S06 Attachment I - Drawing Set Reformatted.pdf
PDF 21 MB Posted
- Attached to
- N045--MAIN WATER LOOP (VA-22-00008301) Federal contract opportunity
- Solicitation number
- 36C24622B0009
About this file
This document provides details for a federal solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation, numbered 36C24622B0009, is for a main water loop project (N045--MAIN WATER LOOP (VA-22-00008301)) to be completed at the location specified in the IFB. The attached file S06 Attachment I - Drawing Set Reformatted.pdf contains the drawing set for the project. Bids are due based on the response date specified in the IFB. The award will be granted based on the terms laid out in the solicitation to provide the necessary services for completing the main water loop project at the VA facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S07 OF 1419 Certified Bid Abstract - Water Loop.pdf | ||
| 36C24622B0009 0005.docx | DOCX document | |
| 36C24622B0009 0004.docx | DOCX document | |
| 36C24622B0009 0003.docx | DOCX document | |
| S06 36C24622B0009 Attachment III Questions and Answers.xlsx | XLSX spreadsheet | |
| S06 36C24622B0009 Attachment II Drawing GI001 Date 4.28.22.pdf | ||
| S06 36C24622B0009 Attachment I SOW Water Loop 3 May 2022.pdf | ||
| 36C24622B0009 0002.docx | DOCX document | |
| S06 637-22-101 Main Water Loop 31 Mar 2022 Site Visit Attendees Sign In Sheet.pdf | ||
| 36C24622B0009 0001.docx | DOCX document | |
| S02 Attachment III - Wage Det NC20220043 25 Feb 2022.pdf | ||
| S02 Attachment IV - Bid Item Cost Breakdown WS.xlsx | XLSX spreadsheet | |
| S02 Attachment I - Specification Package.pdf | ||
| S02 Attachment VI Statement of Work 25 Mar 2022.pdf | ||
| S02 Attachment V - Campus Map.pdf | ||
| S02 Attachment II - Drawing Package.pdf | ||
| 36C24622B0009_2.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rice vil le Roa d
Tunnel Road (HWY 70)
Am bulatory C are Addition AREAW
AY
CANOPY
CONC. RET. W
ALL
CANOPY
70T
686.2614
NORTH
17 16
3A
4A
ELECTRIC SWITCH GEAR
PATIENT PARKING LOTS
BUILDINGS
BELL TOWER
WALKING TRAIL
WALKING TRAIL
WALKING
HELICOPTER
TANKSO2
TRAIL
SOUTH
TOWER
WEST
TOWER
EAST
TOWER
AC
A
72T
POWER PLANT
1 EMPLOYEE PARKING LOTS
BOILER PLANT
3B
4B
5B
5C
WATER TANK
LEGEND
SMOKING
SHELTER
SMOKING
SHELTER
73T
R1
R2
R3
R4
1A
R5
R6
R7
R8
LANDING
AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE MAIN WATER LOOP
Charles George VAMC, ASHEVILLE NC
637-20-101
N/A
7/2/2021Revisions: Date:
www.atriaxgroup.com
Atriax PLLC 102 3rd Avenue, NE Hickory, NC 28601 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 7/2/2021
S E A L 024911
HAROLD J . MARV
I N
PR
OFESSIONAL
ENGINEER
NO
RTH CAROL I NA
300 Ridgefield Ct Ste 301 Asheville, NC 28806
Phone: (828)225-6562
GI001
DIHHJM
COVER SHEET, LOCATION MAP,
CHARLES GEORGE
VETERANS AFFAIRS
MEDICAL CENTER
ASHEVILLE
NORTH CAROLINA
SITE
RICEVILLE RD.
UT
LENN RD .
R D .
MT N .
ALB
KC
L B
E U
D R
I
EG
Y
K P
Approved: Date: Approved: Date:
Approved: Date: Approved: Date:
Approved: Date: Approved: Date:
Approved: Date: Approved: Date:
Approved: Date: Approved: Date:
Requesting ServiceChief, FMS
Infection ControlMedical Center Director
M & O SupervisorAssociate Director
Safety ManagerChief of Staff
AFGEAssociate Director for Patient Care Services
HOURS OF
OPERATION "CONFIDENTIAL"
ASHEVILLE
MEDICAL CENTER
DEPARTMENT of VETERANS AFFAIRS
NORTH CAROLINA
REPLACE MAIN WATER LOOP
PROJECT NO. 637-20-101
BID DOCUMENTS
INDEX OF DRAWINGS
64 FIRE PUMP ROOM
63 STORAGE
47 MAIN HOSPITAL
24 CREDIT UNION
15 ADMINISTRATION/HUMAN RESOURCES
14 ADMINISTRATION / FMS SHOPS
12 GROUNDS - MAINTENANCE
11 LINEN
9 MENTAL HEALTH
2 & 3 QUARTERS
BUILDING FUNCTION
62 COMMUNITY LIVING CENTER
65 BLDG.15 GROUND SOURCE HEAT PUMP
70T MENTAL HEALTH
4,5,6,7
72T SWING SPACE
MENTAL HEALTH
73T MENTAL HEALTH
STATEMENT OF BID ITEM(S)
DRAWINGS INDEX
AutoCAD SHX Text T
AutoCAD SHX Text
CONC. WALL
AutoCAD SHX Text C & G
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text C & G
AutoCAD SHX Text
BLOCK WALL
AutoCAD SHX Text
BLOWER PAD
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
8:00 AM - 4:30 PM UNLESS APPROVED BY THE C.O.R. NO WORK ON GOVERNMENT HOLIDAYS
AutoCAD SHX Text THESE DRAWINGS MUST BE RETURNED TO MUST BE RETURNED TO BE RETURNED TO FACILITIES MANAGEMENT SERVICE, PROJECT SECTION, UPON COMPLETION, OR FINAL USE BY THE CONTRACTOR FOR BIDDING PURPOSES.
AutoCAD SHX Text GI001 01 COVER SHEET, PROJECT LOCATION, DRAWINGS INDEX 01 COVER SHEET, PROJECT LOCATION, DRAWINGS INDEX COVER SHEET, PROJECT LOCATION, DRAWINGS INDEX V-001 02 EXISTING CONDITIONS MAIN CAMPUS 02 EXISTING CONDITIONS MAIN CAMPUS EXISTING CONDITIONS MAIN CAMPUS V-002 03 EXISTING CONDITIONS RICEVILLE ROAD 03 EXISTING CONDITIONS RICEVILLE ROAD EXISTING CONDITIONS RICEVILLE ROAD C-001 04 NOTES, LEGEND, AND ABBREVIATIONS 04 NOTES, LEGEND, AND ABBREVIATIONS NOTES, LEGEND, AND ABBREVIATIONS C-101 05 SITE/PHASING PLAN MAIN CAMPUS 05 SITE/PHASING PLAN MAIN CAMPUS SITE/PHASING PLAN MAIN CAMPUS C-102 06 SITE/PHASING PLAN RICEVILLE ROAD 06 SITE/PHASING PLAN RICEVILLE ROAD SITE/PHASING PLAN RICEVILLE ROAD C-110 07 PHASE '1' PLAN 07 PHASE '1' PLAN PHASE '1' PLAN C-111 08 PHASE `2` PLAN - A 08 PHASE `2` PLAN - A PHASE `2` PLAN - A C-112 09 PHASE `2` PLAN - B 09 PHASE `2` PLAN - B PHASE `2` PLAN - B C-113 10 PHASE `3` PLAN - A 10 PHASE `3` PLAN - A PHASE `3` PLAN - A C-114 11 PHASE `3` PLAN - B 11 PHASE `3` PLAN - B PHASE `3` PLAN - B C-115 12 PHASE `4` PLAN - A 12 PHASE `4` PLAN - A PHASE `4` PLAN - A C-116 13 PHASE `4` PLAN - B 13 PHASE `4` PLAN - B PHASE `4` PLAN - B C-117 14 PHASE `4` PLAN - C 14 PHASE `4` PLAN - C PHASE `4` PLAN - C C-118 15 PHASE `5` PLAN - A 15 PHASE `5` PLAN - A PHASE `5` PLAN - A C-119 16 PHASE `5` PLAN - B 16 PHASE `5` PLAN - B PHASE `5` PLAN - B C-120 17 PHASE `6` PLAN - A 17 PHASE `6` PLAN - A PHASE `6` PLAN - A C-121 18 PHASE `6` PLAN - B 18 PHASE `6` PLAN - B PHASE `6` PLAN - B C-122 19 PHASE `7` PLAN 19 PHASE `7` PLAN PHASE `7` PLAN C-123 20 PHASE `X` PLAN - A 20 PHASE `X` PLAN - A PHASE `X` PLAN - A C-124 21 PHASE 'X' PLAN - B 21 PHASE 'X' PLAN - B PHASE 'X' PLAN - B CG101 22 EROSION & SEDIMENT CONTROL AREA PLAN 22 EROSION & SEDIMENT CONTROL AREA PLAN EROSION & SEDIMENT CONTROL AREA PLAN C-501 23 EROSION CONTROL DETAILS 23 EROSION CONTROL DETAILS EROSION CONTROL DETAILS C-502 24 SITE DETAILS #1 24 SITE DETAILS #1 SITE DETAILS #1 C-503 25 SITE DETAILS #2 25 SITE DETAILS #2 SITE DETAILS #2 C-600 26 HYDRANT & VALVE SCHEDULE 26 HYDRANT & VALVE SCHEDULE HYDRANT & VALVE SCHEDULE
AutoCAD SHX Text
DWG.#
AutoCAD SHX Text
SHEET #
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text BID ITEM I (BASE BID): ALL WORK SHOWN OR SPECIFIED WITHIN THE DRAWINGS AND SPECIFICATIONS. THE PROJECT WILL REPLACE THE CHARLES GEORGE VA MEDICAL CENTER MAIN WATER LOOP. THE PROPOSED MAIN SUMS TO APPROXIMATELY 6200 LF OF 8", 3 PRESSURE REDUCING VALVE STATIONS, AND 600 LF OF 6" DUCTILE IRON PIPE. WORK WILL INCLUDE DEMOLITION OF HARDSCAPES, TRENCHING, WATERLINE AND APPURTENANCES INSTALLATION, INSERTION VALVES, WET TAPS, PAVING, GROUTING EXISTING ABANDONED MAIN SOLID, FIRE HYDRANT ADJUSTMENTS, RELOCATIONS, AND INSTALLATIONS, AS WELL AS THE DEVELOPMENT OF AND COMPLIANCE TO A TRAFFIC CONTROL PLAN AND THE FINANCIAL RESPONSIBILITY ASSOCIATED WITH THE EROSION AND SEDIMENT CONTROL PLAN COMPLIANCE. PHASING IS PRESCRIPTIVE TO CONTROL BUILDING DOWN TIMES. PERMITTING RESPONSIBILITY FOUND WITHIN SPEC 01 00 00 1.4.B. CONTRACT COMPLETION TIME: PERMITTING: 90 CALENDAR DAYS AFTER PERMITTING NOTICE TO PROCEED. CONSTRUCTION: 180 CALENDAR DAYS AFTER CONSTRUCTION NOTICE TO PROCEED. BID ITEM II (DEDUCT ALTERNATE 1): ALL WORK AS SPECIFIED FOR BID ITEM I (BASE BID) MINUS THE FOLLOWING: ALL WORK ASSOCIATED WITH GROUTING EXISTING MAIN SOLID. THIS WORK CONSISTS OF APPROXIMATELY 5600 LF OF 8" DUCTILE IRON TO BE ABANDONED IN PLACE. CONTRACT COMPLETION TIME: PERMITTING: 90 CALENDAR DAYS AFTER PERMITTING NOTICE TO PROCEED. CONSTRUCTION: 180 CALENDAR DAYS AFTER CONSTRUCTION NOTICE TO PROCEED. BID ITEM III (DEDUCT ALTERNATE 2): ALL WORK AS SPECIFIED FOR BID ITEM II (DEDUCT ALTERNATE 1) MINUS THE FOLLOWING: ALL WORK BETWEEN STATION 55+28 AND 60+92 OF THE EASTERN LOOP ALIGNMENT. THIS WORK CONSISTS OF APPROXIMATELY (~) (560) LF OF 8" DUCTILE IRON, (4) FITTINGS, ~ (850) SF OF ROADWAY PAVING, (1550) SF OF LIGHT DUTY PAVING, AND THE ASSOCIATED CONSTRUCTION TIME. CONTRACT COMPLETION TIME: PERMITTING: 90 CALENDAR DAYS AFTER PERMITTING NOTICE TO PROCEED. CONSTRUCTION: 165 CALENDAR DAYS AFTER CONSTRUCTION NOTICE TO PROCEED. BID ITEM IV (DEDUCT ALTERNATE 3): ALL WORK AS SPECIFIED FOR BID ITEM III (DEDUCT ALTERNATE 2) MINUS THE FOLLOWING: ALL WORK ASSOCIATED WITH 'PHASE X' OF CONTRACT DOCUMENTS. THIS WORK CONSISTS OF APPROXIMATELY (~) (1000) LF OF 8" DUCTILE IRON, (50) LF OF 6" DUCTILE IRON, (4) FIRE HYDRANT ADJUSTMENTS, (11) FITTINGS, (5) VALVES, (2) DRY TAPS. (50) SF ROADWAY PAVING. CONTRACT COMPLETION TIME: PERMITTING: 90 CALENDAR DAYS AFTER PERMITTING NOTICE TO PROCEED. CONSTRUCTION: 150 CALENDAR DAYS AFTER CONSTRUCTION NOTICE TO PROCEED. BID ITEM V (DEDUCT ALTERNATE 4): TO BE TREATED AS A STAND ALONE DEDUCTION. THIS WORK SHALL BE PRICED TO BE DEDUCTED FROM ANY OF THE ABOVE ALTERNATES. ALL WORK ASSOCIATED WITH THE MAIN LINE PRESSURE REDUCING VALVE STATIONS FOUND ON C-110, C-114, AND C-124. CONTRACT COMPLETION TIME: 0 CALENDAR DAYS. NOTICE: 1. THE BASE BID CONTAINS ALL THE PROJECT WORK. EACH BID DEDUCT DELETES A PORTION OF THE WORK. THE BASE BID CONTAINS ALL THE PROJECT WORK. EACH BID DEDUCT DELETES A PORTION OF THE WORK. 2. IT IS ANTICIPATED THAT AWARD WILL BE MADE ON BID ITEM 1 (BASE BID). HOWEVER, IF THE BIDS EXCEED THE IT IS ANTICIPATED THAT AWARD WILL BE MADE ON BID ITEM 1 (BASE BID). HOWEVER, IF THE BIDS EXCEED THE FUNDS AVAILABLE, AWARD WILL BE MADE ON BID ITEM II (DEDUCT ALTERNATE 1). 3. EXCLUDING BID ITEM V, THE BID ITEMS ARE LISTED IN DESCENDING ORDER. EXCLUDING BID ITEM V, THE BID ITEMS ARE LISTED IN DESCENDING ORDER. 4. BIDDERS SHALL AFFIX A PRICE TO EACH BID ITEM. FAILURE TO DO SO MAY RENDER THE BID AS NONRESPONSIVE.BIDDERS SHALL AFFIX A PRICE TO EACH BID ITEM. FAILURE TO DO SO MAY RENDER THE BID AS NONRESPONSIVE.
AutoCAD SHX Text WORK WITHIN PHASE X MAY BE USED STARTED AND STOPPED WITHOUT COMPLETION OF THE ENTIRE PHASE. THE INTENT IS TO SHIFT LABOR TO PHASE X, SHOULD WORK STOP ON A SEPARATE PHASE OF THE PROJECT.
Hal Text Box CCT: 180 days + 245 days (8 months for Water Line Material Lead Time) = 425 days
Hal Text Box
CCT
Hal Text Box CCT: 180 days + 245 days (8 months for Water Line Material Lead Time) = 425 days
Hal Text Box CCT: 165 days + 245 days (8 months for Water Line Material Lead Time) = 410 days
Hal Text Box CCT: 150 days + 245 days (8 months for Water Line Material Lead Time) = 395 days
2020 M icrosoft Corporation © 2020 M axar © CNES (2020) Distribution Airbus DS
W W
W W
W
W
W
W
W
WW
W
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W W
W W
WW
W
W
W
W
W
W W
W W
W
W
UE
UE
SS
SS
SS
SS
SS
SS
SS
SS
SS
U N
K U
N K
SS
U E
U E
U E
UE
UE
UNK
UNK
UE
UT
TB
SS
SS
UE
X X
X X
X X
X X
X X
X X
X X
X X
UE
UE
UE
SS
SS
SS
SS
SS
SS
SS
SS
X X
X
X X
X
X X
X X
X X
X X
X X
X X
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
U E
UG
UG
UG
W
W
W
W
W
W W
W
W
W
W
W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
X X
X X X X X
X
UG UG
UG
U G
UG
X X X
SS
SS
STM
SS
SS
SS
SS
SS
ST
M
SS
ST
M
ST
M
ST
M
ST
M
ST
M
STM
STM ST
M
STM
SS
SS
SS
SS
SS
SS
SS
ST
M
ST
M
U E
U E
UE
UE
UE
U N
K
XXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
UT
UT
UT
UT
UT
UT
UT
UT
UT
STM
STM
STM
STM
STMSTM
UE
U E
UE
U E
UE
WSTM
STM
STM
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UNK
UNK
UNK
UE
UE
W
UE
UE
UE
W
UNK
STM
2202 2206 22
15 22
2185 219021
10 22
DISC
"SV20"
DISC
"SV44"
DISC
"SV45"
DISC
"SV42"
DISC
"SV39"
DISC
"SV38"
DISC
"SV18"
DISC
"SV40"
DISC
"SV08"
DISC
"SV43"
DISC
"SV56"
DISC
"SV15"
DISC
"SV01"
DISC
"SV02"
DISC
"SV28"DISC
"SV28"
CONCRETE
VAULT W/
METAL LID
2" OPEN
FLUSH
PIPES
CONCRETE
VAULT W/
METAL LID
SOLAR
PANEL
METAL
UTILITY
BOX
WATER
METERS
EB
G R A S S
SI
D
EW
AL
K
GRATE INLET
TOP: 2210.7'
INV. IN: 2200.6' (NW-15"RCP)
INV. IN: 2196.5' (NW)
INV. OUT: 2196.2' (SE)
BUILDING
BUILDING
SIDEWALK
ASPHALT
PARKING
LOT
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S G R A S S
G R A S S
G R
A S
S
G R A S S G R A S S
G R A S S
G R A S S
EB
SIDEW
ALK
"STEAM"
MANHOLE
TOP: 2205.5'
EB
ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
AS
PH
AL
T
DR
IV
EW
AY
SIDEWALK
SI
DE
W
AL
K
SEWER MANHOLE
MSD# 28-19464
TOP: 2206.4'
INV. IN: 2187.2' (NW)
INV. IN: 2186.8' (NE)
INV. OUT: 2186.4' (SE)
WOODRAMP SEWER MANHOLE
MSD# 28-68615
TOP: 2209.9'
INV. IN: 2199.8' (N-8"DIP)
INV. IN: 2189.1' (N-8"DIP)
INV. IN: 2188.5' (NE)
INV. OUT: 2188.3' (SW)
CURB INLET
TOP: 2210.8'
INV. OUT: 2205.4'
"LOT 5"
SIGN
ASPH
ALT D
R
IVEW
AY
ASPH
ALT D
R
IVEW
AY
SHED
CONCRETE
"TOBACCO
FREE"
SIGN
DISC GOLF
BASKET
CURB INLET
TOP: 2207.4'
INV. IN: 2201.5'
INV. OUT: 2201.0'
ELECTRIC
MANHOLE
TOP: 2210.3'
DIRECTION
SIGN
EB
GRATE INLET
TOP: 2217.3'
INV. IN: 2206.5' (NE)
INV. OUT: 2206.2' (SW)
ASPHALT
DRIVEWAY
ASPHALT
PARKING
LOT
APPROXIMATE
BUILDING LOCATION
(BASED ON AERIAL)
CHAIN LINK FENCE
EBEB
BOOTH
ASPHALT
VIETNAM
MEMORIAL
GROUND
LIGHT
CONCRETE
APPROXIMATE
OVERHANG
(BASED ON AERIAL)
APPROXIMATE
BUILDING LOCATION
(BASED ON AERIAL)
UNKNOWN
UTILITY
BOXES WITH
12" YELLOW
LIDS
YARD INLET
TOP: 2224.5'
BENCH
SWING
FLAGPOLE
ROCK
MONUMENT
ART
DISPLAY
GRATE INLET
TOP: 2223.3'
INV. OUT: 2216.0'
CONCRETE SIDEWALK
BRICK PAVERS
SEWER MANHOLE
MSD# 28-41232
TOP: 2224.9'
INV. OUT: 2206.4'
BENCH
BR
IC
K W
AL
L
CO
NC
RE
TE
D
RI
VE
W
AY
SIDEWALK
ELECTRIC
MANHOLE
TOP: 2224.5'
GRATE INLET
TOP: 2223.4'
INV. OUT: 2222.1' (SW)
INV. OUT: 2221.9' (WSW)
INV. IN: 2221.7' (E)
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S G R A S S
ASPHALT PATH
ASPHALT PATH
SEWER MANHOLE
MSD# 28-422473
TOP: 2216.0'
INV. IN: 2209.1' (NW)
INV. OUT: 2208.5' (SE)
SEWER
MANHOLE
TOP: 2226.9'
SEWER MANHOLE
TOP: 2216.9'
INV. IN: 2212.9' (NW)
INV. OUT: 2212.5' (SE)
BUILDING
ASPHALT
PARKING
LOT
G R A S S ASPHALT
PARKING
LOT
WOODRAMP
SIDEWALK
SIDEWALK
SIDEWALK
SI
D
EW
AL
K
ST
EP
S
CONCRETE WALL
STEPS
METAL
FENCE
ASPHALT
PARKING
LOT
STORM MANHOLE
TOP: 2216.4'
INV.: 2212.4' (4"PVC)
CONCRETE
PAD
G R A S S
G R A S S
G R A S S
G R A S S
GRASS
G R A S S
G R A S S
G R A S S
G R A S S
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
SIDEWALK
ASPHALT
PARKING
LOT
SIDEWALK
MET
AL
F
EN
CE
EB
SEWER MANHOLE
MSD# 28-422467
TOP: 2202.2'
INV. IN: 2194.8' (N)
INV. OUT: 2194.7' (S)
SEWER MANHOLE
MSD# 28-422468
TOP: 2209.9'
INV. IN: 2195.9' (N)
INV. IN: 2195.6' (NW)
INV. OUT: 2195.5' (S)
GRATE INLET
TOP: 2200.6'
INV. INACCESSIBLE
GRATE INLET
TOP: 2206.9'
INV. INACCESSIBLE
BUILDING
GRATE INLET
TOP: 2240.4'
INV. OUT: 2238.4'
GRATE INLET
TOP: 2240.1'
INV.: 2238.0'
STORM MANHOLE
TOP: 2240.2'
INV. IN: 2238.1' (N)
INV. IN: 2237.6' (W)
INV. OUT: 2237.3' (S)
STEPS
SIDEW
ALK
ASPHALT
DRIVEW
AY
AS
PH
AL
T
R O
AD
ASPHALT
R
OAD
SIDEWALK
SIDEWALK
EB
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
G R A S S
G R A S S G R A S S
GRASS
G R A S S
G R A S S
ASPHALT ROAD
SHED
SPEED
BUMP
BLO
C
K W
ALL
BLOCK
WALL METAL GUARDRAIL
METAL FENCE
GRASS
GRASS
ASPHALT
PARKING
LOT
DIRECTION
SIGN
CONCRETE
PAD
METAL FENCE
G R A S S
G R A S S
G R A S S
G R A S S G R A S S
G R A S S
G R A S S
SEWER MANHOLE
MSD# 28-422465
TOP: 2183.8'
INV. IN: 2175.4' (SW)
INV. IN: 2175.3' (N)
INV. OUT: 2175.1' (SE)
SEWER MANHOLE
MSD# 28-19459
TOP: 2181.0'
INV. IN: 2176.0' (NW)
INV. IN: 2175.5' (NE)
INV. OUT: 2172.2' (SE)
SEWER MANHOLE
MSD# 28-19462
TOP: 2186.1'
INV. IN: 2179.5' (N-8"DIP)
INV. IN: 2177.3' (N-8"DIP)
INV. IN: 2176.6'
(W-12"DIP)
INV. OUT: 2176.5' (SE)
ASPHALT ROAD
ASPHALT ROAD
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
ASPHALT ROAD
ASPHALT
ROAD
ASPHALT ROAD
ASPHALT
ROAD
ASPHALT ROAD
& PARKING
AREA
ASPHALT ROAD
ASPHALT ROAD
NO
PARKING
AREA"STEAM"
MANHOLE
TOP: 2173.5'
UNKNOWN
MANHOLE
TOP: 2173.8'
ELECTRIC
MANHOLE
TOP: 2210.3'
ASPHALT PATH
ASPHALT PATH
ASPHALT PATH
ASPHALT PATH
EB
CONCRETE
RETAINING
WALL
"STEAM"
MANHOLE
TOP: 2178.5'
EB
G R A S S
G R A S S
G R A S S
G R A S S
G R
ASS
G
RASS
ELECTRIC
MANHOLE
TOP: 2183.4'
GRATE INLET
TOP: 2183.9'
GRATE INLET
TOP: 2185.1'
ELECTRIC
MANHOLE
TOP: 2192.8'
ELECTRIC
MANHOLE
TOP: 2193.2'
SPEED
BUMP
PARKING
BUMPER
CURB INLET
TOP: 2190.1'
INV. IN: 2187.8' (NW)
INV. IN: 2185.7' (W)
INV. OUT: 2185.2' (SE)
CURB INLET
TOP: 2192.7'
INV. OUT: 2190.3'
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
"VA CREDIT
UNION" SIGN
WITHIN TIMBER
RETAINING
WALL
SPEED
BUMP
SPEED
BUMP
SPEED
BUMP
DOCK
CONCRETE
COVERED CURB INLET W/
MANHOLE LID
TOP: 2193.6'
INV.: 2190.8'
METAL GUARDRAIL
ASPHALT
ROAD
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
ASPHALT LOADING AREA
SPEED
BUMP SID
EWALK
& STEPS
EB
ASPHALT
PARKING
LOT
METAL
FENCE
BUILDING
TRENCH GRATE INLET
TOP: 2203.7' (WEST END)
TOP: 2202.4' (EAST END)
M
ET
AL
FE
NC
E
ELECTRIC
MANHOLE
TOP: 2202.7'
APPROXIMATE
BUILDING LOCATION
(BASED ON AERIAL)
SEWER MANHOLE
MSD# 28-68531
TOP: 2206.0'
INV. OUT: 2201.5'
6"PVC
SI
DE
W
AL
K
CO
NC
RE
TE
W
AL
L
ASPHALT
PARKING
LOT
SIDEWALK STEPS
G R A S S
G R A S S
G R A S S
G R A S S
G R A S SG R A S S
G R A S S
ASPHALT
ROAD
ASPHALT
ROAD
ASPHALT ROAD
SIDEW
ALK
CONCRETE
LOADING
AREA
CONCRETE
WALL
ASPHALT
R
OAD
COVERED CURB INLET W/
MANHOLE LID
TOP: 2201.0'
INV. OUT: 2198.9' (4")
INV. IN: 2195.6' (8")
8" D
IP
4"PVC
6"DIP
8"DIP
8" D
IP
8"D
IP
SEWER MANHOLE
MSD# 28-422464
TOP: 2185.8'
INV. IN: 2174.1' (NW)
INV. OUT: 2173.6' (S)
6"RCP
STORM MANHOLE
TOP: 2240.2'
INV.: 2235.8'
12"DIP
12"DIP
8"DIP
SEWER MANHOLE
MSD# 28-422469
TOP: 2217.9'
INV. IN: 2210.9' (N)
INV. OUT: 2210.7' (S)
SEWER MANHOLE
MSD# 28-422472
TOP: 2208.4'
INV. IN: 2197.0' (NW)
INV. IN: 2196.6' (SW)
INV. OUT: 2196.4' (SE)
8"RCP
8"RCP
6"PVC
8"R
CP
8"
RCP
6"RCP
6"VCP
SEWER MANHOLE
MSD# 28-19451
TOP: 2218.8'
INV. IN: 2216.9' (SW)
INV. IN: 2215.1' (NW)
INV. OUT: 2214.1' (SE)6"VCP
4"PVC
8"
DI
P
8"RCP
8"R C
P
"R
C P
24"R C
P
" R
CP
15"
RCP24
"D
IP
8"PIPE
8"PIPE
STORM MANHOLE
TOP: 2211.2'+/-
INV. IN: 2204.6' (NE-15"RCP)
INV. IN: 2190.9' (WNW)
INV. IN: 2190.8' (NNE)
INV. IN: 2190.6' (SE-27"DIP)
INV. OUT: 2190.5' (NW-18"RCP)
8"PVC
8"
PV
C
8"DIP (2 PIPES)
8"PVC
STORM MANHOLE
(W/ SEWER LID)
TOP: 2203.8'
INV. IN: 2201.4' (WNW-4"PVC)
INV. IN: 2189.6' (NNW-24"CPP)
INV. OUT: 2189.4' (SE)
"C
PP
"C
PP
4"
PV
C
12"RCP
CURB INLET
TOP: 2207.2'
INV. OUT: 2201.7'
12"RCP
12"PVC
"P
VC
12"PVC
CONCRETE SLAB OVER STORM
STRUCTURE
(INVERTS NOT ACCESSIBLE)
TOP: 2182.0'
12"DIP
8"
VC
P
6"D
IP
12"DIP
"STEAM"
MANHOLE
TOP: 2179.0'
SEWER MANHOLE
MSD# 28-41057 (POSSIBLY)
TOP: 2192.0'
INV. IN: 2188.7' (NW-3"PVC)
INV. IN: 2188.6' (E-8"DIP)
INV. IN: 2186.3' (N-10"DIP)
INV. OUT: 2186.1' (SE-8"DIP)
MSD# 28-19474
NOT FOUND
3"PVC
8"DIP8"
DIP
10"D
IP
8"
DI
P
8"DIP
8"D
IP
SEWER MANHOLE
MSD# 28-19458
TOP: 2194.6'
INV. IN: 2189.1' (N)
INV. IN: 2184.1' (SW)
INV. OUT: 2183.9' (SE)
8"DIP
8"DIP
8"DIP
SEWER MANHOLE
MSD# 28-19460
TOP: 2174.6'
INV. IN: 2172.6' (NNW-8"VCP)
INV. IN: 2171.2' (WNW-12"DIP)
INV. IN: 2169.1' (NNW-8"DIP)
INV. IN: 2168.3' (WNW-12"DIP)
INV. OUT: 2168.1' (SE)
8"
DIP
& 8"
VCP
12"DIP
12"DIP (X2)
GRATE INLET IN
CONCRETE DITCH
TOP: 2205.7'
INV. NOT ACCESSIBLE
STORM MANHOLE
(W/ SEWER LID)
TOP: 2216.6'
INV. NOT ACCESSIBLE
CONCRETE SLAB WITH
STORM MANHOLE OVER
STORM STRUCTURE
(INVERTS NOT ACCESSIBLE)
TOP: 2208.7'
BENCH
BUILDING
CONCRETEWALL
EB
MULCH
CONCRETE
BENCH
8"VCP
4"PVC
4"PVC
4"PVC INLET ON
GROUND
INV.: 2224.8'
STORM MANHOLE
TOP: 2224.0'
INV. IN: 2209.5' (ENE)
INV. IN: 2209.3' (NNE)
INV. OUT: 2209.3' (SW)
18"RCP
18"RCP
18"RCP
8"VCP18"RCP
BOLLARD
SANITARY SEWER MANHOLE
LIGHT POLE
UTILITY POLE
WATER VALVE
FIRE HYDRANT
MONUMENT FOUND (AS DESCRIBED)
SIGN
GAS VALVE
GUY WIRE
DEED / PLAT LINE (NOT SURVEYED)
X X X FENCE LINE (AS DESCRIBED)
OVERHEAD UTILITY LINE
SANITARY SEWER LINE
D.B. DEED BOOK
PG. PAGE
GNSS GLOBAL NAVIGATION SATELLITE SYSTEM
PIN PARCEL IDENTIFIER NUMBER
ELEV. ELEVATION
ABBREVIATION LEGEND
WV WATER VALVE
MAJOR CONTOUR INTERVAL
MINOR CONTOUR INTERVAL
LINE TYPE LEGEND
SYMBOL LEGEND
STORM WATER DRAIN LINE
EDGE OF GRAVEL
TREE (AS DESCRIBED)
DBL. DOUBLE
UNDERGROUND WATER LINE
BOUNDARY LINE (SURVEYED)
AG ABOVE GRADE
BG BELOW GRADE
P.B. PLAT BOOK
2249.2 SPOT ELEVATION
FFE FINISHED FLOOR ELEVATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE MAIN WATER LOOP
Charles George VAMC, ASHEVILLE NC
637-20-101
N/A
7/2/2021Revisions: Date:
www.atriaxgroup.com
Atriax PLLC 102 3rd Avenue, NE Hickory, NC 28601 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 7/2/2021
S E A L 024911
HAROLD J . MARV
I N
PR
OFESSIONAL
ENGINEER
NO
RTH CAROL I NA
300 Ridgefield Ct Ste 301 Asheville, NC 28806
Phone: (828)225-6562 V-001
DIHHJM
EXISTING CONDITIONS
GRAPHIC SCALE
1" = 50'
50'0 100'25'
Scale: 1" = 50'-0"
EXISTING CONDITIONS MAIN CAMPUS1
EXISTING CONDITIONS LEGEND2
N
MAIN CAMPUS
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
AutoCAD SHX Text
NC GRID NORTH
NAD 83 (2011)
W
W W
W W
W W
WWWWWWW
W
W
W
W
W
W
W
W W
W W W
X X
X X
X X
X X
X X
X X
X X
X
OU OU OU OU
OU
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
GAS
VALVE
(TYP.)
UT
X X X
X
UE
UE
UE
UT
UT
UNK
UE
UE
UE
U N
K U
N K
SS
UE
UE
U
E
UE
UE
UNK
UNK
UE
UT
TB
SS
SS
UE
SS
SS
SS
SS
SS
W
W
W
W
W
WW
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
ST
M
SSST
M
STM
ST
M
ST
M
STM
SS
SS
SS
SS
U E
U E
U E
UE
UE
U N
K U
N K
U N
K U
N K
U N
K U
N K
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
UT
UT
UT
UT
UT
UT
STM
STM
STM STM STM
STM
UT
U E
UE
2227 22
2215 2210
221022
CONCRETE
VAULT W/
METAL LID
DISC
"SV53"
DISC
"SV25"
CONCRETE
VAULT W/
METAL LID
RPZ
POST
INDICATOR
VALVE (TYP.)
FIRE
HYDRANT
(TYP.)
WATER
VALVE (TYP.)
DISC
"SV24"
DISC
"SV54"DISC
"SV51"
DISC
"SV04"
DISC
"SV23"
DISC
"SV50"
DISC
"SV22"
DISC
"SV09"
DISC
"SV55"
DISC
"SV48"
DISC
"SV20"
DISC
"SV44"
DISC
"SV45"
DISC
"SV15"
LOCATION OF EXISTING
UNDERGROUND WATERLINE
VIA PAINT MARKINGS (TYP.)
WATER
FOUNTAIN
2" OPEN
FLUSH
PIPES
AS
PH
AL
T
DRIV
EW
AY
CHAI
N LI
NK
FE
NCE
ASPHALT ROAD
ASPH
ALT
D R
IVEW
AY
BER
M
BUILDING
PORCH
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
SID
EW
ALK
STEPS
SID
EW
ALK
SEWER MANHOLE
MSD# 28-19489
TOP: 2237.5'
INV. IN:
INV. IN:
INV. OUT: 2231.6' (PER GIS)
SEWER MANHOLE
MSD# 28-41131
TOP: 2252.2'
INV. IN: 2246.4' (NW)
INV. OUT: 2246.1' (SE)
8"CPP
8"CPP
INV.:
2228.8'
INV.:
2228.7'
INV.:
2229.1'
C O
N C
R
ETE C
U R
B & G U
TTER
(TYP.)
ROAD
SIGN
(TYP.)
UTILITY
POLE (TYP.)
RIP-RAP (TYP.)
"VETERANS
HOPE &
RECOVERY"
SIGN
PIPE TERMINUS
NOT FOUND
12"CPP
INV. IN
CONCRETE
HEADWALL:
2231.2'
CONCRETE
PAD
(TYP.)
LIGHT
POLE
(TYP.)
CONCRETE
DITCH
CONCRETE
DITCH
INV.:
2224.9'
INV.:
2224.7'
4"CLAY
PIPE
BRICK
COLUMN
(TYP.)
8' METAL FENCE
DOG
WASTE
STATION
EBASPHALT PATH
METAL
POST
CO
NCRETE CURB & G
UTTER (TYP.)
ASPHALT ROAD
G R A S S
G R A S S G R A S S
G R A S S
G R A S S G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R
A S
S
G R
A S
S
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
SEWER MANHOLE
MSD# 28-19465
TOP: 2219.1'
INV. IN: 2213.7' (NW)
INV. OUT: 2213.7' (SE)
CONCRETE
PAD
(TYP.)
SI
DE
W
AL
K
EB
G R A S S
SI
DE
W
AL
K
GRATE INLET
TOP: 2210.7'
INV. IN: 2200.6' (NW-15"RCP)
INV. IN: 2196.5' (NW)
INV. OUT: 2196.2' (SE)
GRATE INLET
TOP: 2209.2'
INV. OUT: 2202.9'
STORM MANHOLE
TOP: 2210.0'
INV. IN: 2204.5' (NW)
INV. IN: 2204.5' (SW)
INV. OUT: 2204.4' (SE)
STORM MANHOLE
TOP: 2210.1'
INV. IN: 2204.1' (WNW-12"CPP)
INV. IN: 2202.5' (NNW-15"RCP)
INV. IN: 2202.5' (SW)
INV. OUT: 2202.3' (SE)
BUILDING
BUILDING
BOLLARD
(TYP.)
SIDEWALK
"STEAM"
MANHOLE
TOP: 2210.9'
ASPHALT
PARKING
LOT
ASPHALT
PARKING
LOT
ASPHALTPARKINGLOT
G R
A S
S
ASPHALT
PARKING
LOTSHED
SI
DE
W
AL
K
GRASS
G R A S S G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S
G R A S S G R A S S G R A S S
DECK &
STEPS
SIDEWALKSTEPS
TIMBER WALL
TIMBER WALL
EB
EB
SIDEW
ALK
"STEAM"
MANHOLE
TOP: 2205.5'
EB
ASPHALT DRIVEWAY
ASPHALT DRIVEWAY
AS
PH
AL
T
DR
IV
EW
AY
SIDEWALK
SI
DE
W
AL
K
SEWER MANHOLE
MSD# 28-19464
TOP: 2206.4'
INV. IN: 2187.2' (NW)
INV. IN: 2186.8' (NE)
INV. OUT: 2186.4' (SE)
WOODRAMP
SEWER MANHOLE
MSD# 28-68615
TOP: 2209.9'
INV. IN: 2199.8' (N-8"DIP)
INV. IN: 2189.1' (N-8"DIP)
INV. IN: 2188.5' (NE)
INV. OUT: 2188.3' (SW)
CURB INLET
TOP: 2210.8'
INV. OUT: 2205.4'
"LOT 5"
SIGN
SHED
CONCRETE
"TOBACCO
FREE"
SIGN
DISC GOLF
BASKET
CURB INLET
TOP: 2207.4'
INV. IN: 2201.5'
INV. OUT: 2201.0'
ELECTRIC
MANHOLE
TOP: 2210.3'
DIRECTION
SIGN EB
GRATE INLET
TOP: 2217.3'
INV. IN: 2206.5' (NE)
INV. OUT: 2206.2' (SW)
ASPHALT
DRIVEWAY
ASPHALT
PARKING
LOT
APPROXIMATE
BUILDING LOCATION
(BASED ON AERIAL)
CHAIN LINK FENCE
EBEB
BOOTH
ASPHALTVIETNAM
MEMORIAL
GROUND
LIGHT
CONCRETE
APPROXIMATE
OVERHANG
(BASED ON AERIAL)
APPROXIMATE
BUILDING LOCATION
(BASED ON AERIAL)
UNKNOWN
UTILITY
BOXES WITH
12" YELLOW
LIDS
YARD INLET
TOP: 2224.5'
BENCH
SWING
FLAGPOLE
ROCK
MONUMENT
ART
DISPLAY
GRATE INLET
TOP: 2223.3'
INV. OUT: 2216.0'
CONCRETE SIDEWALK
BRICK PAVERS
SEWER MANHOLE
MSD# 28-41232
TOP: 2224.9'
INV. OUT: 2206.4'
BENCH
BR
IC
K W
AL
L
CO
NC
RE
TE
D
RI
VE
W
AY
SIDEWALK
ELECTRIC
MANHOLE
TOP: 2224.5'
GRATE INLET
TOP: 2223.4'
INV. OUT: 2222.1' (SW)
INV. OUT: 2221.9' (WSW)
INV. IN: 2221.7' (E)
G R A S S
G R A S S
G R A S S
ASPHALT PATH
SEWER MANHOLE
MSD# 28-19466
TOP: 2225.9'
INV. IN: 2218.2' (NE)
INV. OUT: 2218.1' (SE)
8" D
IP
8"DIP
6" D
IP
"R
CP
24"R C
P
"R
CP
15"RCP
12"
CPP
18"CPP 18
"C
PP
" R
CP
15"
RCP24
"D
IP
8"PIPE
8"PIPE
STORM MANHOLE
TOP: 2211.2'+/-
INV. IN: 2204.6' (NE-15"RCP)
INV. IN: 2190.9' (WNW)
INV. IN: 2190.8' (NNE)
INV. IN: 2190.6' (SE-27"DIP)
INV. OUT: 2190.5' (NW-18"RCP)
8"PVC
8"P
VC
8"DIP (2 PIPES)
8"PVC
STORM MANHOLE
(W/ SEWER LID)
TOP: 2203.8'
INV. IN: 2201.4' (WNW-4"PVC)
INV. IN: 2189.6' (NNW-24"CPP)
INV. OUT: 2189.4' (SE)
"C
PP
"C
PP
4"
PV
C
STORM MANHOLE
(W/ SEWER LID)
TOP: 2192.4'
INV. IN: 2186.2' (NNW-24"CPP)
INV. IN: 21885.4' (WNW-15"DIP)
INV. OUT: 2184.7' (SE)
(24"CPP INLET IS OBSCURED. INVERT, AND
PIPE MATERIAL AND DIAMETER ARE
ESTIMATED.)
15"DIP
24"DIP
SEWER MANHOLE
MSD# 28-19463
TOP: 2192.1' (PER MSD)
INV.: 2182.4' (PER MSD)
(MANHOLE LOCATION
IS ESTIMATED BASED
ON THE MSD WEBSITE)
12"RCP
CURB INLET
TOP: 2207.2'
INV. OUT: 2201.7'
12"RCP
SEWER MANHOLE
MSD# 28-19496
TOP: 2246.2'
INV. IN: 2239.8' (NW)
INV. OUT: 2239.5' (SE)
6"D
IP
6"D
IP
8"
DI
P
"STEAM"
MANHOLE
TOP: 2193.7'
BENCH
BUILDING
CONCRETE
WALL
MULCH
CONCRETE
BENCH 8"VCP
4"PVC
4"PVC
4"PVC INLET ON
GROUND
INV.: 2224.8'
STORM MANHOLE
TOP: 2224.0'
INV. IN: 2209.5' (ENE)
INV. IN: 2209.3' (NNE)
INV. OUT: 2209.3' (SW)
18"RCP
18"RCP
18"RCP
8"VCP
18"RCP
BOLLARD
SANITARY SEWER MANHOLE
LIGHT POLE
UTILITY POLE
WATER VALVE
FIRE HYDRANT
MONUMENT FOUND (AS DESCRIBED)
SIGN
GAS VALVE
GUY WIRE
DEED / PLAT LINE (NOT SURVEYED)
X X X FENCE LINE (AS DESCRIBED)
OVERHEAD UTILITY LINE
SANITARY SEWER LINE
D.B. DEED BOOK
PG. PAGE
GNSS GLOBAL NAVIGATION SATELLITE SYSTEM
PIN PARCEL IDENTIFIER NUMBER
ELEV. ELEVATION
ABBREVIATION LEGEND
WV WATER VALVE
MAJOR CONTOUR INTERVAL
MINOR CONTOUR INTERVAL
LINE TYPE LEGEND
SYMBOL LEGEND
STORM WATER DRAIN LINE
EDGE OF GRAVEL
TREE (AS DESCRIBED)
DBL. DOUBLE
UNDERGROUND WATER LINE
BOUNDARY LINE (SURVEYED)
AG ABOVE GRADE
BG BELOW GRADE
P.B. PLAT BOOK
2249.2 SPOT ELEVATION
FFE FINISHED FLOOR ELEVATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE MAIN WATER LOOP
Charles George VAMC, ASHEVILLE NC
637-20-101
N/A
7/2/2021Revisions: Date:
www.atriaxgroup.com
Atriax PLLC 102 3rd Avenue, NE Hickory, NC 28601 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 7/2/2021
S E A L 024911
HAROLD J . MARV
I N
PR
OFESSIONAL
ENGINEER
NO
RTH CAROL I NA
300 Ridgefield Ct Ste 301 Asheville, NC 28806
Phone: (828)225-6562 V-002
DIHHJM
EXISTING CONDITIONS
GRAPHIC SCALE
1" = 50'
50'0 100'25'
Scale: 1" = 50'-0"
EXISTING CONDITIONS RICEVILLE ROAD1
EXISTING CONDITIONS LEGEND2
N
MAIN CAMPUS
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE MAIN WATER LOOP
Charles George VAMC, ASHEVILLE NC
637-20-101
N/A
7/2/2021Revisions: Date:
www.atriaxgroup.com
Atriax PLLC 102 3rd Avenue, NE Hickory, NC 28601 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 7/2/2021
S E A L 024911
HAROLD J . MARV
I N
PR
OFESSIONAL
ENGINEER
NO
RTH CAROL I NA
300 Ridgefield Ct Ste 301 Asheville, NC 28806
Phone: (828)225-6562 C-001
DIHHJM
NOTES, LEGEND, AND
ABBREVIATIONS
AutoCAD SHX Text
1. SYMBOLS ARE INFLATED FOR READABILITY. ALLOW FOR SUBTLE DEVIATIONS FROM APPROXIMATE LOCATIONS DUE TO SYMBOL INFLATION. SYMBOLS ARE INFLATED FOR READABILITY. ALLOW FOR SUBTLE DEVIATIONS FROM APPROXIMATE LOCATIONS DUE TO SYMBOL INFLATION. 2. WHEN REFERENCE IS MADE TO ASTM, AWWA, AASHTO, OR OTHER SPECIFICATIONS OR METHODS, IT SHALL BE UNDERSTOOD TO MEAN THE LATEST EDITION WHEN REFERENCE IS MADE TO ASTM, AWWA, AASHTO, OR OTHER SPECIFICATIONS OR METHODS, IT SHALL BE UNDERSTOOD TO MEAN THE LATEST EDITION OR REVISION OF SAID SPECIFICATION, AS AMENDED AND ISSUED AT THE TIME OF THE ADVERTISEMENT FOR BIDS. 3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING, AT HIS/HER EXPENSE, ALL APPLICABLE LICENSES, PERMITS, BONDS, ETC. REQUIRED FOR THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING, AT HIS/HER EXPENSE, ALL APPLICABLE LICENSES, PERMITS, BONDS, ETC. REQUIRED FOR INSTALLATION/SYSTEM MODIFICATION TO COMPLY WITH THIS PROJECT. 4. VA PERSONNEL ARE NOT RESPONSIBLE FOR WORK SITE SAFETY OR COMPLIANCE/ENFORCEMENT OF SAFETY REGULATIONS AND STANDARDS ESTABLISHED BY VA PERSONNEL ARE NOT RESPONSIBLE FOR WORK SITE SAFETY OR COMPLIANCE/ENFORCEMENT OF SAFETY REGULATIONS AND STANDARDS ESTABLISHED BY OTHER AGENCIES. ALL SAFETY COMPLIANCE/ENFORCEMENT AT THE WORK SITE SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 5. ALL MATERIALS USED SHALL BE NEW, IN CONFORMANCE WITH THE APPLICABLE STANDARDS. ALL MATERIALS USED SHALL BE NEW, IN CONFORMANCE WITH THE APPLICABLE STANDARDS. 6. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THESE PLANS AND VA STANDARD SPECIFICATIONS. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THESE PLANS AND VA STANDARD SPECIFICATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROL OF ALL WORK PERFORMANCE AND SHALL IMPLEMENT WHATEVER PROCEDURES, METHODS, THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROL OF ALL WORK PERFORMANCE AND SHALL IMPLEMENT WHATEVER PROCEDURES, METHODS, TESTING, SURVEYING AND SUPERVISION THAT IS REQUIRED IN ORDER TO ENSURE THAT THE WORK CONFORMS TO THE CONSTRUCTION PLANS AND CONTRACT DOCUMENTS. 8. THE CONTRACTOR SHALL PROVIDE A QUALITY CONTROL PROGRAM. THIS PROGRAM SHALL INCLUDE SYSTEMATIC INSPECTION AND TESTING OF THE WORK AND THE CONTRACTOR SHALL PROVIDE A QUALITY CONTROL PROGRAM. THIS PROGRAM SHALL INCLUDE SYSTEMATIC INSPECTION AND TESTING OF THE WORK AND MATERIALS DURING CONSTRUCTION TO ASSURE THE OWNER THAT THE CONTRACTOR IS PROVIDING WORK THAT IS IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. THE PROGRAM WILL ALSO INCLUDE A PRELIMINARY SCHEDULE OF PRESSURE AND DISINFECTION TESTS TO BE PROVIDED TO THE COR. 9. ALL MATERIALS SHALL BE HANDLED WITH EQUIPMENT AND METHODS ADEQUATE TO PREVENT SHOCK OR DAMAGE. UNDER NO CIRCUMSTANCES SHALL ALL MATERIALS SHALL BE HANDLED WITH EQUIPMENT AND METHODS ADEQUATE TO PREVENT SHOCK OR DAMAGE. UNDER NO CIRCUMSTANCES SHALL MATERIALS BE DROPPED. IF ANY PART OF THE COATING OR LINING IS DAMAGED, THE CONTRACTOR SHALL REPAIR OR REPLACE THE MATERIAL AT HIS/HER EXPENSE AS DIRECTED BY THE COR. ALL PIPE AND APPURTENANCES SHALL BE HANDLED IN ACCORDANCE WITH THE APPROPRIATE AWWA AND ASTM STANDARDS. 10. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE SAFE STORAGE AND PROTECTION OF ALL PIPE AND OTHER MATERIALS DELIVERED TO THE WORK THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE SAFE STORAGE AND PROTECTION OF ALL PIPE AND OTHER MATERIALS DELIVERED TO THE WORK SITE. THE INTERIORS OF ALL PIPES AND FITTINGS SHALL BE KEPT FREE FROM DIRT AND FOREIGN MATTER AT ALL TIMES. GASKETS FOR PIPE JOINTS SHALL BE STORED IN A COOL LOCATION OUT OF DIRECT SUNLIGHT. IF SUNBURNED PIPE IS UTILIZED, THE OWNER REQUIRES THAT THE CONTRACTOR PROVIDE A MANUFACTURER'S CERTIFICATION THAT ALL WARRANTIES ARE STILL VALID. THE OWNER RESERVES THE RIGHT TO REJECT SUNBURNED PIPE DEPENDING ON THE SEVERITY OF THE APPARENT DAMAGE. ANY MATERIAL THAT HAS BEEN DAMAGED BEFORE ACTUAL INCORPORATION IN THE WORK SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE. 11. TAPPING SLEEVES AND TAPPING VALVES MUST BE TESTED WITH COMPRESSED AIR TO ENSURE THEY ARE PROPERLY INSTALLED ON THE WATER MAIN. TAPPING SLEEVES AND TAPPING VALVES MUST BE TESTED WITH COMPRESSED AIR TO ENSURE THEY ARE PROPERLY INSTALLED ON THE WATER MAIN. SLEEVE TESTING SHALL BE PERFORMED IN THE PRESENCE OF THE COR. THE PRESSURE TEST SLEEVE AND VALVE ASSEMBLY SHALL BE PRESSURE TESTED AT 30 PSI AIR PRESSURE FOR NO LESS THAN 20 MINUTES. 12. IF REQUIRED, CONTRACTOR TO STORE SOIL STOCKPILE WITHIN ACTIVE PHASE BOUNDARY. PHASE WILL BE CONSIDERED INACTIVE PRIOR TO SILT AND IF REQUIRED, CONTRACTOR TO STORE SOIL STOCKPILE WITHIN ACTIVE PHASE BOUNDARY. PHASE WILL BE CONSIDERED INACTIVE PRIOR TO SILT AND CONSTRUCTION FENCE INSTALLATION AND FOLLOWING BACKFILL COMPLETION. 13. CONTRACTOR SHALL RESTORE HARDSCAPES TO PRE-CONSTRUCTION CONDITIONS AT CONCLUSION OF PHASE; INCLUDING REPLACING CONCRETE SIDEWALKS, CONTRACTOR SHALL RESTORE HARDSCAPES TO PRE-CONSTRUCTION CONDITIONS AT CONCLUSION OF PHASE; INCLUDING REPLACING CONCRETE SIDEWALKS, CONCRETE PAVEMENT, CURB AND GUTTERS, ASPHALT PAVING AND STRIPING. 13.1. SAW CUT EXISTING ASPHALT PAVEMENT PARALLEL AND AT A UNIFORM WIDTH FOR UTILITY TRENCH. SAW CUT EXISTING ASPHALT PAVEMENT PARALLEL AND AT A UNIFORM WIDTH FOR UTILITY TRENCH. 13.2. CONCRETE SIDEWALKS, CONCRETE PAVEMENT AND CURB AND GUTTERS SHALL BE SAW CUT AT THE NEAREST CONTROL JOINT, AND REPLACED TO CONCRETE SIDEWALKS, CONCRETE PAVEMENT AND CURB AND GUTTERS SHALL BE SAW CUT AT THE NEAREST CONTROL JOINT, AND REPLACED TO EXISTING DIMENSIONS AND GRADES. 14. CONTRACTOR TO DISPOSE OF ADDITIONAL SOIL IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES.CONTRACTOR TO DISPOSE OF ADDITIONAL SOIL IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES.
AutoCAD SHX Text
1. ALL WATER MAINS SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE AND FITTINGS AS SPECIFIED BY AWWA C150 AND C151 FOR LAYING CONDITIONS PER ALL WATER MAINS SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE AND FITTINGS AS SPECIFIED BY AWWA C150 AND C151 FOR LAYING CONDITIONS PER THE CITY OF ASHEVILLE STANDARD TRENCH DETAIL AND AS REQUIRED BY THE TECHNICAL SPECIFICATIONS. 2. AT A MINIMUM, ALL PIPE AND FITTINGS 12 INCHES OR LESS SHALL BE RATED CLASS 350 PSI AND PIPE AND FITTINGS LARGER THAN 12 INCHES RATED AT A MINIMUM, ALL PIPE AND FITTINGS 12 INCHES OR LESS SHALL BE RATED CLASS 350 PSI AND PIPE AND FITTINGS LARGER THAN 12 INCHES RATED CLASS 250 PSI. SERVICE LINES LESS THAN 3" IN DIAMETER SHALL BE TYPE K COPPER TUBING. 3. ALL FITTINGS, BENDS, TEES, CROSSES, AND VALVES SHALL BE ADEQUATELY RESTRAINED. APPROVED RESTRAINT INCLUDES RETAINING GLANDS, FIELD LOCK ALL FITTINGS, BENDS, TEES, CROSSES, AND VALVES SHALL BE ADEQUATELY RESTRAINED. APPROVED RESTRAINT INCLUDES RETAINING GLANDS, FIELD LOCK GASKETS, AND RESTRAINT SYSTEMS PROVIDED BY APPROVED PIPE MANUFACTURERS. MINIMUM RESTRAINED LENGTHS FOR PIPE DIAMETERS UP TO 10 INCHES AND WORKING PRESSURE UP TO 200 PSI CAN BE FOUND BELOW. SEE DETAIL W.22/C-503 4. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1'-0" BETWEEN ALL UTILITIES AT CROSSINGS UNLESS OTHERWISE SPECIFIED BELOW. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF AT LEAST 1'-0" BETWEEN ALL UTILITIES AT CROSSINGS UNLESS OTHERWISE SPECIFIED BELOW. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN ACCORDANCE WITH STATE, AND O.S.H.A. STANDARDS FOR ALL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING TRENCH SAFETY REQUIREMENTS IN ACCORDANCE WITH STATE, AND O.S.H.A. STANDARDS FOR ALL EXCAVATIONS OF MORE THAN FIVE (5) FEET. FOR TRENCHING WIDTH, SEE DETAIL W.21/C-503. 6. THE LOCATION OF ALL UTILITIES LOCATED ON THESE PLANS ARE TAKEN FROM RECORD ENGINEERING PLANS AND SURVEYS. THE EXACT LOCATION AND THE LOCATION OF ALL UTILITIES LOCATED ON THESE PLANS ARE TAKEN FROM RECORD ENGINEERING PLANS AND SURVEYS. THE EXACT LOCATION AND ELEVATION OF ALL UTILITIES MUST BE DETERMINED BY THE CONTRACTOR. IT SHALL BE THE DUTY OF THE CONTRACTOR TO ASCERTAIN WHETHER ANY ADDITIONAL FACILITIES OTHER THAN THOSE SHOWN ON THE PLANS MAY BE PRESENT. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL PUBLIC AND PRIVATE UTILITIES IN THE CONSTRUCTION OF THIS PROJECT. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL PUBLIC AND PRIVATE UTILITIES IN THE CONSTRUCTION OF THIS PROJECT. 8. A NC LICENSED UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING TAPS. A NC LICENSED UTILITY CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING TAPS. 9. ALL BRASS FITTINGS SHALL BE CERTIFIED LEAD FREE. ALL BRASS FITTINGS SHALL BE CERTIFIED LEAD FREE. 10. INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE CITY OF ASHEVILLE CURRENT DESIGN GUIDELINES AND STANDARD DETAILS, INSTALLED BY A NORTH INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE CITY OF ASHEVILLE CURRENT DESIGN GUIDELINES AND STANDARD DETAILS, INSTALLED BY A NORTH CAROLINA LICENSED UTILITY CONTRACTOR. 11. A MINIMUM COVER DEPTH OF 3' SHALL BE MAINTAINED OVER ALL WATER LINES. A MAXIMUM OF 5' OF COVER OVER THE WATER MAIN IS ALLOWED. A MINIMUM COVER DEPTH OF 3' SHALL BE MAINTAINED OVER ALL WATER LINES. A MAXIMUM OF 5' OF COVER OVER THE WATER MAIN IS ALLOWED. 12. CONTRACTOR SHALL EXPLORE AHEAD PRIOR TO INSTALLATION AND DETERMINE ANY CONFLICTS WITH EXISTING UTILITIES THAT ARE NOT SHOWN ON THE CONTRACTOR SHALL EXPLORE AHEAD PRIOR TO INSTALLATION AND DETERMINE ANY CONFLICTS WITH EXISTING UTILITIES THAT ARE NOT SHOWN ON THE PLANS. 13. CONTRACTOR SHALL MAINTAIN MINIMUM SEPARATIONS FOR WATER AND SANITARY SEWER AS FOLLOWS. CONTRACTOR SHALL MAINTAIN MINIMUM SEPARATIONS FOR WATER AND SANITARY SEWER AS FOLLOWS. 13.1. WATER AND SEWER: 10' HORIZONTALLY OR 18" VERTICALLY.WATER AND SEWER: 10' HORIZONTALLY OR 18" VERTICALLY.
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
AutoCAD SHX Text
1. PERIMETER DIKES, SWALES, DITCHES, AND SLOPES SHALL BE STABILIZED WITHIN 7 DAYS OF ANY PHASE OF GRADING. PERIMETER DIKES, SWALES, DITCHES, AND SLOPES SHALL BE STABILIZED WITHIN 7 DAYS OF ANY PHASE OF GRADING. 2. CUT AND FILL SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED WITHIN 7 DAYS OF ANY PHASE OF GRADING. IF SLOPES ARE 10' OR LESS IN LENGTH CUT AND FILL SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED WITHIN 7 DAYS OF ANY PHASE OF GRADING. IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 3. CUT AND FILL SLOPES 3:1 OR FLATTER SHALL BE STABILIZED WITHIN 14 DAYS OF ANY PHASE OF GRADING AND 7 DAYS FOR SLOPES GREATER THAN 50' CUT AND FILL SLOPES 3:1 OR FLATTER SHALL BE STABILIZED WITHIN 14 DAYS OF ANY PHASE OF GRADING AND 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. 4. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 SHALL BE STABILIZED WITHIN 14 DAYS OF ANY PHASE OF GRADING EXCEPT FOR PERIMETERS AND HIGH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 SHALL BE STABILIZED WITHIN 14 DAYS OF ANY PHASE OF GRADING EXCEPT FOR PERIMETERS AND HIGH QUALITY WATER (HQW) ZONES WHICH SHALL BE STABILIZED WITHIN 7 DAYS. 5. ALL DITCHES AND AREAS OF CONCENTRATED FLOW WITH A VELOCITY EXCEEDING 2 FT/SEC SHALL BE STABILIZED WITH EROSION CONTROL BLANKETS, LINED ALL DITCHES AND AREAS OF CONCENTRATED FLOW WITH A VELOCITY EXCEEDING 2 FT/SEC SHALL BE STABILIZED WITH EROSION CONTROL BLANKETS, LINED WITH EROSION CONTROL STONE OR RIPRAP AS SPECIFIED ON PLAN. 6. SILT FENCE SHALL BE PLACED 10 FEET OFF THE TOE OF FILL SLOPES AND SOIL STOCKPILES TO PROVIDE ADEQUATE SPACE FOR SEDIMENT STORAGE AND SILT FENCE SHALL BE PLACED 10 FEET OFF THE TOE OF FILL SLOPES AND SOIL STOCKPILES TO PROVIDE ADEQUATE SPACE FOR SEDIMENT STORAGE AND MAINTENANCE. 7. STABILIZE AND SEED SEDIMENT TRAP SLOPES IMMEDIATELY AFTER CONSTRUCTION. STABILIZE AND SEED SEDIMENT TRAP SLOPES IMMEDIATELY AFTER CONSTRUCTION. 8. CRITICAL SLOPES (3:1 OR STEEPER) SHALL BE STABILIZED AS SOON AS POSSIBLE. FACE OF SLOPES 2:1 TO 3:1 SHALL BE REINFORCED WITH NORTH CRITICAL SLOPES (3:1 OR STEEPER) SHALL BE STABILIZED AS SOON AS POSSIBLE. FACE OF SLOPES 2:1 TO 3:1 SHALL BE REINFORCED WITH NORTH AMERICAN GREEN S150 DOUBLE NET STRAW BLANKET OR APPROVED EQUIVALENT. AS AN ALTERNATE, THE GRADING CONTRACTOR MAY HYDROMULCH THESE SLOPES WITH NORTH AMERICAN GREEN HYDRA-CX2 (A HIGH PERFORMANCE FIBER REINFORCED MATRIX) OR AN APPROVED EQUIVALENT. DOCUMENTATION OF PRODUCT SELECTED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO APPLICATION. 9. INLET PROTECTION SHALL BE INSTALLED AT ALL INLETS IN THE WORKING AREA AFFECTED BY CONSTRUCTION AND MAINTAINED UNTIL THE SITE IS FULLY INLET PROTECTION SHALL BE INSTALLED AT ALL INLETS IN THE WORKING AREA AFFECTED BY CONSTRUCTION AND MAINTAINED UNTIL THE SITE IS FULLY STABILIZED. ADJUST TEMPORARY DIVERSIONS TO DIRECT FLOW TO INLETS WHERE PRACTICAL. 10. TO MINIMIZE DAMAGE TO EXISTING TREES NEAR THE EDGE OF EXCAVATION, AS NEEDED, THE CONTRACTOR SHALL CUT MINIMUM 2' TRENCHES ALONG THE TO MINIMIZE DAMAGE TO EXISTING TREES NEAR THE EDGE OF EXCAVATION, AS NEEDED, THE CONTRACTOR SHALL CUT MINIMUM 2' TRENCHES ALONG THE LIMITS OF DISTURBANCE, SO AS TO CUT, RATHER THAN TEAR, ROOTS. 11. THE STREETS AND PAVED AREAS AFFECTED BY THE PROJECT WILL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION WILL BE REQUIRED. THE STREETS AND PAVED AREAS AFFECTED BY THE PROJECT WILL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION WILL BE REQUIRED. 12. RETURN ALL DISTURBED AREAS TO PRIOR CONDITION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SEEDING AND EROSION AND SEDIMENT CONTROL RETURN ALL DISTURBED AREAS TO PRIOR CONDITION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SEEDING AND EROSION AND SEDIMENT CONTROL MEASURES UNTIL VIGOROUS STANDARD HEALTHY GROWTH IS ACHIEVED. 13. BUILDING WASTES HANDLING: BUILDING WASTES HANDLING: 13.1. DEDICATED DEMOLITION AND OTHER WASTE AREAS AND EARTHEN MATERIAL STOCKPILES MUST BE LOCATED AT LEAST 50' FROM STORM DRAINS OR DEDICATED DEMOLITION AND OTHER WASTE AREAS AND EARTHEN MATERIAL STOCKPILES MUST BE LOCATED AT LEAST 50' FROM STORM DRAINS OR STREAMS UNLESS NO ALTERNATIVE IS FEASIBLE. 13.2. CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 14. TAKE COMPLIANCE SERIOUSLY! PROJECTS THAT VIOLATE STORMWATER PERMIT CONDITIONS AND/OR HAVE UNAUTHORIZED WATER QUALITY IMPACTS ARE TAKE COMPLIANCE SERIOUSLY! PROJECTS THAT VIOLATE STORMWATER PERMIT CONDITIONS AND/OR HAVE UNAUTHORIZED WATER QUALITY IMPACTS ARE SUBJECT TO FINES. IF SEDIMENT IS DEPOSITED IN A STREAM OR WETLAND, THE DIVISION OF WATER QUALITY REGIONAL OFFICE MUST BE NOTIFIED WITHIN 24 HOURS AND PROVIDE WRITTEN NOTICE WITHIN 5 DAYS. 15. WHEN TRENCH DEWATERING IS NECESSARY, CONTRACTORS OPERATIONS SHALL COMPLY WITH SPEC 31 23 19. WHEN TRENCH DEWATERING IS NECESSARY, CONTRACTORS OPERATIONS SHALL COMPLY WITH SPEC 31 23 19.
AutoCAD SHX Text
1. OBTAIN ALL NECESSARY PERMITS FOR CONSTRUCTION AND RECEIVE NPDES COVERAGE FROM NCDEQ. OBTAIN ALL NECESSARY PERMITS FOR CONSTRUCTION AND RECEIVE NPDES COVERAGE FROM NCDEQ. 2. PLACE NCDEQ EROSION & SEDIMENT CONTROL AND STORMWATER PERMIT AND APPROVED PLANS AT A LOCATION ON THE SITE. PLACE NCDEQ EROSION & SEDIMENT CONTROL AND STORMWATER PERMIT AND APPROVED PLANS AT A LOCATION ON THE SITE. 3. CONDUCT A PRE-CONSTRUCTION MEETING ON-SITE WITH LAND QUALITY INSPECTOR. CONDUCT A PRE-CONSTRUCTION MEETING ON-SITE WITH LAND QUALITY INSPECTOR. 4. NOTIFY NCDEQ ASHEVILLE REGIONAL OFFICE LAND QUALITY SECTION 72 HOURS PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. NOTIFY NCDEQ ASHEVILLE REGIONAL OFFICE LAND QUALITY SECTION 72 HOURS PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. 5. CLEAR AND GRUB SITE AS NECESSARY FOR INSTALLATION OF PERIMETER CONTROLS. CLEAR AND GRUB SITE AS NECESSARY FOR INSTALLATION OF PERIMETER CONTROLS. 6. INSTALL PERIMETER CONTROLS - SILT FENCE AND SILT FENCE OUTLET. INSTALL PERIMETER CONTROLS - SILT FENCE AND SILT FENCE OUTLET. 7. TAKE CARE TO MINIMIZE DISTURBANCE AS NECESSARY TO INSTALL ALL EROSION CONTROL MEASURES. TAKE CARE TO MINIMIZE DISTURBANCE AS NECESSARY TO INSTALL ALL EROSION CONTROL MEASURES. 8. INITIATE TEMPORARY VEGETATIVE STABILIZATION MEASURES AS NECESSARY. INITIATE TEMPORARY VEGETATIVE STABILIZATION MEASURES AS NECESSARY. 9. INSTALL TEMPORARY CONCRETE WASHOUT BASIN PRIOR TO ORDERING ANY CONCRETE. INSTALL TEMPORARY CONCRETE WASHOUT BASIN PRIOR TO ORDERING ANY CONCRETE. 10. SEE RESPECTIVE PHASING PLAN SHEETS FOR SPECIFIC INSTALLATION INSTRUCTIONS. SEE RESPECTIVE PHASING PLAN SHEETS FOR SPECIFIC INSTALLATION INSTRUCTIONS. 11. FINE GRADE THE SITE FOR PAVING OPERATIONS. FINE GRADE THE SITE FOR PAVING OPERATIONS. 12. PAVE IN ACCORDANCE WITH PAVING LIMITATIONS LISTED BELOW. PAVE IN ACCORDANCE WITH PAVING LIMITATIONS LISTED BELOW. 13. INITIATE PERMANENT VEGETATIVE STABILIZATION MEASURES. INITIATE PERMANENT VEGETATIVE STABILIZATION MEASURES. 14. REMOVE ACCUMULATED SEDIMENT AND MAINTAIN SEDIMENT DEVICES UNTIL SITE HAS BEEN STABILIZED. REMOVE ACCUMULATED SEDIMENT AND MAINTAIN SEDIMENT DEVICES UNTIL SITE HAS BEEN STABILIZED. 15. NOTIFY NCDEQ ASHEVILLE REGIONAL OFFICE LAND QUALITY INSPECTOR FOR FINAL WALK THROUGH TO VERIFY SITE IS FULLY STABILIZED. NOTIFY NCDEQ ASHEVILLE REGIONAL OFFICE LAND QUALITY INSPECTOR FOR FINAL WALK THROUGH TO VERIFY SITE IS FULLY STABILIZED. 16. REMOVE SEDIMENT DEVICES ONCE SITE IS FULLY STABILIZED AND GIVEN APPROVAL BY NCDEQ AND THE GOVERNMENT. REMOVE SEDIMENT DEVICES ONCE SITE IS FULLY STABILIZED AND GIVEN APPROVAL BY NCDEQ AND THE GOVERNMENT. 17. ISSUE NOTICE OF TERMINATION.ISSUE NOTICE OF TERMINATION.
AutoCAD SHX Text
UTILITY NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
EROSION CONTROL GENERAL NOTES
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text
HYDROSTATIC PRESSURE TESTING AND DISINFECTION PROCESS
AutoCAD SHX Text
1. HYDROSTATIC PRESSURE TESTING HYDROSTATIC PRESSURE TESTING 1.1. KEEP THE SECTION BEING HYDROSTATICALLY TESTED FULL OF WATER FOR A PERIOD OF 24 HOURS BEFORE THE PRESSURE AND LEAKAGE TESTS ARE KEEP THE SECTION BEING HYDROSTATICALLY TESTED FULL OF WATER FOR A PERIOD OF 24 HOURS BEFORE THE PRESSURE AND LEAKAGE TESTS ARE CONDUCTED. 1.2. A SECTION OF LINE WHICH IS TO BE HYDROSTATICALLY TESTED, SHALL BE SLOWLY FILLED WITH WATER AT 50-PSI (350-KPA) INCREMENTS AND A SECTION OF LINE WHICH IS TO BE HYDROSTATICALLY TESTED, SHALL BE SLOWLY FILLED WITH WATER AT 50-PSI (350-KPA) INCREMENTS AND INSPECTED AT EACH JOINT BETWEEN INCREMENTS. TEST PRESSURE SHALL BE HELD FOR 1 HOUR; THEN DECREASED TO 0 PSI (0 KPA); THEN SLOWLY INCREASED TO TEST PRESSURE AGAIN AND HELD FOR 1 MORE HOUR. HAND PUMPS SHALL NOT BE USED FOR THE PRESSURE TESTING OF WATER MAINS. 1.3. THE HYDROSTATIC TEST SHALL BE WITNESSED BY THE COR DURING THE FULL DURATION. THE HYDROSTATIC TEST SHALL BE WITNESSED BY THE COR DURING THE FULL DURATION. 1.4. THE LINE SHALL BE TESTED TO A MINIMUM PRESSURE OF 200 PSI WITH A MAXIMUM OF 250 PSI AT THE LOWEST ELEVATION. THE PRESSURE GAUGE THE LINE SHALL BE TESTED TO A MINIMUM PRESSURE OF 200 PSI WITH A MAXIMUM OF 250 PSI AT THE LOWEST ELEVATION. THE PRESSURE GAUGE USED IN THE HYDROSTATIC TEST SHALL BE CALIBRATED IN INCREMENTS OF 10 PSI OR LESS. PRESSURE SHALL BE MAINTAINED AT A MINIMUM OF 200 PSI +/- 5 PSI AT THE HIGHEST POINT THROUGHOUT THE DURATION OF THE TEST BY PUMPING ADDITIONAL WATER INTO THE TEST SECTION AS OFTEN AS NECESSARY. AT THE END OF THE TEST PERIOD, THE LEAKAGE SHALL BE MEASURED BY APPROVED MEANS. 1.5. THE LINE TO BE TESTED MUST UTILIZE A BACKFLOW PREVENTION ASSEMBLY AS SHOWN ON W28/C-503. ALL WATER FOR TESTING MUST BE DRAWN THE LINE TO BE TESTED MUST UTILIZE A BACKFLOW PREVENTION ASSEMBLY AS SHOWN ON W28/C-503. ALL WATER FOR TESTING MUST BE DRAWN THROUGH THIS ASSEMBLY. PRIOR TO CONNECTING TO THE EXISTING WATER LINE THE NEW WATER LINE EXTENSION SHALL BE PRESSURE TESTED, DISINFECTED AND A CLEAR WATER SAMPLE OBTAINED. FURTHERMORE, ALL CLOSING REQUIREMENTS OUTLINED IN THE DESIGN & CONSTRUCTION MANUAL ARE TO BE MET BEFORE CONNECTION. 1.6. THE MAXIMUM ALLOWABLE LEAKAGE IS 2 QUARTS (1.89 L) PER HOUR PER 100 JOINTS. REMAKE LEAKING JOINTS WITH NEW MATERIALS AND REPEAT THE MAXIMUM ALLOWABLE LEAKAGE IS 2 QUARTS (1.89 L) PER HOUR PER 100 JOINTS. REMAKE LEAKING JOINTS WITH NEW MATERIALS AND REPEAT TEST UNTIL LEAKAGE IS WITHIN ALLOWABLE LIMIT. 1.7. CAREFULLY EXAMINE ALL EXPOSED PIPE FITTINGS, VALVES, HYDRANTS, AND JOINTS DURING THE TEST. LOCATE AND REPAIR LEAKS AND REPLACE CAREFULLY EXAMINE ALL EXPOSED PIPE FITTINGS, VALVES, HYDRANTS, AND JOINTS DURING THE TEST. LOCATE AND REPAIR LEAKS AND REPLACE DEFECTIVE MATERIALS IF THE WATER LOSS DURING THE TEST PERIODS EXCEEDS THE ALLOWABLE LEAKAGE. 1.8. MAKE THE NECESSARY REPAIRS, REPLACE DEFECTIVE MATERIAL AND REPEAT THE HYDROSTATIC TEST UNTIL THE LEAKAGE DOES NOT EXCEED THE MAKE THE NECESSARY REPAIRS, REPLACE DEFECTIVE MATERIAL AND REPEAT THE HYDROSTATIC TEST UNTIL THE LEAKAGE DOES NOT EXCEED THE ALLOWABLE LEAKAGE AS DEFINED HEREIN. 1.9. SHOULD THE CONTRACTOR WISH, HE/SHE MAY, AT HIS/HER OWN RISK, BACKFILL THE TRENCH, IN PART OR IN FULL, AS SOON AS PRACTICABLE SHOULD THE CONTRACTOR WISH, HE/SHE MAY, AT HIS/HER OWN RISK, BACKFILL THE TRENCH, IN PART OR IN FULL, AS SOON AS PRACTICABLE AFTER INSTALLATION OF PIPE. THE CONTRACTOR, HOWEVER, REMAINS RESPONSIBLE FOR REMOVING AND LATER REPLACING SUCH BACKFILL, AT HIS/HER OWN EXPENSE, SHOULD HE/SHE BE ORDERED TO DO SO IN ORDER TO LOCATE AND REPAIR LEAKING OR DEFECTIVE JOINTS OF PIPE. 2. DISINFECTION AND TESTING DISINFECTION AND TESTING 2.1. ALL ADDITIONS OR REPLACEMENTS TO THE WATER SYSTEM SHALL BE CHLORINATED BEFORE BEING PLACED IN SERVICE. SUCH DISINFECTION SHALL ALL ADDITIONS OR REPLACEMENTS TO THE WATER SYSTEM SHALL BE CHLORINATED BEFORE BEING PLACED IN SERVICE. SUCH DISINFECTION SHALL TAKE PLACE UNDER THE CONTINUOUS SUPERVISION OF THE COR. THE MAXIMUM TOTAL LENGTH OF WATER MAIN WHICH MAY BE DISINFECTED AT THE SAME TIME IS 3000 LINEAR FEET. DISINFECTION, FLUSHING, AND SAMPLING OF A COMPLETED LINE SHALL BE CARRIED OUT IN THE FOLLOWING MANNER: 2.1.1. TAPS WITH EXTENDED COPPER TUBING WILL BE MADE AT THE CONTROL VALVE AT THE UPSTREAM END OF THE LINE AND AT ALL EXTREMITIES OF TAPS WITH EXTENDED COPPER TUBING WILL BE MADE AT THE CONTROL VALVE AT THE UPSTREAM END OF THE LINE AND AT ALL EXTREMITIES OF THE LINE INCLUDING VALVES. THESE ADDITIONAL TAPS WILL NOT BE NECESSARY WHERE A SUITABLE PERMANENT TAP IS ALREADY AVAILABLE AS APPROVED BY THE COR. 2.1.2. PRIOR TO INTRODUCING THE CHLORINE SOLUTION INTO THE PIPE, ALL BLOW-OFFS SHALL BE CHECKED TO CONFIRM THAT ALL AIR HAS BEEN PRIOR TO INTRODUCING THE CHLORINE SOLUTION INTO THE PIPE, ALL BLOW-OFFS SHALL BE CHECKED TO CONFIRM THAT ALL AIR HAS BEEN EXPELLED FROM THE PIPE AND THE PIPE IS FILLED WITH WATER. DURING THE INTRODUCTION OF CHLORINATED SOLUTION INTO THE PIPE, THE OPERATION OF BLOW-OFFS SHALL BE CAREFULLY CONTROLLED TO MAKE SURE THE SOLUTION ENTERS ALL MAIN LINES, BRANCH LINES, AND SERVICE LINES THOROUGHLY AND THAT NO AIR IS INTRODUCED. 2.1.3. ALL GAUGE PRESSURE AND RESIDUAL CHLORINE FIELD TEST EQUIPMENT SHALL BE PROPERLY CALIBRATED. ALL EQUIPMENT USED IN THE ALL GAUGE PRESSURE AND RESIDUAL CHLORINE FIELD TEST EQUIPMENT SHALL BE PROPERLY CALIBRATED. ALL EQUIPMENT USED IN THE DISINFECTION PROCESS SHALL BE CLEANED AND SUITABLE FOR POTABLE WATER APPLICATION. 2.1.4. A SOLUTION OF WATER CONTAINING HIGH TEST SODIUM HYPOCHLORITE (HTH) (70% AVAILABLE CHLORINE) SHALL BE INTRODUCED INTO THE LINE BY A SOLUTION OF WATER CONTAINING HIGH TEST SODIUM HYPOCHLORITE (HTH) (70% AVAILABLE CHLORINE) SHALL BE INTRODUCED INTO THE LINE BY REGULATED PUMPING AT THE CONTROL-VALVE TAP. THE SOLUTION SHALL BE OF SUCH A CONCENTRATION THAT THE LINE SHALL HAVE A UNIFORM CONCENTRATION OF 50 PPM TOTAL CHLORINE IMMEDIATELY AFTER DISINFECTION. THE CHART BELOW SHOWS THE REQUIRED QUANTITY OF 70% HTH COMPOUND TO BE CONTAINED IN SOLUTION IN EACH 1000 FEET SECTION OF LINE TO PRODUCE THE DESIRED CONCENTRATION OF 50 PPM. PIPE SIZE POUNDS HIGH TEST HYPOCHLORITE (70%) POUNDS HIGH TEST HYPOCHLORITE (70%) INCHES PER 1000 FEET OF LINE PER 1000 FEET OF LINE 6 .88 .88 8 1.56 1.56 10 2.42 2.42 2.1.5.
This is the start of the file's text. The full file is on GovTribe.