36C24622R0010.docx

DOCX document 269 KB Posted

Attached to
Upgrade ADA for Various Buildings Project 590-19-113 Federal contract opportunity
Solicitation number
36C24622R0010
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This federal solicitation requests proposals for construction services to upgrade facilities to meet ADA requirements at the Hampton VA Medical Center. Offerors must provide plans and work for removing and replacing structures, mechanical, electrical, and plumbing per specifications across multiple buildings.

Key details include a 180-day period of performance, with work across building 137C, 114, and 83. An alternate deduct proposal removes work associated with an awning. Pricing is required for base and alternate proposals. Proposals are due by December 23, 2021. The solicitation is a total small business set-aside. Evaluation will consider technical capability, past performance, and price. The award is a best value determination.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade ADA for Various Buildings Project 590-19-113, newest first.
File Type Posted
36C24622R0010 0002.docx DOCX document
36C24622R0010 0003.docx DOCX document
Sign-In Sheet for Upgrade ADA 11-30-2021.pdf PDF
36C24622R0010 0001.docx DOCX document
19-027_2020_08_24_100 percent - SPECIFICATION FINAL.pdf PDF
19-027_2020_08_24_100 percent - DRAWINGS PRINT.pdf PDF
Attachment B - Corp Experience Form.docx DOCX document
Construction Safety Handbook.pdf PDF
Attachment A - Base Proposal Item Price Breakdown.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date, and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24622R0010

X 11-23-2021

TBD

590-19-113

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 Vangie Miller 757-315-3999 Project Title: Upgrade ADA Various Buildings Project Number: 590-19-113 NAICS Code: 236220 (Commercial and Institutional Building Construction) with a size standard of $39.5 million.

Magnitude of Construction: Between $500,000 and $1,000,000.

Project Description: Provide construction services for the removal and replacement, and all associated mechanical, electrical, and plumbing as per attached plans and specifications at Hampton, VA Veterans Affairs Medical Center.

Site Visit will be conducted on November 30, 2021 at 8:00 AM Eastern Time. Meet outside Bldg. 27 (Contracting Building) If you wish to attend, contact the Contracting Officer no later than November 29, 2021 via email: vangie.miller@va.gov All individuals that enter any VA facility are always required to wear a face mask and will be pre-screened for COVID19

Questions are due to the Contracting Officer no later than Wednesday, December 8, 2021 at 1:00 PM Eastern Time.

*Questions received after said date will not be guaranteed a response.

Responses to questions will be posted at https://beta.sam.gov/ through amendment (s) no later than December 14, 2021.

Deadline for proposals is no later than Thursday, December 23,2021 at 5:00 PM Eastern Time.

It is solely the responsibility of the offerors to ensure the Government receives the proposal before or on the exact due date and time set forth in this solicitation.

Period of Performance: One Hundred and Eighty calendar days including submittals.

This is a total Small Business set-aside.

X X

52.211-10 X

17:00

EST

12-23-2021 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Base Proposal $______________________________

Alternate I $______________________________

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 http://www.fsc.va.gov/einvoice.asp Department of Veterans Affairs Financial Services Center

PO BOX 149971

Austin TX 78714-9971

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS10
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS11
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)25
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)25
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)26
2.4 52.233-2 SERVICE OF PROTEST (SEP 2006)27
2.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)27
2.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)28
2.7 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)29
2.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)29
REPRESENTATIONS AND CERTIFICATIONS30
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION)30
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)33
3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)36
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021)37
GENERAL CONDITIONS40
4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)40
4.2 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)40
4.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (SEP 2021)41
4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021)42
4.5 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)46
4.6 52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.46
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021)47
4.8 52.236-4 PHYSICAL DATA (APR 1984)51
4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS52
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)53
4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)55
4.12 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)56
4.13 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)56
4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)59
4.16 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)59
4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)62
4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)63
4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)64
4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)65
4.21 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)65
4.22 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)65
4.23 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)67

STATEMENT OF WORK

Upgrade ADA for Various Buildings Project 590-19-113 Scope: Provide construction services for the removal and replacement, and all associated mechanical, electrical, and plumbing as per attached plans and specifications at Hampton, VA Veterans Affairs Medical Center:

(a) General: The following is a summary of the work:

1. BASE PROPOSAL ITEM I, GENERAL CONSTRUCTION: The contractor shall provide all tools, labor, materials (to include two (2) ADA compliant temporary ramps, two (2) new automatic door operators and associated operating accessories), equipment, supervision, and expertise required to perform general construction, alterations, removal of existing structures and construction debris as per contract drawings and specifications at buildings 137C, 114, and 83 located at the Department of Veterans Affairs Medical Center in Hampton, VA 23667.

2. PROPOSAL ITEM II DEDUCT ALTERNATE NO. I: Work associated with the awning from building 137C. This shall include all architectural, structural, and electrical work.

(b) Place of Performance: Tasks will be performed at the VA Medical Center, Hampton, VA, 23667. Work will be around an occupied healthcare facility in operation 24 hours a day.

(c) Specific Requirements (see drawings for area of work):

a. DIVISION 00 – SPECIAL SECTIONS

(i) List of Drawing sheets – section 00 01 15

b. DIVISION 01 – GENERAL REQUIREMENTS

(i) General Requirements – section 01 00 00

(ii) Project Schedules – section 01 32 16.15

(iii) Shop Drawings, Product Data, and Samples – section 01 33 23

(iv) Safety Requirements – section 01 35 26

(v) Reference Standards – section 01 42 19

(vi) Quality Control – section 01 45 00

(vii) Testing Laboratory Services – section 01 45 29 (viii)Special Inspections – section 01 45 35

(ix) Temporary Environmental Controls – section 01 57 19

(x) Construction Waste Management – section 01 74 19

(xi) Sustainable Construction Requirements – section 01 81 13

(xii) General Commissioning Requirements – section 01 91 00

c. DIVISION 02 – EXISTING CONDITIONS

(i) Site Surveys – section 02 21 13

(ii) Demolition – 02 41 00

d. DIVISION 03 – CONCRETE

(i) (Short-Form) Cast-in-Place Concrete – section 03 30 53

e. DIVISION 05 – METALS

(i) Structural Steel Framing – section 05 12 00

f. DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

(i) Rough Carpentry – section 06 10 00

g. DIVISION 07 – THERMAL AND MOISTURE PROTECTION

(i) Roof and Deck Insulation – section 07 22 00

(ii) Ethylene-Propylene-Diene-Monomer Roofing – section 07 53 23

(iii) Flashing and Sheet Metal – section 07 60 00

(iv) Firestopping – section 07 84 00

(v) Joint Sealants section 07 92 00

h. DIVISION 08 – OPENINGS

(i) Aluminum-Framed Entrances and Storefronts – section 08 41 13

(ii) Door Hardware – section 08 71 00

(iii) Automatic Door Operators – section 08 71 13

(iv) Glazing – section 08 80 00

i. DIVISION 09 – FINISHES

(i) Subsurface Preparation for Floor Finishes – section 09 05 16

(ii) Schedule for Finishes – section 09 06 00

(iii) Non-Structural Metal Framing – section 09 22 16

(iv) Gypsum Board – section 09 29 00

(v) Painting – section 09 91 00

j. DIVISION 21 – FIRE SUPRESSION

(i) Wet-Pipe Sprinkler Systems – section 21 13 13

k. DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

(i) Common Work Results for HVAC – section 23 05 11

(ii) Noise and Vibration Control for HVAC Piping & Equipment -section 23 05 41

(iii) Testing, Adjusting, and Balancing for HVAC – section 23 05 93

(iv) HVAC and Boiler Plant Insulation – section 23 07 11

(v) Commissioning of HVAC Systems – section 23 08 00

(vi) Refrigerant Piping – section 23 23 00

(vii) Air-Source Unitary Heat Pumps – section 23 81 43

l. DIVISION 26 – ELECTRICAL

(i) Requirements for Electrical Installations – section 26 05 11

(ii) Low-Voltage Electrical Power Conductors and Cables – section 26 05 19

(iii) Grounding and Bonding for Electrical Systems – section 26 05 26

(iv) Raceway and Boxes for Electrical Systems – section 26 05 33

(v) Wiring Devices – section 26 27 26

(vi) Enclosed Switches and Circuit Breakers – section 26 29 21

(viii) Interior Lighting – section 26 51 00

m. DIVISION 31 – EARTHWORK

(i) Earthwork (Short Form)

(ii) Dewatering – section 31 23 19

n. DIVISION 32 – EXTERIOR IMPROVEMENTS

(i) Cement and Concrete for Exterior Improvements – section 32 05

(d) Period of Performance: Contractor shall commence work under this contract promptly after Notice to Proceed (NTP), execute the work diligently, and achieve final completion and acceptance including final cleanup of the premises within one-hundred eighty calendar days including submittals.

(e) Specific Site Requirements: Contractor and all subcontractors shall obtain a flash badge from the Police Service, provide proof of completion from an approved OSHA 10-hour training course (30-hour for superintendent), provide TB test results, and shall abstain from smoking within the perimeters of the facility. All individuals that enter any VA facility are required to wear a face mask and will be pre-screened for COVID 19; to include Veterans, employees, visitors, volunteers, and contractors. Contractors working outside within six (6) feet of another individual shall also be required to wear a face mask.

(f) Construction Safety Requirements: See attached Hampton Construction Safety Handbook and section 01 35 26.

(g) Submittals: See sections 01 00 00, 01 33 23, and all applicable trade sections.

(h) Quality Control: See section 01 45 00.

(i) Schedules: See section 01 32 16.15.

(j) Environmental and Waste Management: See sections 01 57 19, and 01 74 19.

VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements: 1) If fully vaccinated, shall show proof of vaccination. i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

PROPOSAL ITEMS

VA Medical Center Hampton, VA Project No. 590-19-113 Upgrade ADA Various Bldg.’s

A. BASE PROPOSAL, GENERAL CONSTRUCTION: Work includes, but is not limited to, general construction, alterations, removal of existing structures and construction debris, installation and removal of automatic door operators and temporary ramps. (Completion time 180 calendar days)

· ITEM I (BASE PROPOSAL) $

B. ALTERNATE NO. I (Completion time 166 calendar days): Perform all work described in Bid Item I above except: Work associated with the awning from building 137C. This shall include all architectural, structural, and electrical work.

(DEDUCT ALTERNATE I) $

Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

Point of Contact: Vangie Miller Email: vangie.miller@va.gov

SUBMISSIONS OF OFFERS

All references to “Bid” or “Bidder” shall be understood to mean “Offer” or “Offeror”.

(A) GENERAL INSTRUCTIONS:

1. All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.

2. The price, technical response and past performance of each Offeror will be evaluated independently. Offerors shall separately document each of the three factors. Each of the three offer sections shall therefore be labeled with the Offerors name, business address, and VA Solicitation Number.

3. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including these instructions, the terms and conditions, representations and certifications, and technical and past performance requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

The offer shall consist of three (3) separate parts:

• Part I – TECHNICAL CAPABILITY

• Part II – PAST PERFORMANCE

• Part III – PRICE

(B) SPECIFIC INSTRUCTIONS

1. PART I - TECHNICAL PROPOSAL – Submit electronic PDF document(s) by email.

Format as follows:

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principal Points of Contact with addresses, phone numbers and email addresses.

TAB B: Technical Capability

a. Management Approach – Subfactor 1

b. Corporate Experience – Subfactor 2 (See Attachment B – Corp Experience Form)

c. Key Personnel Qualifications – Subfactor 3

d. Quality Control Plan – Subfactor 4

2. PART II – PAST PERFORMANCE - Submit electronic PDF document(s) by email.

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principal Points of Contact with addresses, phone numbers and email addresses.

TAB B: Past Performance Information

a. Information provided under Technical Sub-factor 2, Corporate Experience, will be used to evaluate past performance. Please resubmit the same experience information under the heading, “Part II – Past Performance, TAB B – Past Performance Information”.

3. PART III - PRICE PROPOSAL - Submit electronic PDF document(s) by email.

TAB A: General Information

a. Cover page with Solicitation Number and Project Title

b. Table of Contents

c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principal Points of Contact with addresses, phone numbers and email addresses.

TAB B: Offer, Guarantee, and Certifications

a. Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, 20C. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 20A. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP. All sections of the RFP, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.

b. Complete the PROPOSAL ITEM LIST. As part of their proposal, each Offeror shall be required to complete the attached Base Proposal Item Price Breakdown Form for the Base Proposal Item only. (See Attachment A – Base Proposal Item Price Breakdown)

c. Complete 52.204-8 Annual Representations and Certifications, paragraph (d) applies to this contract. 52.209-7 paragraph (b) and 52.204-24. Print out these provisions in their entirety and submit it with the proposal. Offerors shall submit only those pages that require fill-in.

d. Acknowledgement of Amendments

e. Bid Bond/Offer Guarantee (electronic pdf. file) and Surety point of contact information.

f. Provide a printout of your company’s VetBiz Registration and CVE Letter, showing your firm as a CVE-verified SDVOSB (if applicable).

g. SAFETY AND ENVIRONMENTAL RECORD: To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an Experience Modification Rate (EMR) of equal to or less than 1.0.

All Bidders/Offerors shall submit the following information pertaining to their past Safety and Environmental record with their proposal.

1) A self-certification on company letterhead that the bidder has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. Bidders shall submit copies of their OSHA logs (OSHA Form 300A) for the past three (3) years with their bid. If the firm has been in business for less than three years, they shall submit copies of their OSHA logs for the period of time they have been in business.

2) Information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder’s/offeror’s insurance company and be furnished on the insurance carrier’s letterhead.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

(C) GENERAL INFORMATION

1. Format for proposal Part I & II shall be as follows:

a. A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.

b. Typing shall not be less than font size 11.

2. Offers shall be submitted via email to the Contracting Officer, Vangie Miller, at Vangie.Miller@va.gov prior to the due date and time identified in the solicitation. Multiple emails will likely be required to submit all attachments. Server capacity is 10MB for file attachments, per email.

3. Each response shall address each factor in the sequence listed and clearly identify which factor is being addressed.

4. There shall be no mention of costs in the Technical Proposal.

5. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by the Contracting Office and Hampton VA Medical Center:

• New Year’s Day – 1 January

• Martin Luther King’s Birthday – Third Monday in January

• Presidents Day – Third Monday in February

• Memorial Day – Last Monday in May

• Independence Day – 4 July

• Labor Day – First Monday in September

• Columbus Day – Second Monday in October

• Veterans Day – 11 November

• Thanksgiving Day – Fourth Thursday in November

• Christmas Eve – 24 December

• Any other Federal Holiday granted by the President of the United States

EVALUTATION FACTORS FOR AWARD

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.

(a) The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Part I –TECHNICAL CAPABILITY Part II – PAST PERFORMANCE Part III –PRICE

(b) BASIS FOR CONTRACT AWARD: This is a Best Value (Tradeoff) source selection in which all evaluation factors other than price, when combined, are significantly more important than price. The factors other than price include technical and past performance. The Government reserves the right to award a contract to other than the lowest priced offer(s) where higher priced offers received better technical and past performance ratings than the lower priced offer(s). The Source Selection Authority shall make an integrated assessment best value award decision, where the perceived benefits of the selected higher priced proposal, and the rationale for tradeoffs, shall be documented in the contract file in accordance with FAR 15.406.

(c) By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable.

(d) RESPONSIVENESS OF OFFERS Offers will first be evaluated for responsiveness to the solicitation requirements without regard to evaluation of specific technical capability, past performance, or price factors. Clarifications may be conducted to identify/confirm missing documentation and a determination will be made regarding whether the offeror should/can be allowed to submit any missing/deficient documentation without adverse effect to other offerors or the timeliness of award. Responsive offers will be provided to the Technical Evaluation Board (TEB) for the next evaluation stage.

The technical rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, weaknesses, deficiencies, and risks of a proposal.

Strength means an aspect of an offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. See VAAM Appendix M815 – A The term weakness means a flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.

The term deficiency means a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

PART I – TECHNICAL CAPABILITY

The technical capability of all offers will be evaluated on strengths, weaknesses, and deficiencies. Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan sub-factors will be weighted equally, and all areas must have ACCEPTABLE rating or better. The Technical capability sub-factors ratings of Acceptable or better will be required to be considered for award. Proposals receiving an “unacceptable” rating for any technical subfactor will not be considered for award. An overall technical proposal rating will be assigned, also using the below ratings. Offers receiving a less than acceptable overall technical proposal rating will be rejected.

Evaluators shall assign a rating based on the minimum requirements stated below.

Sub-Factor 1 - Management Approach - Combined Technical/Risk Ratings

Ratings

Descriptions

Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

A description of the organization’s program management policies and procedures to include project planning approach(s) and management approach(s) for multi-discipline, phased projects.

1. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a brief narrative outlining the following:

a. The Offeror has clearly demonstrated that they have established project planning approaches, specifically the Offeror has identified the principal business concepts used and principal technologies deployed.

b. The Offeror has clearly demonstrated that they have experience with project management approaches for multidiscipline, phased projects, specifically identifying the principal business concepts used and principal technologies deployed.

Sub-Factor 2 – Corporate Experience - Combined Technical/Risk Ratings

Ratings

Descriptions

Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Demonstration that the Company has extensive experience, as a Prime Contractor, in multi-phase construction including renovations that upgrade facilities to meet ADA requirements within the Dept of Veterans Affairs Medical Centers. Level of experience can be directly tied to strengths that will significantly benefit the Government. The scope of previous projects is nearly identical to the scope of this project.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. Demonstration that the Company has some experience in in multi-phase construction including renovations that upgrade facilities to meet ADA requirements within the VA Medical Centers of the Federal Government (VA or DoD) or Commercial Hospitals as a Prime contractor. Level of experience can be directly tied to strengths that will benefit the government.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate. Demonstration that the Company has some experience in multi-phase construction including renovations that upgrade facilities to meet ADA requirements of Government Buildings as a Prime Contractor.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. Demonstration that the Company has some experience in multi-phase construction including architectural, interior finishes, mechanical and civil work of Government Buildings operating in subcontractor capacity.
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. Contractor fails to make any disclosure with regards to experience in construction whether it can be deemed relevant or irrelevant and fails to provide any references for works previously performed.

2. CRITERIA: Offerors must provide a minimum of three (3) and a maximum of five (5) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principal objective was multi-phase construction renovations that upgrade facilities to meet ADA requirements in hospitals within the United States, with a total contract value exceeding $500,000) to the requirement being solicited. Experience of subcontractors may be used to fulfill this requirement, but future unavailability of the subcontractor to perform work may result in contract termination.

3. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of three (3) and a maximum of five (5) examples of their choice of completed projects or in progress of similar contracts in size and scope (minimum threshold: Projects where the principle objective was multi-phase construction including renovations that upgrade facilities to meet ADA requirements in hospitals within the United States, with a total contract value exceeding $500,000). In describing the multi-phase construction, provide the following information:

a. Project title, location and brief description of the project and contracting method (design build, design bid construct, CM at risk, Turnkey, etc.).

b. Project owner and name and telephone number of owner’s contact person.

c. Indicate your firm’s role as a prime contractor or subcontractor, etc.

d. Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s).

e. Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; and any awards (prizes) received.

f. Confirmation that the prime contractor and subcontractors are licensed for the work being performed in the state where the project is located, where specified, or otherwise in the state from which the contractor or subcontractor originates. Work requiring license in the State of Virginia includes all Contractors, HVAC, Plumbing, Electrical work, and Asbestos/lead Project Monitoring.

g. Please use the Corporate Experience Form (See Attachment B – Corp Experience Form) included with the solicitation to provide the requested information for Experience. Utilize block 10 to provide information required by solicitation in details; attach separate sheet if additional space is needed.

Sub-Factor 3 – Key Personnel Qualifications - Combined Technical/Risk Ratings

Ratings

Descriptions

Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Proposal demonstrates superior understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have a vast background in performance of exact works of this project for a Dept of Veterans Affairs Medical Center. Strengths of Personnel have been clearly articulated how experiences to bring significant benefit to the success of this project.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. Proposal demonstrates understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have some background in performance of similar works of this project at the Dept of Veterans Affairs Medical Center, DoD Medical Center or Commercial Medical Center. Strengths of Personnel articulate benefit to the success of this project.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate. Proposal demonstrates understanding of key personnel requirements regarding relevant experience and personnel meet the education/certification requirements. Articulation of the experience of Personnel bring benefit to the success of this project.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high. Contractor addresses Key Personnel Requirements by only providing information that demonstrates minimum acceptability and fails to address relevancy of experiences and fails to articulate how the personnel aid in the successful and timely completion of the project.
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable. Contractor fails to fully address Key Personnel Requirements by failing to proffer evidence of understanding of the Key Personnel Requirements, fails to proffer evidence of minimum education and certifications of proposed Key Personnel and fails to articulate how the personnel aid in the successful and timely completion of the project.

4. CRITERIA: Offeror must provide an organizational chart identifying key on-site personnel with a description of their work experience relating to projects similar in size and scope (multidiscipline construction projects including renovations that upgrade facilities to meet ADA requirements with a minimum threshold value of $500,000) to the requirement being solicited. The key personnel required for this contract shall include: Project Manager and Alternate Project Manager; Site Superintendent and Alternate Site Superintendent; Site Safety and Health Officer (SSHO) and Alternate Site Safety and Health Officer (SSHO); Quality Control Manager and Alternate Quality Control Manager in addition to any other personnel that are required within Statement of Work: (c) Specific Requirements.

5. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides:

a. An organizational block identifying on-site key personnel associated with this requirement to include:

i. Each individual’s name, title, duty, years of experience and experience level relating to similar contracts including renovations that upgrade facilities to meet ADA requirements in size and scope (multidiscipline construction projects with a minimum threshold value of $500,000).

ii. Narratives for the key personnel identified within the organizational block, listing experience for projects of similar size and scope (multidiscipline construction projects with a minimum threshold value of $500,000), showing project history with these key personnel in relations to the project’s description. The Quality Control Manager and the Safety Manager may be the same individual if they meet both specifications requirements.

Sub-Factor 4 – Quality Control Plan - Combined Technical/Risk Ratings

Ratings

Descriptions

Outstanding
Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government.
Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

6. CRITERIA: Offeror must provide a plan to implement the requirements of Contract Clause entitled “Inspection of Construction” FAR 52.246-12 and section 01 45 00 “Quality Control”. The plan shall identify personnel, procedures, control, and instructions. A finalized, more detailed Quality Control Plan (QCP) will be required to be submitted and approved after contract award, which include the identification of all contract submittals, tests, records, and forms.

7. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standards of acceptability are met when the Offeror provides:

a. A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Quality Control (QC) Manager shall implement the three-phase control system for all aspects of work specified. The QC System Manager shall report to the project manager or someone higher in the Contractor’s organization. Project Manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production.

· The proposal provides a Quality Control approach that effectively addresses the internal processes to identify and prevent deficiencies in the quality of construction.

· This approach shall also show the plans for implementation ensuring the compliance of regulatory and Specification statutes are strictly adhered to.

· The approach shall also clearly address the QC organizational lines of authority and the Offeror’s approach to monitor corrective actions ensuring successful and timely problem resolution.

· The detailed QC approach shall identify how quality inspections will meet the minimum requirements of the Specifications.

· The QCP shall effectively address how the Offeror will correct identified discrepancies found during QC checks and the process to provide resolution to the CO/COR for any discrepancies identified in the Specifications or design.

· The QCP shall include the Offeror’s method for identifying subcontractors to meet the specific requirements of all trade’s specifications included in the project, see each specification section for QC details and section 01 45 00.

b. A narrative demonstrating how a quality plan was successfully implemented in at least three projects of similar size and type, in a similar climate within the past five years.”

PART II – PAST PERFORMANCE

Next, the Government will evaluate the Offeror’s demonstrated past performance of recent and relevant projects, to determine the Offeror’s ability to perform the contract successfully and help determine responsibility. There are two aspects to the past performance evaluation: 1. Relevancy of contractual work performed; and 2. How well the contractual work was performed.

An overall Past Performance Confidence Assessment Rating will be assigned, but each past performance reference will first be evaluated for “recency” and “relevancy”. Therefore, the following ratings tables will be used. “Recent” past performance is defined as projects completed within the last five years, with the actual completion date being not earlier than November 23, 2016. Past Performance examples will be assigned a relevancy rating based on the below rating definitions, in comparison with the scope of work detailed in the Specifications and Drawings.

Past Performance Relevancy Rating Method

Adjectival Rating
Description
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and

complexities this solicitation requires.

Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Performance Confidence Assessment Rating Method

Adjectival Rating
Description
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence
Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence
No recent/relevant performance record is available, or the Offeror’s performance

record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

A. CRITERIA and SUBMISSION REQUIREMENTS: The information submitted in response to Technical Subfactor 2 (“Corporate Experience”) will be used, to assign a Performance Confidence Assessment Rating. Project owners may be contacted to verify information provided, where necessary, and to obtain documentation regarding successful or unsuccessful performance, and to obtain information regarding the following performance areas. Where past performance assessments are available in the Government’s Contractor Performance Assessment Reporting System (CPARS), that information will take precedent as documentation of successful or unsuccessful performance. The offeror’s past performance records, generally, will also be reviewed in the Federal Awardee Performance and Integrity Information System (FAPIIS) and Contractor Performance Assessment Reporting System (CPARS) for the purpose of identifying any existing derogatory records impacting the evaluation team’s confidence in the offeror to perform the work.

B. The following is a list of evaluation areas/concerns that may be addressed when communicating with past performance points of contact, where CPARS assessments are unavailable.

I. Quality 1.Contractor provided effective quality control and inspection procedures that resulted in a quality-finished project.

2.Contractor developed and submitted realistic progress schedules.

3.Contractor provided well researched and clearly identified submittals that matched contract requirements.

4.Contractor completed all work with good workmanship and in conformance with the specifications, resulting in minor, if any, punch list items.

5.Contractor thoroughly reviewed design package proposals for accuracy, completeness, and compliance with contract requirements.

6.Contractor designs were all concise, accurate and captured all details of the site visit.

II. Timely Performance 1.Contractor met established project schedules to complete the project on time.

2.Contractor performed all work without the issuance of a cure notice or show cause letter. (If a notice was issued, please describe the circumstances on a separate sheet of paper and identify if liquidated damages were assessed.)

3.Contractor provided timely cost/design proposals.

4.Contractor submitted the progress schedule and interim progress reports as required in a timely manner and the schedule was approved prior to actual construction.

5.Contractor provided submittals on time as required.

6.Contractor provided payrolls for both their firm and their subcontractor’s employees as required and scheduled.

7.Contractor provided timely resolution of all punch list items.

III. Management Effectiveness 1.Contractor provided experienced qualified managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2.Contractor hired quality subcontractors and effectively managed and coordinated their work.

3.Contractor hired, maintained, and replaces as necessary, qualified personnel and subcontractors/suppliers.

4.Contractor ensured the site manager had sufficient authority to make decisions and take actions during project performance to keep the project on schedule.

5.Contract…