Schedule of Services (2nd revision).docx
DOCX document 43 KB Posted
- Attached to
- S205--Refuse and Recycling Services Federal contract opportunity
- Solicitation number
- 36C24622Q0537
About this file
This document contains a schedule of services and pricing for refuse collection and recycling services for the Hampton VA Medical Center. The contractor shall provide all supplies, materials, equipment, vehicles, personnel, and supervision to service dumpsters, roll-offs, compactors, and common trash receptacles over a base year and four option years. Key items include 6-CY and 8-CY dumpsters, 30-CY roll-offs for construction and scrap metal, 8-CY recycling dumpsters, and various 34-CY self-contained and stationary compactors. Pricing is provided for landfill tipping fees not to exceed $35,000 per year, with credits for recycling. The contractor must also service special events and storm debris cleanup for up to $5,000 annually. The related federal contract opportunity is a pre-solicitation notice for solicitation 36C24622Q0537 seeking these refuse and recycling services with a 100% SDVOSB set-aside. The requirement is for the Hampton VAMC in Hampton, Virginia.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24622Q0537 0005.docx | DOCX document | |
| 36C24622Q0537 0004.docx | DOCX document | |
| Appendix A (revised).pdf | ||
| Schedule of Services (revised).docx | DOCX document | |
| 36C24622Q0537 0003.docx | DOCX document | |
| 36C24622Q0537 0002.docx | DOCX document | |
| 36C24622Q0537 0001.docx | DOCX document | |
| Wage Determination (Hampton).pdf | ||
| Attachment II - Station Map.pdf | ||
| Attachment I- QASP.doc | DOC document | |
| 36C24622Q0537_2.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
?.## SCHEDULE OF SERVICES
Contractor shall provide all supplies, materials, equipment, vehicles, personnel/labor, and technical supervision necessary to perform refuse collection and recycling services for Hampton VA Medical Center, located at 100 Emancipation Dr., Hampton, Virginia 23667.
Base Period:
October 1, 2022 - September 30, 2023
| ITEM |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT COST |
| TOTAL ESTIMATED COST |
Refuse Collection Dumpsters (Contractor Furnished)
· 6-CY Dumpster Slanted/Open top (4-Ea)
· 8-CY Dumpster w/lockable sliding door on both sides (6-Ea)
MO
Open Top Roll-Off (Contractor Furnished)
· 30-CY for Construction (1-Ea)
· 30-CY for Scrap Metal (1-Ea)
Recyclable Collection Dumpsters (Contractor furnished)
· 8-CY Dumpsters w/lockable sliding door on both sides; slit cut on front for inserting cardboard and paper (11-Ea)
Compactors (Contractor Furnished)
· 34-CY Self-contained Compactor w/LH Feed Doghouse (1-Ea Trash)
· 34-CY Stationary (with receiving boxes) Compactor w/Rear Feed Hopper, 4-sided w/ramp from dock to hopper, w/safety switch (3-Ea Recycle)
· 34-CY Self-contained Compactor with Rear Feed Doghouse, w/safety switch (3-Ea Trash)
| 0005 |
| Empty Common Use Trash Receptacle |
(89-each Government Owned/30-gallon), replace damaged liners, replace garbage bags, and pick up trash in and around trash receptacle.
| 0006 |
| Landfill Tipping Fees |
Price: $_______/ ton
| Not to Exceed: |
| $35,000.00 |
| 0007 |
| Recycle Program Credit |
| 0008 |
| In accordance with (IAW) the Performance Work Statement (PWS) Section 3.4 & 3.5 |
Unscheduled / Special Events / Clean ups, including Storm Debris.
40-CY open top Dumpster: $_________
Not to Exceed:
$5,000.00
| TOTAL COST BASE PERIOD: |
| $ |
Option Year 1:
October 1, 2023 - September 30, 2024
| ITEM |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT COST |
| TOTAL ESTIMATED COST |
Refuse Collection Dumpsters (Contractor Furnished)
Open Top Roll-Off (Contractor Furnished)
Recyclable Collection Dumpsters (Contractor furnished)
· 8-CY Dumpsters w/lockable sliding door on both sides; slit cut on front for inserting cardboard and paper (11-Ea)
Compactors (Contractor Furnished)
· 34-CY Self-contained Compactor w/LH Feed Doghouse (1-Ea Trash)
· 34-CY Stationary (with receiving boxes) Compactor w/Rear Feed Hopper, 4-sided w/ramp from dock to hopper, w/safety switch (3-Ea Recycle)
| 1005 |
| Empty Common Use Trash Receptacle |
(89-each Government Owned/30-gallon),
| 1006 |
| Landfill Tipping Fees |
Price: $_______/ ton
| Not to Exceed: |
| $35,000.00 |
| 1007 |
| Recycle Program Credit |
| 1008 |
| In accordance with (IAW) the Performance Work Statement (PWS) Section 3.4 & 3.5 |
Unscheduled / Special Events / Clean ups, including Storm Debris.
Not to Exceed:
| TOTAL COST OPTION YEAR ONE (1): |
| $ |
Option Year 2:
October 1, 2024 - September 30, 2025
| ITEM |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT COST |
| TOTAL ESTIMATED COST |
Refuse Collection Dumpsters (Contractor Furnished)
Open Top Roll-Off (Contractor Furnished)
Recyclable Collection Dumpsters (Contractor furnished)
· 8-CY Dumpsters w/lockable sliding door on both sides; slit cut on front for inserting cardboard and paper (11-Ea)
Compactors (Contractor Furnished)
· 34-CY Self-contained Compactor w/LH Feed Doghouse (1-Ea Trash)
· 34-CY Stationary (with receiving boxes) Compactor w/Rear Feed Hopper, 4-sided w/ramp from dock to hopper, w/safety switch (3-Ea Recycle)
| 2005 |
| Empty Common Use Trash Receptacle |
(89-each Government Owned/30-gallon),
| 2006 |
| Landfill Tipping Fees |
Price: $_______/ ton
| Not to Exceed: |
| $35,000.00 |
| 2007 |
| Recycle Program Credit |
| 2008 |
| In accordance with (IAW) the Performance Work Statement (PWS) Section 3.4 & 3.5 |
Unscheduled / Special Events / Clean ups, including Storm Debris.
Not to Exceed:
| TOTAL COST OPTION YEAR TWO (2): |
| $ |
Option Year 3:
October 1, 2025 - September 30, 2026
| ITEM |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT COST |
| TOTAL ESTIMATED COST |
Refuse Collection Dumpsters (Contractor Furnished)
Open Top Roll-Off (Contractor Furnished)
Recyclable Collection Dumpsters (Contractor furnished)
· 8-CY Dumpsters w/lockable sliding door on both sides; slit cut on front for inserting cardboard and paper (11-Ea)
Compactors (Contractor Furnished)
· 34-CY Self-contained Compactor w/LH Feed Doghouse (1-Ea Trash)
· 34-CY Stationary (with receiving boxes) Compactor w/Rear Feed Hopper, 4-sided w/ramp from dock to hopper, w/safety switch (3-Ea Recycle)
| 3005 |
| Empty Common Use Trash Receptacle |
(89-each Government Owned/30-gallon),
| 3006 |
| Landfill Tipping Fees |
Price: $_______/ ton
| Not to Exceed: |
| $35,000.00 |
| 3007 |
| Recycle Program Credit |
| 3008 |
| In accordance with (IAW) the Performance Work Statement (PWS) Section 3.4 & 3.5 |
Unscheduled / Special Events / Clean ups, including Storm Debris.
Not to Exceed:
| TOTAL COST OPTION YEAR THREE (3): |
| $ |
Option Year 4:
October 1, 2026 - September 30, 2027
| ITEM |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT COST |
| TOTAL ESTIMATED COST |
Refuse Collection Dumpsters (Contractor Furnished)
Open Top Roll-Off (Contractor Furnished)
Recyclable Collection Dumpsters (Contractor furnished)
· 8-CY Dumpsters w/lockable sliding door on both sides; slit cut on front for inserting cardboard and paper (11-Ea)
Compactors (Contractor Furnished)
· 34-CY Self-contained Compactor w/LH Feed Doghouse (1-Ea Trash)
· 34-CY Stationary (with receiving boxes) Compactor w/Rear Feed Hopper, 4-sided w/ramp from dock to hopper, w/safety switch (3-Ea Recycle)
| 4005 |
| Empty Common Use Trash Receptacle |
(89-each Government Owned/30-gallon),
| 4006 |
| Landfill Tipping Fees |
Price: $_______/ ton
| Not to Exceed: |
| $35,000.00 |
| 4007 |
| Recycle Program Credit |
| 4008 |
| In accordance with (IAW) the Performance Work Statement (PWS) Section 3.4 & 3.5 |
Unscheduled / Special Events / Clean ups, including Storm Debris.
Not to Exceed:
| TOTAL COST OPTION YEAR FOUR (4): |
| $ |
| Total Estimated Cost (Base + Options): |
| $ |
File details come from the government source that posted it. Updated .