Itemized_Cost_Breakdown.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
658-14-117 Replace Finishes Various Buildings (VA-19-00017617)
Solicitation number
36C24619R0038
Issued by

About this file

36C24619R0038 Itemized Cost Breakdown.xlsx

View the file

Other files

File Type Posted
36C24619R0038-0004000.docx DOCX document
36C24619R0038-0004001.pdf PDF
36C24619R0038-0003000.docx DOCX document
36C24619R0038-0003001.pdf PDF
36C24619R0038-0002002.pdf PDF
36C24619R0038-0002001.pdf PDF
36C24619R0038-0002000.docx DOCX document
36C24619R0038-0001000.docx DOCX document
Consolidated_Drawings_658-14-117.pdf PDF
Specifications_658-14-117_Repair_Finishes_Various_Bldgs_112818.pdf PDF
36C24619R0038_2.docx DOCX document
DOL_Wage_Rate_Determination_VA180057_1-05-2018.pdf PDF
36C24619R0038_3.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

636576521011523375

Building Estimate SummaryProject 658-14-117
Replace Finishes Various Building
1970 Roanoke Blvd.
SalemVirginia24153
Unit Cost Estimate
BuildingQuantityLineNumberLine SourceDescriptionUnitMaterialLaborEquipmentTotalNotes
2A024119210580Selective demolition, gutting, building interior, residential building, includes disposal, excludes dumpster fees, maximum
2A028120101270Hazardous waste cleanup/pickup/disposal, transportation to disposal site, truckload = 80 drums or 25 C.Y. or 18 tons, maximum
2A028213420400Preparation of asbestos containment area, personnel decontamination chamber, 2" x 4" @ 16", 3/4" plywood each side
2A028213450200OSHA testing, asbestos sampling and PCM analysis, NIOSH 7400, minimum
2A028213460200Decontamination of asbestos containment area, spray exposed substrate with surfactant (bridging), flat surfaces
2A028213463000Decontamination of asbestos containment area, structural demolition
2A028213450130OSHA testing, industrial hygienist, max
2A028213435000Bulk asbestos removal, remove VAT and mastic from floor by hand, includes disposable tools & 2 suits & 1 respirator filter/day/worker
2A028213420900Preparation of asbestos containment area, set up negative air machine, 1-2k CFM/25 MCF volume
2A028213420400Preparation of asbestos containment area, personnel decontamination chamber, 2" x 4" @ 16", 3/4" plywood each side
2A028213416300Asbestos abatement equipment, disposable fiber drums, 3 CF
2A028213412570Asbestos abatement equipment, glove bag, 50" x 64", 7 mil
2A028213412550Asbestos abatement equipment, respirator, single use, cartridge
2A096513131100Wall base, rubber, straight or cove, standard colors, 4" high, 1/8" thick
2A096519197350Flooring, vinyl composition tile, marbleized, 12" x 12" x 1/8"
2A096510103600Cementitious leveling compound for resilient flooring, 1/8" thick
12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors096723231600Composition flooring, epoxy, heavy duty epoxy topping, 1/4" thick, over 10,000 S.F.
2A099123721670Painting walls, complete, on drywall or plaster, primer and 2 finish coats, with roller, including surface preparation
2A092910302090Gypsum wallboard, on walls, standard, w/compound skim coat (level 5 finish), 5/8" thick
77090505200900Flooring demolition, vinyl composition tile, 12" x 12"
2A090505303760Walls and partitions demolition, tile, ceramic, on walls, thin set
12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors090505202020Flooring demolition, tile, ceramic, mud set
2A,12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors024119195100Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition cost
2A,12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors024119192005Selective demolition, rubbish handling, 0 - 50' haul, load, haul, dump and return, wheeled, cost to be added to demolition cost
143096513232500Stair treads & risers, vinyl, tread & riser combined, 1/8" thick
Total$ - 0