Specifications_658-14-117_Repair_Finishes_Various_Bldgs_112818.pdf

PDF 1 MB Posted

Attached to
658-14-117 Replace Finishes Various Buildings (VA-19-00017617)
Solicitation number
36C24619R0038
Issued by

About this file

36C24619R0038 Specifications 658-14-117 Repair Finishes Various Bldgs 112818.pdf

View the file

Other files

File Type Posted
36C24619R0038-0004000.docx DOCX document
36C24619R0038-0004001.pdf PDF
36C24619R0038-0003000.docx DOCX document
36C24619R0038-0003001.pdf PDF
36C24619R0038-0002002.pdf PDF
36C24619R0038-0002001.pdf PDF
36C24619R0038-0002000.docx DOCX document
36C24619R0038-0001000.docx DOCX document
Consolidated_Drawings_658-14-117.pdf PDF
Itemized_Cost_Breakdown.xlsx XLSX spreadsheet
36C24619R0038_2.docx DOCX document
DOL_Wage_Rate_Determination_VA180057_1-05-2018.pdf PDF
36C24619R0038_3.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 658-14-117

Replace Finishes Various Buildings

Table of Contents - 1

Project #: 658-14-117

TABLE OF CONTENTS

DIVISION 0 - SPECIAL SECTIONS

00 01 15 List of Drawings

DIVISION 1 - GENERAL REQUIREMENTS

01 00 00 General Requirements

01 25 00 Interim Life Safety Plan for Construction

01 33 23 Shop Drawings, Product Data and Samples

01 35 26 Safety Requirments

01 74 19 Construction Waste Management

DIVISION 2 – EXISTING CONDITIONS

02 41 00 Demolition

02 82 13.19 Asbestos Floor Tile and Mastic Abatement

DIVISION 3 – CONCRETE

03 30 00 Cast-In-Place Concrete

DIVISION 4 – MASONRY

04 05 13 Masonry Mortaring

04 05 16 Masonry Grouting

04 20 00 Unit Masonry

DIVISION 5 – METALS

05 22 16 Non-Structural Metal Framing

DIVISION 6 - WOOD AND PLASTIC

06 10 00 Rough Carpentry

06 20 00 Finish Carpentry

DIVISION 7 - (Not Used)

DIVISION 8 - (Not Used)

DIVISION 9 – FINISHES

09 29 00 Gypsum Board

09 65 13 Resilient Base and Accessories

09 65 16 Resilient Sheet Flooring

Table of Contents - 2

09 91 00 Painting

DIVISION 10 - Specialties

10 26 00 Wall and Door Protection

DIVISIONS 11 – 21 (Not Used)

DIVISIONS 11 – 21 (Not Used)

DIVISION 23 – (Not Used)

DIVISIONS 24 – 25 (Not Used)

DIVISION 26 - (Not Used)

DIVISIONS 27 - 35 (Not Used)

List of Drawings - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Sheet#/Drawing# Title

1 OF 11 G100 TITLE AND INDICES SHEET.

2 OF 11 HA101 BLDG. 2A Bsmt. FLR. CORRIDOR FLOORING REPLACEMENT AND WALL

REPAIR.

3 OF 11 HA101 BLDG. 2A 1ST FLR. CORRIDOR FLOORING REPLACEMENT AND WALL REPAIR.

4 OF 11 AF101 BLDG. 4 BSMT. CORRIDOR FLOORING REPLACEMENT.

5 OF 11 AF101 BLDG. 12 BSMT. CORRIDOR FLOOR REPLACEMENT.

6 OF 11 AF101 BLDG. 76 BSMT. CORRIDOR FLOOR REPLACEMENT.

7 OF 11 AF101 BLDG. 77 BSMT. CORRIDOR FLOOR REPLACEMENT.

8 OF 11 AF101 CONNECTING CORRIDORS 74-75, 75-76, 76-77 FLOOR REPLACEMENT.

9 OF 11 AF101 BLDG. 143 STAIRWELLS 1,2,3,4,5,6,7,8 STAIR TREAD AND NOSING

REPLACEMENT.

10 OF 10 AF101 BLDG. 4 -74 CONNECTING CORRIDOR HANDRAIL INSTALLATION.

- - - END - - -

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor, materials, tools, equipment, transportation, and qualified supervision necessary for Project No. 658-14-117 “Replace Finishes

Various Buildings” at the Salem VA Medical Center as required by the drawings and specifications.

B. Visits to the site by Bidders outside of the scheduled pre-bid meeting may be made only by appointment with the COR. Requests for visits outside of the scheduled pre-bid meeting may be denied depending on workload.

C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of VA credentialing services, be identified by project and employer, and restricted from unauthorized access. The contractor shall submit a list of anticipated employees (both prime contract employees and subcontract employees) to the COR at least 2 weeks prior to start of physical work. This list will aid in the credentialing and badging process for all contract employees. Badges shall be worn by all workers on the Project site at all times.

D. Prior to commencing work, general contractor shall provide proof that a

OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

E. Training:

1. All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by VA Contracting

Officer with input from the ICRA team. The Prime Contractor

Superintendent and the OSHA certified “competent person” noted above shall have the 30-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by the VA

CO with input from the ICRA team.

2. Submit training records of all such employees for approval before the start of work. Contractor shall submit training records of all such employees to the Contracting Officer for approval before the start of work. There will be no exceptions to the training requirements. No contractor or subcontractor employee shall be allowed to perform work under the resultant contract without proper documentation of the required training.

1.2 SCOPE OF WORK

The Contractor shall furnish all labor, materials, tools, equipment, transportation and qualified supervision necessary for a construction project to replace various finishes for building 2A walls and floors, building 4, 12, 76, 77 basement quarry tile floors and adjacent connecting corridor quarry tile floors, and to replace building 143 stairwells stair treads and nosing’s which are located at the Salem VA Medical Center in Salem, VA. 24153.

The intent of this project is to provide demolition of existing ACM mastic in building 2A and replace with new basement flooring, walls, wall protection and handrails. Work will initiate with abatement of certain hazardous materials including asbestos-containing materials

(ACM) in floor tile and wall ceramic tile mastic in bldg. 2A basement and a section of 2A first floor corridor. Contractor shall provide in building 2A new half wall height of impact resistant fiberglass 5/8” wallboard and a protective wall covering and handrails. Contractor shall replace demoed (ACM) existing VCT floors with new Welded Seam

Flooring with an integral Cove Base installed at intersection of floor and vertical surfaces.

Contractor shall demo all remaining existing quarry tile flooring in connecting corridors in the west loop (in proximity to buildings 76 and

77) and replace floors with new epoxy urethane floor surface.

Contractor shall demo basement hallway quarry tile floors in buildings

12, 76 and 77 and replace floors with new epoxy urethane floor surface.

The work shall be conducted with the buildings occupied, so the work must provide for appropriate environmental control measures to ensure that the building and any other structures dependent on utilities emanating from these buildings are adequately heated and cooled during the construction process. Contractor shall also provide new stair vinyl stair treads and nosing in each stair well located in bldg. 143.

All work shall be done after hospital work hours and on weekends. At no time shall work interfere with the operation of the hospital.

All hazmat abatement shall be conducted in accordance with all local, state, federal regulatory and VA requirements. Contractor shall conform to VA Infection Control Requirements, Interim Life Safety

Measures, site restoration requirements, and all related activities to maintain a safe work site during construction. Work will involve temporary partitions/ infection control measures, the extent of which will depend on configuration and location. Approximately 10% of the work can be conducted during normal business hours; however, approximately 90% of the work will have to take place outside of normal hospital work hours 7:45AM to 4:30PM. This project is aimed at providing new wall and floor and stair surfaces for various VAMC Salem

Bldgs. All work, including final cleanup and completion of any punch list items, shall be performed within four hundred (400) calendar days of receipt of the Notice to Proceed.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, specifications and drawings will be furnished to the contractor via electronic format. All documents will be furnished in Adobe Acrobat .pdf format.

1.4 CONSTRUCTION SECURITY REQUIREMENETS

A. Security Plan:

1. The Contractor shall develop and submit for CO approval a Security

Plan which clearly defines the security measures which will be employed for conducting this work. The plan shall address all security concerns in reference to the proposed work. The security plan shall define both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. Neither General Contractor’s employees nor subcontractor employees shall enter the project site without appropriate badge. Badges shall be obtained from the VA credentialing service located in the

Human Resource wing of Building 74. To be issued badges, employees will be required to provide two valid forms of identification including at least one photo ID AND their names will need to be included on the employee list submitted by the General Contractor.

Employees may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days notice to the Contracting

Officer so that security arrangements can be provided for the employees and proper notification timeframes can be provided to VA security personnel. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down the project site and order

General Contractor’s employees off the premises in the event of a national or local emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the COR for any space/area not remaining under the existing keying system for the Medical Center. This access shall be provided for the purpose of security inspections of every area of the project including tool boxes and parked machines. Upon concurrence of the COR, the existing keying system (Best 7-pin removable core) may be used for the project area.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.

D. Document Control:

1. The General Contractor is responsible for safekeeping of all drawings, project manual, and other project information. This information shall be shared only with those with a specific need to accomplish the project.

E. Motor Vehicle Restrictions

1. Contractor work vehicles shall be subject to restrictions and requirements of VAMC Memorandum 658-138-05. Work vehicles shall be limited to paved areas unless work requirements dictate that they must be parked on turf areas or other generally untrafficked areas.

In cases where they must be located on generally untrafficked areas, the Contractor shall comply with restrictions of the VAMC Memorandum noted above. Any damage to these areas shall be repaired by the

Contractor and at the Contractor’s expense as quickly as feasible.

2. Contractor employee vehicles shall be subject to restrictions noted in VAMC Memorandum 658-138-05 noted above. Employee vehicles shall be parked in the primary contractor staging area located Northwest of Parking Lot T or within Parking Lot T to the maximum extent feasible. Contractor employees using station parking areas shall, at a minimum, be subject to the same restrictions and requirements as VA employees. Construction Contractor employee parking locations will be at the discretion of the Contracting Officer, and may be changed at any time dependent on parking availability.

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this

Article to extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-1998 ........................ Surface Burning Characteristics of Building Materials

2. National Fire Protection Association (NFPA):

10-1998 .......................... Standard for Portable Fire Extinguishers

FCLCH-30-2000 ............. Flammable and Combustible Liquids Code

51B-1999 ........................ Standard for Fire Prevention During Welding, Cutting and

Other Hot Work

70-2000 .......................... National Electrical Code

241-2000 ........................ Standard for Safeguarding Construction, Alteration, and

Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 .................. Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, Shop

Drawings, Product Data, and Samples. Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc.

Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with

COR.

F. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to

COR.

G. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA

241 and NFPA 10.

H. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

I. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with COR and Facility Safety Officer. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.

J. Hot Work: Perform and safeguard hot work operations in accordance with

NFPA 241 and NFPA 51B. Coordinate all hot work with the COR utilizing the procedures established in VAMC Memorandum 658-001-82. Obtain permits from facility Safety Officer or their designee as specified in requirements of the Memorandum. Designate contractor's responsible project-site fire prevention program manager to coordinate permitting of hot work.

K. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to the COR and facility Safety Officer.

L. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

M. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

N. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or

Local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, roads, or turf areas.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR. In general, the contractor shall be allowed to temporarily locate an office and/or storage trailer within the confines of the existing contractor storage area located adjacent to Parking Lot

T. Exceptions to this restriction can be made by the Contracting

Officer depending on the project requirements.

E. Workmen are subject to rules of the Medical Center applicable to their conduct. Execute work in such a manner as to interfere as little as possible with Medical Center business and work being done by others.

Keep roads and sidewalks clear of construction materials, debris, standing construction equipment and vehicles at all times. Provide traffic control (including sign-men, as required) when any traffic lane is impacted by the work. The contractor shall maintain at least one lane of traffic at all times.

F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure are not permitted in buildings that are jointly occupied, during construction, by patients or medical personnel and Contractor's personnel.

Exceptions to this policy may be made by the CO or the COR where required by limited working space or other situations such as full-time occupancy. In these situations, the COR shall determine the most advantageous timeframe for conducting this type of work activity.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas in a manner which will minimize interference with Medical Center operations. Provide unobstructed access to Medical Center areas required to remain in operation.

G. Phasing: To insure execution of the work for minimization of interference with Medical Center business, the Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of the site. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to the COR, Contracting

Officer, and Contractor. Some of the planned work is to be conducted in critical space (Radiology Area) and will require strict adherence to agreed-upon scheduling plans.

H. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris, and standing construction equipment and vehicles.

I. Construction Fence: Temporary fencing, if applicable, will be required to exclude all unauthorized personnel from the work areas. This shall include installation of a minimum 6 ft. high chain link fence to enclose all scaffolding areas, tear off areas, materials staging area, demolition debris areas, and any other areas considered as potential hazards by the COR or VA Safety Service. Temporary fencing shall consist, at a minimum, of chain link construction fence, six ft.

minimum height, around the area as agreed upon by the COR and the

Contractor. Provide gates as required for access with necessary hardware, including hasps and padlocks. Gates shall be locked at all times when the Contractor is not present in the work area(s). Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade.

Remove the fence when work is completed or when directed by the COR.

1.7 ALTERATIONS

A. Pre-Work Condition Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA

Supply Service, of the work area and affected appurtenances, and furnish a report, signed by both to the Contracting Officer. This report shall list by location:

1. Existing condition and types of appurtenances not required to be altered throughout the work site.

2. Existence and conditions of items required by drawings to remain in the vicinity of the construction, be reused, or be relocated.

3. Any discrepancies between drawings and existing conditions at site.

4. Any areas for working space, materials storage, and routes of access to areas where work occurs and which have been agreed upon by the

Contractor and the COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent or, in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. Re-Survey of Site Conditions: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of construction involved in the work.

They shall furnish a report on conditions then existing of all construction affected work and areas, as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to any site appurtenances, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

1.8 INFECTION PREVENTION MEASURES

A. Implement the requirements of VAMC’s Infection Control Risk Assessment

(ICRA) team. The ICRA team may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.

B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23, Shop

Drawings, Product Data, and Samples.

1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

C. Medical Center Infection Control personnel may monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:

1. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, the following preventive measures shall be adopted during construction to minimize dust and prevent mold.

1. Dampen debris to keep down dust. The contractor shall blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction, as necessary.

2. Do not perform dust producing tasks within or adjacent to occupied areas without the approval of the COR. This work is almost entirely interior work, some of which will be performed in critical areas;

therefore, dust control is critical and shall be managed in strict accordance with the ICRA determination. During the entire construction process, the dust must be managed to eliminate any impacts to patients, building occupants, adjacent buildings or areas, or other contract work which may be on-going.

a. Pay particular attention in the subject contract to all HVAC terminal points, and make sure these are appropriately addressed during any dusty work. If work in an area is not completed in one construction action, insure that the area is cleaned thoroughly prior to resumption of use by the Medical Center.

b. The contractor shall not haul debris through patient-care or business areas without prior approval of the COR and the Medical

Center. Debris accumulation points shall be carefully located and managed to minimize any impacts to Medical Center business, employee access, or other on-going contract work.

E. Final Cleanup:

1. Upon completion of project, or as work progresses, remove all construction debris that have been part of the construction.

2. Perform HEPA vacuum cleaning of all surfaces in the construction area that might have been impacted by the work.

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Any reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass), on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The

Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment or workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

The contractor shall remove all trees, limbs, and shrubs as indicated by the COR for conducting the work and for insuring security of the site.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site. The Contractor shall be responsible for determining the location of all underground utilities with general assistance from the VA, and shall take all necessary measures to identify exact locations in order to avoid damage to utilities and/or disruption of utility services due to construction traffic. The

Contractor shall repair any damage to those facilities resulting from failure to comply with the requirements of this contract, failure to properly identify utilities or utility locations, or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the

Contractor. The Contractor shall be responsible for coordinating the work with any affected utilities and government entities.

(FAR 52.236-9)

1.11 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, floors, mechanical and electrical work, paving, roads, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2) of GENERAL CONDITIONS.

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR to review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads and other access which are necessary in the performance of contract work. This work will require driving on existing turf areas, and this shall be limited to the maximum extent practicable. The contractor shall be responsible for repair of any and all damage to turf or landscaped areas as a result of this work.

1.14 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor. The Contractor may propose a plan for access to existing utilities subject to COR approval. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, and associated paraphernalia.

C. Electricity (for Construction and Testing):

1. Obtain electricity by connecting to the Medical Center electrical distribution system as feasible and practicable for this project.

D. Water (for Construction and Testing):

1. As feasible and practicable for this project, obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at any connection made. Water is available at no cost to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use to the extent possible. Failure to stop leakage or other wastes will be cause for revocation (at COR's discretion) of use of water from Medical

Center's system.

1.15 TEMPORARY TOILETS

A. Provide where directed or approved, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by CO, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.16 RELOCATED EQUIPMENT

A. Contractor shall disconnect, dismantle as necessary, remove and reinstall in new location, all existing equipment on drawings or otherwise shown to be relocated by the Contractor.

B. Perform relocation of such equipment or items at such times and in such a manner as directed by the COR.

C. Suitably cap existing service lines, such as steam, condensate return, water, drain, gas, air, vacuum and/or electrical, whenever such lines are disconnected from equipment to be relocated. Remove abandoned lines in finished areas.

D. Provide all mechanical and electrical service connections, fittings, fastenings and any other materials necessary for assembly and installation of relocated equipment; and leave such equipment in proper operating condition.

E. All service lines such as noted above for relocated equipment shall be in place at point of relocation ready for use before any existing equipment is disconnected. Make relocated existing equipment ready for operation or use immediately after reinstallation.

1.17 HISTORIC PRESERVATION

Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.

1.18 HOURS WORKED

Due to the locations of much of this work, the bulk will be required to be performed outside of normal business hours. Normal business hours are Monday through Friday, approximately 7:30 a.m. to 4:30 p.m. For some of the locations, the work may require additional restrictions on hours, but must definitely be conducted outside of normal business hours. Work required outside of normal business hours will likely exceed 90% of the overall project. The ten (10) holidays observed by the Federal Government shall be considered non-workdays. They are:

New Years Day

Martin Luther Kings Jr.’s Birthday

Presidents Day

Memorial Day

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

Christmas Day

Or any other day declared by the President of the United States of

America to be a Federal Holiday.

1.21 CONTRACT COMPLETION DATE

Work shall be accomplished within a period of two hundred ten (210) calendar days from the date of receipt of Notice to Proceed for

Proposal Item I (Base Proposal) or as listed in Section 1.2 for Bid

Alternates. “Completion Date” shall mean that date as established by the Contracting Officer upon which the Contractor shall turn over the entire project or portions thereof to the government. Contract completion includes final inspection and completion of all punchlist items, to include final clean up.

- - - E N D - - -

SECTION 01 25 00

INTERIM LIFE SAFETY PLAN FOR CONSTRUCTION

1. LIFE SAFETY CONSIDERATIONS

A. The Interim Life Safety Plan shall document any Life Safety Code deficiencies which are known to exist at the project site prior to the start of the construction contract.

B. Life Safety Code (NFPA 101) requirements affected by construction:

1. Chapter 1, Administration.

2. Chapter 7, Means of Egress.

3. Chapter 8, Features of Fire Protection.

4. Chapter 9, Building Service and Fire Protection Equipment.

5. Chapter 19, Existing Health Care Occupancies.

6. Chapter 19, Existing Business Occupancies.

C. INTERIM LIFE SAFETY MEASURES AT THE PROJECT SITE: To maintain an equivalent level of life safety, the project shall be monitored daily to insure compliance with NFPA 241, SAFEGUARDING BUILDING CONSTRUCTION AND DEMOLITION OPERATIONS. When requirements for fire safety protection or environment and grounds safety are affected by construction the contractor, shall institute and document Interim Life Safety Measures (ILSM) to temporarily compensate for the hazards posed by construction activities, as required by NFPA 241 and this section.

1. The interim life safety measures must be continued and documented so that the level of life safety is not diminished in any occupied area and a safe environment and grounds are maintained throughout construction of or alteration to buildings or grounds. Compliance to these provisions is mandatory, partial compliance is not acceptable.

2. The interim life safety measures are a series of thirteen administrative actions required to be taken to temporarily compensate for the reduction if Life Safety Code (LSC) provisions caused by construction activities. The ILSM are:

a. Ensuring free and obstructed exists. Personnel receive additional training when alternative exits are designated. Buildings or areas under construction must maintain escape routes for construction workers at all times. Means of existing construction areas are inspected daily.

b. Ensuring free and unobstructed access to emergency services and for fire, police, and other emergency forces.

c. Ensuring fire alarm, detection, and suppression systems are in good working order. A temporary but equivalent system shall be provided when any fire system is impaired. Temporary systems must be inspected and tested monthly.

d. Ensuring temporary construction partitions are smoke tight and built of noncombustible or limited combustible materials that will not contribute to the development or spread of fire.

e. Providing additional fire-fighting equipment and training personnel in its use.

f. Prohibiting smoking according to EC.5 throughout the organization’s buildings, and in adjacent to construction areas.

g. Developing and enforcing storage, housekeeping, and debris removal practices that reduce the building’s flammable and combustible fire load to the lowest feasible level.

h. Conducting a minimum of two fire drills per shift per quarter.

i. Increasing hazard surveillance of buildings, grounds, and equipment, with special attention to excavations, construction areas, construction storage, and field offices.

j. Training personnel to compensate for impaired structural or compartmentalization features of fire safety.

k. Conducting organizationwise safety education programs to promote awareness of LSC deficiencies, construction hazards, and ILSM.

3. Implementation of ILSM is required in or adjacent to all construction areas and grounds. ILSM apply to all personnel, including construction workers. Implementation of ILSM must begin upon project mobilization, and be continuously enforced through project completion. Not all eleven measures have to be implemented in every case, but all eleven measures must be considered and documentation provided explaining why any measures were not implemented.

4. ILSM are intended to provide a level of life safety comparable to that described in chapters 1- 7, 31, and the applicable occupancy chapters of the 1991 edition of the LSC (NFPA 101).

Frequencies for inspection, testing, training, and monitoring and evaluation shall be as established herein.

5. In addition, the contractor and its workman shall comply with the following provisions:

a. Construction Processes and Hazards:

(1) Cutting and Welding Operations: To minimize the risk of fires during construction, alteration, demolition operations, or making repairs while performing hot work, such as, cutting, welding, thermal welding, brazing, soldering, grinding, thermal spraying, thawing pipe, or any other similar work, the contractor shall be responsible for assigning an authorized supervisory representative to issue hot work permits. Before any cutting, welding or other hot work is conducted, the contractor or subcontractors shall obtain permission from the contractor’s authorized representative by the issuance of this permit. All hot work shall be conducted safely in accordance with National Fire Protection Association Standard No. 51B, Fire Prevention in the Use of Cutting and Welding Process, 1989 edition.

The permit format at the end of this section, or a similar format, shall be used. Permits shall be issued on a daily basis by the contractor’s authorized supervisor. The COR inspects the work area before, during, and after the work covered by the permit is performed. A separate permit will be issued for each distinctive location, i.e., different floors of the building. The permit requires the contractor to provide and/or maintain fire extinguishers and, as needed, a fire watch throughout the period for which the permit is issued.

(2) Smoking Restrictions: Smoking will not be allowed in this Medical Center. Smoking will not be permitted in or around construction areas. The contractor agrees to require his/her employees, subcontractors, suppliers, etc., to smoke only in designated smoking areas. The Government may require the contractor to remove from the Medical Center any of his/her employees, subcontractors, suppliers, etc., who violate the Medical Center smoking regulations.

When possible, the COR may designate an outdoor smoking zone near the construction site.

The contractor shall post “NO SMOKING” signs at each entrance to the construction site and at two other locations within the construction site. A copy of the Medical Center’s smoking policy will be provided to the contractor at the pre-construction conference. The COR will verify enforcement.

(3) Trash Disposal: The contractor is responsible for maintaining a clean work environment. The contractor shall, at all times, keep the construction site, including storage areas, free from accumulations of trash, debris, and construction waste. The work area shall be cleaned and all trash and debris removed at the end of each shift or workday. Burning of trash or construction debris on Medical Center grounds is not permitted. Removal of hazardous waste shall be in accordance with current EPA, Commonwealth of Virginia and local government regulations.

Hazardous waste disposals must be reviewed by the Medical Center industrial hygienist.

b. Utilities:

(1) To insure the safety of patients, visitors, staff and the contractor’s employees and suppliers no utility service, such as water, gas, steam, sewers, electricity, fire protection, or communications shall be interrupted without prior written approval by the COR.

(2) Utilities shall be turned off and turned on by members of the Medical Center’s maintenance and operations staff only. The contractor shall not attempt to close any valves, controls, or circuits.

(3) Refer to specification section 01010-1.5 for specific contract requirements for requesting utility interruptions.

c. Fire Protection:

(1) Fire Cut-Offs: The contractor shall maintain existing fire and smoke barriers until such times as these barriers must be removed in order to complete project work. At this time, he will construct temporary barriers between the project site and adjacent Medical Center space. The temporary barriers shall be maintained by the contractor until new permanent barriers are in place or until the project is complete.

(2) Access for Fire Fighting: The contractor shall keep the construction area free of obstructions that would prevent the use of fire fighting apparatus. Free access from the street to fire hydrants and to outside connections for standpipes, sprinklers, or other fire extinguishing equipment shall be provided and maintained at all times. Free access to permanent, temporary, or portable first aid fire equipment shall be maintained at all times.

(3) Sprinkler Protection: When it becomes necessary to temporarily shut-down existing sprinkler systems in the performance of project work, the contractor shall schedule the work to minimize the length of shut-down. The contractor shall disconnect only that portion of the existing system within the project site. The contractor shall provide all the materials, labor, and equipment necessary to keep all other sections of the sprinkler system outside the construction site in full operation. The contractor shall expedite renovation of the project site sprinkler system so the system may be returned to full service as soon as practical.

(4) First Aid Fire Equipment: In addition to the fire extinguishers required by the Engineering Service Hot Work Permit, the contractor shall provide at least two fully charged extinguishers within the project site.

d. Ceiling tiles must be in place at all times unless work is on-going or the construction area is secured behind a fire rated construction barrier.

D. ADDITIONAL INTERIM REQUIREMENTS: The contractor, shall as part of this contract, maintain an enclosed, LOCKED project site. Each construction barrier/partition shall be equipped with a self-closing, automatic locking entry door to restrict access by non-construction personnel, especially hospital staff, patients, visitors, or the general public. This area shall be adequately secured and posted. The contractor shall immediately seal all penetrations in existing building fire and smoke partitions with temporary, or permanent, firestop material in order to maintain such separation during the length of the project. The enclosure erected by the contractor shall provide a two hour fire barrier between the project site and adjoining areas of the building. No other contract work shall be performed until this barrier is in place. The contractor shall not obstruct normal access to the building, roads, loading dock, or parking areas. Specific details of barrier/partition construction are shown in the drawings.

E. ENFORCEMENT PROCEDURES: The COR shall inspect the project for compliance with this plan during regular progress inspections. Enforcement shall be as stated in the General Conditions, paragraphs 52.236-13, ACCIDENT PREVENTION.

2. PUBLICATION INCORPORATED BY REFERENCE:

A. This section incorporates the following publications by reference, with the same force and effect as if they were given in full text. Latest edition of each publication shall apply as of bid opening date. Upon written request from the contractor, the COR will make their full text available.

1. National Fire Protection Association (NFPA):

10 Fire Extinguishers, Portable 51B Cutting and Welding Processes 70 National Electric Code 101 Life Safety Code 241 Building Construction and Demolition Operations

SECTION 01 33 23

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

1-1. Refer to Articles titled SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(FAR 52.236-21).

1-2. For the purposes of this contract, samples (including laboratory samples to be tested), test reports, certificates, and manufacturers' literature and data shall also be subject to the previously referenced requirements. The following text refers to all items collectively as

SUBMITTALS.

1-3. Submit for approval, all of the items specifically mentioned under the separate sections of the specification, with information sufficient to evidence full compliance with contract requirements. Materials, fabricated articles and the like to be installed in permanent work shall equal those of approved submittals. After an item has been approved, no change in brand or make will be permitted unless:

A. Satisfactory written evidence is presented to, and approved by

Contracting Officer, that manufacturer cannot make scheduled delivery of approved item or;

B. Item delivered has been rejected and substitution of a suitable item is an urgent necessity or;

C. Other conditions become apparent which indicates approval of such substitute item to be in best interest of the Government.

1-4. Forward submittals in sufficient time to permit proper consideration and approval action by…