRIOR TO ROUGH-IN.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ACQUISITION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT

GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Name Address City, State Zip Phone number Contact

W.J.B. Dorn VA Medical Center B10

Permanent Diesel Fire Pump

Acquisition Package

B

IM

/B

O w n e r

R e q u e s te d C h a n g e s /4

C E

C e n tr a l M o d e l.

rv t

/3 /2

:0

:3

P M

FA-002

FIRE DETECTION - FIRE

DETECTION DETAILS

COLUMBIA, SC

544-22-130

BUILDING 10

05/03/22 JRC

BID SET

GATRev. No. Revisions: Date:

FIRE ALARM UL NOTES

1. REFER TO SECTION 078416 OF THE SPECIFICATIONS. FOR QUALITY CONTROL REQUIREMENTS, REFER

TO THE QUALITY CONTROL PORTION OF THE SPECIFICATION NOTED ABOVE.

2. DETAILS SHOWN ARE TYPICAL DETAILS, IF FIELD CONDITIONS DO NOT MATCH THE REQUIREMENTS OF THE TYPICAL DETAILS, APPROVED ALTERNATE DETAIL SHALL BE UTILIZED. FIELD CONDITIONS AND DIMENSIONS NEED TO BE VERIFIED FOR COMPLIANCE WITH THE DETAIL(S), INCLUDING BUT NOT

LIMITED TO THE FOLLOWING:

A. MINIMUM AND MAXIMUM WIDTH OF JOINTS.

B. TYPE AND THICKNESS OF FIRE-RATED CONSTRUCTION. THE MINIMUM ASSEMBLY RATING OF

THE FIRE STOP ASSEMBLY SHALL MEET OR EXCEED THE HIGHEST RATING OF ADJACENT

CONSTRUCTION.

3. IF ALTERNATE DETAILS MATCHING THE FIELD CONDITIONS ARE NOT AVAILABLE, MANUFACTURER'S

ENGINEERED JUDGEMENT DRAWINGS ARE ACCEPTABLE. DRAWINGS SHALL FOLLOW THE

INTERNATIONAL FIRESTOP COUNCIL (IFC) GUIDELINES FOR EVALUATING FIRESTOP SYSTEM

ENGINEERED JUDGEMENT AND THE ENGINEERED JUDGEMENT MUST BE SUBMITTED TO THE VA COR

AND ENGINEER FOR REVIEW AND COMMENT PRIOR TO ITS USE.

4. REFERENCES:

A. 2013 UNDERWRITER'S LABORATORIES FIRE RESISTANCE DIRECTORY, VOLUME 2

B. NFPA 101, LIFE SAFETY CODE, 2021 EDITION

C. ALL GOVERNING LOCAL AND VA FIRE PROTECTION DESIGN MANUAL

5. FIRESTOP SYSTEM MUST MEET THE REQUIREMENTS OF ASTM E-814 (UL 1479) TESTED ASSEMBLIES

THAT PROVIDE A FIRE RATING EQUAL TO THAT OF THE CONSTRUCTION BEING PENETRATED.

6. ALL RATED THROUGH-PENETRATION SHALL BE PROMINENTLY LABELED WITH THE FOLLOWING

INFORMATION.

A. ATTENTION: FIRE RATED ASSEMBLY

B. UL SYSTEM #

C. PRODUCT(S) USED

D. HOURLY RATING (F-RATING)

E. INSTALLATION DATE

NOT TO SCALE

THROUGH PENETRATION FIRESTOP SYSTEM

(PROVIDE UL LISTED SYSTEM)

A

A

Section A-A

1. RATED WALL OR FLOOR ASSEMBLY - PROVIDE FIRE STOPPING ASSEMBLY FOR PARTITION

TYPE & RATING ENCOUNTERED.

2. THROUGH PENETRATION - PROVIDE FIRE STOPPING ASSEMBLY FOR SIZE & MATERIAL OF

THROUGH PENETRATION UTILIZED.

3. FIRE STOPPING MATERIAL - PROVIDE FIRE STOPPING MATERIAL FOR WALL ASSEMBLY &

THROUGH PENETRATION MATERIAL ENCOUNTERED. FILL VOIDS OR CAVITY ACCORDING TO

THE REQUIREMENTS OF THE FIRE STOPPING SYSTEM UTILIZED.

ALL RATED WALLS, PARTITIONS OR FLOORS SHALL BE PROVIDED WITH A UL LISTED FIRE

STOP SYSTEM. THE SYSTEM UTILIZED SHALL MATCH THE SEPARATION PENETRATED AND THE

THROUGH PENETRATION MATERIAL.

DETAILS FOR THE INSTALLATION OF SYSTEM TYPE UTILIZED SHALL BE AVAILABLE AT THE

PROJECT SITE FOR THE DURATION OF CONSTRUCTION AND SHALL BE PROVIDED TO THE

BUILDING OWNER AT THE PROJECT COMPLETION.

PROVIDE WALL OR FLOOR LABLES INDICATING THE SYSTEM MANUFACTURER AND UL LISTED

ASSEMBLY NUMBER AT EACH LOCATION WHERE THE FIRE STOPPING SYSTEM IS INSTALLED.

PIPE SLEEVE THROUGH WALL DETAIL

NTS

PIPE

NOTES:

1. FOR INTERIOR WALLS

AND BELOW GRADE

GROUND TO GROUND

WALLS

CUT OPENING IN

EXISTING MASONRY

WALL LARGER THAN

SLEEVE AND FORM &

FILL WITH

EXPANSIVE

TYPE GROUT

FIRE

RESISTANT

SILICONE FOAM

SEALER

ESCUTCHEON PLATE

ON ONE OR BOTH

SIDES WHERE PIPING

IS EXPOSED

PIPE SLEEVE

EXISTING POURED

CONCRETE OR

C.M.U. WALL.

ANCHOR

LUGS

(MIN. 3 REQ'D)

PIPE

INSULATION

(WHERE REQ'D)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ACQUISITION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT

GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Name Address City, State Zip Phone number Contact

W.J.B. Dorn VA Medical Center B10

Permanent Diesel Fire Pump

Acquisition Package

B

IM

/B

O w n e r

R e q u e s te d C h a n g e s /4

C E

C e n tr a l M o d e l.

rv t

/3 /2

:0

:2

P M

FA-003

FIRE DETECTION - FIRESTOP

DETAILS

COLUMBIA, SC

544-22-130

BUILDING 10

05/03/22 JRC

FIRE DETECTION INPUT/OUTPUT MATRIX 2

NOTES:

1. DEVICES SHOWN ARE TYPICAL. REFER TO FIRE DETECTION SHEETS FOR DEVICE LOCATIONS AND QUANTITIES.

2. PROVIDE END OF LINE RESISTORS AS REQUIRED.

3. ANNUNCIATION SHALL BE THREE TEMPORAL BEEPS.

4. DUCT SMOKE DETECTORS AND DAMPERS SHALL BE PROVIDED AND WIRED TO FACP AND POWER BY ELECTRICAL CONTRACTOR. MECHANICAL CONTRACTOR SHALL

INSTALL THEM.

5. FOR LARGER DUCTS, PROVIDE ADDITIONAL DUCT DETECTORS AS REQUIRED BY NFPA 72.

6. EQUIPMENT MUST BE COMPATIBLE WITH THE FIRE ALARM CONTROL PANEL SOFTWARE.

NTS

A U

D

IB

L E

A L A

R M

S A

C T

IV

A

T

IO

N

AREA SMOKE DETECTOR - FIRST FLOOR

AREA SMOKE DETECTOR - SECOND FLOOR

A

SYSTEM INPUTS

SYSTEM

OUTPUTS

D

IS

P L A

Y A

L A

R M

S

IG

N A

L

D

IS

P L A

Y S

U P

E R

V

IS

O R

Y S

IG

N

A L

D

IS

P L A

Y T

R O

U B

L E

S

IG

N A

L

T R

A N

S M

IT

S

U P

E R

V

IS

O R

Y S

IG

N

A L

T O

S U

P E

R V

IS

O

R Y

S T

A T

IO

N

T R

A N

S M

IT

T

R O

U B

L E

S

IG

N A

L

S U

P E

R V

IS

O

R Y

S T

A T

IO

N

T R

A N

S M

IT

A

L A

R M

S

IG

N A

L

P E

R V

IS

O

R Y

S T

A T

IO

N

C L O

S E

D A

M P

E R

S O

N F

A N

S P

R O

X

IM

A

E

D E

T E

C T

O R

R E

C O

R D

S E

V E

N T

A T

F A

C P

S O

U N

D S

G E

N E

R A

L B

U

IL

D

IN

G A

L A

R M

S H

U T

D O

W N

A

IR

H A

N D

L E

R S

E R

V E

D B

Y

D

T E

C T

O R

AREA SMOKE DETECTOR - THIRD FLOOR

DUCT SMOKE DETECTOR - FIRST FLOOR

DUCT SMOKE DETECTOR - ATTIC LEVEL

DOOR RELEASE SMOKE DETECTOR18

B C

DRY PIPE VALVE ROOM TEMPERATURE ALARM

FIRE SPRINKLER WATER FLOW/PRESSURE SWITCH

FIRE ALARM AC POWER FAILURE

FIRE ALARM LOW BATTERY

FIRE ALARM OPEN CIRCUIT

FIRE ALARM GROUND FAULT

MANUAL PULL BOXES - BASEMENT

MANUAL PULL BOXES - FIRST FLOOR

MANUAL PULL BOXES - SECOND FLOOR

MANUAL PULL BOXES - THIRD FLOOR

MANUAL PULL BOXES - ATTIC

WATER CONTROL VALVE TAMPER SWITCH6

7 HIGH/LOW PRESSURE DRY-PIPE SPRINKLER SYSTEM

IN

IT

IA

T

E E

L E

V A

T O

R S

H U

T T

R

IP

A N

IS

C O

N N

E C

T E

L E

V A

T O

R P

O W

E R

E L E

V A

T O

R R

E C

A L L

ELEVATOR LOBBY SMOKE DETECTORS

ELEVATOR INTERFACE CIRCUIT SUPERVISORY

A B C D E F G H I J K L M

FIRE ALARM SEQUENCE OF OPERATION

THE FIRE ALARM NOTIFICATION SYSTEM SHALL GO INTO ALARM UPON ACTIVATION OF A MANUAL PULL STATION, AREA SMOKE DETECTOR, OR FLOW SWITCH. THE ALARM SHALL BE DISPLAYED BY AUDIBLE AND VISUAL NOTIFICATION APPLIANCES. THE ELEVATOR(S) SHALL BE RECALLED UPON ACTIVATION THE EACH INDEPENDENT FLOOR ELEVATOR LOBBY SMOKE DETECTOR AND THE AIR HANDLING UNITS SHALL BE SHUT DOWN UPON ACTIVATION OF AIR HANDLER(S) DUCT SMOKE DETECTOR. THE FIRE ALARM SYSTEM SHALL DISPLAY A TROUBLE CONDITION UNDER LOSS OF POWER, OR IF A SMOKE DETECTOR IS REMOVED FROM THE BASE. THE FIRE ALARM SYSTEM SHALL DISPLAY A

SUPERVISORY CONDITION UPON ACTIVATION OF A TAMPER SWITCH OR DUCT SMOKE DETECTOR.

O P

E N

S L

O C

K E

D E

G R

E S

S D

O O

R S

F

L O

O R

O F

F

IR

E O

R

IG

IN

N

FIRE EXTINGUISHER MONITORING SYSTEM

D E F G H I J K L M N

7. ALL NOTIFICATIONS TO THE FIRE DEPARTMENT SHALL OCCUR BY THE EMERGENCY COMMUNICATION CENTER AT THE MAIN HOSPITAL, BUILDING 100; WHERE, THIS BUILDING'S FIRE ALARM CONTROL PANEL SHALL REPORT ALL ALARM INDICATION.

R E

C A

L L E

L E

V A

T O

R S

T O

P R

IM

A

R Y

C

A L L F

L O

O R

O

R E

C A

L L E

L E

V A

T O

R S

T O

A L T

E R

N A

C

A L L F

L O

O R

P

O P

ELEVATOR LOBBY SMOKE DETECTOR - 1ST FLR23

C L O

S E

A S

S O

C

IA

T E

S M

O K

E B

A R

R

IE

R D

O

T H

E F

L O

O R

Q

Q

FIRE PUMP RUNNING

FIRE PUMP FAILURE - PHASE REVERSAL

DOUBLE CHECK VALVE TAMPER SWITCH

27 FIRE PUMP HOUSE TEMPERATURE ALARM

28 POST INDICATOR VALVE TAMPER SWITCH

29 ELEVATOR LOBBY SMOKE DETECTOR - 1ST 2ND,

3RD AND ATTIC/ROOF LEVELS

HEAT TRACE LOSS OF CONTROL POWER

F

IR

E

A L R

M H

E A

T T

R A

C E

S U

P E

R V

IS

P

E R

V

IS

IO

N

R

R

HEAT TRACE LOSS OF CURRENT

HEAT TRACE LOW INDUCED VOLTAGE

HEAT TRACE HIGH/LOW TEMPERATURE INDICATION

HEAT TRACE SWITCH FAILURE

FIRE PUMP - FAILURE TO START

FIRE PUMP - CONTROLLER OFF OR IN MANUAL

POSITION

TS WF DD

CD CD CD

BUILDING B10

ADDRESSABLE

FIRE ALARM

CONTROL PANEL

EVAC DACT

EVAC

BATT

M M M M

M M M M

RI

P

CM CM CD CM

CD CD CD CM

P

EXISTING

FIRST

FLOOR

BASEMENT

CONDUCTORS PER MANUFACTURER'S

PUBLISHED RECOMMENDATIONS IN

3/4" C MINIMUM TYPICAL

NEW MAIN FIRE ALARM

CONTROL PANEL / VOICE

COMMUNICATOR PANEL TO

BE INTERFACED WITH

SPEAKER / STROBES, SMOKE

DETECTORS,

STROBES, ETC.

DIGITAL VOICE COMMAND

(DV) FOR FIRE / VOICE TO

BE LOCATED IN THE

VESTIBULE AREA OF

BUILDING, B10

TO BE LOCATED WITHIN

THE COMMUNICATION

ROOM WITH ROOM

DESIGNATION "T103."

VOIP

VOIP

POWER CONNECTOR

POWER CONNECTOR

BUILDING 100, ROOM LA104

EMERGENCY COMMAND

CENTER / TELEPHONE

OPERATOR STATION

UNDERGROUND CLASS X

CIRCUIT AND PATHWAY

NETWORK

BUILDING B10, FIRE ALARM NETWORK

FIRE DETECTION AND FIRE EXTINGUISHER MONITORING RISER DIAGRAM

1NTS

EXISTING

FIRST

FLOOR

EVM EVM EVM EVM EVM

ADDRESSABLE

FIRE EXTINGUISHER

MONITORING PANEL

POWER CONNECTOR

ADDRESSABLE

FACP

FURNISHED / INSTALLED BY THIS CONTRACTOR

INCLUDING ALL INTERFACES BETWEEN THE

BUILDING, B10 FIRE / DIGITAL VOICE PANEL AND

MAIN HOSPITAL, BUILDING 100 FIRE / DIGITAL

VOICE PANEL.

EXISTING NOTIFIER

FIRE / DIGITAL VOICE

PANEL MODEL NFS2-3030

PROGRAMMING / UPDATES FOR REMOTE MONITORING

OF BUILDING, B10 FIRE / DIGITAL VOICE PANEL BY THIS

CONTRACTOR AT THE MAIN HOSPITAL, BUILDING 100,

EMERGENCY COMMUNICATION SYSTEM, FIRE DIGITAL

VOICE ALARM PANEL

M M M M

CD CD CD CM

SECOND

FLOOR

M M M M

CD CD CD CM

THIRD

FLOOR

M M M M

CD CD CD CM

ATTIC

EXISTING

EVM EVM EVM

EVM EVM EVM

EVM EVM EVM

EVM EVM EVM EVM

SECOND

FLOOR

BASEMENT

THIRD

FLOOR

ATTIC

REFER TO TELECOMMUNICATION DRAWINGS

FOR ALL NETWORKING BETWEEN BUILDING 10

DACT AND BUILDING 100, EMERGENCY

COMMUNICATION CENTER'S FIRE ALARM

CONTROL PANEL/INTERFACE POINT

(ABOVEGROUND AND BELOWGROUND

INSTALLATIONS).

GAP

BATT

POWER CONNECTOR

GRAPHIC ANNUNCIATOR

PANEL TO BE LOCATED AT THE

FRONT VESTIBULE.

CLASS B CIRCUIT AND

PATHWAY, REFER TO NFPA 72.

CLASS B CIRCUIT AND PATHWAY, REFER TO NFPA 72

(TYPICAL).

CLASS B CIRCUIT AND

PATHWAY, REFER TO

NFPA 72.

CLASS X CIRCUIT AND PATHWAY,

REFER TO NFPA 72.

NOTE:

1. ALL INITIATING DEVICES (IDC), SIGNALING LINE CIRCUITS (SLC) AND NOTIFICATION APPLIANCE CIRCUITS SHALL BE A CLASS B

CIRCUIT AND PATHWAY CIRCUIT INTERFACE BETWEEN THE INDIVIDUAL DEVICES AND THE ADDRESSABLE FACP.

2. CLASS X CIRCUIT AND PATHWAY BETWEEN THE ADDRESSABLE FIRE EXTINGUISHER MONITORING PANEL AND THE ADDRESSABLE

FIRE ALARM SYSTEM PANEL WITHIN BUILDING 10.

3. CLASS X CIRCUIT AND PATHWAY CIRCUITS BETWEEN BUILDING 10 ADDRESSABLE FIRE ALARM CONTROL PANEL AND BUILDING 100, EMERGENCY COMMUNICATION CENTER'S FIRE ALARM CONTROL PANEL.

4. PATHWAY SURVIVABILITY BETWEEN THE GRAPHIC ANNUNCIATOR PANEL AND THE FIRE EXTINGUISHER MONITORING AND

INTERFACE WITH THE ADDRESSABLE FIRE ALARM CONTROL SYSTEM SHALL MEET THE REQUIREMENTS STATED IN DIVISION 28 SPECIFICATION AND NFPA 72, E.G., SPECIFICALLY MONITORING FOR INTEGRITY AND CIRCUIT PERFORMANCE.

FIRE PUMP FIRE

ALARM TERMIANL

CABINET

CLASS X CIRCUIT AND

PATHWAY, REFER TO NFPA 72.

CLASS X CIRCUIT AND

PATHWAY, REFER TO NFPA 72.

EVM NEW EXTERIOR

FIRE PUMP HOUSE

EXISTING

M

CD

M

CD

EXTERIOR

FIRE PUMP

NEW

HEAT TRACE DIGITAL ELECTRONIC

CONTROLLER (PROPOSED

LOCATION BASEMENT MECHANICAL

EQUIPMENT ROOM)

TS WF

NEW

M

EVM

FIRE ALARM GENERAL NOTES AND REQUIREMENTS:

A. THE FIRE EXTINGUISHER MONITORING SYSTEM SHALL HAVE THE CAPABILITY TO

MONITOR INDIVIDUAL HAND PORTABLE FIRE EXTINGUISHERS FOR PRESENCE, OFF

NORMAL PRESSURE, LOSS OF MONITORING SYSTEM INTERFACE POWER AND ANY

OBSTRUCTION THAT COULD POSSIBLY BLOCK ACCESS TO EACH INDIVIDUAL

PORTABLE EXTINGUISHER.

B. REFER TO TELECOMMUNICATION DRAWINGS Ts003, ts002 AND TS003 FOR ALL

INTERFACED BETWEEN THE FIRE ALARM CONTROL SYSTEM DIGITAL TRANSMITTER

(DACT) AT THE NEW BUILDING B10 FIRE ALARM CONTROL PANEL AND THE MAIN FIRE

ALARM CONTROL PANEL LOCATED IN BUILDING 100 EMERGENCY COMMUNICATION

CENTER. THE FIBER OPTICS INSTALLATIONS SHOWN ON THE TELECOMMUNICATION

DRAWINGS INCLUDE ABOVE GROUND AND BELOW GROUND NETWORK

INSTALLATIONS.

C. THE MAIN FIRE ALARM CONTROL PANEL LOCATED IN BUILDING 100 EMERGENCY

COMMUNICATION CENTER SERVES AT THE 24-HOUR MANNED LOCATION FOR

MONITORING OF THE VA CAMPUS. BUILDING 100 EMERGENCY COMMUNICATION

CENTER’S FIRE ALARM CONTROL PANEL SHALL NOT NOTIFY THE COLUMBIA, SOUTH

CAROLINA FIRE DEPARTMENT, AS INDICATED THIS IS THE VA COLUMBIA, EMERGENCY

COMMUNICATION CENTER’S RESPONSIBILITY. BUILDING B10, FIRE ALARM CONTROL

PANEL SHALL NOT UNDER ANY CIRCUMSTANCES SEND SIGNALS FROM THE BUILDING

B10 TO THE COLUMBIA, SOUTH CAROLINA FIRE DEPARTMENT.

D. THE MAIN FIRE ALARM CONTROL PANEL LOCATED AT BUILDING 100 SHALL RECEIVE

SPECIFIC INPUTS FROM BUILDING B10 FIRE ALARM CONTROL PANEL FOR ALARM,

TROUBLE AND SUPERVISORY INDICATION. THE INPUTS RECEIVED FROM THE

BUILDING B10FIRE ALARM CONTROL PANEL SHALL PROVIDE THE LOCATION, DEVICE,

FLOOR/ROOM AND AREA OF WHERE THE ALARM INDICATION HAS OCCURRED WITHIN

BUILDING B10.

E. THE REQUIRED FORMAT FOR ALARM, TROUBLE AND SUPERVISORY THAT ACTIVATES

AT BUILDING B10 LOCAL FIRE ALARM CONTROL PANEL SHALL BE TRANSMITTED TO

BUILDING 100, EMERGENCY COMMUNICATION CENTER’S MAIN FIRE ALARM CONTROL

PANEL. THE SIGNAL FORMAT AT BUILDING B10 FIRE ALARM CONTROL PANEL / MODEM

COMMUNICATOR SHALL BE COMPATIBLE WITH THE EXISTING FIRE ALARM CONTROL

PANEL LOCATED AT BUILDING 100, EMERGENCY COMMUNICATION CENTER’S FIRE

ALARM CONTROL PANEL IS A PROJECT SCOPE OF WORK REQUIREMENT. BOTH FIRE

ALARM CONTROL PANEL S SHALL BE ABLE TO TRANSMIT AND RECEIPT OF SIGNALS

BOTH WAYS, E.G., MULTIMODE COMMUNICATION AND BE 100% COMPATIBLE.

F. A SINGLE FAULT ON A PATHWAY CONNECTED TO THE ADDRESSABLE DEVICE SHALL

NOT CAUSE THE LOSS OF DEVICES IN MORE THAN ONE ZONE/FLOOR (NFPA 72,

PARAGRAPH 23.6.1.1). FOR PURPOSES ON THIS PROJECT, EACH FLOOR OF THE

BUILDING SHALL BE CONSIDERED A SEPARATE ZONE [NFPA 72, PARAGRAPH 23.6.1.1].

FIRE ALARM GENERAL NOTES AND REQUIREMENTS CONTINUED:

E. THE REQUIRED FORMAT FOR ALARM, TROUBLE AND SUPERVISORY THAT ACTIVATES AT BUILDING B10 LOCAL FIRE ALARM CONTROL PANEL SHALL BE TRANSMITTED TO BUILDING 100, EMERGENCY COMMUNICATION CENTER’S MAIN FIRE ALARM CONTROL PANEL. THE SIGNAL FORMAT AT BUILDING

B10 FIRE ALARM CONTROL PANEL / MODEM COMMUNICATOR SHALL BE COMPATIBLE WITH THE

EXISTING FIRE ALARM CONTROL PANEL LOCATED AT BUILDING 100, EMERGENCY COMMUNICATION CENTER’S FIRE ALARM CONTROL PANEL IS A PROJECT SCOPE OF WORK REQUIREMENT. BOTH FIRE ALARM CONTROL PANEL S SHALL BE ABLE TO TRANSMIT AND RECEIPT OF SIGNALS BOTH WAYS, E.G., MULTIMODE COMMUNICATION AND BE 100% COMPATIBLE.

F. A SINGLE FAULT ON A PATHWAY CONNECTED TO THE ADDRESSABLE DEVICE SHALL NOT CAUSE THE LOSS OF DEVICES IN MORE THAN ONE ZONE/FLOOR (NFPA 72, PARAGRAPH 23.6.1.1). FOR PURPOSES ON THIS PROJECT, EACH FLOOR OF THE BUILDING SHALL BE CONSIDERED A SEPARATE ZONE [NFPA

72, PARAGRAPH 23.6.1.1].

G. REFER TO DIVISION 28 SPECIFICATIONS AND FA-001 FOR CIRCUIT AND PATHWAY REQUIREMENTS

FOR THIS SCOPE OF WORK BETWEEN THE NEW REHABILITATION CENTER'S AND THE MAIN FIRE

ALARM CONTROL PANE AS WELL AS INITIATING DEVICE CIRCUITS (IDCS), SIGNALING LINE CIRCUITS (SLCS) AND NOTIFICATION APPLIANCE CIRCUITS (NACS) BETWEEN BUILDING B10 INDIVIDUAL FIRE

ALARM DEVICES AND THIS BUILDING'S ADDRESSABLE FIRE ALARM CONTROL PANEL (FACP).

H. REFER TO THE INPUT/OUTPUT MATRIX FOR ALL SIGNAL INPUTS TO BE RECEIVED AT BUILDING B10 NEW LOCAL FIRE ALARM CONTROL PANEL AND THE MAIN FIRE ALARM CONTROL PANEL AT BUILDING

100, EMERGENCY COMMUNICATION CENTER’S HAS DIRECT RESPONSIBILITY FOR THE 24-HOUR

MANNED LOCATION FOR ALARM MONITORING PURPOSES TO MEET NFPA 72 REQUIREMENTS.

ELEVATOR MANUFACTURER WRITTEN ELEVATOR SMOKE DETECTION REQUIREMENTS:

A. FOR EACH ELEVATOR PROVIDE A NORMALLY CLOSED CONTRACT REPRESENTING THE SMOKE

DETECTOR AT THE DESIGNATED RETURN LANDING.

B. REQUIREMENTS FOR INTERMITTENTLY ILLUMINATING FIRE HAT VISUAL SIGNAL IN THE CAR

OPERATING WITH EITHER (B) OR (C) BELOW:

C. FOR A SINGLE UNIT OR FOR A GROUP OF ELEVATORS HAVING ONE COMMON MACHINE

ROOM/MACHINE SPACE AND ONE COMMON HOISTWAY, PROVIDE ONE ADDITIONAL NORMALLY

CLOSED CONTACT REPRESENTING THE MACHINE ROOM/MACHINE SPACE AND HOISTWAY SMOKE

DETECTORS.

D. IF THE GROUP CONTAINS MORE THAN ONE HOISTWAY AND HOISTWAY SMOKE DETECTORS ARE

INSTALLED, PROVIDE ONE NORMALLY CLOSE CONTACT FOR EACH ELEVATOR. THE CONTACT IS TO

REPRESENT THE SMOKE DETECTOR IN THE MACHINE SPACE FOR THAT PARTICULAR ELEVATOR,

AND ANY SMOKE DETECTOR IN THE HOISTWAY CONTAINING THAT PARTICULAR ELEVATOR.

E. FIRE SUPPRESSION (E.G., SPRINKLER PROTECTION) SHALL BE FURNISHED/INSTALLED IN THE

HOISTWAY AND ELEVATOR MACHINE ROOM / MACHINE SPACE(S) AN AUTOMATIC MEANS TO

DISCONNECT THE MAINLINE POWER SUPPLY TO THE AFFECTED ELEVATOR AND ANY OTHER POWER

SUPPLIES USED TO MOVE THE ELEVATOR, UPON OR PRIOR TO THE APPLICATION OF WATER IS

REQUIRED. SMOKE DETECTORS SHALL NOT BE USED TO ACTIVATE FIRE SUPPRESSION (E.G.,

SPRINKLER PROTECTION) IN THE HOISTWAYS OR MACHINE ROOMS / MACHINE SPACE OR TO

DISCONNECT THE MAIN POWER LINE.

DEFINITIONS:

A. ACTIVE COMMUNICATION: REFERS TO A METHOD OF SIGNAL TRANSMISSION TO A 24-

HOUR MANNED EMERGENCY COMMUNICATION CENTER IN WHICH COMMUNICATION

BETWEEN THE PROTECTED PREMISE FIRE ALARM COMMUNICATOR AND THE STATION

RECEIVER IS CONTINUOUSLY SUPERVISED. LOSS OF COMMUNICATION WILL RESULT IN

A TROUBLE CONDITION AT BOTH THE COMMUNICATOR AND THE RECEIVER AND WILL

TRIGGER A PREDETERMINED RESPONSE BY PERSONNEL AT THE 24-HOUR MANNED

MONITORING STATION.

B. ALARM VERIFICATION: A METHOD BY WHICH AS ALARM (OR SUPERVISORY) EVENT

MUST UNDERGO ANOTHER PROCESS IN ORDER TO CONFIRM AN ACTUAL CONDITION

EXISTS WHICH REQUIRES THE ACTIVATION OF AN OUTPUT DEVICE. THIS MAY INCLUDE

THE REQUIREMENT FOR ANOTHER INDEPENDENT DEVICE MONITORING THE SAME

PROTECTED AREA TO ENTER AN ALARM STATE. IT MAY ALSO INVOLVE PROGRAMMING

SOFTWARE OR FIRMWARE THAT REQUIRES ONE EVENT TRIGGER TO FOLLOW

ANOTHER WITHIN A SPECIFIED AND USUALLY PROGRAMMABLE TIMEFRAME.

C. DIGITAL ALARM COMMUNICATOR TRANSMITTER (DACT): A SYSTEM COMPONENT AT

THE PROTECTED PREMISE FIRE ALARM CONTROL PANEL (E.G., NEW REHABILITATION

BUILDING) TO WHICH INITIATING DEVICES, SIGNALING LINE CIRCUIT AND NOTIFICATION

APPLIANCE CIRCUITS ARE CONNECTED. THE DACT SEIZES THE CONNECTED

TELEPHONE LINE OR OTHER TRANSMISSION MEDIA, DIALS A PRESELECTED NUMBER

TO CONNECT TO A DACR, AND TRANSMIT SIGNALS INDICATING A STATUS CHANGE OF

THE LOCAL FIRE ALARM DEVICE.

D. DIGITAL ALARM COMMUNICATOR RECEIVER (DACR): A SYSTEM COMPONENT THAT

ACCEPTS AND DISPLAYS SIGNAL FROM THE DIGITAL ALARM COMMUNICATOR

TRANSMITTER (DACT) LOCATED AT A PROTECTED PREMISE THROUGH THE PUBLIC-

SWITCH TELEPHONE NETWORK OR A DIGITAL ALARM COMMUNICATOR RECEIVER

(DACR).

E. DIGITAL COMMUNICATOR: THIS IS AN OUTPUT DEVICE UTILIZE BY THE FIRE ALARM

SYSTEM TO COMMUNICATE ALARM, TROUBLE OR SUPERVISORY SIGNAL TO A 24-HOUR

MANNED EMERGENCY COMMUNICATION CENTER. IT USED THE PREMISE NORMAL

TELEPHONE LINE OR OTHER COMMUNICATION MEDIA TO TRANSMIT THE SIGNAL AT

THE NEW REHABILITATION BUILDING FOR ACTION BY THE MAIN HOSPITAL'S

EMERGENCY COMMUNICATION CENTER.

F. ABBREVIATION EVM MEANS FIRE EXTINGUISHER STATION MODULE.

G. CLASS B CIRCUIT AND PATHWAY: REFER TO NFPA 72, SECTION 12.3 FOR DEFINITION

AND REQUIREMENT OF PATHWAY DESIGNATION.

H. CLASS X CIRCUIT AND PATHWAY: REFER TO NFPA 72, SECTION 12.3 FOR DEFINITION

AND REQUIREMENTS OF THE PATHWAY DESIGNATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ACQUISITION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT

GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Name Address City, State Zip Phone number Contact

W.J.B. Dorn VA Medical Center B10

Permanent Diesel Fire Pump

Acquisition Package

B

IM

/B

O w n e r

R e q u e s te d C h a n g e s /4

C E

C e n tr a l M o d e l.

rv t

/3 /2

:0

:0

P M

FA-004

FIRE DETECTION - RISER

DIAGRAMS AND I/O MATRIX

COLUMBIA, SC

544-22-130

BUILDING 10

05/03/22 JRC

CG CG

CGCG

CG CG

CG

CG

CG CG

CG CG

CG

CG

CG

CG

CG

CG CG CG

CG

CG

CG

CG CG

CG

CG

CG CG CG

CG

CG

CG

CG CG CG

CG

CG

CG

CG

CG

CG CG

CG

CG

CG

CG

CG

CG

CG CG

CG

CG

CG

CG CG CG

CG

CG

CG

CG

CG

CG

CGCG

CG

CG CG

CG

CG

CG

CG CG

CG CG

CG

CG

CG

CG

CGCG

CG

CGCG

CG

CG CG CG

CG

CGCG

CG

CG CG

CG

CG

CG

CG

CG

CG

CG

CG

CG CG

CG

CG

CG

CG

CG

CG

CG CG

CG

CG

CG

TS

MM

TS

TS

TS

TS

WF

TS TS

F A

C P

TS

TS

2 HOUR FIRE RESISTIVE CONSTRUCTION & SMOKE BARRIER

2 HOUR FIRE RESISTIVE CONSTRUCTION

1 HOUR FIRE RESISTIVE CONSTRUCTION & SMOKE BARRIER

1 HOUR FIRE RESISTIVE CONSTRUCTION

SMOKE TIGHT PARTITION (BUT NOT SMOKE RATED.)

WALL RATING LEGEND:

FIRE EXTINGUISHER SCHEDULE

FIRE EXTINGUISHER, 20 LB (40B:C) CARBON DIOXIDE FOR

FIRE PUMP ROOMFE3

CONTRACTOR SHALL PROVIDE FIRE ALARM TERMINAL CABINET

THAT SHALL INTERFACE ALL TAMPER/WATER FLOW SWITCHES,

FIRE PUMP MONITORING DEVICES AND THE FIRE EXTINGUISHER

MONITORING SYSTEM. THIS FIRE ALARM TERMINAL CABINET

SHALL BE NETWORKED WITH THE LOCAL FIRE ALARM CONTROL

PANEL LOCATED ON THE FIRST FLOOR OF BUILDING B10. THIS

SCOPE OF WORK SHALL INCLUDE ALL EQUIPMENT AND

PROGRAMING AT THE LOCAL FIRE ALARM CONTROL PANEL WITHIN

THE FIRE PUMP HOUSE, LOCAL FIRE ALARM CONTROL PANEL AT

BUILDING B10 AND THE MAIN FIRE ALARM CONTROL PANEL

LOCATED WITHIN BUILDING 100, EMERGENCY COMMUNICATION

CENTER. THE DESIGN BASIS FOR THE FIRE ALARM TERMINAL

CABINET WOULD BE EQUAL TO ACER BOX IF SERIES FIRE ALARM

TERMINAL CABINET, PART NUMBER SSU00660, 32 TERMINATION

POINTS, SIZE 14" X 14" X 3-1/4" WITH KEY LOCK.

FIRE EXTINGUISHER MONITORING SYSTEM WIRING/CABLING;

ROUTE CABLING FROM THE FIRE PUMP HOUSE TO ADDRESSABLE

FIRE EXTINGUISHER MONITORING PANEL LOCATED ON THE FIRST

FLOOR OF BUILDING B10.

FIRE DETECTION SHALL NOT BE REQUIRED IN HOISTWAYS OF

TRACTION ELEVATORS COMPLYING WITH THE REQUIREMENTS OF

NFPA 13, SECTION 9.3.6.3 AND THE REQUIREMENTS OF NFPA 72,

SECTION 21.4

EXTERIOR SPEAKER-STROBE TO BE WEATHER PROOF MEETING

NEMA 4 X REQUIREMENTS.

TEMPORARY FIRE PUMP LOCATION; FINAL LOCATION TO BE

COORDINATED WITH THE VA COR.

FIRE ALARM CONTROL PANEL

KEYED NOTES

GENERAL NOTES

A. REFER TO DRAWING FA-001 FOR FIRE ALARM GENERAL NOTES,

ABBREVIATIONS AND SYMBOLS.

B. REFER TO DRAWING FA-001 FOR TEMPORARY FIRE ALARM, FIRE

EXTINGUISHER AND FIRE SUPPRESSION REQUIREMENTS DURING AN

IMPAIRMENT TO EXISTING SYSTEM INSTALLED UNDER A PRIOR

PROJECT PHASE.

C. REFER TO FA-004 FOR FIRE ALARM INPUT / OUTPUT MATRIX. ALL NEW

TAMPER SWITCHES SHALL BE INTERFACED WITH THE FIRE ALARM

SYSTEM AT BOTH BUILDING B10, LOCAL FIRE ALARM CONTROL PANEL

AND BUILDING 100, EMERGENCY COMMUNICATION CENTER'S MAIN

FIRE ALARM CONTROL PANEL.

D. REFER TO DRAWING FX-004 FOR IMPAIRMENT AND TEMPORARY FIRE

ALARM/DETECTION AND FIRE SUPPRESSION REQUIREMENTS.

THE INFORMATION GIVEN HEREIN IS AS EXACT AS COULD BE

SECURED FOR BIDDING PURPOSES AND ITS ACCURACY IS NOT

GUARANTEED. THE FIRE ALARM CONTRACTOR IS RESPONSIBLE FOR

EXAMINING NEW JOB CONDITIONS AND VERIFYING ALL

MEASUREMENTS, DISTANCES, ELEVATIONS, CLEARANCES, PIPE

SIZES, ETC., BEFORE STARTING THE DEMOLITION OR NEW WORK.

E. THE DRAWING SHALL NOT BE SCALED FOR CONSTRUCTION

PURPOSES. THE SCALE WHEN INDICATED FOR GENERAL REFERENCE

ONLY.

F. ALL VALVES CONTROLLING FIRE PROTECTION EQUIPMENT AND FIRE

PROTECTION MAINS SHALL BE PROVIDED WITH A

TAMPER/SUPERVISORY SWITCHES WIRED TO THE FIRE ALARM

CONTROL PANEL.

G. EXACT LOCATIONS AND QUANTITIES OF WATERFLOW AND TAMPER

SWITCHES SHALL BE VERIFIED BY THE CONTRACTOR. ALL FIRE

SPRINKLER SYSTEM SHALL HAVE THESE DEVICES, CONTRACTOR

PRICING SHALL INCLUDE CONNECTION OF THESE DEVICES WHETHER

SHOWN OR LOCATED ON THE DESIGN DOCUMENT DRAWINGS.

H. FIRE DETECTION CONTRACTOR SHALL PROVIDE COVERAGE ABOVE

AND BELOW ALL OBSTRUCTIONS COMPLYING WITH NFPA 72.

I. FIRE ALARM SYSTEM WIRING/CABLING WITHIN THE FIRE PUMP HOUSE

AND TO/FROM TO/FROM THE EXTERIOR FIRE PUMP HOUSE TO

BUILDING B10, LOCAL FIRE ALARM CONTROL PANEL IS A NOTIFIER

FIRE ALARM SYSTEM. THEREFORE, THE NEW LOCAL FIRE ALARM

CONTROL PANEL WITHIN THE FIRE PUMP HOUSE SHALL BE NOTIFIER

FIRE ALARM PANEL AND HAVE THE CAPACITY TO INTERFACE, SEND

AND RECEIVE ALARMS, DIGITAL VOICE COMMUNICATION, ETC., FOR

THIS SCOPE OF WORK. REFER TO SPECIFICATION 28 05 13,

"CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND

SECURITY" AND SPECIFICATION 28 05 28.33, "CONDUITS AND

BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY."

J. FINAL LOCATION OF THE LOCAL FIRE ALARM TERMINAL CABINET

WITHIN THE FIRE PUMP HOUSE SHALL BE LOCATED IN AN APPROVED

LOCATION AND ELEVATION BY THE FIRE PUMP / PUMP HOUSE

MANUFACTURER, LOCAL VA AND CITY OF COLUMBIA LOCAL

JURISDICTION HAVING AUTHORITY(E.G., VA FIRE MARSHAL AND/OR

LOCAL FIRE DEPARTMENT FIRE MARSHAL). REFER TO NFPA 101,

PARAGRAPH 9.6.6, TITLED "LOCATION OF CONTROL."

K. THIS CONTRACTOR SHALL COORDINATE WITH THE GENERAL

CONTRACTOR ON THE POURING OF THE CONCRETE PAD SINCE

EXISTING CONDITIONS AT THE SITE THERE ARE TWO UTILITY BOXES,

E.G., ONE ELECTRICAL BOX W/COVER AND ONE PLUMBING

CLEANOUT. THE CONSTRUCTION OF THE FIRE PUMP HOUSE, FIRE

PUMP ASSEMBLY AND ALL COMPONENTS MUST WITHIN THE FINAL

FIRE PUMP HOUSE/EQUIPMENT DESIGN PROVIDE ACCESSIBILITY TO

BOTH OF THE ABOVE UTILITY CONNECTION, NO EXCEPTIONS WILL BE

ACCEPTED. THIS IS A CONDITION OF PROCUREMENT WITH THE VA

DORN COR AND ENGINEER OF RECORD.

L. FURNISH/INSTALL HEAT TRACE SYSTEM FOR PROTECTION OF THE

UNDERGROUND AND ABOVEGROUND PIPING. REFER TO FX-201 FOR

PIPING CONFIGURATION. THE HEAT TRACING SYSTEM SHALL BE UL

LISTED AND SHALL PROTECT FIRE SUPPRESSION DISTRIBUTION LINES

AS SHOWN ON FX-201 WHERE THE HEAT TRACING SYSTEM SHALL BE

SPECIFICALLY LISTED FOR USE ON DISTRIBUTION LINES. ELECTRONIC

SUPERVISION WITH AN INTELLIGENT ELECTRONIC CONTROLLER

SHALL BE PROVIDED CAPABLE OF MONITORING THE FOLLOWING

CONDITIONS WITH INTERFACE TO THE FIRE ALARM SYSTEM:

a. LOSS OF SUPPLY VOLTAGE

b. GROUND FAULT

c. LOSS OF CONTROL POWER

d. INDUCED LOW VOLTAGE

e. TEMPERATURE

f. SWITCH FAILURE

2345 18 7 6910 011

G

F

D

H

A

B

C

12131415

E

B.4 B.1

C.4 C.4

12.8 12.512.412.212.1 11.1

SP

SP

(ON LOW

ROOF)

EVM

FE3

GENERATOR (E)

CHILLER (E)

FIRE ALARM SYMBOLS

FIRE SUPPRESSION TAMPER SWITCH TO SPRINKLER SYSTEM;

FIRE ALARM INTERFACE REQUIRED

TS

FIRE SUPPRESSION WATER FLOW SWITCH TO SPRINKLER SYSTEM;

FIRE ALARM INTERFACE REQUIRED

WF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ACQUISITION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT

GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Name Address City, State Zip Phone number Contact

W.J.B. Dorn VA Medical Center B10

Permanent Diesel Fire Pump

Acquisition Package

B

IM

/B

O w n e r

R e q u e s te d C h a n g e s /4

C E

C e n tr a l M o d e l.

rv t

/3 /2

:0

:0

P M

FA-201

FIRE DETECTION - FIRST FLOOR /

FIRE PUMP

COLUMBIA, SC

544-22-130

BUILDING 10

05/03/22 JRC

BID SET

GAT

1/8" = 1'-0"

FIRST FLOOR PLAN - FIRE DETECTION PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

ACQUISITION

DRAWINGS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT

GMK Associates, Inc.

1201 Main Street, Suite 2100 Columbia, SC 29201 803-256-0000 Jerome K. Simons, AIA

STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

Odell International 129 Fast Lane, Suite 200 Mooresville, NC 28117 704-401-2040 C. Harmon Reed, Jr. AIA

CONSULTANT

Name Address City, State Zip Phone number Contact

W.J.B. Dorn VA Medical Center B10

Permanent Diesel Fire Pump

Acquisition Package

B

IM

/B

O w n e r

R e q u e s te d C h a n g e s /4

C E

C e n tr a l M o d e l.

rv t

/3 /2

:1

:3

P M

FA-202

FIRE DETECTION - FIRE PUMP

LOCATION EXISTING CONDITIONS

COLUMBIA, SC

544-22-130

BUILDING 10

05/03/22 JRC

BID SET

GAT

PLUMBING CLEANOUT WHERE THE

FIRE PUMP HOUSE INTERNAL CONFIGURATION

MUST PROVIDE ACCESS TO THIS BOX WITHIN

THE FIRE PUMP HOUSE AND COORDINATE

ACCESSIBILITY WITHIN THE FIRE PUMP

HOUSE & EQUIPMENT.

ELECTRICAL BOX W/COVER WHERE WHERE THE

FIRE PUMP HOUSE INTERNAL CONFIGURATION

MUST PROVIDE ACCESS TO THIS BOX WITHIN

THE FIRE PUMP HOUSE AND COORDINATE

ACCESSIBILITY WITHIN THE FIRE PUMP

HOUSE & EQUIPMENT

Rev. No. Revisions: Date:

NOTE: THE FIRE PUMP PACKAGE FOOTPRINT IS FIXED AT 11' (WIDE) X 16'

(LONG), NO DEVIATIONS ALLOWED.

FIRE PROTECTION DESIGN CRITERIA

ORDINARY HAZARD GROUP 2 - FIRE PUMP HOUSE; NFPA 13,

SECTION 26.27.1.8

DESIGN DENSITY: 0.25GPM/SQ.FT

HYDRAULICALLY MOST DEMANDING AREA:OVER ENTIRE ROOM AREA

SPRINKLER ORIFICE: 3/4INCH

MAXIMUM COVERAGE/SPRINKLER HEAD: 130SQ.FT.

HOSE STREAM ALLOWANCE INSIDE/OUTSIDE: 250GPM

K FACTOR: 8.0GPM/(PSI)½

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

52.

53.

54.

THE NEW FIRE PUMP ASSEMBLY COMPLETE SHALL BE SIZED IN ACCORDANCE WITH THE VA FIRE PROTECTION MANUAL, AND SHALL BE HYDRAULICALLY CALCULATED TO MEET THE REQUIREMENTS OF NFPA 13 AND

APPROVED BY VA FIRE SAFETY OFFICIAL HAVING JURISDICTION, THE CONTRACTOR

SHALL BE RESPONSIBLE FOR OBTAINING THEIR FLOW TEST DATA FROM THE CITY OF COLUMBIA MEETING THE REQUIREMENTS OF NFPA 291 AND NFPA 13, SECTION 23.2.1 INCLUDING ANY FEES.

THE SYSTEM SHALL BE DESIGNED AND BUILT IN A WORKMANLIKE MANNER, IN ACCORDANCE WITH

DETAILED DRAWINGS TO BE SUBMITTED FOR APPROVAL. THE WORK SHALL INCLUDE ALL

COMPONENTS REQUIRED TO PROVIDE A COMPLETE SYSTEM.

THE FIRE PROTECTION CONTRACTOR SHALL PROVIDE A SET OF SHOP DRAWINGS THAT INCLUDE ALL PIPE SIZES, ELEVATIONS, HEAD LOCATIONS, DIMENSIONS, VALVES, INSPECTOR TESTS, FLOW SWITCHES, TAMPER SWITCHES, ETC.

FIRE PROTECTION MAIN/BRANCH PIPING SHALL BE PROVIDED AND LOCATED IN ACCORDANCE WITH

NFPA 13 AND THE VA FIRE PROTECTION DESIGN MANUAL. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO CONFIRM LOCATIONS FOR COMPLIANCE WITH THE CODE REQUIREMENTS.

THE FIRE PROTECTION CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

FIRE SUPPRESSION PIPING SHOULD BE ROUTED AS HIGH AS POSSIBLE WHILE STILL COORDINATING WITH OTHER TRADES. ELEVATION OF SPRINKLER PIPING MUST BE DETERMINED BY PROPOSED SPACE IN THE

BASEMENT CRAWL SPACE AND BASEMENT MECHANICAL EQUIPMENT ROOM.

FIRE SUPPRESSION PIPING SHALL NOT BE INSTALLED IN ANY AREAS SUBJECT TO FREEZING

CONDITIONS WITHOUT PROPER FREEZE PROTECTION, THAT SHALL INCLUDE INSULATION, FREEZE

PROTECTION AND EXTERIOR METAL JACKET.

ALL MATERIAL AND ITS INSTALLATION SHALL BE IN COMPLETE COMPLIANCE WITH ALL APPLICABLE

SECTIONS OF THE LATEST EDITION OF NFPA FACTORY MUTUAL GUIDELINES AND VA FIRE

PROTECTION DESIGN MANUAL GUIDELINES.

THE FIRE PROTECTION CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL AND EQUIPMENT; AND, PERFORM ALL OPERATIONS NECESSARY FOR THE INSTALLATION OF A COMPLETE FIRE PROTECTION SYSTEM THAT IS READY FOR USE WITHIN THE INTENT OF AND AS INDICATED ON THE DRAWINGS, SPECIFICATIONS AND AS HEREIN SPECIFIED.

SMALL ITEMS NOT SHOWN OR SPECIFIED, BUT OBVIOUSLY REQUIRED BY GOOD GENERAL PRACTICE TO

COMPLETE THE WORK SHALL BE FURNISHED AND INSTALLED THE SAME AS IF BOTH SHOWN AND

SPECIFIED.

BY SUBMITTING A PROPOSAL FOR THIS WORK, THE CONTRACTOR WILL BE HELD TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .