Attachment D_1 - Past Performance Questionnaire.docx
DOCX document 44 KB Posted
- Solicitation number
- 36C24625R0028
About this file
This document is a Past Performance Questionnaire (PPQ) template for architectural and engineering (A/E) services related to a renovation project at the Hampton VA Medical Center. The questionnaire is designed to capture detailed performance evaluations across multiple service categories, including design services, construction support, and potentially LEED and BIM documentation, with a rating scale from Unsatisfactory (1) to Exceptional (5).
The document is associated with Solicitation Number 36C24625R0028 for renovating Building 135 (Project 590-25-101) under the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The PPQ allows past clients to comprehensively assess an A/E firm's performance by rating 21 specific factors, such as technical competence, design issue resolution, cost control, document accuracy, and overall management performance. The form includes sections for general project information, evaluator details, performance ratings, and a narrative summary, with a specific emphasis on capturing nuanced feedback about the firm's professional capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A_1 - 590-25-101 SOW_Final_16JAN25.docx | DOCX document | |
| Attachment C_1 - 590-25-101 Security Badge Requirement.docx | DOCX document | |
| Attachment E_1 - VA privacy form.doc | DOC document | |
| 36C24625R0028_1.docx | DOCX document | |
| Attachment B_1 - ICRA SOW Attachment.docx | DOCX document | |
| Attachment B - ICRA SOW Attachment.docx | DOCX document | |
| Attachment C - 590-25-101 Security Badge Requirement.docx | DOCX document | |
| Attachment E - VA privacy form.doc | DOC document | |
| Attachment A - 590-25-101 SOW_Final_16JAN25.docx | DOCX document | |
| Attachment D - Past Performance Questionnaire.docx | DOCX document | |
| 36C24625R0028.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION ATTACHMENT - PAST PERFORMANCE QUESTIONNAIRE AND COVER LETTER
Complete one set of letters and forms for at least three (3) projects identified in your firm’s SF330 Section F, Example Projects Which Best Illustrate Proposed Team’s Qualifications for This Contract. Additional space or blank sheets may be added to answer any question.Transmittal Letter to Accompany Past Performance Questionnaire
FROM: [Insert Company Official Name, Title, and Company Name] SUBJECT: Past Performance Questionnaire (PPQ) for Contract(s):
[Insert Company Name] is currently responding to VHA Network Contracting Office 6 and the Hampton VA Medical Center, regarding a request for SF 330, Architect- Engineer Qualifications for Project 590-25-101, Renovate Bldg. 135.
This Request for SF330’s requires respondents to identify customers and solicit their response regarding [Insert Company Name] performance.
[Insert Company Name] is providing past performance data to VHA Network Contracting Office 6 relating to our performance on contract [Insert contract name/number] and have identified [Insert name of reference] as the point of contact for this contract.
****** NOTE: Make sure the PPQ’s are signed by the evaluator. *********************
A. GENERAL INFORMATION
A-E FIRM TO BE EVALUATED:
Firm Name: Address:
Unique Entity Identification:
Project Title:
Description of Project:
Description of A-E Firms’ Responsibilities:
Contract Number: Dollar Amount:
Contract Period of Performance:
The A-E Firm performed as the Prime Contractor Sub-Contractor/Consultant/Team Member Percent of work performed by A-E Firm:
B. EVALUATOR INFORMATION:
Evaluator’s Company or Agency Name: Company or Agency Address: Evaluator’s Name:
Title of Evaluator:
Telephone:
E-mail:
PERFORMANCE INFORMATION: Choose the appropriate rating that most accurately describes the A/E’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ALL RATINGS OF Marginal or Unsatisfactory on page 7 under Narrative Summary.
| Exceptional (5) |
| Very Good (4) |
| Satisfactory (3) |
| Marginal (2) |
| Unsatisfactory (1) |
| N/A |
| -Performance meets |
| -Performance meets or |
| -Performance meets |
| -Performance does |
| -Performance does |
| -Not applicable |
| or met contractual |
| met contractual |
| or met contractual |
| or did not meet |
| or did not meet |
| or rater has not |
| requirements and |
| requirements and |
| requirements. The |
| some contractual |
| most contractual |
| observed |
| exceeds or |
| exceeds or exceeded |
| contractual |
| requirements. The |
| requirements and |
| performance in |
| exceeded many of |
| some of your |
| performance reflects |
| contractual |
| recovery is not |
| this area. |
| your company’s |
| company’s |
| or reflected some |
| performance reflects |
| likely or did not |
| expectations. The |
| expectations. The |
| minor problems. |
| or reflected serious |
| occur. The |
| contractual |
| contractual |
| Corrective actions |
| problems(s) for |
| contractual |
| performance |
| performance reflects or |
| being taken by the |
| which the contractor |
| performance |
| reflects or reflected |
| reflected some minor |
| contractor appear to |
| has not yet |
| contains or |
| few minor problems |
| problems and |
| be effective or |
| identified acceptable |
| contained serious |
| and corrective |
| corrective actions |
| Corrective actions |
| corrective actions or |
| problem (s) for |
| actions taken by the |
| being taken by the |
| taken were |
| did not provide |
| which the |
| contractor appear to |
| contractor appear to be |
| effective. |
| acceptable |
| contractor’s |
| be highly effective |
| effective or Corrective |
| corrective actions. |
| corrective actions |
| or corrective actions |
| actions taken were |
appear ineffective
| taken were |
| effective. |
or were ineffective.
effective.
Place an “X” in the appropriate column using the above definitions matrix.
Item
FACTORS TO BE RATED
| Exceptional (5) |
| Very Good (4) |
| Satisfactory (3) |
| Marginal (2) |
| Unsatisfactory (1) |
| N/A |
Design Services:
| 1. |
| Overall skill level and technical competence of A/E’s personnel. |
| 2. |
| A/E’s ability to identify and resolve design issues expeditiously. |
| 3. |
| A/E’s responsiveness to design review questions. |
| 4. |
| A/E’s ability to effectively coordinate, integrate and manage their consultants/subcontractors/team |
| 5. |
| A/E’s effectiveness and responsiveness in interfacing with the Client’s staff |
Item
FACTORS TO BE RATED
| Exceptional (5) |
| Very Good (4) |
| Satisfactory (3) |
| Marginal (2) |
| Unsatisfactory (1) |
| N/A |
| 6. |
| Overall accuracy, completeness and coordination of final design documents. (Quality) |
| 7. |
| A/E’s ability to provide detailed, accurate cost estimates. |
| 8. |
| A/E’s ability to meet contract schedule. |
Follow-On Construction Support Services:
| 9. |
| Thoroughness and timely review of construction submittals. |
| 10. |
| Timely resolution of construction design issues. |
| 11. |
| Overall quality, responsiveness and timeliness of A/E follow- on construction support services. |
LEED (If Applicable):
| 12. |
| Overall accuracy, completeness, timeliness and coordination of LEED documentation. |
| 13. |
| A/E’s ability and understanding of the overall LEED process. |
BIM (If Applicable):
| 14. |
| Overall accuracy, completeness, timeliness and coordination of BIM documentation. |
| 15. |
| A/E’s ability and understanding of the overall BIM process. |
Owner’s Representative on Design/Build Projects (If applicable):
| 16. |
| Overall accuracy, completeness, timeliness and coordination of requirements documents and bridging documents. |
| 17. |
| A/E’s ability, thoroughness, timeliness and support as Owner’s Representative throughout the project. |
Overall:
| 18. |
| How would you rate the A/E’s ability to control cost? |
| 19. |
| How would you rate the A/E’s overall management performance on this contract? |
| 20. |
| How would you rate the A/E’s overall technical/quality performance on this contract? |
| 21. |
| Would you use this A/E again? (If “No”, please comment in the Narrative Summary) |
YES
NO
Number of A/E Design Errors & Omissions on Project: _ Increased Project Cost Due to A/E Design Errors & Omissions:
NARRATIVE SUMMARY REGARDING PERFORMANCE:
| Item |
| COMMENTS |
Evaluator’s Name and Title
Signature
Date