36C24718R0118-00003001.pdf
PDF 186 KB Posted
- Attached to
- Install Emergency Power Generator, Project #557-16-102 Federal contract opportunity
- Solicitation number
- 36C24718R0118
About this file
36C24718R0118 00003 Attachment #1 - RFI LOG 00003 - RESPONSES.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24718R0118-00004000.docx | DOCX document | |
| 36C24718R0118-00003000.docx | DOCX document | |
| 36C24718R0118-00002001.pdf | ||
| 36C24718R0118-00002000.docx | DOCX document | |
| 36C24718R0118-00002002.pdf | ||
| 36C24718R0118-00001002.pdf | ||
| 36C24718R0118-00001004.pdf | ||
| 36C24718R0118-00001003.pdf | ||
| 36C24718R0118-00001000.docx | DOCX document | |
| 36C24718R0118-00001001.pdf | ||
| 36C24718R0118-004.pdf | ||
| 36C24718R0118-002.docx | DOCX document | |
| 36C24718R0118-003.pdf | ||
| 36C24718R0118-001.docx | DOCX document | |
| 36C24718R0118-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C247R0118
Project #557-16-102
"Install Emergency Power Generator"
Request for Information (RFI) LOG
Amendment #00003
Question # Question Government Response
The specifications do not indicate whom is responsible for filling the new 10,000 gallon diesel tank. The specifications only indicate that the Contractor is to top off the tank after load bank testing. Please advise whom is responsible for filling – the Government or the Contractor.
The contractor is responsible for filling the diesel tank.
Please confirm federal, state, and local taxes (FAR 52.229-3) shall be paid on this project (i.e. the project is NOT sales tax exempt). We have been subject to paying the 8% Dublin, GA sales tax rate on previous projects.
This project is not sales tax exempt.
The specifications include section 23 10 00, however there is no mechanical drawings included with the drawing package. Please provide mechanical one-line drawings, plan view drawings and elevations drawings/details for the fuel oil piping scope of work. At this point, we do not know if the fuel oil piping should go underground or aboveground, if aboveground, no hanger details or pipe sizes are indicated. These noted drawings are typical for a project such as this.
Fuel piping is aboveground. Support per applicable Codes. See previous amendment addressing fuel oil piping installation.
The specifications did not include div. 09 for painting of piping – please confirm the fuel oil piping does not get painted.
Prepare and prime surfaces as recommended by top coat manufacturer. Paint with minimum 2 coats alkyd industrial enamel.
The specifications did not include div. 13 for seismic provisions/delegated design – please confirm there are no seismic/anchoring requirements on this project.
Per the VA’s Seismic Zone Map H 18-8, there are no seismic considerations for Dublin, GA.