This is an Amendment of Solicitation (SF 30) issued by the Department of Veterans Affairs Veterans Integrated Service Network 6, Network Contracting Office 6, located at 100 Emancipation Drive, Hampton, Virginia. The amendment extends the receipt deadline for offers to November 16, 2026, at 10:00 AM EST for solicitation 36C24627Q0071 titled "N044--REPLACE AIR SEPARATOR AND RELOCATE."

The amendment provides clarification and supporting documentation in response to three questions posed by potential offerors. The first question requested existing air separator specifications including manufacturer, model, dimensions, connection sizes, and replacement specifications with flow capacity and pressure/temperature ratings; the government responded that photos have been posted. The second question asked for current and proposed locations, piping extension lengths, elevation changes, pipe sizes, materials, and installation clearances; again, the government indicated photos showing the areas have been posted. The third question sought confirmation whether the separator serves steam or a hot-water heating loop; the government stated "The service has the Value. It just need it to be installed and replaced." Three image documents are referenced as attachments to support the work requirements. No pricing terms, set-asides, or contract vehicles are specified in this amendment document.

View the file

Other files

File Type Posted
processed-58D6F4B8-BAA6-432F-867B-FE95F4744C4C.jpeg JPEG file
original-AE545666-FE96-4B50-B696-A851203A8E5C.jpeg JPEG file
original-9D97E61C-BDF7-4281-89F3-6CD668DCF88F.jpeg JPEG file
36C24627Q0071.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER

IS ISSUED

PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT

ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office , appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11-10-2026 none Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders

36C24627Q0071

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 11-16-2026 10:00 AM EST x

1. The purpose of this amendment is to answer questions asked and attach picture being requested.

2. The requesting Service has the valve. The valve just needs to be installed and replaced as

3. Please see pictures attached.

Audrey Wooten Contracting Officer Question and Answer Responses

1. Please provide the existing separator’s manufacturer, model, dimensions, and connection sizes and types, along with the required replacement specifications, including flow capacity and pressure and temperature ratings. A nameplate photo would be helpful.

Answer: Photos have been posted.

1. Please identify the current and proposed locations, the required piping extension lengths and elevation changes, pipe sizes and materials, and available installation clearances. Could you share photos or a marked-up drawing showing the relocation and mounting requirements?

Answer: Photos have been posted showing the areas

1. The scope mentions shutting down and restarting steam and reconnecting to the heating loop. Please confirm whether the separator serves steam or a hot-water heating loop.

Answer: The service has the Value. It just need it to be installed and replaced. The Attached are the pictures requested for repair and replacement.

See attached document: processed-58D6F4B8-BAA6-432F-867B-FE95F4744C4C.

See attached document: original-AE545666-FE96-4B50-B696-A851203A8E5C.

See attached document: original-9D97E61C-BDF7-4281-89F3-6CD668DCF88F.

image1.jpeg

File details come from the government source that posted it. Updated .