36C24619B0023-0003000.docx
DOCX document 19 KB Posted
- Attached to
- Relocate Agent Cashier B-137A Project 590-18-201
- Solicitation number
- 36C24619B0023
About this file
36C24619B0023 0003 36C24619B0023 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24619B0023-0004000.docx | DOCX document | |
| 36C24619B0023-0003002.pdf | ||
| 36C24619B0023-0003003.pdf | ||
| 36C24619B0023-0003001.pdf | ||
| 36C24619B0023-0002000.docx | DOCX document | |
| 36C24619B0023-0001000.docx | DOCX document | |
| 36C24619B0023-006.pdf | ||
| 36C24619B0023-005.pdf | ||
| 36C24619B0023-004.docx | DOCX document | |
| 36C24619B0023-003.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-27-2019 590-18-201 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton
VA
23667 To all Offerors/Bidders
36C24619B0023 06-27-2019
X x x x
1. The purpose of this amendment is to address questions,extend the due date/bid opening and amend specs as follows:
a. The due date for receipt of bids/bid opening has been extended from 6/28/2019 to 7/2/2019 at 1:00 pm EST
b. Bids may be mailed to the address in block 6 of this document or hand carried to the bid opening
c. Address bids to the attention of Desiree Mills; bid box will be located 100 Emancipation Dr. bldg 27 Hampton,VA 23667
d. See questions/answers on page 2 and specification modifications and drawings attached.
Desiree Mills Contracting Officer
1. The 1hr. ICRA wall, is noted at full height partition from slab to 2nd floor deck. Main corridor access and usage will be impeded, especially during construction of the ICRA wall. When ICRA wall is being constructed and demolished at end of project, a temporary dust containment wall will have to be utilized. Please advise for corridor traffic and accessibility during this task. Also, ICRA wall drawn is to be located 2 ft. parallel to existing M352-1, this distance does not allow a safe work environment during demolition or construction of the M352-1 wall.
Construction of Temp. Wall (ICRA Barrier) will have to occur on weekends to not interfere with egress. Temporary dust containment, (Poly, etc.) must be used during temporary wall construction, corridor traffic will be rerouted during weekend activities associated with building temp. walls. Space will allow approximately 3 ft separation from existing wall to temporary barriers, to provide additional space for a safer working environment.
2. Demo Notes #5 -8, indicates remove and store/protect for reuse, at direction of COR. Where will storage facility be located from work area?
Contractor will provide a storage containment unit to store items located at the VA contractor laydown area coordinated with the COR.
3. Per the wall type & Door schedule listed on AE101, Door A11B is on a wall marked as “M351”. This is a non-fire rated wall but is a STC 51 rated acoustical wall. Typically, the door would be a STC50 rated door. Please confirm if door A11B is to be STC50 rated. Additionally, door A11B is listed to be full vision lite (FNV), which is not typical as STC walls and doors are for privacy. Please confirm if door A11B is to include the tempered glass.
The wall between the 2 rooms does not have a sound control requirement. The use of M351 wall type for the small section of wall with Door A11B is for continuity. M351 has mineral wool as part of the fire rated assembly. It is not for sound. So:
a. Door A11B is not rated for sound.
b. Door A11B is an FNV Door type
c. The glass in this door and all doors is tempered.
The door shown on the FNV door type is labeled as “A11A” . CORRECT to “A11B”
4. Will any other areas be affected by the datacom work?
DATA COM work may affect other areas…IT data shall be coordinated with the IT team and the COR before DEMO to isolate construction area data
5. Can the Superintendent act as the QC Manager as well as the SSHO (Site Safety Health Officer)? AE has no objections for this size project.
6. Will the space be in use during the course of construction?
The construction space will be unoccupied
See attached document: 36C24619B0023 Site Visit Attendance Sheet.
See attached document: Revised Specs.
See attached document: Revised Drawings.
File details come from the government source that posted it.