RFI Clarifications 0004.pdf
PDF 129 KB Posted
- Attached to
- J061--EXTENSION TO DUE DATES
- Solicitation number
- 36C24622B0041
About this file
This announcement provides details for a solicitation seeking renovation services at a Department of Veterans Affairs medical center. The solicitation involves renovating approximately 2,400 square feet of a 3rd floor Dialysis Suite, including selective demolition, general construction, and alterations. Offerors must furnish all labor, materials, equipment, and supervision to perform required demolition and construction work, including architectural, plumbing, and electrical systems modifications. The work is to be completed during normal business hours excluding federal holidays, with activities affecting patient care occurring outside normal hours. The North American Industry Classification code is 236220 and the acquisition size is between $500,000 to $1,000,000. The Government intends to award a firm fixed price contract within 120 days of bid opening to a verified Service-Disabled Veteran Owned Small Business. Electronic submissions only will be accepted by the specified due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OF 1419.pdf | ||
| 36C24622B0041 0006.pdf | ||
| 36C24622B0041 0005_1.docx | DOCX document | |
| 02 Drawings Renovate Dialysis.pdf | ||
| 36C24622B0041 0005.pdf | ||
| 36C24622B0041 0004.pdf | ||
| drawings 1.pdf | ||
| 36C24622B0041 0003_1.docx | DOCX document | |
| 36C24622B0041 0003.pdf | ||
| 36C24622B0041 0002_1.docx | DOCX document | |
| 36C24622B0041 0002.pdf | ||
| 36C24622B0041 0001.pdf | ||
| 36C24622B0041_2.docx | DOCX document | |
| 03 Specifications Renovate Dialysis.pdf | ||
| 00 SOW Renovate Dialysis updated.pdf | ||
| Drawings.pdf | ||
| 36C24622B0041_1.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Question 10, 11, 12, and 13 are all answered with “See Architectural General Notes L and M”. General Notes L and M do not pertain to the questions that were asked in questions 10, 11, 12, and 13 and do not indicate that any fire alarm or fire sprinkler work is required. Are we to assume the only MEP demo required is based on what is shown on sheet AD113, and A113 (these two drawings show lights and HVAC grills)? M. BEFORE
REMOVAL OF EXISTING SUSPENDED CEILING SYSTEM, CONTRACTOR MUST
IDENTIFY ALL FIXTURES OR SYSTEMS MOUNTED TO CEILING. PROVIDE AN
INVENTORY OF EQUIPMENT AND STATUS OF FUNCTIONALITY. IF NOT IN
WORKING ORDER, CONTACT COR FOR DIRECTION. AFTER INSTALLATION
OF CEILING SYSTEM, ALL FIXTURES OR EQUIPMENT TO BE RE-INSTALLED
IN SAME LOCATIONS AND RESTORED TO FULL FUNCTIONALITY.
2. AD103 – Note 18 is shown several times on the floor plan on sheet AD103. However under keyed notes, there is no Note 18. It goes from 17 to 19 (18 is skipped) Typo – Note 18 should be Note 17.
3. Question 14 – Based on the response – will another site visit be scheduled so the area can be surveyed? If not, please can the ceiling height changes and details be provided as originally requested. Ceiling height verification is part of ceiling survey listed in notes L & M
4. See attached for drawings downloaded from VA website. These still do not appear to be correct in terms of scaling and are in “portrait view” See attached file