36C24626Q0638 0002.docx

DOCX document 19 KB Posted

Attached to
Y1LZ--Warehouse Exterior Improvements
Solicitation number
36C24626Q0638
Issued by

About this file

This is an Amendment/Modification of Solicitation (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office for solicitation 36C24626Q0638, dated August 11, 2026. The amendment posts answers to questions previously submitted by offerors regarding the Y1LZ--Warehouse Exterior Improvements project at the Hampton VA Healthcare System. The solicitation seeks a qualified General Contracting firm to provide construction services for installation of a concrete pad for vehicle use and installation of a concrete ramp.

The amendment addresses six questions from offerors. Key responses clarify that no work is required inside a VAMC building; a stamped design is not required for the new catch basin; field investigations will be necessary to identify the catch basin location; a laydown area is available on a first-come, first-serve basis requiring coordination with the Contracting Officer Representative and grounds; field investigations are required to obtain details on existing rain leaders; and no additional details are available regarding landscaping to redirect water flow through berms and paving wall. The due date for offers is not extended by this amendment, and all terms and conditions of the original solicitation remain in full force and effect. The Contracting Officer for this modification is Aaron Holmes.

View the file

Other files

File Type Posted
Attachment AA - pictures.docx DOCX document
36C24626Q0638 0001.docx DOCX document
Attachment F - VA20260195.txt TXT text file
Attachment A - Site Visit.docx DOCX document
Attachment B - Construction Safety Pamphlet.pdf PDF
Attachment E - Facility Site Survey.pdf PDF
Attachment D - 32_05_23_Cement_and_Concrete_for_Exterior_Improvements.docx DOCX document
Attachment C - 01_35_26_Safety_Requirements.docx DOCX document
36C24626Q0638_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 1 of 08-11-2026 none 36C246 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667

To all Offerors/Bidders

36C24626Q0638 07-02-2026

X X X The purpose of this amendment is to post answers to questions received. See page two for details. The due date for offers is not extended.

Aaron Holmes Contracting Officer Answers to Received Questions

1. Is there any work required inside a VAMC Bldg. associated with this project?

0. No

1. Is a stamped design required for the new catch basin?

1. No

1. Is the location identified in a drawing as to where the catch basin is located and new one required?

2. No. Field investigations will be required.

1. Is there a laydown are identified?

3. Laydown area available but at a first come first serve basis. Will need to coordinate with COR and grounds for availability

1. Are there details on the existing rain leaders?

4. No. Field investigations will be required.

1. Are there any additional details to support the following statement? “Landscaping to redirect water flow through berms and paving wall”

5. None

1. Is the existing retaining wall needing extension the split face. CMU wall perpendicular to the Bldg?

6. None