This document provides the solicitation for architectural and engineering services to replace and expand the nurse call system at the Charles George Veterans Affairs Medical Center in Asheville, North Carolina. The scope of work includes replacing existing nurse call systems covering approximately 160,000 square feet and 700 devices in two patient ward buildings, as well as expanding the system to cover an additional 200,000 square feet and 500 devices in outpatient primary and specialty care clinics and public restrooms. The selected firm will be responsible for demolishing old equipment and wiring, installing new wiring and conduit as needed, and replacing devices at patient headwalls and nursing stations. The firm must also install conduit, wiring and pull stations in approximately 50 public restrooms and patient care areas. Responses are due by September 23, 2021 and will be evaluated based on professional qualifications, specialized experience in medical facility design, capacity to complete the work on schedule, past performance on government contracts, and record of claims due to improper services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24621R0125 0003.docx | DOCX document | |
| 36C24621R0125 A0002 Nurse Call System 9.03.2021.pdf | ||
| 36C24621R0125_3.docx | DOCX document | |
| Attachment A - Past Performance Questionnaire AE Nurse Call System slg.pdf | ||
| 36C24621R0125 Solicitation - Nurse Call System 8.23.2021.pdf | ||
| Attachment B - SF330 Nurse Call System.pdf | ||
| 36C24621R0125_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24621R0125 0002 Box 14 Continuation Description
The purpose of Amendment 0002 is to provide SF330 evaluation criteria.
Please see attached Box 14 Continuation.
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 9/03/2021 637-22-105 Department of Veterans Affairs Network Contracting Office 6 1100 Tunnel Road Asheville NC 28805 Department of Veterans Affairs Network Contracting Office 6 1100 Tunnel Road Asheville NC 28805 To all Offerors/Bidders
36C24621R0125 08-23-2021
X x x
The purpose of Amendment 0002 is to provide SF330 evaluation criteria.
Please see attached Box 14 Continuation.
SF330's are to be submitted to Shirley Gregory at Shirley.Gregory@va.gov and cc Patrick Stultz at Patrick.Stultz@va.gov no later than 10:00am EDT on September 23, 2021.
Note: All proposal preparation costs will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation costs.
OFFERORS WILL BE EVALUATED ON THE FOLLOWING CRITERIA:
The submitted SF-330s will be evaluated on the following criteria:
This acquisition will be in accordance with FAR Part 36.602-1 and VAAR Part 836.601-1. The following evaluation criteria will be used to evaluate SF 330 technical proposals:
The A/E must demonstrate its qualifications with respect to the published evaluation criteria for all services. Evaluation Criteria (1) through (4) are considered the most important and listed in descending order of importance; Criteria (5) is of significantly less importance than (1) through (4) but the associated value of 1 through 4 are in a declining value and order of importance. Criterion (1) is the highest with Criterion (5) being the lowest.
(1) Professional qualifications necessary for satisfactory performance of required services;
(2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical facility design;
(3) Capacity to accomplish the work in the required time;
(4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules;
(5) Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
CRITERION 1 - Professional Qualifications necessary for satisfactory performance of required services. Offerors will be evaluated in terms of the qualifications, competence and experience of the key personnel and technical team proposed to accomplish this work. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Provide a balanced licensed and or certified workforce in the following disciplines – Electrical and Electronic Engineering, Telecommunications, Biomedical, and Architectural.
Submission requirements: Provide resumes for all proposed key personnel. Resumes are limited to one page each and should cite project specific experience and indicate proposed role in this contract. Provide professional registration, certification, licensure and/or accreditation. Indicate participation of key personnel in example projects in the SF-330 Part 1 Section G.
CRITERION 2 - Specialized experience and technical competence in the type of work required, including, where appropriate, experience in medical Facility design. Offerors will be evaluated on specialized experience and technical competence in the performance of services like those anticipated under this contract about:
· Special knowledge of Hospital Nurse Call and Intercom Systems in Medical Facilities
· Special knowledge of Electrical Wiring, Frequencies, and Telecommunications
· Experience working in and around an operational Hospital
· Specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team.
Submission requirements: Size: Maximum size of the e-mail message shall not exceed ten (10) megabytes. The SF330, in its entirety, shall not exceed one email of 5MB. The SF330 (not including past performance questionnaires) are limited to 20 pages. If the page limits are exceeded, the pages in excess of the limit will not be read nor considered. Only one email is permitted unless otherwise stated in this paragraph or in writing by the Contract Officer submitting the solicitation. Due to VA IT Security protocols, email submissions are limited to 10Mb per email. Furthermore, it is the sole responsibility of the prospective firms to confirm receipt of their submission in its entirety prior to the closing date & time of their submission in response to this synopsis.
Provide up to six (6) projects completed or substantially completed within the past ten (10) years that best illustrate specialized experience of the proposed team in the areas outlined above. Example projects shall note project’s square footage. All projects provided in the SF-330 must be completed by the office/branch/regional office/individual team member proposed to manage and/or perform work under this contract. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part 1, Section F Item 25 “Firms from Section C Involved in this Project,” block (1). Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). Include in the project description, the contract period of performance, award contract value, current contract value, and summary of the work performed that demonstrates relevance to specialized experience as outlined above. If the contractor served as a subcontractor on a project, indicate the value of the work they provided towards the performance of the overall project. If a project was performed by a joint venture, and not all joint venture partners are on the team proposed for this contract, the offeror/team should specifically address the work performed by the joint venture partner offering/teaming on this contract. Likewise, if the offeror/team member worked as a subcontractor on a project, the description should clearly describe the work performed by the offeror/team member and the roles and responsibilities of each on the project, rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. Additionally, Firms are required to return and submit the Attachment B titled Criterion 2 Format, which will clearly demonstrate specific experiences and qualifications of personnel proposed for assignment to the project and their record of working together as a team. Specifically list similar scoped projects covering the previous 10 years and clearly show participation. (See SF330 Part I Section G, but not excluding other information provided on the SF330 and supporting documentation.)
NOTE: If the Offeror is a joint venture, information should be submitted as a joint venture; however, if there is no information for the joint venture, information should be submitted for either joint venture partner, not to exceed a total of six (6) projects for this criterion. Projects shall be submitted on the SF-330. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders or stand-alone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated.
Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower.
All information for Criterion 2 should be submitted in Part 1, Section F of the SF-330. The Government WILL NOT consider information submitted in addition to Part 2, Section F in evaluating Criterion 2.
CRITERION 3 - Capacity to accomplish the work in the required time. Firms/teams will be evaluated in terms of their ability to plan for and manage work under the contract and capacity to accomplish the work in the required time.
Submission requirements: Describe the firm’s ability to concurrently perform and manage multiple projects in different locations to meet aggressive schedules, multiple disciplines, and control costs and the firm’s capacity to accomplish multiple projects simultaneously. Additionally, Prospective contractors are required to provide a list of current projects with a design fee of greater than $25,000 currently being designed in the firms’ office. Indicate the availability of the proposed project team (including sub-consultants) for the specified contract performance period in terms of: (1.) both the average and maximum number of projects being worked simultaneously for the previous twelve (12) month period, for each key personnel member, (2.) the number of projects currently being worked by each key personnel member identified in the SF330, and (3.) the number of projects that could be added to workload, given size and complexity.
CRITERION 4 - Past Performance – Offerors will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 1 projects and may include other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being rated lower. NOTE: Past performance information for projects listed under Criterion 1.
Project Recency: A project will be considered recent only if performance was completed within five (5) years of the date of issuance of this public announcement. Ongoing projects will not be considered as no accurate performance record can exist for work not yet completed.
Submission requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF THERE IS NOT A COMPLETED CPARS/ACASS EVALUATION, the Past Performance Questionnaire (PPQ) included in this notice is provided for the offeror or its team members to submit to the client for each project the offeror includes under Criterion 1. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Submit no less than three (3) and no more than five (5) past performance references for recent and relevant projects identified on SF330 Part I Section F. Completed PPQs should be submitted with your SF-330. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, offerors should complete and submit with their responses the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) if it is on the same form as posted with this Synopsis. Offerors should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Network Contracting Office 6, Attn: Shirley Gregory via email at Shirley.Gregory@va.gov prior to the response date. Offerors shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
CRITERION 5 - Record of significant claims against the firm because of improper or incomplete architectural and engineering services.
SELECTION PROCESS: The agency has convened an evaluation board for the evaluation of responses to this notice. Responses will be evaluated in accordance with the Selection of Architects and Engineers Statute (Public Law 92-582), formerly known as the Brooks Act, and implemented in Federal Acquisition Regulation (FAR) 36.6. Specifically, SF 330 submissions will be evaluated to identify the most highly qualified firms, using the selection criteria identified above. Discussions will be held with at least three (3) of the most highly qualified firms. Interviews may be conducted. The processes at FAR 36.602-4 and FAR 36.606 will then be followed.
SELECTION INTERVIEW:
Interviews shall be scheduled with firms slated as the most highly qualified. Firms slated for interviews will be asked a series of established questions. Elaborate presentations are not desired.