Additional Questions.pdf
PDF 54 KB Posted
- Solicitation number
- 36C24626Q0100
About this file
This document is a Questions and Answers (Q&A) document for a VA Hampton pedestrian crossing sign installation project. The project involves installing 30 single-post pedestrian crossing signs, with the contractor responsible for all sign design files, drawings, and graphics. The contractor must comply with the VA Technical Information Library, PG 18-10 Signage and Wayfinding Design Manual requirements. The VA cannot guarantee a clean underground path, so the contractor will need to be prepared to address potential obstacles like old concrete, large rocks, or abandoned debris during installation. A site plan has been attached to the document, and the contractor is expected to correct any damages made during the installation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C24626Q0100 0002.pdf | ||
| VA Hampton - Ext - Dwg Loc Map - PedX.pdf | ||
| S06 36C24626Q0100 0001.pdf | ||
| Crosswalks.pdf | ||
| 36C24626Q0100_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: Should we anticipate any concrete cutting or asphalt restoration during installation?
A: Contractor to correct any damages made to existing conditions. VA Hampton cannot guarantee a clean path underground (old concrete, large rocks, abandoned debris).
Q: Lastly, is a site visit or pre-bid walkthrough scheduled? If not, could a site plan or location map of the thirty proposed sign installations be provided?
A: Site plan has been attached.
Q: Could you confirm how many of the thirty (30) pedestrian crossing signs are single-post versus double-post configurations?
A: All 30 pedestrian crossing signs will be single-post. More details are available via the Statement of Work.
Q: Will the VA provide the final sign design files, drawings, and graphics, or is the contractor expected to develop these as part of the contract?
A: The ownness will fall on the contractor as stated in the Statement of Work. The contractor shall ensure compliance with the VA Technical Information Library, PG 18-10 Signage and Wayfinding Design Manual requirements.