This document is a Questions and Answers (Q&A) file for Solicitation 36C24626Q0114, a Department of Veterans Affairs electrical breaker testing contract. The opportunity involves comprehensive electrical equipment testing across multiple buildings, including 175 breakers ranging from 100 to 3000 amps at voltage levels of 208 to 480 volts, located in Buildings 2, 3, 4, 5, 8, 11, 12, 17, 18, 20, 21, 31, 42, and 43. The incumbent contractor is J & B HARTIGAN, with the previous contract valued at $197,446.60, and the current scope of work remains unchanged from the prior year.
Key testing requirements include primary injection testing for breakers 225 amps and higher, infrared scanning, and testing of automatic transfer switches (ATS), breakers, and transformers. The contract has a service-disabled veteran-owned business (SDVOB) component, with work to be performed Monday through Friday from 7:00 AM to 5:00 PM. Testing will cover circuit breakers, with secondary and primary injection methods, and for medium voltage liquid-filled transformers, testing may include oil sampling, inspection, and potential additional electrical tests such as Polarization Index, Excitation Current, Turns Ratio, Insulation, and Winding Resistance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for 36C24626Q0114 Electric Breaker Testing
| • | RFI #1: Who is the incumbent contractor? J & B HARTIGAN |
| • | RFI #2: What was the contract value of the previous award? 197,446.60 |
| • | RFI# 3: Are there any changes to the scope of work compared to the previous contract? NO |
| • | RFI #4: Can you provide the previous scope of work, or alternatively, identify and itemize any changes from the prior version? THE SOW IS SAME AS PREVIOUS YEAR |
| • | RFI #5: Please provide the complete electrical equipment list that requires testing, including: |
| o | Breaker quantities 175 |
| o | Sizes (frame/interrupt ratings) 3000 AMPS TO 100 AMPS |
| o | Voltage levels 480 VOTS TO 208 VOLTS |
| o | Panel/switchgear locations BLDG 2,3,4,5,8,11,12,17,18,20,21,31,42,43 |
| o | IR scan equipment list SAME AS ABOVE |
· RFI # 6: Which breakers are required to receive primary injection testing?
· 225 AMP AND HIGHER
Can you please confirm the quantities highlighted for each of the following taken from the scope of work:
1. Building 43 o Qty: 50 ea. ATS 2 ATS’S 2.Building 4 6 ATS’S o 4 Qty: 1 ea. ATS
1. Page 12/23, working hours is Monday through Friday, 8:00 am – 4:30 pm. Meanwhile, page 4/23 mention working hours is from 7:00 am to 5:00 pm.
>> Can you confirm the working hours for this bid? 7:00AM TO 5:00PM
2. >> Will electrical panels require testing, or only the named devices in the equipment list be required? NO, ONLY BREAKERS, ATS’S, AND TRANSFORMERS.
>> If Yes, can you verify the quantity of all panels?
| 3. | >> Can you confirm the voltage level of all electrical equipment that requires testing? 480 VOTS TO 208 VOLTS |
| 4. | >> In according with NETA & VHA Directive 1028, do all CBs (>225A) require primary injections, and all CBs (=<225A) require normal testing only? YES |
>> If Yes, can you confirm the number of CBs that are >225A and =<225A? (100) 225 AMPS AND UP AND (75) BELOW 225 AMPS
| 5. | >> Will all liquid transformers require oil test and electrical test? YES |
| 6. | >> Do relevant electrical components like CTs, Meters, Relays… require testing too? NO |
>> If Yes, can you provide the SLD and/or confirm the quantity?
7. RFQ C.3 VAAR 852.219-75 , page 18, the value for SDVOB contract is 75%, however, in Attachment B, the value is left blank.
>> Can you confirm the subcontract value for SDVOB? That is a discrepancy when the VAAR 852.219-75 clause was generated. The VAAR 852.219-75 clause - Services should be checked as well as the pdf that is attached for signature and returned with the quote submission.
Please answer the following technical questions regarding request 36C24626Q0114:
| 1- | Can all circuit breakers be tested by secondary injection? If not, how many require primary injection? Yes |
| 2- | Can MV Liquid Filled Transformers testing be limited to oil sampling, and inspection? Yes |
| 3- | If the answer to the previous question is no, should we perform tests for Polarization Index, Excitation Current, Turns Ratio, Insulation and Winding Resistance on the MV Transformers? |