Additional Questions.pdf

PDF 54 KB Posted

Attached to
9905--PEDESTRIAN CROSSING SIGNAGE W/ INSTALLATION
Solicitation number
36C24626Q0100
Issued by

About this file

This document is a Questions and Answers (Q&A) document for a VA Hampton pedestrian crossing sign installation project. The project involves installing 30 single-post pedestrian crossing signs, with the contractor responsible for all sign design files, drawings, and graphics. The contractor must comply with the VA Technical Information Library, PG 18-10 Signage and Wayfinding Design Manual requirements. The VA cannot guarantee a clean underground path, so the contractor will need to be prepared to address potential obstacles like old concrete, large rocks, or abandoned debris during installation. A site plan has been attached to the document, and the contractor is expected to correct any damages made during the installation process.

View the file

Other files

File Type Posted
S06 36C24626Q0100 0002.pdf PDF
VA Hampton - Ext - Dwg Loc Map - PedX.pdf PDF
S06 36C24626Q0100 0001.pdf PDF
Crosswalks.pdf PDF
36C24626Q0100_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: Should we anticipate any concrete cutting or asphalt restoration during installation?

A: Contractor to correct any damages made to existing conditions. VA Hampton cannot guarantee a clean path underground (old concrete, large rocks, abandoned debris).

Q: Lastly, is a site visit or pre-bid walkthrough scheduled? If not, could a site plan or location map of the thirty proposed sign installations be provided?

A: Site plan has been attached.

Q: Could you confirm how many of the thirty (30) pedestrian crossing signs are single-post versus double-post configurations?

A: All 30 pedestrian crossing signs will be single-post. More details are available via the Statement of Work.

Q: Will the VA provide the final sign design files, drawings, and graphics, or is the contractor expected to develop these as part of the contract?

A: The ownness will fall on the contractor as stated in the Statement of Work. The contractor shall ensure compliance with the VA Technical Information Library, PG 18-10 Signage and Wayfinding Design Manual requirements.