This is a solicitation for a chiller maintenance agreement at the Salisbury VA Medical Center. The agreement covers preventative maintenance and repairs for centrifugal chillers, air cooled chillers, package units, and split systems. Required services include comprehensive coverage for parts and labor for repairs, preventative maintenance including inspections and cleaning, and emergency service. The base period of performance is from November 2022 to November 2023 with four one-year option periods. The solicitation includes a schedule of equipment by location, model and serial number. Offerors are required to provide pricing for the base period and each option period. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 6 Network Contracting Office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24623Q0082 0003_1.docx | DOCX document | |
| SF30 Amendment 36C24623Q0082 0003.pdf | ||
| 36C24623Q0082 0002_1.docx | DOCX document | |
| SF30 Amendment 36C24623Q0082 0002.pdf | ||
| 36C24623Q0082 0001_1.docx | DOCX document | |
| S02 - SF1449 Solicitation 36C24623Q0082.pdf | ||
| 36C24623Q0082_1.docx | DOCX document | |
| Campus Map 2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 10
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
To all Offerors/Bidders
36C24623Q0082
10-25-2022
X
X X
See CONTINUATION Page
The purpose of this amendment is to make minor changes to the CLIN descriptions which do not effect the scope of work.
All other terms and conditions remain unchanged. The Schedule of Items beginning on page 2 hereby replaces the original Schedule of Items.
Daniel Spaulding Contracting Officer, NCO 6
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
12.00 MO __________________ __________________
CHILLER MAINTENANCE AGREEMENT for Centrifugal Chillers, Air Cooled Chillers and Package units and split systems located at the Salisbury VA Medical Center. Service includes: 1. Comprehensive service contract that covers the replacement and repair of all parts, components, refrigerant, oil, and other materials that may be needed. 2. Includes all labor to diagnose, repair and replace failed components covered under this contract. 3. Provides emergency service and minor repairs seven days a week 24 hours a day. 4.
Provides the following preventative maintenance procedures as a part of this contract: Oil analysis once a year, annual visual inspection of condenser tubes including removal of heads, annual brush cleaning of condenser tubes, annual cleaning of condenser coils on air cooled chillers, replacement of belts on equipment equipped with belts, and all materials and supplies required to carry out these procedures. Contractor shall dispose of all used refrigerant removed from equipment.
Contractor is required to submit written reports on all repairs and preventive maintenance completed and refrigerant recovered. Centrifugal Chillers will have one annual inspection consisting of leak testing, Meg the compressor, motor and oil pump motor, clean oil strainer, replace filter and gasket where required, tighten oil heater leads, check the operation of vane positioners, change compressor oil as indicated by analysis, check condition of chiller starter contacts, and inspect overloads, mechanical trips, and verify settings on electronics.
There will be three scheduled maintenance services performed during operation consisting of inspecting operating and safety controls, checking the operation control circuit, log of temperatures, voltage, and amperage, check entire oil lube system, check motor and starter operation, check refrigerant and oil levels, check shift logs and discus the operation of the equipment. Air Cooled Chillers will have one annual inspection consisting of leak testing machine, Meg compressor motor, test vent piping of all relief valves, tighten motor terminals and control terminals, check oil level, check differential pressure switch settings, check and calibrate all machine operating and safety controls, tighten oil heater heads, check operation of condenser fans, clean condenser coils, replace oil filter, provide tube services. There will be three inspection performed during operation to include inspecting safety controls, review operating logs, check refrigeration charge, complete operating log temperatures, pressures, voltages, and amperage, check refrigerant filter temp and drop at full load, and check oil filter pressure drop. Package units and split systems will receive a total of four inspection which will consist of the following, inspect evap coil, inspect drain pan and drain lines, clean drain pans, check for refrigerant leaks, report all leaks to owner, check and calibrate safety controls and overloads, Meg test compressor motor and record readings, check the main starter tighten all starter terminals and check contacts for wear, check oil level in compressors, tighten motor terminals and control terminals, check crank case heaters, check external interlocks, lube bearings, inspect and adjust belts, check damper operation, inspect filters change as needed, record refrigerant pressures, temps, super heat, and sub cooling, check for proper refrigerant charge. The vendor will provide to the customer representative following each regular inspection or emergency call and report uncorrected deficiencies. EQUIPMENT LIST: Centrifugal Chillers: Chiller one York model number YKHRFVP8-SG serial number SAVM- 211530. Chiller two York model number YKHRFVPI-CVE serial number SAKM-238310. Chiller three McQuay model number PEH126-ZA81037-00-C85 serial number 5ZA81037.
Air Cooled Chillers: MICU - McQuay model number AGZ020AS12-ER10 serial number STNU0350037. OR - McQuay model number AGZ035DHHNN-ER10 serial number STU101200170. OR - McQuay model number AGZ030DHHNN serial number STNU110900020. Laundry - McQuay model number ALR065C serial number 5XDQ183200.
Credit Union - Trane model number RTAA080AYT01A3D0B serial number U08L02426. Portable - McQuay model number AWS260CDSEWNN serial number STNU130900145. Lab - Trane model number CGAM052AE02AX08 serial number U11K25627. Hospice - York model number YCAL0066FE17XE serial number SEXM-936470. Audiology - Carrier model number 30RAN018H-611KJ serial number 0208Q04152. Package Units & Split Systems: Travel Pay - York model number J10YCC00A2TLA2 serial number N1H0201834. PACU - Trane model number 2TTA3060A3000AA serial number 9091KD64F. Core Clinic - Carrier model number D08A2G5A0A0A0 serial number 0810G50463. Building Seven - Carrier model number 50DJ008 serial number 2192G20381. Building Seven - Carrier model number 50DJ004 serial number 1992G13745. Building Five - York model number J104CC00A25L serial number N1H0201834.
Contract Period: Base POP Begin: 11-21-2022 POP End: 11-20-2023
Chillers, Air Cooled Chillers and Package units and split systems located at the Salisbury VA Medical Center. Service includes: 1. Comprehensive service contract that covers the replacement and repair of all parts, components, refrigerant, oil, and other materials that may be needed. 2. Includes all labor to diagnose, repair and replace failed components covered under this contract. 3. Provides emergency service and minor repairs seven days a week 24 hours a day. 4.
Provides the following preventative maintenance procedures as a part of this contract: Oil analysis once a year, annual visual inspection of condenser tubes including removal of heads, annual brush cleaning of condenser tubes, annual cleaning of condenser coils on air cooled chillers, replacement of belts on equipment equipped with belts, and all materials and supplies required to carry out these procedures. Contractor shall dispose of all used refrigerant removed from equipment.
Contractor is required to submit written reports on all repairs and preventive maintenance completed and refrigerant recovered. Centrifugal Chillers will have one annual inspection consisting of leak testing, Meg the compressor, motor and oil pump motor, clean oil strainer, replace filter and gasket where required, tighten oil heater leads, check the operation of vane positioners, change compressor oil as indicated by analysis, check condition of chiller starter contacts, and inspect overloads, mechanical trips, and verify settings on electronics.
There will be three scheduled maintenance services performed during operation consisting of inspecting operating and safety controls, checking the operation control circuit, log of temperatures, voltage, and amperage, check entire oil lube system, check motor and starter operation, check refrigerant and oil levels, check shift logs and discus the operation of the equipment. Air Cooled Chillers will have one annual inspection consisting of leak testing machine, Meg compressor motor, test vent piping of all relief valves, tighten motor terminals and control terminals, check oil level, check differential pressure switch settings, check and calibrate all machine operating and safety controls, tighten oil heater heads, check operation of condenser fans, clean condenser coils, replace oil filter, provide tube services. There will be three inspection performed during operation to include inspecting safety controls, review operating logs, check refrigeration charge, complete operating log temperatures, pressures, voltages, and amperage, check refrigerant filter temp and drop at full load, and check oil filter pressure drop. Package units and split systems will receive a total of four inspection which will consist of the following, inspect evap coil, inspect drain pan and drain lines, clean drain pans, check for refrigerant leaks, report all leaks to owner, check and calibrate safety controls and overloads, Meg test compressor motor and record readings, check the main starter tighten all starter terminals and check contacts for wear, check oil level in compressors, tighten motor terminals and control terminals, check crank case heaters, check external interlocks, lube bearings, inspect and adjust belts, check damper operation, inspect filters change as needed, record refrigerant pressures, temps, super heat, and sub cooling, check for proper refrigerant charge. The vendor will provide to the customer representative following each regular inspection or emergency call and report uncorrected deficiencies. EQUIPMENT LIST: Centrifugal Chillers: Chiller one York model number YKHRFVP8-SG serial number SAVM- 211530. Chiller two York model number YKHRFVPI-CVE serial number SAKM-238310. Chiller three McQuay model number PEH126-ZA81037-00-C85 serial number 5ZA81037.
Air Cooled Chillers: MICU - McQuay model number AGZ020AS12-ER10 serial number STNU0350037. OR - McQuay model number AGZ035DHHNN-ER10 serial number STU101200170. OR - McQuay model number AGZ030DHHNN serial number STNU110900020. Laundry - McQuay model number ALR065C serial number 5XDQ183200.
Credit Union - Trane model number RTAA080AYT01A3D0B serial number U08L02426. Portable - McQuay model number AWS260CDSEWNN serial number STNU130900145. Lab - Trane model number CGAM052AE02AX08 serial number U11K25627. Hospice - York model number YCAL0066FE17XE serial number SEXM-936470. Audiology - Carrier model number 30RAN018H-611KJ serial number 0208Q04152. Package Units & Split Systems: Travel Pay - York model number J10YCC00A2TLA2 serial number N1H0201834. PACU - Trane model number 2TTA3060A3000AA serial number 9091KD64F. Core Clinic - Carrier model number D08A2G5A0A0A0 serial number 0810G50463. Building Seven - Carrier model number 50DJ008 serial number 2192G20381. Building Seven - Carrier model number 50DJ004 serial number 1992G13745. Building Five - York model number J104CC00A25L serial number N1H0201834.
Contract Period: Option 1 POP Begin: 11-21-2023 POP End: 11-20-2024
Chillers, Air Cooled Chillers and Package units and split systems located at the Salisbury VA Medical Center. Service includes: 1. Comprehensive service contract that covers the replacement and repair of all parts, components, refrigerant, oil, and other materials that may be needed. 2. Includes all labor to diagnose, repair and replace failed components covered under this contract. 3. Provides emergency service and minor repairs seven days a week 24 hours a day. 4.
Provides the following preventative maintenance procedures as a part of this contract: Oil analysis once a year, annual visual inspection of condenser tubes including removal of heads, annual brush cleaning of condenser tubes, annual cleaning of condenser coils on air cooled chillers, replacement of belts on equipment equipped with belts, and all materials and supplies required to carry out these procedures. Contractor shall dispose of all used refrigerant removed from equipment.
Contractor is required to submit written reports on all repairs and preventive maintenance completed and refrigerant recovered. Centrifugal Chillers will have one annual inspection consisting of leak testing, Meg the compressor, motor and oil pump motor, clean oil strainer, replace filter and gasket where required, tighten oil heater leads, check the operation of vane positioners, change compressor oil as indicated by analysis, check condition of chiller starter contacts, and inspect overloads, mechanical trips, and verify settings on electronics.
There will be three scheduled maintenance services performed during operation consisting of inspecting operating and safety controls, checking the operation control circuit, log of temperatures, voltage, and amperage, check entire oil lube system, check motor and starter operation, check refrigerant and oil levels, check shift logs and discus the operation of the equipment. Air Cooled Chillers will have one annual inspection consisting of leak testing machine, Meg compressor motor, test vent piping of all relief valves, tighten motor terminals and control terminals, check oil level, check differential pressure switch settings, check and calibrate all machine operating and safety controls, tighten oil heater heads, check operation of condenser fans, clean condenser coils, replace oil filter, provide tube services. There will be three inspection performed during operation to include inspecting safety controls, review operating logs, check refrigeration charge, complete operating log temperatures, pressures, voltages, and amperage, check refrigerant filter temp and drop at full load, and check oil filter pressure drop. Package units and split systems will receive a total of four inspection which will consist of the following, inspect evap coil, inspect drain pan and drain lines, clean drain pans, check for refrigerant leaks, report all leaks to owner, check and calibrate safety controls and overloads, Meg test compressor motor and record readings, check the main starter tighten all starter terminals and check contacts for wear, check oil level in compressors, tighten motor terminals and control terminals, check crank case heaters, check external interlocks, lube bearings, inspect and adjust belts, check damper operation, inspect filters change as needed, record refrigerant pressures, temps, super heat, and sub cooling, check for proper refrigerant charge. The vendor will provide to the customer representative following each regular inspection or emergency call and report uncorrected deficiencies. EQUIPMENT LIST: Centrifugal Chillers: Chiller one York model number YKHRFVP8-SG serial number SAVM- 211530. Chiller two York model number YKHRFVPI-CVE serial number SAKM-238310. Chiller three McQuay model number PEH126-ZA81037-00-C85 serial number 5ZA81037.
Air Cooled Chillers: MICU - McQuay model number AGZ020AS12-ER10 serial number STNU0350037. OR - McQuay model number AGZ035DHHNN-ER10 serial number STU101200170. OR - McQuay model number
AGZ030DHHNN serial number STNU110900020. Laundry - McQuay model number ALR065C serial number 5XDQ183200.
Credit Union - Trane model number RTAA080AYT01A3D0B serial number U08L02426. Portable - McQuay model number AWS260CDSEWNN serial number STNU130900145. Lab - Trane model number CGAM052AE02AX08 serial number U11K25627. Hospice - York model number YCAL0066FE17XE serial number SEXM-936470. Audiology - Carrier model number 30RAN018H-611KJ serial number 0208Q04152. Package Units & Split Systems: Travel Pay - York model number J10YCC00A2TLA2 serial number N1H0201834. PACU - Trane model number 2TTA3060A3000AA serial number 9091KD64F. Core Clinic - Carrier model number D08A2G5A0A0A0 serial number 0810G50463. Building Seven - Carrier model number 50DJ008 serial number 2192G20381. Building Seven - Carrier model number 50DJ004 serial number 1992G13745. Building Five - York model number J104CC00A25L serial number N1H0201834.
Contract Period: Option 2 POP Begin: 11-21-2024 POP End: 11-20-2025
Chillers, Air Cooled Chillers and Package units and split systems located at the Salisbury VA Medical Center. Service includes: 1. Comprehensive service contract that covers the replacement and repair of all parts, components, refrigerant, oil, and other materials that may be needed. 2. Includes all labor to diagnose, repair and replace failed components covered under this contract. 3. Provides emergency service and minor repairs seven days a week 24 hours a day. 4.
Provides the following preventative maintenance procedures as a part of this contract: Oil analysis once a year, annual visual inspection of condenser tubes including removal of heads, annual brush cleaning of condenser tubes, annual cleaning of condenser coils on air cooled chillers, replacement of belts on equipment equipped with belts, and all materials and supplies required to carry out these procedures. Contractor shall dispose of all used refrigerant removed from equipment.
Contractor is required to submit written reports on all repairs and preventive maintenance completed and refrigerant recovered. Centrifugal Chillers will have one annual inspection consisting of leak testing, Meg the compressor, motor and oil pump motor, clean oil strainer, replace filter and gasket where required, tighten oil heater leads, check the operation of vane positioners, change compressor oil as indicated by analysis, check condition of chiller starter contacts, and inspect overloads, mechanical trips, and verify settings on electronics.
There will be three scheduled maintenance services performed during operation consisting of inspecting operating and safety controls, checking the operation control circuit, log of temperatures, voltage, and amperage, check entire oil lube system, check motor and starter operation, check refrigerant and oil levels, check shift logs and discus the operation of the equipment. Air Cooled Chillers will have one annual inspection consisting of leak testing machine, Meg compressor motor, test vent piping of all relief valves, tighten motor terminals and control terminals, check oil level, check differential pressure switch settings, check and calibrate all machine operating and safety controls, tighten oil heater heads, check operation of condenser fans, clean condenser coils, replace oil filter, provide tube services. There will be three inspection performed during operation to include inspecting safety controls, review operating logs, check refrigeration charge, complete operating log temperatures, pressures, voltages, and amperage, check refrigerant filter temp and drop at full load, and check oil filter pressure drop. Package units and split systems will receive a total of four inspection which will consist of the following, inspect evap coil, inspect drain pan and drain lines, clean drain pans, check for refrigerant leaks, report all leaks to owner, check and calibrate safety controls and overloads, Meg test compressor motor and record readings, check the main starter tighten all starter terminals and check contacts for wear, check oil level in compressors, tighten motor terminals and control terminals, check crank case heaters, check external interlocks, lube bearings, inspect and adjust belts, check damper operation, inspect filters change as needed, record refrigerant pressures, temps, super heat, and sub cooling, check for proper refrigerant charge. The vendor will provide to the customer representative following each regular inspection or emergency call and report uncorrected deficiencies. EQUIPMENT LIST: Centrifugal Chillers: Chiller one York model number YKHRFVP8-SG serial number SAVM- 211530. Chiller two York model number YKHRFVPI-CVE serial number SAKM-238310. Chiller three McQuay model number PEH126-ZA81037-00-C85 serial number 5ZA81037.
Air Cooled Chillers: MICU - McQuay model number AGZ020AS12-ER10 serial number STNU0350037. OR - McQuay model number AGZ035DHHNN-ER10 serial number STU101200170. OR - McQuay model number AGZ030DHHNN serial number STNU110900020. Laundry - McQuay model number ALR065C serial number 5XDQ183200.
Credit Union - Trane model number RTAA080AYT01A3D0B serial number U08L02426. Portable - McQuay model number AWS260CDSEWNN serial number STNU130900145. Lab - Trane model number CGAM052AE02AX08 serial number U11K25627. Hospice - York model number YCAL0066FE17XE serial number SEXM-936470. Audiology - Carrier model number 30RAN018H-611KJ serial number 0208Q04152. Package Units & Split Systems: Travel Pay - York model number J10YCC00A2TLA2 serial number N1H0201834. PACU - Trane model number 2TTA3060A3000AA serial number 9091KD64F. Core Clinic - Carrier model number D08A2G5A0A0A0 serial number
0810G50463. Building Seven - Carrier model number 50DJ008 serial number 2192G20381. Building Seven - Carrier model number 50DJ004 serial number 1992G13745. Building Five - York model number J104CC00A25L serial number N1H0201834.
Contract Period: Option 3 POP Begin: 11-21-2025 POP End: 11-20-2026
Chillers, Air Cooled Chillers and Package units and split systems located at the Salisbury VA Medical Center. Service includes: 1. Comprehensive service contract that covers the replacement and repair of all parts, components, refrigerant, oil, and other materials that may be needed. 2. Includes all labor to diagnose, repair and replace failed components covered under this contract. 3. Provides emergency service and minor repairs seven days a week 24 hours a day. 4.
Provides the following preventative maintenance procedures as a part of this contract: Oil analysis once a year, annual visual inspection of condenser tubes including removal of heads, annual brush cleaning of condenser tubes, annual cleaning of condenser coils on air cooled chillers, replacement of belts on equipment equipped with belts, and all materials and supplies required to carry out these procedures. Contractor shall dispose of all used refrigerant removed from equipment.
Contractor is required to submit written reports on all repairs and preventive maintenance completed and refrigerant recovered. Centrifugal Chillers will have one annual inspection consisting of leak testing, Meg the compressor, motor and oil pump motor, clean oil strainer, replace filter and gasket where required, tighten oil heater leads, check the operation of vane positioners, change compressor oil as indicated by analysis, check condition of chiller starter contacts, and inspect overloads, mechanical trips, and verify settings on electronics.
There will be three scheduled maintenance services performed during operation consisting of inspecting operating and safety controls, checking the operation control circuit, log of temperatures, voltage, and amperage, check entire oil lube system, check motor and starter operation, check refrigerant and oil levels, check shift logs and discus the operation of the equipment. Air Cooled Chillers will have one annual inspection consisting of leak testing machine, Meg compressor motor, test vent piping of all relief valves, tighten motor terminals and control terminals, check oil level, check differential pressure switch settings, check and calibrate all machine operating and safety controls, tighten oil heater heads, check operation of condenser fans, clean condenser coils, replace oil filter, provide tube services. There will be three inspection performed during operation to include inspecting safety controls, review operating logs, check refrigeration charge, complete operating log temperatures, pressures, voltages, and amperage, check refrigerant filter temp and drop at full load, and check oil filter pressure drop. Package units and split systems will receive a total of four inspection which will consist of the following, inspect evap coil, inspect drain pan and drain lines, clean drain pans, check for refrigerant leaks, report all leaks to owner, check and calibrate safety controls and overloads, Meg test compressor motor and record readings, check the main starter tighten all starter terminals and check contacts for wear, check oil level in compressors, tighten motor terminals and control terminals, check crank case heaters, check external interlocks, lube bearings, inspect and adjust belts, check damper operation, inspect filters change as needed, record refrigerant pressures, temps, super heat, and sub cooling, check for proper refrigerant charge. The vendor will provide to the customer representative following each regular inspection or emergency call and report uncorrected deficiencies. EQUIPMENT LIST: Centrifugal Chillers: Chiller one York model number YKHRFVP8-SG serial number SAVM- 211530. Chiller two York model number YKHRFVPI-CVE serial number SAKM-238310. Chiller three McQuay model number PEH126-ZA81037-00-C85 serial number 5ZA81037.
Air Cooled Chillers: MICU - McQuay model number AGZ020AS12-ER10 serial number STNU0350037. OR - McQuay model number AGZ035DHHNN-ER10 serial number STU101200170. OR - McQuay model number AGZ030DHHNN serial number STNU110900020. Laundry - McQuay model number ALR065C serial number 5XDQ183200.
Credit Union - Trane model number RTAA080AYT01A3D0B serial number U08L02426. Portable - McQuay model number AWS260CDSEWNN serial number STNU130900145. Lab - Trane model number CGAM052AE02AX08 serial number U11K25627. Hospice - York model number YCAL0066FE17XE serial number SEXM-936470. Audiology - Carrier model number 30RAN018H-611KJ serial number 0208Q04152. Package Units & Split Systems: Travel Pay - York model number J10YCC00A2TLA2 serial number N1H0201834. PACU - Trane model number 2TTA3060A3000AA serial number 9091KD64F. Core Clinic - Carrier model number D08A2G5A0A0A0 serial number 0810G50463. Building Seven - Carrier model number 50DJ008 serial number 2192G20381. Building Seven - Carrier model number 50DJ004 serial number 1992G13745. Building Five - York model number J104CC00A25L serial number N1H0201834.
Contract Period: Option 4 POP Begin: 11-21-2026 POP End: 11-20-2027
GRAND TOTAL __________________
| A.1 PRICE/COST SCHEDULE |
| ITEM INFORMATION |