This document contains as-built drawings and mechanical plans for renovations to Building 6 at the Salisbury VAMC. The project includes demolishing existing finishes and doors, reconfiguring ductwork and diffusers, and converting the HVAC system from constant volume to variable air volume. A new inline exhaust fan and ductwork will be installed to serve new restrooms. The mechanical plans show demolition of existing ductwork and equipment, locations for new VVT boxes and a bypass damper to control two variable zones, and notes specifying control requirements including BACNET compatibility. Hernandez Consulting prepared the as-built drawings dated March 25, 2018.

The related federal contract opportunity is a pre-solicitation for structural roof repairs to Building 6 at the Salisbury VAMC. The Department of Veterans Affairs Veterans Health Administration VISN 6 is the agency. An amendment updated the mandatory site visit date and time from November 10, 2020 to November 13, 2020 at 9:30 AM EST.

View the file

Other files

File Type Posted
Old drawings_ incls pool area.pdf PDF
B6 Roof Struct_RFIs.pdf PDF
Old elevation drawing.pdf PDF
amendment 36C24621B0001 0002_1.docx DOCX document
36C24621B0001 0001_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AS-BUILT DRAWINGS - HERNANDEZ CONSULTING, LLC

03-25-18

DOOR OPENING NOT EXISTING, MOVED TO CONFERENCE ROOM EXISTING OPENING

OPENING DEMO

EXISTING DOORS REMAIN

EXISTING DOOR DEMO

EXISTING FINISHES DEMO

DOOR 123B REMOVED FROM SCOPE

DOOR 123 MOVED TO EMPLOYEE 2ND ENTRANCE

DOOR REMOVED

DOOR AND AWNING MOVED TO EMPLOEE ENTRANCE PHASE 2

NEW AWNING LOCATION

NEW STORE FRONT

LOCATION

BLDG 6 – HIMS Renovation – Finishes Schedule

Paint, P P1 – PPG Water Chestnut L1807 #30YY 62/127 (low luster) P2 – Sherwin‐Williams Refuge SW6228 (low luster) P3 – PPG Golden Wheat L0648 #10YY 53/337 (low luster) P4 – Sherwin‐Williams Unusual Gray SW7059 (low luster) P5 – Sherwin‐Williams Pearl Gray SW0052 (low luster) P6 – Sherwin‐Williams Poised Taupe SW6039 (low luster)

Wall Protection, Cornerguard InPro Surface Mount Corner Guard, color Oatmeal 0239

Carpet, CPT CPT1 –Shaw Contract, Unearthed Collection, Style Agate 5T015, Color Zircon 14740, size 18”x36” Installed in herringbone pattern.

CPT2 – Shaw Contract, Unearthed Collection, Style Mica 5T014, Color Hematite 14760, size 18”x36” Installed in brick pattern.

CPT3 – Mannington Commercial Walk‐Off Carpet – Ruffian II or Traverse, color/pattern TBD

Luxury Vinyl Tile, LVT LVT1 – Centiva, Contour series, Style Modern Wood, Color Thistle CMD 3602, Natural Grain (NG) finish, square edge, size 6”x36” LVT2 – Centiva, Event series, Style Travertine, Color Toscano Travertine ETR 7212, Quarry (QU) finish, square edge, size 18”x18” LVT3 – Centiva, Event series, Style Travertine, Color Silver Travertine ETR 7213, Quarry (QU) finish, square edge, size 18”x18”

Rubber Base, RB RB1 – Johnsonite Cove Base, Fawn 80, 4” Traditional RB2 – Johnsonite Cove Base, Fawn 80, 6” Traditional

Acoustic Ceiling Tile, ACT ACT1 – Armstrong Ultima and Prelude XL, 1911 – Tegular

A7301 – 12’ HD Main Beam 15/16” AXL7328 – 2’ Prelude XL Cross Tee 15/16”, AXL7348 – 4’ Prelude XL Cross Tee 15/16” A7809 – 12’ Wall Angle 15/16”

High Pressure Laminates, HPL HPL1 – Formica, Hardrock Maple, Matte finish, 86992‐58 (for vertical surfaces) HPL2 – Formica, Earthen Twill, Matte finish, 8828‐58 (for horizontal surfaces)

REVISED TO va SELECTIONS

REVISED TO ATTACEHD ENGINEERS DIAGRAMIC DRAWING

see attached electrical drawing awning

AWNING PROFILE

ELECTRICAL

FIRE SUPRESSION

Project: 17-013

VA SALISBURY HVAC RENOVATION

SEAL & SIGNATURE

PROJECT NO.: 17-013

DRAWING BY:

CHK BY: RPM

DWG NO.:

DRAWING BY: RPM

OCT 11 2017 SKETCH

DATE: OCT 11 2017

/x

P. (504) 457-8750 rpm group #17-013

825 Mehle Avenue Aribi, LA

M-101

MECHANICAL FIRST FLOOR DEMOLITION PLAN

SWAP (RL)

VVT-1

VVT-2

T

AHU

10"10"

10" 12"

10"

16" 18"

12"

8"

10"

8"

NUMBERED NOTES

1 MOVE AIR DEVICE INTO GRID IN NEWLY DEMISED

ROOM. EXTEND DUCTWORK TO NEW LOCATION.

REMOVE EXISTING RETURN AIR DUCTWORK

BACK TO THIS POINT. LEAVE OPEN ABOVE

CEILING TO PROVIDE PLENUM RETURN FOR

SPACE.

FIELD VERIFY LOCATION OF DUCT. THIS DUCT

MAY RUN IN A SPACE THAT WILL BE USED FOR

SUPPORT OF NEW MOVEABLE WALL. PROVIDE

AN ADDITIVE ALTERNATE PRICE (ADD ALT 1) FOR

RELOCATING THIS DUCTWORK TO THE EAST 6'.

BPD-1

4 BYPASS DAMPER FOR VVT SYSTEM. 12" INLET

BOX TO HANDLE 1800 CFM. CARRIER 35E OR

EQUAL. PROVIDE WITH CARRIER i-Vu

COMPATIBLE BACNET CONTROLS OR EQUAL.

VVT DAMPERS

VVT-1: 1850 CFM MAX, 600 CFM MIN

VVT-2: 450 CFM MAX, 150 CFM MIN

DESIGN CONCEPT

FOR AREA TO THE PLAN NORTH CURRENTLY USED AS

OFFICES, RECONFIGURE DUCTWORK AND DIFFUSERS

AS SHOWN. SOME WORK MAY NEED TO BE DONE TO

ALIGN THE DIFFUSERS WITH A CHANGE IN THE

CEILING GRID LOCATION.

FOR AREA TO THE PLAN SOUTH THAT IS SERVED

CURRENTLY BY A CONSTANT VOLUME, VARIABLE

TEMPERATURE CARRIER AHU LOCATED IN THE

BASEMENT, THE INTENT IS TO CHANGE THE CONTROL

OF THIS AIR DISTRIBUTION SYSTEM FROM CONSTANT

VOLUME TO A VARIABLE-AIR-VOLUME AND VARIABLE-

AIR-TEMPERATURE SYSTEM (VVT). THERE WILL BE

TWO VARIABLE ZONES, WITH VVT BOXES AS SHOWN

ON THE SKETCH. THE AREAS TO BE USED AS

CONFERENCE SPACES SHALL REMAIN CONSTANT

VOLUME AND SHALL HAVE THE PRIMARY THERMOSTAT

FOR THE AHU LOCATED IN THEM.

A COMPREHENSIVE VVT CONTROLLER SYSTEM SHALL

BE PROVIDED. THIS SHALL INCLUDE TWO ZONE

CONTROLLERS WITH THERMOSTATS, A BYPASS

DAMPER CONTROLLER, AN OPEN CONTROLLER FOR

THE AHU, AND SPACE SENSORS AS NECESSARY. ALL

PROGRAMMING SHALL BE SIMILAR TO THR CARRIER i- Vu SYSTEM, AND SHALL BE BACNET COMPATIBLE TO

BE MONITORED AND HAVE SETPOINTS CHANGED

USING THE EXISTING CONTROLS FRONT END AT THE

SITE.

THE CONTRACTOR IS URGED TO PROVIDE INPUT FOR

THE MOST COST EFFECTIVE SOLUTIONS FOR THIS

PROJECT, AND IS RESPONSIBLE FOR FIELD VERIFYING

ALL CONDITIONS PRIOR TO BID.

THE RETURN DUCT SHALL BE REMOVED TO THE

POINTS SHOWN ON THE DRAWING TO CONVERT THE

RETURN SYSTEM TO A PLENUM RETURN.

A NEW INLINE EXHAUST FAN SHALL BE PROVIDED TO

SERVE THE NEW RESTROOMS, WITH ITS DISCHARGE

TERMINATING THROUGH THE ROOF ABOVE THE

SPACE.

EF-1: 150 CFM @ 0.375" WC. INLINE FAN. GREENHECK

OR EQUAL

EXHAUST FAN

EF-1

GENERAL NOTES

THIS IS A SKETCH THAT IS DIAGRAMMATIC IN NATURE

ONLY. IT IS NOT INTENDED TO SHOW ALL PIECES AND

PARTS NECESSARY FOR A COMPLETE SYSTEM.

BIDDING CONTRACTORS SHALL BE REQUIRED TO

PROVIDE A FULLY WORKING SYSTEM IN COMPLIANCE

WITH VA DESIGN STANDARDS AND SPECIFICATIONS.

IF AN AIR DEVICE IS NOT SHOWN AS RELOCATED, AND

INDICATED WITH A RED AREA FROM ANNOLD

LOCATION TO A NEW LOCATION, IT IS ASSUMED TO BE

NEW.

ALL NEW RETURNS ARE PERFORATED FACE RETURNS

WITH OPEN BACKING, SIMILAR TO TITUS PAR OR

EQUAL.

DUCT SIZES SHOWN ARE FOR ROUND DUCT. PROVIDE

RECTANGULAR DUCT OF EQUAL FREE AREA AND

FRICTION AS NEEDED TO ACCOMMODATE STRUCTURE

OR OTHER TRADES.

÷ 1 .

. it:"gig

MECHANICAL REFERENCE FROM MODIFICATION 1

G-000 REV 1
AD-100 REV 1
AE-100 REV 1
AC-100 REV 1
AF-100 REV 1
Plumbing REV 1
Electrical REV 1