Price Breakdown.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 36C24624Q0513
About this file
This document contains two cost breakdown worksheets and a related federal contract opportunity solicitation. The first worksheet provides an estimate for asbestos removal and fire damper repair at a property in Durham, North Carolina, with a total estimated base offer cost of $9,840.67. The second empty worksheet is a template for replacing flooring at the Fayetteville VA Medical Center in Fayetteville, North Carolina.
The related federal contract opportunity solicitation seeks a flooring contractor to remove existing sheet flooring and install new flooring in two behavioral health dayrooms at the Fayetteville VA Medical Center. The site visit is scheduled for March 20, 2024 at 10am EST at the historical entrance of Building 1. Interested offerors should meet at the lobby at the scheduled time. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| Department of Veterans Affairs | ||||||||||
| FACILITIES MANAGEMENT CONSTRUCTION ESTIMATE WORKSHEET | DATE | SHEET NO.__1_____ OF ___1____ SHEETS | ||||||||
| 1/4/24 | ESTIMATE WORKSHEET - SHORT FORM CSI FORMAT | |||||||||
| LOCATION | PROJECT NUMBER AND NAME | TYPE OF ESTIMATE | ||||||||
| 508 Fulton Street Durham, NC 27705 | asbestos removal and fire damper repair | X | NO DESIGN COMPLETED | |||||||
| ESTIMATOR | BUILDING NO(S).: | DRAWING NO. | PRELIMINARY DESIGN | |||||||
| FINAL DESIGN | ||||||||||
| Materials/Equipment | Labor | TOTAL | ||||||||
| Description | Quantity | Unit | $/Unit | Materials Total | Quantity | Unit | $/Unit | Labor Total | ||
| asbestos removal and fire damper repair | 1 | $30,000.00 | ||||||||
| Plaster | 16 | bg | $ 22.78 | $364.48 | ||||||
| 1/2 sheet rock | 12 | ea | $ 19.98 | $239.76 | ||||||
| 5/8 sheet rock | 6 | ea | $ 17.44 | $104.64 | ||||||
| metal studs | 14 | ea | 8.98 | $125.72 | ||||||
| metal track | 4 | ea | $ 10.48 | $41.92 | ||||||
| block | 14 | ea | $ 2.25 | $31.50 | ||||||
| mortor | 16 | bg | $ 16.12 | $257.92 | ||||||
| sand | 6 | bg | $ 7.67 | $46.02 | ||||||
| brick | 296 | ea | 1.01 | 298.96 | ||||||
| access pnl | 2 | ea | 231.45 | 462.9 | ||||||
| asbesto removal | 1 | $ 7,866.85 | $7,866.85 | 0 | ||||||
| total | 9840.67 |
Sheet1
| BASE OFFER COST BREAKDOWN | DATE | SHEET NO.__1_____ OF ___1____ SHEETS | |||||||
| ESTIMATE WORKSHEET - SHORT FORM CSI FORMAT | |||||||||
| LOCATION | PROJECT NUMBER AND NAME | TYPE OF ESTIMATE | |||||||
| 2300 Ramsey St., Fayetteville NC | Replace Flooring | X | NO DESIGN COMPLETED | ||||||
| ESTIMATOR | BUILDING NO(S).: | DRAWING NO. | PRELIMINARY DESIGN | ||||||
| Behaviorial Health Dayroom | FINAL DESIGN | ||||||||
| Materials/Equipment | Labor | TOTAL | |||||||
| Description | Quantity | Unit | $/Unit | Materials Total | Quantity | Unit | $/Unit | Labor Total |
total $0.00 $0.00 $0.00
| Sub-Total | $0.00 |
| Bonding | $0.00 |
| Profit | $0.00 |
| Overhead | $0.00 |
| Total | $0.00 |