Price Breakdown.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Flooring replacement for Behavioral Health Dayroom 518 and 560
Solicitation number
36C24624Q0513
Issued by

About this file

This document contains two cost breakdown worksheets and a related federal contract opportunity solicitation. The first worksheet provides an estimate for asbestos removal and fire damper repair at a property in Durham, North Carolina, with a total estimated base offer cost of $9,840.67. The second empty worksheet is a template for replacing flooring at the Fayetteville VA Medical Center in Fayetteville, North Carolina.

The related federal contract opportunity solicitation seeks a flooring contractor to remove existing sheet flooring and install new flooring in two behavioral health dayrooms at the Fayetteville VA Medical Center. The site visit is scheduled for March 20, 2024 at 10am EST at the historical entrance of Building 1. Interested offerors should meet at the lobby at the scheduled time. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

Department of Veterans Affairs
FACILITIES MANAGEMENT CONSTRUCTION ESTIMATE WORKSHEETDATESHEET NO.__1_____ OF ___1____ SHEETS
1/4/24ESTIMATE WORKSHEET - SHORT FORM CSI FORMAT
LOCATIONPROJECT NUMBER AND NAMETYPE OF ESTIMATE
508 Fulton Street Durham, NC 27705asbestos removal and fire damper repairXNO DESIGN COMPLETED
ESTIMATORBUILDING NO(S).:DRAWING NO.PRELIMINARY DESIGN
FINAL DESIGN
Materials/EquipmentLaborTOTAL
DescriptionQuantityUnit$/UnitMaterials TotalQuantityUnit$/UnitLabor Total
asbestos removal and fire damper repair1$30,000.00
Plaster16bg$ 22.78$364.48
1/2 sheet rock12ea$ 19.98$239.76
5/8 sheet rock6ea$ 17.44$104.64
metal studs14ea8.98$125.72
metal track4ea$ 10.48$41.92
block14ea$ 2.25$31.50
mortor16bg$ 16.12$257.92
sand6bg$ 7.67$46.02
brick296ea1.01298.96
access pnl2ea231.45462.9
asbesto removal1$ 7,866.85$7,866.850
total9840.67

Sheet1

BASE OFFER COST BREAKDOWNDATESHEET NO.__1_____ OF ___1____ SHEETS
ESTIMATE WORKSHEET - SHORT FORM CSI FORMAT
LOCATIONPROJECT NUMBER AND NAMETYPE OF ESTIMATE
2300 Ramsey St., Fayetteville NCReplace FlooringXNO DESIGN COMPLETED
ESTIMATORBUILDING NO(S).:DRAWING NO.PRELIMINARY DESIGN
Behaviorial Health DayroomFINAL DESIGN
Materials/EquipmentLaborTOTAL
DescriptionQuantityUnit$/UnitMaterials TotalQuantityUnit$/UnitLabor Total

total $0.00 $0.00 $0.00

Sub-Total$0.00
Bonding$0.00
Profit$0.00
Overhead$0.00
Total$0.00