This statement of work describes elevator maintenance and repair services required by the Department of Veterans Affairs at multiple facilities in Alabama. The solicitation seeks a contractor to provide full maintenance and preventative services for 27 elevators and dumbwaiters across locations in Montgomery, Tuskegee, and the VA Regional Office in Montgomery. Services include monthly preventative maintenance in accordance with manufacturer specifications, emergency response within two hours, routine service response within eight hours, and repair services. The performance period is an initial base year from October 2020 to September 2021 with four optional one-year extensions. Contractors must demonstrate experience maintaining comparable hospital elevator systems and hold required state licenses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24720Q1119.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
09-09-2020 none
Department of Veterans Affairs Central Alabama Veterans Health Care
215 Perry Hill Road Montgomery AL 36109-3798
Department of Veterans Affairs Central Alabama Health Care System East Campus 2400 Hospital Road Tuskegee AL 36083-5001 To all Offerors/Bidders
36C24720Q1119 09-09-2020
X x x
Offer date is September 14, 2020, 10am x
This amendment has the following information:
1. Offer due date has changed from September 11, 2020, 10am est to September 14, 2020, 10am est. RFI time period has been changed from 9-8-2020, 3:00 pm est to 9-11-2020, 3:00 pm est. No phones calls will be accepted during solicitation phase.
2. Please submit all requested information or documents with solicitation.
3. See updated SOW, all terms and conditions shall remain the same.
Benford Brundage Contracting Officer
Statement of Work For Elevator Maintenance and Repair Central Alabama Veterans Health Care System
General Scope of Work
The intent of this scope of work is to obtain full maintenance and repair of all elevators and dumbwaiters in accordance with the manufacturer’s original specifications located at Veterans Affairs Regional Office, Montgomery, Alabama, Central Alabama Veterans Health Care System, Montgomery, Alabama and Central Alabama Veterans Health Care System, Tuskegee, Alabama. This contract is for a base year and 4 option years to cover the vertical hoists as listed, for each of the years. The Contractor shall furnish all labor, transportation, equipment, materials, tools, supplies, supervision, incidental engineering, and management required to perform testing, maintenance, repair, and component replacement as required to maintain elevator, and dumbwaiter equipment systems in accordance with the manufacture’s original specifications. Responsibility also includes emergency telephone operation inside elevator cab and all associated wiring inside hoist way to the machine equipment room. Work includes the performance of service work, preventive maintenance of equipment, routine and periodic tests, and other services as described herein. The Contractor must show evidence of having provided similar services to hospitals having comparable size and number of elevators. Dumbwaiters are also listed under this solicitation. Documentation must be provided with the offer.
Performance Period:
| Base Year 1: | October 1, 2020 – September 30, 2021 |
| Option Year 1: | October 1, 2021 – September 30, 2022 |
| Option Year 2: | October 1, 2022 – September 30, 2023 |
| Option Year 3: | October 1, 2023 – September 30, 2024 |
| Option Year 4: | October 1, 2024 – September 30, 2025 |
Elevators and dumbwaiters addressed under this contract are as follows:
MONTGOMERY CAMPUS
| ELEVATORS | ELEVATOR NO. TYPE | MAKE | CAPACITY | |||||
| Bldg. 1, 6 levels | E1P1-001-MO | Passenger, Traction | ThyssenKrupp 4000 lb. | |||||
| Bldg. 1, 6 levels | E1P2-00l-MO | Passenger, Traction ThyssenKrupp 4000 lb. | ||||||
| Bldg. 1, 6 levels | E1P3-00l-MO | Passenger, Traction ThyssenKrupp 5000 lb. | ||||||
| Bldg. 4, 3 levels | E1P1-004-MO | Freight, Hydraulic | ThyssenKrupp | 3500 lb. | ||||
| Bldg. 6, 3 levels | E1P6-006-MO | Passenger, Hydraulic ThyssenKrupp 2500 lb. | ||||||
| Bldg. 7, 4 levels | E1P7-007-MO | Passenger, Hydraulic ThyssenKrupp 2500 lb. | ||||||
| Bldg. 1, 3 levels | E1P4-001-MO | Passenger, Hydraulic ThyssenKrupp 5000 lb. | ||||||
| Bldg. 1, 3 levels | E1P5-001-MO | Passenger, Hydraulic ThyssenKrupp 5000 lb. | ||||||
| Bldg. 1, 3 levels | E1S3-00l-MO | Freight, Hydraulic | ThyssenKrupp 5000 lb. | |||||
| Bldg. 1, 6 levels | E1S1-00-MO | Service, Traction | ThyssenKrupp | 4000 lb. | ||||
| Bldg. 1, 8 levels | E1S2-00-MO | Service, Traction | ThyssenKrupp | 4000 lb. | ||||
| DUMBWAITERS | NUMBER | TYPE | MAKE | CAPACITY | ||||
| Bldg. 1, 2 levels | D1-MAS | Traction | D.A. Matol Inc | 200 lb. | ||||
| Bldg. 1, 2 levels | D2-Pharmacy | Traction | D.A. Matol Inc | 200 lb. | ||||
| Bldg. 1, 2 levels | D3-Lab | Traction | D.A. Matol Inc | 200 lb. |
VA REGIONAL OFFICE
| ELEVATORS | ELEVATOR NO. | TYPE | MAKE | CAPACITY | ||
| Bldg. 42, 3 levels | P-1 | Passenger, Hydraulic | Esco | 4,000 lb. | ||
| Bldg. 42, 3 levels | P-2 | Passenger, Hydraulic | Esco | 4,000 lb. |
TUSKEGEE CAMPUS
| ELEVATORS | ELEVATOR NO. | TYPE | MAKE | CAPACITY | ||||
| Bldg. 2, 4 levels | ElP1-002-TU | Passenger, Hydraulic | Gemco | 3000 lb. | ||||
| Bldg. 2. 4 levels | E1P2-002-TU | Passenger, Hydraulic | Gemco | 3000 lb. | ||||
| Bldg. 3A, 5 levels | E1P2-003A-TU | Passenger, Traction | Gemco | 4000 lb. | ||||
| Bldg. 3A, 5 levels | El P2-003A-TU | Passenger. Traction | Gemco | 4000 lb. | ||||
| Bldg. 4A, 4 levels | E1P1-004A-TU | Passenger, Hydraulic Esco | 4000 lb. Bldg. 5, 2 levels | ElP1-005-TU | Freight, Hydraulic | Esco | 2000 lb. | |
| Bldg. 5, 4 levels | E1P2-005-TU | Pass/Freight, Hydraulic AL Elevator | 4000 lb. | |||||
| Bldg. 68, 4 levels | EIP2-068-TU | Passenger, Hydraulic | Esco | 4000 lb. | ||||
| Bldg. 120, 5 levels | E1P1-120-TU | Passenger, Traction | AL Elevator | 5000 lb. Bldg. 120, 5 levels | E2P2-120-TU** | Passenger, Traction | AL Elevator | 5000 lb. |
| Bldg. 120, 5 levels | E3P3-120-TU** | Passenger, Traction | AL Elevator | 5000 lb. | ||||
| Bldg. 129, 2 levels | E1P1-129-TU | Passenger, Hydraulic | Montg. Kone | 5000 lb. | ||||
| Bldg. 129, 2 levels | E2P2-129-TU | Passenger, Hydraulic | Montg. Kone | 5000 lb. |
**Elevators should not be included in the base year contract due to them being out of service or under warranty.
1. PREVENTIVE MAINTENANCE & REPAIR: The contractor shall provide all supervision, labor, equipment, materials, tools, and supplies necessary to perform monthly preventive maintenance (PM) and repair at the locations cited above. Preventive maintenance will be scheduled at least three (3) days in advance with the Contracting Officer Representative (COR) and to be performed within the first five (5) working days of each month. Preventive maintenance shall be performed in accordance with manufacturer’s instructions and comply with the most current OSHA, ASME 17.1 – 8.6 guides, ANSI A1 7.1 and all applicable codes for the Preventive Maintenance, Repair and safety of elevators and dumbwaiters and will include the following:
1. Visual inspections;
1. Calibration checks;
1. Cleaning and lubrication;
1. Electrical checks; and
1. Performance checks
1. 5-year load test (option year 4)
1. Annual elevator inspection, via 3rd party
1. Elevators with fire fighters’ emergency operations are tested monthly with completion dates and results documented.
Excessive or repeated system breakdowns or deficiencies may be considered by the government as an indication of unsatisfactory performance of preventive maintenance by the Contractor. Contractor shall perform a quarterly walk-through with their Service Supervisor and the COR and provide a written report of the Supervisor’s findings to the COR within 5 workdays of the walk-through.
2. REPORTING REQUIREMENTS:
Montgomery Campus
Upon arriving at the Montgomery campus to perform services, the contractor’s personnel shall report to the Boiler Plant, building 14, to obtain keys and shall indicate check-in and check-out times and sign on the VA furnished register that is maintained in the Boiler Plant. If during normal business hours, the elevator technician shall notify the Work Order Clerk that they are on station and what areas they will be working. Upon completion of the services, the contractor shall furnish a written report of services performed. Such reports shall advise of any repairs or repair parts, including costs, not required to be furnished under the contract that are necessary to maintain the equipment in a safe and reliable operating condition. The written report (service ticket) must be signed by the Boiler Plant operator, Work Order Clerk or their designee before leaving the facility.
Tuskegee Campus
Upon arriving at the Tuskegee campus to perform services, the contractor’s personnel shall report to the Engineering Service Office, building 68, room 15, to obtain keys and shall indicate check-in and check-out times and sign on the VA furnished register that is maintained in the office. If during normal business hours, the elevator technician shall notify the Engineering Service Office/Work Order Clerk that they are on station and what areas they will be working. Upon completion of the services, the contractor shall furnish a written report of services performed. Such reports shall advise of any repairs or repair parts, including costs, not required to be furnished under the contract that are necessary to maintain the equipment in a safe and reliable operating condition. The written report (service ticket) must be signed by the Work Order Clerk or their designee before leaving the facility.
Outside of normal business hours, the technician shall report to the Administrative Officer of the Day (AOD) Office in Building 2, Room 106 to obtain keys and shall indicate check-in and check-out times and sign on the VA furnished register that is maintained in the AOD office. Upon completion of the services, the contractor shall furnish a written report of services performed. Such reports shall advise of any repairs or repair parts, including costs, not required to be furnished under the contract that are necessary to maintain the equipment in a safe and reliable operating condition. The written report must be signed by the AOD or their designee before leaving the facility.
VA Regional Office
VA Regional Office normal working hours are 7:30 am until 4:00 p.m. Upon arriving at the Regional Office to perform services, the contractor’s personnel shall report to the Support Service Specialist (SSS) Office to obtain keys and shall indicate check-in and check-out times and sign on the VA furnished register that is maintained in the office. Upon completion of the services, the contractor shall furnish a written report of services performed. Such reports shall advise of any repairs or repair parts, including costs, not required to be furnished under the contract that are necessary to maintain the equipment in a safe and reliable operating condition. The written report (service ticket) must be signed by the SSS, or their designee before leaving the facility. A copy should also be forwarded to the VA Work Order Clerk located on the Montgomery campus.
NOTE: Payment of invoices may be delayed if the appropriate reports are not properly completed and submitted to the Program Analyst as required above.
3 PERFORMANCE: The Contractor must respond to service calls within two (2) hours of notification and be on-station within (8) hours for routine service calls and two hours for emergency service calls. All work must be performed by competent personnel who are experienced and qualified to work on the specific equipment. All work performed shall be accomplished in accordance with the manufacturer's instructions including, but not limited to, adjustments, calibrations, cleaning, lubrication, testing, disassembly, check-out, replacement of worn or defective parts, etc., required to keep the equipment in operating condition. Contractor's maintenance of the equipment must satisfy all requirements as set forth by NFPA, OSHA, ASME and The Joint Commission (TJC).
The Contractor must be licensed by the State in which work is to be performed to provide the maintenance and repair services specified in this contract. All work shall be performed by elevator mechanics specifically qualified and trained to work on elevator, and dumbwaiter systems and equipment. Evidence of all required licenses and documentation of the qualifications of personnel, must be provided to the CO along with the contractors offer as well as when 10 days of new personnel being hired.
4 HOURS OF WORK: Work required in the performance of the contract shall be performed during the hours of 8:00 AM - 4:30 PM, Monday - Friday, excluding federal holidays. Contract shall also include after hour call backs, emergency repairs and entrapments. The contractor shall provide prompt emergency call back service at any hour of any day of the week.
5 FAILING TO RESPOND: Failure to respond to intervening service calls within two (2) hours after notification by the Contracting Officer Representative, a deduction of 50% of the quarterly rate will be taken for each day a machine is inoperable. Furthermore, failure to respond will be automatically annotated in CPARS.
6 SAFETY STANDARDS: The contractor shall perform electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Department of Veterans Affairs (DVAMC), DM&S Supplement MP-3, "Supplement to DVAMC Engineering", Chapter 2, Appendix 2C, Change 4, 11/4/83, "Leakage Current Limits". A copy of these standards will be provided by the DVAMC Mechanical unit Engineering Section upon request. These standards are strictly enforced. Any equipment not meeting the minimum of these standards shall be considered "inoperable" until such time as it "passes" the minimum standards. All equipment will be subject to inspection by VA Engineering Section personnel to verify compliance with these standards.
7 ADDITIONAL SERVICES: The Contractor guarantees all equipment covered in this contract shall be in optimum working condition at the contract expiration date, provided the Contractor is notified of deficiencies at least seven (7) day before the contract expiration date. All changes, updates or retrofits made on any component or system shall be annotated on station equipment manuals and records. Services also include recording all routine work, corrections and repair work in the equipment log.
8 AUTHORIZED SERVICES: The only services authorized under this contract are routine repairs and preventative maintenance checks and services. Routine repairs are defined as those repairs caused by normal wear and tear. Services not covered under this contract shall be paid under a separate purchase order based on the rates quoted in the contract. Before performing any service or repair of a non-contractual nature, the Contracting Officer or his/her designee must be advised of the reason for this additional work. If appropriate, the Contracting Officer may authorize the additional services or repairs under a separate purchase authorization. Contractor is cautioned that only the Contracting Officer may authorize additional services or repairs and reimbursement will not be made unless this prior authorization is obtained.
(a) Emergency Service Calls: Service calls will be classified as emergency at the discretion of the COR. Generally, calls will be classified as emergency when system failures constitute a danger to personnel, threaten to damage property, or threaten to disrupt activity, operations, training missions or elevators only in in-patient care areas. Examples include personnel “trapped” inside an elevator, a fire or electrical defect which could cause fire or shock. The Contractor shall provide a mechanic at the site and on the job ready to service the elevator or dumbwaiter within TWO (2) hours of receiving the call, 24 hours a day, 7 days a week. After beginning work, the Contractor shall work continuously until the work is complete for each location.
(b) Routine Service Calls: Service calls will be classified as routine when the work does not qualify as an emergency call. The Contractor shall respond to service calls within two hours and begin work on routine service calls within 8 hours after receipt of the call unless it is after regular work hours. If a call is received after normal work hours, the contract shall respond the next business day. If the call is received on Friday, the contractor shall respond by the same time on Monday. Routine service work shall normally be performed during the Government’s regular work hours of 8:00 AM - 4:30 PM unless prior approval is received from the COR. After procuring parts, the Contractor shall work continuously during regular hours until the repair is completed.
If the Contractor responds to a service call and discovers that the elevator is running on arrival, the Contractor will perform and document a diagnostic evaluation before releasing the elevator to normal operation. Excessive or repeated systems and equipment malfunctioning may be considered by the government to be unsatisfactory performance of service work by the Contractor. The Contractor shall respond to all service calls, including those calls where the accomplishment of repairs is subsequently determined to be beyond the major repair limit.
(c) Service Call Reception. Authorized government representatives will advise the Contractor by phone of all service call requests received, both during and after regular working hours, as well as the classification of each call based on the definitions provided above. The Contractor shall have adequate procedures for receiving and responding to service calls 24 hours per day, including weekends and holidays. A single local or toll-free telephone number shall be provided by the Contractor for receipt of all service calls. An individual fully familiar with the Contractor’s work control procedures and the terms and conditions of this contract shall answer all telephone calls. Calls shall be considered received by the Contractor at the time and date the telephone call is placed.
9 RECONDITIONING: Reconditioning and/or extensive repair work determined not to be economically feasible by the Contracting Officer Representative is not included in this contract and the Government reserves the right to obtain such services from other than the listed Contractor.
10 DISCONTINUANCE OF SERVICE: The Government reserves the right to terminate service on a machine meeting replacement criterion upon thirty (30) days written notice to the Contractor with payment to be prorated.
11 PARTS: (a) Only new, standard parts shall be furnished by the Contractor. All parts shall be of current manufacture and have versatility with presently installed equipment.
(b) All newly installed replacement parts become the property of the Government. Replaced parts are to be disposed of by the Contractor after obtaining approval from the Contracting Officer Representative.
12 TEST EQUIPMENT: The VAMC will not furnish parts and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring the appropriate equipment and/or supplies necessary to complete the work as required within.
13 PERFORMANCE CONFERENCE: If appropriate, the Contracting Officer will schedule a performance conference for contract orientation purposes with the Contractor receiving award.
14 HAZARD COMMUNICATION STATEMENT:
1. As a vendor, supplier, and/or contractor under contract to the VAMC for the purpose delineated in the subject contract, you should be aware of this facility's hazard communication program. By the provisions of your contract, you may be required to work in certain areas where there are hazardous chemicals in use. Examples include, but are not limited to, areas in Pharmacy Service, Engineering Service, Environmental Management Service, Dental Service, Acquisition & Material Management Service, Radiology Service, Laboratory Service, and Dietetic Service.
2. It is the responsibility of each Contractor to familiarize himself with the specific area(s) in which his contract requires him to work. This shall include the Contractor introducing himself to the exposure zone supervisor. The Contractor may obtain from the exposure zone supervisor the nature of the on-going VAMC work and the type of chemicals used. In addition, the Contractor should also learn the procedures for obtaining, in an emergency involving the Contractor, the safety data sheet (SDS) pertaining to hazardous chemicals in the exposure zone.
3. It is also the responsibility of each Contractor to meet certain criteria.
These include:
a. Prior to the beginning of any contract, provide the Contracting Officer Representative (COR) with a complete list of all chemicals to be used by the Contractor on the facility’s premises. Appropriate SDS’s shall accompany the list of chemicals. The COR shall forward a copy of this list and the SDS’s to the VAMC Industrial Hygienist (001-S).
b. The Contractor shall ensure that all chemical containers are properly labeled, and SDS for each chemical shall be available on the VAMC premises. SDS shall be maintained by the senior representative of the Contractor at this facility.
c. Protective equipment for Contractor personnel shall be the Responsibility of the Contractor.
d. All other DVA, EPA and OSHA regulations shall apply as appropriate.
15 INDICATOR LIGHTS: Contractor shall replace indicator lights inside cars and on each floor.
16 EMERGENCY CALL SYSTEM: Contractor shall insure all emergency call systems in the elevators are in proper working condition.
17 CONTRACTOR SUBMITTALS: Within fifteen calendar days after award date, but no later than performance of the first servicing of equipment, Contractor will furnish to the Contracting Officer two (2) copies of its preventive maintenance procedures manual that will be used during the preventive maintenance services of this contract. These manuals are required by the Government as a condition of the facility's TJC accreditation and must be received before any invoice can be certified for payment. The manual shall include, for each specific equipment system the location (system number); work to be performed (monthly, quarterly); and the week of the month that the work will be performed. The Contractor shall schedule and perform preventive maintenance during regular government working days between the hours of 8:00 am and 11:00 am, and between the hours of 1:00 pm and 4:00 pm unless stated otherwise on individual location’s special requirements. Once the Contractor’s manual and schedule is approved by the COR, the Contractor shall perform all maintenance work without further authorization by the COR. The Contractor shall strictly adhere to the scheduled dates to facilitate government verification of the work. If the Contractor finds it necessary to reschedule, a written request shall be made to the COR detailing the reasons for the proposed change at least five working days prior to the originally scheduled date. No scheduled dates shall be changed without the prior written approval of the COR.
18 SERVICE CONTACTS: Bidder shall provide in the space provided below, the name, location, and telephone number of the office where service calls are to be placed:
Name:
Address:
Telephone No: (Area Code)
19 OFFEROR’S QUALIFICATIONS: The Offer is required to submit sufficient evidence of adequate equipment, facilities, personnel and experience to establish themselves as being able to perform the services required under the statement of work. Failure to submit any of the required documents will result in your quote being considered materially deficient. Any offeror, who does not have adequate experience, personnel and/or equipment, in the opinion of the Contracting Officer Representative, will be deem not technically acceptable. To assist in this determination, bidder is required to furnish the following information:
1. Offerors shall fill out pricing total by year AND per elevation in the spaces provided above.
1. Quote shall include at a copy of State Elevator Mechanic & Contractor license.
1. Quote shall include submit up to two pages of information describing work experience to include number of years’ experience performing the type of services indicated & familiarity with Alabama building codes and ordnances.
1. Quote shall include number of regular, full-time personnel employed.
1. Quote may include up to 3 references that include point of contact name, phone number, email address and contract number associated with the service, period of performance and description of services rendered. References shall only be of similar scope and size to this solicitation.
20 OBSOLETE MACHINES: Services under a resulting contract will not cover obsolete machines where parts for such obsolete machines are not available under the original manufacturer's commercial price list, unless mutually agreed to by the Contracting Officer and the Contractor.
21 ORDERS: The Contractor's repairman will report to the office of the Contracting Officer Representative (COR) prior to start of work and after completing the services required during that call. Services to be rendered will be directed by the COR and any changes must receive concurrence of the Contracting Officer.
22 INSPECTIONS, TESTING AND CERTIFICATION: The semi-annual maintenance inspections of elevators and dumbwaiters, inspections of annual tests of governor and safety devices and five year full load test will be performed under a separate government contract, however; the maintenance contractor shall be present during testing and will be required to provided certified weights for the full load test. Deficiencies discovered during testing by the government inspector shall be corrected as part of this contract. These corrections must be made within 30 calendar days after notice is given in writing.
Weekly inspection of passenger and service type elevators shall be made on Tuesdays. Bi-weekly inspection of freight type elevator and dumbwaiters shall be made on second and fourth Tuesdays. If a holiday falls on Tuesday, the service must be performed on the following workday.
The freight elevator located in building 5 is used to move Nutrition and Food Service subsistence from the first floor to the kitchen directly above. Any time this elevator is inoperable it must be considered an emergency.
RFI question and answers
1. I noticed the statement of work for va Montgomery elevator service has two different paragraphs, one saying response time is 8 hours and one says 24 hours
3 PERFORMANCE: The Contractor must respond to service calls within two (2) hours of notification and be on-station within (8) hours for routine service calls and two hours for emergency service calls. All work must be performed by competent personnel who are experienced and qualified to work on the specific equipment. All work performed shall be accomplished in accordance with the manufacturer's instructions including, but not limited to, adjustments, calibrations, cleaning, lubrication, testing, disassembly, check-out, replacement of worn or defective parts, etc., required to keep the equipment in operating condition. Contractor's maintenance of the equipment must satisfy all requirements as set forth by NFPA, OSHA, ASME and The Joint Commission (TJC).
(a) Emergency Service Calls: Service calls will be classified as emergency at the discretion of the COR. Generally, calls will be classified as emergency when system failures constitute a danger to personnel, threaten to damage property, or threaten to disrupt activity, operations, training missions or elevators only in in-patient care areas. Examples include personnel “trapped” inside an elevator, a fire or electrical defect which could cause fire or shock. The Contractor shall provide a mechanic at the site and on the job ready to service the elevator or dumbwaiter within TWO (2) hours of receiving the call, 24 hours a day, 7 days a week. After beginning work, the Contractor shall work continuously until the work is complete for each location. (No changes)
(b) Routine Service Calls: Service calls will be classified as routine when the work does not qualify as an emergency call. The Contractor shall respond to service calls within two hours and begin work on routine service calls within 8 hours after receipt of the call unless it is after regular work hours. If a call is received after normal work hours, the contract shall respond the next business day. If the call is received on Friday, the contractor shall respond by the same time on Monday. Routine service work shall normally be performed during the Government’s regular work hours of 8:00 AM - 4:30 PM unless prior approval is received from the COR. After procuring parts, the Contractor shall work continuously during regular hours until the repair is completed.
All answers are highlighted in red.
1. How many hours of PM are being requested per month for all facilities? The number of hours should be determined by the manufacture’s recommendation for each elevator and how fast or slow your technician performs the work. There is no set number of hours per month.
Is there a part cost threshold amount provided by this contract? IE.. If the replacement part cost more than $2500.00 the government will pay for the part but not the labor. There is no part cost threshold
See attached document: Attendance Roster.