About this file

36C24719B0004 0001 521-17-101 Combined Drawings_Part3.pdf

View the file

Other files

File Type Posted
36C24719B0004-0004000.docx DOCX document
36C24719B0004-0003000.docx DOCX document
36C24719B0004-0002002.pdf PDF
36C24719B0004-0002003.pdf PDF
36C24719B0004-0002001.pdf PDF
36C24719B0004-0002000.docx DOCX document
36C24719B0004-0001001.pdf PDF
36C24719B0004-0001000.docx DOCX document
36C24719B0004-0001002.pdf PDF
36C24719B0004-000.docx DOCX document
36C24719B0004.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-708

P-402

AC

AC

PHARMACY

OFFICE

1101B

CLOSET

1101A-A

BF

ROOF

CORRIDOR

OFFICE

1101B

CLOSET

1101A-A

OFFICE

OPEN

OFFICE

DLB DLB

A. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF FLOORS,

CEILINGS AND/OR SLABS AFFECTED BY PLUMBING MODIFICATIONS.

REPAIR SURFACES TO MATCH EXISTING UNLESS NOTED OTHERWISE

ON ARCHITECTURAL DRAWINGS.

B. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING SANITARY

WASTE AND/OR SEWER PIPING BEFORE MAKING ANY NEW

CONNECTIONS. CONTRACTOR SHALL NOTIFY COR OF ALL SANITARY

SEWER WHICH IS NOT SERVICEABLE AND REQUIRE REPLACEMENT.

C. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL PLUMBING

CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL SANITARY SEWER

PIPING CHANGES DIRECTION OVER 45°. NO CLEANOUT(S) WILL BE

ALLOWED ABOVE CEILING UNLESS NOTED OTHERWISE.

D. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A MINIMUM TWO

PERCENT, ONE-QUARTER INCH PER FOOT. NEW 3" AND 4" SANITARY

SEWER PIPING SHALL BE SLOPED A MINIMUM ONE PERCENT,

ONE-EIGHTH INCH PER FOOT.

NEW WORK NOTES FOR THIS DRAWING ONLY

1. CONNECT NEW DOMESTIC COLD WATER SUPPLY PIPING TO EXISTING

DOMESTIC COLD WATER SUPPLY RISER IN PIPE CHASE ABOVE FIRST

FLOOR CEILING LEVEL AT APPROXIMATE LOCATION INDICATED.

2. CONNECT NEW DOMESTIC HOT WATER SUPPLY PIPING TO EXISTING

DOMESTIC HOT WATER SUPPLY RISER IN PIPE CHASE ABOVE FIRST

FLOOR CEILING LEVEL AT APPROXIMATE LOCATION INDICATED.

3. CONNECT NEW VENT PIPING TO EXISTING VENT STACK IN PIPE CHASE

ABOVE FIRST FLOOR CEILING LEVEL AT APPROXIMATE LOCATION

INDICATED.

4. CONNECT NEW SANITARY SEWER PIPING TO EXISTING SANITARY

SEWER STACK BELOW FLOOR IN PIPE CHASE ABOVE BASEMENT

CEILING LEVEL AT APPROXIMATE LOCATION INDICATED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FINAL SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE SPACE FOR

RELOCATION OF

INPATIENT PHARMACY

BIRMINGHAM VA MEDICAL CENTER

521-17-101

Project Director

08-31-2018Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

KEY PLAN

N.T.S.

GENERAL NOTES

FLOOR PIPING PLAN

PHASE 1 PARTIAL FIRST

FLOOR PIPING PLAN

PHASE 2 PARTIAL FIRST

DLB DLB

PARTIAL SECOND FLOOR PIPING PLAN PARTIAL SECOND FLOOR ROOF PIPING PLAN

A. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF FLOORS,

CEILINGS AND/OR SLABS AFFECTED BY PLUMBING MODIFICATIONS.

REPAIR SURFACES TO MATCH EXISTING UNLESS NOTED OTHERWISE

ON ARCHITECTURAL DRAWINGS.

B. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING SANITARY

WASTE AND/OR SEWER PIPING BEFORE MAKING ANY NEW

CONNECTIONS. CONTRACTOR SHALL NOTIFY COR OF ALL SANITARY

SEWER WHICH IS NOT SERVICEABLE AND REQUIRE REPLACEMENT.

C. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL PLUMBING

CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL SANITARY SEWER

PIPING CHANGES DIRECTION OVER 45°. NO CLEANOUT(S) WILL BE

ALLOWED ABOVE CEILING UNLESS NOTED OTHERWISE.

D. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A MINIMUM TWO

PERCENT, ONE-QUARTER INCH PER FOOT. NEW 3" AND 4" SANITARY

SEWER PIPING SHALL BE SLOPED A MINIMUM ONE PERCENT,

ONE-EIGHTH INCH PER FOOT.

E. ALL HORIZONTAL STORM DRAINAGE PIPING, RAIN WATER LEADER, AND

BOTTOM OF ROOF DRAIN SHALL BE INSULATED.

NEW WORK NOTES FOR THIS DRAWING ONLY

1. H.V.A.C. EQUIPMENT. REFER TO MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

2. PROVIDE AND INSTALL NEW 3" VENT THRU ROOF.

3. PROVIDE AND INSTALL NEW 4" HUB DRAIN. SET HUB RIM 2" ABOVE

ROOF.

4. PROVIDE AND INSTALL NEW 1" REDUCE PRESSURE BACKFLOW

PREVENTION ASSEMBLY.

5. CONNECT NEW SANITARY SEWER PIPING TO EXISTING SANITARY

SEWER STACK ABOVE SECOND FLOOR CEILING LEVEL AT

APPROXIMATE LOCATION INDICATED.

6. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING ABOVE

SECOND FLOOR CEILING LEVEL AT APPROXIMATE LOCATION

INDICATED.

7. CONNECT 1" DOMESTIC COLD WATER SUPPLY TO EXISTING DOMESTIC

WATER STACK ABOVE SECOND FLOOR CEILING IN PIPING CHAS.

8. 1"DCWS-UP.

9. 1"DCWS-DN. HEAT TRACE ALL PIPING ON ROOF AND IN HVAC UNIT

REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION.

10. 2"V-UP TO VENT THRU ROOF.

11. 3"V-UP TO VENT THRU ROOF.

12. 4"SS-P-TRAP FOR HUB DRAIN ON ROOF.

13. 1"DCWS FOR H.V.A.C. MAKE-UP WATER. REFER TO MECHANICAL

DRAWINGS FOR ADDITIONAL INFORMATION.

14. PROVIDE AND INSTALL 3/4" HOSE BIB.

15. PROVIDE AND INSTALL NEW 3" ROOF DRAIN.

16. CONNECT NEW 4" STORM DRAINAGE PIPING TO EXISTING STORM

DRAINAGE PIPING ABOVE SECOND FLOOR CEILING AT APPROXIMATE

LOCATION INDICATED.

17. 3"SD-UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FINAL SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE SPACE FOR

RELOCATION OF

INPATIENT PHARMACY

BIRMINGHAM VA MEDICAL CENTER

521-17-101

Project Director

08-31-2018Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

KEY PLAN

N.T.S.

GENERAL NOTES

DLB DLB

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FINAL SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE SPACE FOR

RELOCATION OF

INPATIENT PHARMACY

BIRMINGHAM VA MEDICAL CENTER

521-17-101

Project Director

08-31-2018Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

PENDENT

SPRINKLER

ESCUTCHEON

PLATE

ESCUTCHEON

RETAINER

CAULK

PERIMETER

RETURN BEND DROP TO PENDENT SPRINKLER

HEAD FOR USP CLEAN ROOM DETAIL

NONE

1" DROP

NIPPLE

1"x1/2" REDUCER

COUPLING

GYP BOARD

CEILING

SPRINKLER

MAIN SUPPLY

PIPING

CAULK PERIMETERGYP BOARD

CEILING

RETURN BEND DROP TO

PENDENT SPRINKLER HEAD DETAIL

NONE

1" DROP

NIPPLE

1"x1/2" REDUCER

COUPLING

PENDENT

SPRINKLER

TILE CEILING

ESCUTCHEON

PLATE

SPRINKLER

MAIN

SUPPLY

PIPING

ESCUTCHEON RETAINER

PIPE HANGER DETAIL

NONE

PIPE

GENERAL NOTES:

(HANGER DETAIL ONLY)

A ALL HANGERS SHALL BE SPACED IN ACCORDANCE WITH

PIPE MANUFACTURERS REQUIREMENTS.

EXTERNAL PLUG

DROP IN CONCRETE

ANCHOR

EXISTING TO REMAIN SPRINKLER PIPE

NEW PENDENT SPRINKLER HEAD

POINT OF CONNECTION

EXISTING PENDENT SPRINKLER HEAD TO REMAIN

PIPE TURN DOWN

NEW SPRINKLER PIPE

SPRINKLER PIPE TO BE DEMOLISHED

FIRE PROTECTION LEGEND

EXISTING UPRIGHT SPRINKLER HEAD

EXISTING PENDENT SPRINKLER HEAD TO BE REMOVED

HANGER

ROD

HEX NUT

CLEVIS TYPE

HANGER

STRAP

HANGER

HANGER

ROD

HANGER

ROD

CONCRETE STRUCTURE

PIPE

1 OFFICE

1365F

OF

LAB

1101D

OFFICE

1101C

PHARMACY

CLOSET

1101A-A

STORAGE

1101A

TOILET

1101E

OFFICE

1101B

1 1

2 2 2 2 2 2

CORRIDOR

OFFICE

1365F

OFFICE

I.V.

BUFFER

1101K

ANTE

ROOM

1101J

CHEMO

BUFFER

1101L

CLOSET

1101A-A

OFFICE

1101B

1 1

2 2 2 2 2

DLB DLB

A. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES TO

PREVENT CONFLICT OF SPACE IN ALL NEW WORK AREAS.

B. PER THE LIFE SAFETY CODE, WHEN A REQUIRED AUTOMATIC FIRE

SPRINKLER SYSTEM (SECTION 9.7.6.1) OR AUTOMATIC FIRE ALARM

SYSTEM (SECTION 9.6.1.6) IS OUT OF SERVICE FOR MORE THAN 4 HOURS

IN A 24-HOUR PERIOD, THE AUTHORITY HAVING JURISDICTION MUST BE

NOTIFIED AND THE BUILDING SHALL BE EVACUATED OR A FIRE WATCH

WILL BE POSTED. THE BUILDING SHALL REMAIN OCCUPIED.

CONTRACTOR SHALL PROVIDE THE REQUIRED FIRE WATCH. IN NO CASE

SHALL THE FIRE PROTECTION SYSTEM BE SHUT DOWN DURING OFF

HOURS OF WORKDAY WITHOUT A FIRE WATCH. THE DURATION OF THE

FIRE WATCH WILL BE UNTIL THE AFFECTED SYSTEM IS FULLY

RESTORED. SYSTEM SHALL BE RETURNED TO NORMAL OPERATING

CONDITIONS AT END OF EACH WORKDAY.

DEMOLITION NOTES FOR THIS SHEET ONLY

1. CONTRACTOR SHALL REMOVE EXISTING SPRINKLER HEADS AND

ASSOCIATED PIPING DROPS REQUIRED BY CEILING REMOVAL.

2. CONTRACTOR SHALL REMOVE EXISTING SPRINKLER HEAD CEILING

ESCUTCHEON IN AREA WHERE CEILING IS BEING REMOVED AND

REPLACED FOR HVAC EQUIPMENT AND DUCT WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FINAL SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE SPACE FOR

RELOCATION OF

INPATIENT PHARMACY

BIRMINGHAM VA MEDICAL CENTER

521-17-101

Project Director

08-31-2018Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

KEY PLAN

N.T.S.

GENERAL NOTES

FLOOR DEMOLITION FIRE PROTECTION PLAN

PHASE 1 PARTIAL FIRST

FLOOR DEMOLITION FIRE PROTECTION PLAN

PHASE 2 PARTIAL FIRST

1 1

3 5

3 5

3 5

PHARMACY

OFFICE

1101B

CLOSET

1101A-A

4 5

4 5

6 6 6 6 6 6

2 2

4 5

CORRIDOR

OFFICE

1101B

CLOSET

1101A-A

OFFICE

OPEN

OFFICE

4 5

4 5

4 5

6 6 6 6 6 6

DLB DLB

FLOOR FIRE PROTECTION PLAN

PHASE 1 PARTIAL FIRST

FLOOR FIRE PROTECTION PLAN

PHASE 2 PARTIAL FIRST

NEW WORK NOTES FOR THIS DRAWING ONLY

1. CONTRACTOR SHALL INSTALL NEW SPRINKLER PIPING DROPS AND

QUICK RESPONSE SPRINKLER HEADS FOR CLEAN ROOM IN

ACCORDANCE WITH NFPA 13. REFER TO RETURN BEND DROP TO

PENDENT SPRINKLER HEAD FOR USP CLEAN ROOM DETAIL ON FIRE

PROTECTION DRAWING F-001.

2. CONTRACTOR SHALL INSTALL NEW SPRINKLER PIPING DROPS AND

QUICK RESPONSE SPRINKLER HEADS FOR STANDARD COVERAGE IN

ACCORDANCE WITH NFPA 13. REFER TO RETURN BEND TO PENDENT

SPRINKLER HEAD DETAIL ON FORE PROTECTION DRAWING F-001.

3. CONTRACTOR SHALL LOCATE SPRINKLER HEADS IN A UNIFORM

PATTERN AND COORDINATE WITH OTHER CEILING EQUIPMENT

4. CONTRACTOR SHALL LOCATE SPRINKLER HEADS IN CENTER OF CEILING

TILE AND COORDINATE WITH OTHER CEILING EQUIPMENT

5. CONTRACTOR SHALL SUPPORT SPRINKLER PIPING IN ACCORDANCE

WITH SEISMIC REQUIREMENTS OF NFPA 13.

6. CONTRACTOR SHALL INSTALL SPRINKLER HEAD CEILING ESCUTCHEON

IN AREA WHERE CEILING WAS REMOVED AND REPLACED FOR

INSTALLATION OF HVAC EQUIPMENT AND DUCT WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

FINAL SUBMITTAL

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

RENOVATE SPACE FOR

RELOCATION OF

INPATIENT PHARMACY

BIRMINGHAM VA MEDICAL CENTER

521-17-101

Project Director

08-31-2018Revisions: Date:

440 Martin Luther King Jr. Blvd

Macon, GA 31201

478.743.8415 Fax: 478.743.8239

www.clarknexsen.com

KEY PLAN

N.T.S.

GENERAL NOTES

A. CONTRACTOR SHALL COORDINATE WITH ALL OTHER TRADES TO

PREVENT CONFLICT OF SPACE IN ALL NEW WORK AREAS.

B. PER THE LIFE SAFETY CODE, WHEN A REQUIRED AUTOMATIC FIRE

SPRINKLER SYSTEM (SECTION 9.7.6.1) OR AUTOMATIC FIRE ALARM

SYSTEM (SECTION 9.6.1.6) IS OUT OF SERVICE FOR MORE THAN 4 HOURS

IN A 24-HOUR PERIOD, THE AUTHORITY HAVING JURISDICTION MUST BE

NOTIFIED AND THE BUILDING SHALL BE EVACUATED OR A FIRE WATCH

WILL BE POSTED. THE BUILDING SHALL REMAIN OCCUPIED.

CONTRACTOR SHALL PROVIDE THE REQUIRED FIRE WATCH. IN NO CASE

SHALL THE FIRE PROTECTION SYSTEM BE SHUT DOWN DURING OFF

HOURS OF WORKDAY WITHOUT A FIRE WATCH. THE DURATION OF THE

FIRE WATCH WILL BE UNTIL THE AFFECTED SYSTEM IS FULLY

RESTORED. SYSTEM SHALL BE RETURNED TO NORMAL OPERATING

CONDITIONS AT END OF EACH WORKDAY.

3 Plumbing.pdf
PL101.pdf
7580 PL101
7580 PL 101
PL102.pdf
7580 PL102
7580 PL 102
4 Fire Protection.pdf
F-001.pdf
7580 F-001
7580 F-001
FD101.pdf
7580 FD101
7580 FD101
FP101.pdf
7580 FP101
7580 FP 101

File details come from the government source that posted it.