Itemized_Cost_Breakdown.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24619R0038
About this file
36C24619R0038 Itemized Cost Breakdown.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24619R0038-0004000.docx | DOCX document | |
| 36C24619R0038-0004001.pdf | ||
| 36C24619R0038-0003000.docx | DOCX document | |
| 36C24619R0038-0003001.pdf | ||
| 36C24619R0038-0002002.pdf | ||
| 36C24619R0038-0002001.pdf | ||
| 36C24619R0038-0002000.docx | DOCX document | |
| 36C24619R0038-0001000.docx | DOCX document | |
| Consolidated_Drawings_658-14-117.pdf | ||
| Specifications_658-14-117_Repair_Finishes_Various_Bldgs_112818.pdf | ||
| 36C24619R0038_2.docx | DOCX document | |
| DOL_Wage_Rate_Determination_VA180057_1-05-2018.pdf | ||
| 36C24619R0038_3.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
636576521011523375
| Building Estimate Summary | Project 658-14-117 | |||||||||
| Replace Finishes Various Building | ||||||||||
| 1970 Roanoke Blvd. | ||||||||||
| Salem | Virginia | 24153 | ||||||||
| Unit Cost Estimate | ||||||||||
| Building | Quantity | LineNumber | Line Source | Description | Unit | Material | Labor | Equipment | Total | Notes |
| 2A | 024119210580 | Selective demolition, gutting, building interior, residential building, includes disposal, excludes dumpster fees, maximum | ||
| 2A | 028120101270 | Hazardous waste cleanup/pickup/disposal, transportation to disposal site, truckload = 80 drums or 25 C.Y. or 18 tons, maximum | ||
| 2A | 028213420400 | Preparation of asbestos containment area, personnel decontamination chamber, 2" x 4" @ 16", 3/4" plywood each side | ||
| 2A | 028213450200 | OSHA testing, asbestos sampling and PCM analysis, NIOSH 7400, minimum | ||
| 2A | 028213460200 | Decontamination of asbestos containment area, spray exposed substrate with surfactant (bridging), flat surfaces | ||
| 2A | 028213463000 | Decontamination of asbestos containment area, structural demolition | ||
| 2A | 028213450130 | OSHA testing, industrial hygienist, max | ||
| 2A | 028213435000 | Bulk asbestos removal, remove VAT and mastic from floor by hand, includes disposable tools & 2 suits & 1 respirator filter/day/worker | ||
| 2A | 028213420900 | Preparation of asbestos containment area, set up negative air machine, 1-2k CFM/25 MCF volume | ||
| 2A | 028213420400 | Preparation of asbestos containment area, personnel decontamination chamber, 2" x 4" @ 16", 3/4" plywood each side | ||
| 2A | 028213416300 | Asbestos abatement equipment, disposable fiber drums, 3 CF | ||
| 2A | 028213412570 | Asbestos abatement equipment, glove bag, 50" x 64", 7 mil | ||
| 2A | 028213412550 | Asbestos abatement equipment, respirator, single use, cartridge | ||
| 2A | 096513131100 | Wall base, rubber, straight or cove, standard colors, 4" high, 1/8" thick | ||
| 2A | 096519197350 | Flooring, vinyl composition tile, marbleized, 12" x 12" x 1/8" | ||
| 2A | 096510103600 | Cementitious leveling compound for resilient flooring, 1/8" thick | ||
| 12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors | 096723231600 | Composition flooring, epoxy, heavy duty epoxy topping, 1/4" thick, over 10,000 S.F. | ||
| 2A | 099123721670 | Painting walls, complete, on drywall or plaster, primer and 2 finish coats, with roller, including surface preparation | ||
| 2A | 092910302090 | Gypsum wallboard, on walls, standard, w/compound skim coat (level 5 finish), 5/8" thick | ||
| 77 | 090505200900 | Flooring demolition, vinyl composition tile, 12" x 12" | ||
| 2A | 090505303760 | Walls and partitions demolition, tile, ceramic, on walls, thin set | ||
| 12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors | 090505202020 | Flooring demolition, tile, ceramic, mud set | ||
| 2A,12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors | 024119195100 | Selective demolition, rubbish handling, over 8 C.Y. truck, loading & trucking, haul, per mile, includes 2 mile haul, cost to be added to demolition cost | ||
| 2A,12,76,77 bsmt. flrs. & 76, 77 adj. connecting corridors | 024119192005 | Selective demolition, rubbish handling, 0 - 50' haul, load, haul, dump and return, wheeled, cost to be added to demolition cost | ||
| 143 | 096513232500 | Stair treads & risers, vinyl, tread & riser combined, 1/8" thick | ||
| Total | $ - 0 |