36C24618B0613-002.pdf

PDF 15 MB Posted

Attached to
Renovate Bldg. 66, All HVAC, lighting and 2nd Floor renovation (UNFUNDED)
Solicitation number
36C24618B0613
Issued by

About this file

36C24618B0613 S02 - Final Design Drawings.pdf

View the file

Other files

File Type Posted
36C24618B0613-00003000.docx DOCX document
36C24618B0613-00003001.pdf PDF
36C24618B0613-00003002.pdf PDF
36C24618B0613-00002000.docx DOCX document
36C24618B0613-00001000.docx DOCX document
36C24618B0613-001.docx DOCX document
36C24618B0613-004.pdf PDF
36C24618B0613-003.pdf PDF
36C24618B0613-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RENOVATE

ADMINISTRATIVE

BUILDING 66

590-14-102

NO. DESCRIPTION DATE

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

B

A

C

D

E

F

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

100% FINAL DESIGN - NOT FOR CONSTRUCTION

FULLY SPRINKLERED

T

M C

EWNO

M

O

OF VIRG

N

A I

I

LA H

GERALD P. LAMINA JR.

Lic. No. 039989

ANOISSEF

O

R P

L E N G I N E

E R

COVER SHEET

PRE-EVALUATION,

AND DRAWING INDEX

66-G-001

DSST

DOOR TAG

1i

1i

M349

1i

EXISTING DOOR

NEW DOOR

DEMO DOOR

NEW WALL

EXISTING WALL

DEMO WALL OR ITEMS

ABOVE OR BELOW

WALL PROTECTION TAG

WALL TAG

ROOM NUMBER

REVISION TAG

EQUIPMENT TAG

TOILET ACCESSORY TAG

DEMOLITION NOTE

NEW WORK NOTE

A810

DEMO ROOM NUMBER

A101

SIM

CURTAINWALL AND

WINDOW MARKER1i

1i

INTERIOR ELEVATION

MARKER

SECTION OR WALL

SECTION NUMBER

COLUMN GRID NUMBER

EXISTING COLUMN

GRID NUMBER

EXISTING WINDOW MARKER

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-A001

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102Architectural Abbreviations and Legends

Abbreviations

TERRAZZOTER

EXISTING TO REMAINETR

BT BRICK TILE

ON CENTERO.C.

MOUNTINGMTG

CERAMIC WALL PAVER TILECWPT

RA

R

QT.

PTD

PNT

PLAM

CG

COL

CLG, CLNG

ACT

A.F.F.

CORNER GUARD

CEILING

COLUMN

ACOUSTICAL TILE

ABOVE FINISH FLOOR

VERT

VB.

TYP

SUSP.

STOR

AT@

GWB

FIN

EXIST.

EWC

ELEV

ELEC

CORR

CONT. CONTINUOUS

CORRIDOR

ELECTRIC(AL)

ELEVATOR

EXISTING

FINISH(ED)

NIC.

MTL

MECH

MAX

L

HT

HR

HDWR

NOT IN CONTRACT

HARDWARE

HOUR

HEIGHT

LENGTH

MAXIMUM

MECHANICAL

METAL

CFCI

CFOI

OFOI

OFCI

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED

OWNER FURNISHED

OWNER FURNISHED

ELECTRIC WATER

GYPSUM

SIM

CONCRETECONC.

PLASTIC LAMINATE

VINYL BASE

VERTICAL

TYPICAL

PAINT

PAINTED

QUARRY TILE

RISER

RETURN AIR

SIMILAR

STORAGE

SUSPENDED

DIAMETER

ANGLE

CENTER LINE

EXP EXPOSED

TO MATCH EXISTINGTME

COOLER

WALLBOARD

CONTRACTOR INSTALLED

OWNER INSTALLED

CONTRACTOR INSTALLED

OWNER INSTALLED

CL

O

Legend

MB MILLWORK BASE VAT VINYL ASBESTOS TILE

RST RESILIENT STAIR TREAD

GRT GROUT

CPT CARPET TILE

SV. SHEET VINYL

WT WALL TILE

QR. QUARTER ROUND

SS SOLID SURFACE

TB. TILE BASE

SVT. SOLID VINYL TILE

MT. MOSAIC TILE

RT RUBBER TILE

WP WAINSCOTING PANEL

TP. TOILET PARTITION

PT PORCELAIN TILE

FT FLOOR TILE, MOSAIC

TR. TRIM ACCESSORY

CT CERAMIC TILE

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

ARCHITECT

1 HR RATED WALL

BUILDING REGULATION DATA

APPLICABLE CODES AND STANDARDS

NFPA 101, 2012

INTERNATIONAL BUILDING CODE (IBC 2012)

NFPA-101 LIFE SAFETY CODE (2012)

NFPA-220 STANDARD TYPE OF BUILDING CONSTRUCTION (2012)

NFPA-10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS (2012)

NFPA-70 NATIONAL ELECTRIC CODE (2008)

NFPA-101 LIFE SAFETY CODE (2012) CHAPTER 43.6 RECONSTRUCTION

CLASSIFICATION OF OCCUPANCY:

1. EXISTING BUILDING OCCUPANCY CHAPTER 39.

BUILDING HAS AUTOMATIC FIRE SUPPRESSION SYSTEM.

HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH TABLE 18.3.2.1 AS FOLLOWS:

CONSTRUCTION TYPE:

1. NFPA 220 (2012 EDITION) TYPE V (000), FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13.

MEANS OF EGRESS:

1. MAX ALLOWED LENGTH OF EXIT ACCESS 300 FEET PER PARAGRAPH 39.2.6.2.2; MAX TRAVEL IN THIS FACILITY IS

LESS THAN 300 FEET.

2. OCCUPANT LOAD PER TABLE 7.3.1.3

100 GSF PER PERSON

19,119 GSF = 192 OCCUPANTS

3. EGRESS WIDTH FOR DOORS AND CORRIDORS REQUIRED IS .20 INCHES X 96 OCCUPANNTS = 18.4" INCHES

(MINIMUM 36 INCHES)

ACTUAL EGRESS CAPACITY IS 72 INCHES (360) PEOPLE.

FINISH REQUIREMENTS (NFPA 101 10.2.2):

EXIT ENCLOSURES / EXIT PASSAGEWAYS: CLASS (A) OR (B)

EXIT ACCESS CORRIDORS & OTHER EXIT WAYS: CLASS (A) OR (B)

ROOMS AND ENCLOSED SPACES: CLASS (A) OR (B)

FLOORS IN EXIT ENCLOSURES, EXIT PASSAGEWAYS AND CORRIDORS

(OTHER THAN WOOD, VINYL, LINOLEUM AND RESILIENT FLOORS W/O FIBER MATERIALS): CLASS (I) OR (II)

FIRE PROTECTION:

AUTOMATIC SPRINKLER SYSTEMS: FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13, PORTABLE FIRE

EXITINSHERS (NFPA 10).

CLASS ABC TYPE; MIN. RATING 2-A (WHERE INDICATED ON LIFE SAFETY PLAN)

MAIXUM TRAVEL DISTANCE: 75'

(FULLY SPRINKLERED)

USE GROUP B, PER SECTION 304

CONSTRUCTION TYPE B, PER SECTION 602.5; 9000 S.F. PER STORY + 200% = 27,000 S.F. PER STORY

AREA: 54,000 GSF (2 STORIES ALLOWED)

AREA OF 1ST FLOOR: 10,400 S.F.

AREA OF 2ND FLOOR: 8,719 S.F.

BUILDING TOTAL: 19,119 GSF

AREA OF RENOVATION 1ST FLOOR: 373 GSF

AREA OF RENOVATION 2ND FLOOR: 7,362 GSF

OCCUPANCY LOAD = 1 PERSON PER 100 S.F.

TOTAL OCCUPANTS: 192 PEOPLE

LIFE SAFETY LEGEND

BUILDING AREA AND HEIGHT LIMITATIONS

2 3 4 5

6 7

8 9 10 11

B

D

A

C

E

107A

103G

C-1

103F

103E

104B

102A

102E 102F 102G 102H 102L

102D 102C102B

EG-1

101B

101A

101C

104C 104D 104E 104F

104G

104A

104J

104I104H

104Q C-2

104P 104O 104N 104M

104L

100 100A

100C

100 100A

103E

103G107A

108B

2.1 2.2 2.3

2.A

202F

202G 202H

202J

201B

202B202C202D

202E

204Q

204B

204K

204A

C-3

203D

203E

201A

201C201

EG-2

2.4

2.B

2.5 2.6

203C

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-LS110

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102Life Safety- First and Second Floor

1/8" = 1'-0"

FIRST FLOOR - LIFE SAFETY

1/8" = 1'-0"

SECOND FLOOR - LIFE SAFETY

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

D103

D102LD102H

D102GD102FD102E

D102A

D108

D104CC

D102B D102C D102D

DC-1

D106

DEG-1

D101B

D101

D101C

D101A

D100 D100A

D107B

D107A

D104P D104O D104N D104M D104L

D105

D104A

D104G

D104FD104ED104DD104C

D104B

D104Q

D104

DC-2

D104S D104I D104J

2 3 4 5

6 7

8 9 10 11

B

D

A

C

E

D100C

7 7

15 15

TYP

TYP

17 17

PIPING PIPING

PIPING

21 21

D105B

D105C

D105A D103A

D103B

PHASE III PHASE I

PHASE III PHASE I

GENERAL DEMOLITION NOTES

• ARCHITECTURAL DEMOLITION DRAWINGS INDICATE IN GENERAL, THE EXTENT OF ARCHITECTURAL DEMOLITION. SEE OTHER DISCIPLES DRAWINGS FOR EXTENT OF STRUCTURAL , MECHANICAL, AND ELECTRICAL DEMOLITION. REMOVE ALL ASSOCIATED APPURTENANCES NOT REQUIRED IN THE NEW WORK, ALL ABANDONED ITEMS, AND ALL ITEMS REQUIRED FOR THE INSTALLATION OF NEW WORK, TO PROVIDE FOR A COMPLETE PROJECT. ITEMS NOT SPECIFICALLY INDICATED THAT ARE QUESTIONABLE FOR REMOVAL SHALL BE

BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR A DECISION.

• THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO

THE START OF CONSTRUCTION.

• THE CONTRACTOR SHALL PATCH ALL EXISTING SURFACES TO MATCH EXISTING WHERE AFFECTED BY CONSTRUCTION OPERATIONS, INCLUDING BUT NOT LIMITED TO PLUMBING, MECHANICAL AND ELECTRICAL

WORK.

• THE CONTRACTOR SHALL PATCH NAIL HOLES, ETC, AND REMOVE MISCELLANEOUS APPURTENANCES ON

EXISTING WALLS TO BE PAINTED OR COVERED WITH WALL COVERING.

• ALL EXISTING FLOORING MATERIALS WHICH ARE TO REMAIN IN PLACE SHALL BE COMPLETELY CLEANED AND

STRIPPED OF WAX IN ORDER TO RECEIVE NEW FINISHES.

• ALL NEW WORK SHALL ALIGN WITH EXISTING WHERE THEY INTERSECT UNLESS OTHERWISE NOTED.

• THE CONTRACTOR SHALL PATCH AND REPAIR ALL EXISTING SURFACES WHICH WERE PREVIOUSLY DAMAGED PRIOR TO CONSTRUCTION OPERATIONS IF VISIBLE AFTER NEW WORK IS COMPLETE, REGARDLESS IF THE ITEM

WAS SPECIFICALLY NOTED OR NOT.

• THE CONTRACTOR SHALL REMOVE AND PATCH ANY AREAS UNCOVERED WHERE WOOD NAILERS OR GROUNDS ARE FOUND TO EXIST BEHIND ANY TRIM ITEMS OR EQUIPMENT REMOVED. WALLS SHALL BE MADE FLUSH WITH

EXISTING ADJACENT SURFACES AND READY TO RECEIVE NEW FINISHES.

• IF ANY ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED DURING THE COURSE OF CONSTRUCTION OPERATIONS WHICH IS NOT INDICATED ON THE CONTRACT DOCUMENTS THE CONTRACTOR SHALL NOTIFY THE

ARCHITECT IMMEDIATELY.

• WHERE EXISTING VINYL WALL COVERING IS REMOVED ON EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL PATCH AND REPAIR WALL AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO

INSTALL NEW FINISHES.

• WHERE EXISTING CERAMIC TILE IS REMOVED FROM EXISTING WALLS TO REMAIN, THE CONTRACTOR SHALL LEVEL WALL WITH PLASTER AS REQUIRED TO PROVIDE A LEVEL AND TRUE SURFACES ON WHICH TO INSTALL

NEW FINISHES.

• WHERE EXISTING CERAMIC TILE IS REMOVED FROM CONCRETE FLOORS TO REMAIN, THE CONTRACTOR SHALL LEVEL FLOOR AREAS WITH CONCRETE AS REQUIRED TO BE LEVEL WITH ADJACENT FLOOR SURFACES.

• ALL SIGNAGE WHICH OCCURS ON WALL OR ON DOORS TO BE REMOVED SHALL BE REMOVED BY THE

CONTRACTOR AND TURNED OVER TO THE OWNER.

• ALL FINISHES LISTED IN THE DEMOLITION SCHEDULE SHALL BE REMOVED COMPLETELY UNLESS INDICATED OTHERWISE. DEMOTION SHALL INCLUDE BACKINGS, MASTIC AND GLUES, SETTING BEDS, AND SUBSTRATE AS

REQUIRED TO PREPARE THE MATERIAL FOR NEW WORK AND/OR FINISHES.

• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS OTHERWISE

NOTED.

• EXISTING HAND RAIL AND BUMPER GUARD SHALL BE REMOVED AND TURNED OVER TO THE OWNER.

• ALL EXISTING SMOKE DETECTORS, AND SPEAKERS TO REMAIN AND REWORKED WITH NEW CEILING SYSTEM.

• EXISTING WALL FINISHES TO BE VERIFIED AND PREPPED ACCORDINGLY FOR NEW FINISHES SCHEDULES - BY

CONTRACTOR.

• DESIGN INTENT IS TO UPGRADE ALL FINISHES TO FULLEST EXTENT.

• ALL EXISTING ACCESSORY / EQUIPMENT ITEMS: SECURITY CAMERAS, WIRELESS CONNECTION BOXES, EMERGENCY LIGHT FIXTURES, WINDOW COVERINGS, CEILING AND WALL MOUNTED SPEAKERS, THERMOSTAT CONTROLS, RAISED OUTETS ON CMU WALLS, PUSH BUTTON CONTROL BOXES, FIRE PULLS AND FIRE EXTINGUISHERS SHALL BE FIELD VERIFIED BY THE CONTRACTOR FOR WORKING CAPACITY, LOCATION AND TYPE. RETAIN ITEMS FOR INSTALLATION IN EXISTING LOCATION UNLESS OTHER WISE NOTED. REPAIR AND REPLACE ITEMS AS NECCESARY; MATCH EXISTING. SEE M.E.P. DRAWINGS FOR EXTENT OF WORK.

• OWNER SHALL BE RESPONSIBLE FOR REMOVING, REPLACING, SPECIFYING AND COORDINATING EXISTING FF & E ITEMS, INTERIOR SIGNAGE, AS WELL AS ANY WALL MOUNTED DISPLAY ITEMS PRIOR TO PROJECT COMMENCEMENT. CONTRACTOR SHALL WORK WITH OWNER TO STORE, PROTECT AND RE-INSTALL ITEMS AS

NECCESARY.

DEMOLITION NOTES

1. REMOVE EXISTING DOOR, FRAME AND HARDWARE IN ITS ENTIRETY. SALVAGE ALL HARDWARE AND TURN OVER TO

OWNER. REMOVE EXISTING GLASS ARCH TRANSOM WINDOW ABOVE.

2. REMOVE EXISTING PLUMBING FIXTURES AND TOILET ACCESSORIES IN THEIR ENTIRETY. SEE PLUMBING DRAWINGS FOR

EXTENT OF WORK.

3. REMOVE EXISTING FLOOR DRAIN IN ITS ENTIRETY. PATCH VOIDS TO MATCH EXISTING SLAB. SEE PLUMBING DRAWINGS

FOR EXTENT OF WORK.

4. REMOVE EXISTING DOOR, FRAME, AND HARDWARE IN ITS ENTIRETY. INCLUDING BUT NOT LIMITED TO ALL JAMB

ANCHORS AND DOOR STOPS. SALVAGE ALL DOOR HARDWARE AND TURN OVER TO OWNER.

5. REMOVE TOILET PARTITION IN ITS ENTIRETY.

6. REMOVE METAL STUD AND GYPSUM WALL BOARD PARTITION IN ITS ENTIRETY..

7. REMOVE EXISTING WINDOW AND HARDWARE IN ITS ENTIRETY. REMOVE EXISTING LOUVER IN IT'S ENTIRETY; PREP

OPENING TO RECEIVE NEW LOUVER, SEE SHEET A801.

8. REMOVE EXISTING WALL WAINSCOTING, WALL BASE AND CHAIR RAIL IN ITS ENTIRETY.

9. REMOVE EXISTING NURSE CALL CONNECTIONS AND BOX IN ITS ENTIRETY. SEE ELECTRICAL DRAWINGS FOR EXTENT

OF WORK.

10. REMOVE RADIATOR UNIT IN ITS ENTIRETY AND TURN OVER TO OWNER. SEE MECHANICAL, ELECTRICAL, PLUMBING

DRAWINGS FOR EXTENT OF WORK.

11. REMOVE EXISTING PARTIAL HEIGHT CHASE WALL AND CORRESPONDING CONNECTIONS.

12. REMOVE ALL PLUMBING CONNECTIONS NOT UTILIZED. SEE PLUMBING DRAWINGS FOR EXTENT OF WORK. RE-DIRECT

ALL EXPOSED PVC PIPES TO BE ALIGNED TO WALL OR CEILING AS NECCESARY.

13. REMOVE 2" THICK, 3/4" HEIGHT WALL VINYL WRAPPED PLYWOOD PANEL IN ITS ENTIRETY.

14. NOT USED.

15. REMOVE EXISTING ASBESTOS VINYL COMPOSITION TILE IN ITS ENTIRETY. PROVIDE ASBESTOS ABATEMENT AND

REPAIR SUBSTRATE AS NEEDED TO BE CLEAN AND LEVEL TO RECIEVE NEW FINISHES.

16. REMOVE METAL ACCESS WALL PANEL.

17. REMOVE EXISTING VINYL COMPOSITION TILE IN ITS ENTIRETY. PREP AND REPAIR SUBSTRATE AS NEEDED TO BE

CLEAN AND LEVEL TO RECIEVE NEW FINISHES. SEE ASBESTOS PLAN FOR EXTENT OF WORK.

18. REMOVE EXISTING AIR HANDLING UNIT. SEE MECHANICAL DRAWINGS FOR EXTENT OF WORK.

19. REMOVE EXISTING MASONRY WALL IN IT'S ENTIRETY.

20. REMOVE EXISTING DOOR, FRAME, HARDWARE AND MASONRY ABOVE IN ITS ENTIRETY. TURN HARDWARE OVER TO

OWNER,

21. REMOVE EXISTING FLOOR AND FRAMING AS REQUIRED TO INSTALL NEW STRUCTURAL SUPPORT SYSTEM. SEE

STRUCTURAL DRAWINGS FOR EXTENT OF WORK.

22. REMOVE EXISTING DOOR AND HARDWARE IN IT'S ENTIRETY. FRAME TO REMAIN. PREP FRAME TO RECIEVE NEW

DOOR HARDWARE.

*** DEMOLITION NOTES APPLY TO THIS SHEET ONLY ***

1. EXISTING CEILING TILE AND SUSPENSION SYSTEM SHALL BE REMOVED AND RETAINED FOR REUSE AS REQUIRED TO

INSTALL NEW DUCKWORK.

2. UNLESS INDICATED BY DASHED LINES, EXISTING CMU OR GWB TO REMAIN.

3. EXISTING WINDOW SOFFITS TO REMAIN; TYPICAL ALL EXISTING SOFFITS.

DEMOLITION SCHEDULE REMARKS

D203A D202J

D202H

D202G

D202F

D208

D202E

D202D D202C D202B

D201B

D202 D203E

D203B

D203D

DC-3

DEG-2

D201 D201C

D201A D201D

D204Q

D204B

D204

D204K

D205

D204A

122.1 2.2 2.3

2.A

7 7

2.4

2.B

2.5 2.6

PIPING

PIPING

PIPING

TYP

18 18

TYP

D203C

1717 17

PHASE IV PHASE II

PHASE IV PHASE II

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-AD110

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102Demolition Plan - First and Second Floor

1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN

DEMOLITION SCHEDULE - FIRST FLOOR

** ALL FINISHES LISTED IN THIS SCHEDULE ARE TO BE REMOVED

COMPLETELY UNLESS OTHERWISE NOTED **

NUMBER FLOOR BASE WALL CEILING REMARKS

D100 CPT RB ETR ETR 2

D100A ETR ETR ETR ETR 1

D100C ETR ETR ETR ETR 1

D101 CPT RB ETR ACT 2

D101A CPT RB ETR ACT 2

D101B ETR ETR ETR ETR 1

D101C ETR ETR ETR ETR 1

D102 VT RB ETR ACT 1

D102A ETR ETR ETR ETR 1

D102B ETR ETR ETR ETR 1

D102C ETR ETR ETR ETR 1

D102D ETR ETR ETR ETR 1

D102E ETR ETR ETR ETR 1

D102F ETR ETR ETR ETR 1

D102G ETR ETR ETR ETR 1

D102H ETR ETR ETR ETR 1

D102L SC - ETR EXP -

D103 VAT / RST RB ETR ACT / PTD

GWB

D103A FT TB CWPT / CT / CMU

/ PTD GWB

ACT 2

D103B FT TB CWPT / CT / CMU

/ PTD GWB

ACT 2

D104 VT ETR ETR ACT 1

D104A VT RB ETR ACT 1,3

D104B VT RB ETR ACT 1

D104C VT RB ETR ACT 1,3

D104D VT RB ETR ACT 1,3

D104E VT RB ETR ACT 1,3

D104F VT RB ETR ACT 1,3

D104G VT RB ETR ACT 1

D104I VT RB ETR ACT 1

D104J VT RB ETR ACT 1

D104L VT RB ETR ACT 1,3

D104M VT RB ETR ACT 1,3

D104N VT RB ETR ACT 1,3

D104O VT RB ETR ACT 1,3

D104P VT RB ETR ACT 1,3

D104Q VT RB ETR ACT 1

D104S VT RB ETR ACT 1

D105 VAT / RST RB ETR ACT / PTD

GWB

D105A FT TB CWPT / CMU /

PTD GWB

ACT 2

D105B CPT RB CWPT / CT / CMU

/ PTD GWB

ACT 2

D105C FT TB CWPT / CT / CMU

/ PTD GWB

ACT 2

D106 ETR ETR ETR ETR 1

D107A CPT RB PTD GWB / CMU ACT 2

D107B CPT RB PTD GWB / CMU /

WP

ACT 2

D108 VAT / RST RB ETR ACT / PTD

GWB

DC-1 CPT RB ETR ACT 2

DC-2 ETR RB ETR ETR 2

DEG-1 ETR ETR ETR ETR -

1/8" = 1'-0"

SECOND FLOOR DEMOLITION PLAN

DEMOLITION SCHEDULE - SECOND FLOOR

** ALL FINISHES LISTED IN THIS SCHEDULE ARE TO BE REMOVED

COMPLETELY UNLESS OTHERWISE NOTED **

NUMBER FLOOR BASE WALL CEILING REMARKS

D201 CPT RB ETR ACT 2

D201A ETR ETR ETR ETR 3

D201C ETR ETR ETR ETR -

D202 ETR ETR PTD GWB / CMU ETR 1

D202A ETR ETR PTD GWB / CMU ETR 1

D202B ETR ETR PTD GWB / CMU ETR 1,3

D202C ETR ETR PTD GWB / CMU ETR 1,3

D202D ETR ETR PTD GWB / CMU ETR 1,3

D202E ETR ETR PTD GWB / CMU ETR 1,3

D202F ETR ETR PTD GWB / CMU ETR 1,3

D202G ETR ETR PTD GWB / CMU ETR 1,3

D202H ETR ETR PTD GWB / CMU ETR 1,3

D202J ETR ETR PTD GWB / CMU ETR 1

D203A CPT RB / TB CWPT / CMU /

PTD GWB

ACT 2

D203B FT TB CWPT / CT / CMU

/ PTD GWB

ACT 2

D203C FT TB CWPT / CT / CMU

/ PTD GWB

ACT 2

D203D FT TB CT / CMU ACT 2

D203E VAT / RST RB PTD GWB / CMU ETR PTD GWB 2

D204 VCT RB PTD GWB / CMU ETR 2,3

D204A VCT RB PTD GWB / CMU ETR 2,3

D204B VCT RB ETR EXP 2

D204K VCT RB PTD GWB / CMU ETR 2,3

D204Q VCT RB PTD GWB / CMU ETR 2,3

D205 VAT / RST RB PTD GWB / CMU ETR PTD GWB 2

D208 VAT / RST RB PTD GWB / CMU ETR PTD GWB 2

DC-3 CPT RB PTD GWB ACT 2

DEG-2 ETR ETR ETR ETR -

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

107A

103G

C-1 103F103E

104B

102A

102E 102F 102G 102H 102L

102D102C102B

EG-1

101B

101A

101C

104C 104D 104E 104F

104G

104A

104J104I104H

104Q C-2

104P 104O 104N 104M 104L

100 100A

100C

2 3 4 5

6 7

8 9 10 11

B

D

A

C

E

100 100A

103E

103G107A

108B

TYP

TYP

6 6

TYP

TYP

9 TYP

TYP

TYP

TYP

9 TYP

TYP

D D D D

B B

19 3316

21LVT

LVT

105B

100C

PHASE III PHASE I

PHASE III PHASE I

202F

202G 202H

202J

201B

202B202C202D

202E

204Q

204B

204K

204A

C-3

203D203

203E

201A

201C201

EG-2

2.1 2.2 2.3

2.A

TYP

TYP

TYP

TYP

TYP

1111 11

TYP

TYP

TYP

2.4

2.B

2.5 2.6

203C

LVT

TYP

TYP

TYP

203C

19 19C C C C

A A

203D

TYP

TYP

11 11

TYP

TYP

20 20

LVT

PHASE IV PHASE II

PHASE IV PHASE II

10 10

10 10 10

• CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT FOR A RESOLUTION. ADJUSTMENTS TO DIMENSIONS AND CONDITIONS SHOWN MAY BE

REQUIRED.

• ALL DIMENSIONS ARE REFERENCED FROM FACE OF STUD AT NEW CONSTRUCTION UNLESS

OTHERWISE NOTED. DIMENSIONS ARE REFERENCED FROM FACE OF FINISH AT EXISTING

CONSTRUCTION.

• ALL DIMENSIONS INDICATED +/- ARE APPROXIMATE AND MUST BE FIELD VERIFIED PRIOR TO THE

START OF CONSTRUCTION.

• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE READY FOR ITS INTENDED USE.

• WHERE WORK ABUTS OR ADJOINS EXISTING SURFACES WHICH WILL REMAIN EXPOSED, ALIGN NEW

WORK FLUSH WITH EXISTING ADJACENT SURFACES.

• THE CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATER TIGHT CONDITION

THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION

OPERATIONS. TAKE ALL PRECAUTIONS NECESSARY TO PROTECT THE BUILDING AND ITS OCCUPANTS

DURING THE CONSTRUCTION PERIOD.

• CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT ENTRY TO THE CONSTRUCTION AREA.

BARRIERS SHALL NOT INTERFERE WITH THE OWNERS USE OF THE SITE.

• THE CONTRACTOR SHALL PROVIDE NEGATIVE PRESSURE IN THE AREA OF RENOVATION TO PREVENT

THE SPREAD OF DUST TO OCCUPIED AREAS OF THE BUILDING.

• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS ONLY UNLESS OTHERWISE

NOTED.

• ALL EXISTING ACCESSORY / EQUIPMENT ITEMS: SECURITY CAMERAS, WIRELESS CONNECTION

BOXES, EMERGENCY LIGHT FIXTURES, WINDOW COVERINGS, CEILING AND WALL MOUNTED

SPEAKERS, THERMOSTAT CONTROLS, RAISED OUTETS ON CMU WALLS, PUSH BUTTON CONTROL

BOXES, FIRE PULLS AND FIRE EXTINGUISHERS SHALL BE FIELD VERIFIED BY THE CONTRACTOR FOR WORKING CAPACITY, LOCATION AND TYPE. RETAIN ITEMS FOR INSTALLATION IN EXISTING LOCATION UNLESS OTHER WISE NOTED. REPAIR AND REPLACE ITEMS AS NECCESARY; MATCH EXISTING. SEE

M.E.P. DRAWINGS FOR EXTENT OF WORK.

• OWNER SHALL BE RESPONSIBLE FOR REMOVING, REPLACING, SPECIFYING AND COORDINATING EXISTING FF & E ITEMS, INTERIOR SIGNAGE, AS WELL AS ANY WALL MOUNTED DISPLAY ITEMS PRIOR

TO PROJECT COMMENCEMENT. CONTRACTOR SHALL WORK WITH OWNER TO STORE, PROTECT AND

RE-INSTALL ITEMS AS NECCESARY.

• THE PROJECT IS CONSTRUCTED IN FOUR PHASES. EACH PHASE IS SELF CONTAINED.

GENERAL NEW WORK NOTES

1. INSTALL BLOWN INSULATION @ INTERSECTION OF EXISTING WALL AND NEW CONSTRUCTION, OR EXISTING

WALL AND EXISTING CONSTRUCTION TYP.

2. INSTALL FLOOR MOUNTED TOILET PARTITION.

3. PROVIDE LOUVER IN TOP WINDOW OPENING, APPROXIMATELY 3'-0" WIDE X 1'-0" HIGH. FIELD VERIFY.

4. PROVIDE URINAL. SEE PLUMBING DRAWINGS FOR EXTENT OF WORK.

5. PROVIDE NEW WALL HUNG TOILET. SEE PLUMBING DRAWINGS FOR EXTENT OF WORK.

6. PROVIDE WALL MOUNTED, PREMOLED LAVATORY WITH QUARTZ COUNTERTOP AND HARDWIRED SENSOR

FAUCETS. SEE PLUMBING DRAWINGS FOR EXTENT OF WORK.

7. PROVIDE TOILET ACCESSORIES AND EQUIPMENT. SEE TOILET ACCESSORY SCHEDULE ON SHEET 66-A700.

8. PROVIDE A MIN. 32" WIDE X 36" HIGH LOCKABLE METAL ACCESS PANEL DOOR FOR EXISTING MECHANICAL

CHASE.

9. PROVIDE 1 5/8" MTL STUDS AT 16" O.C. MAX WITH 5/8" GWB. PROVIDE MINERAL WOOL INSULATION

(1-1/2" THICK), EXTEND TO DECK ABOVE.

10. INFILL EXISTING WALL WITH BLOWN INSULATION. EXTEND EXISTING WALL TO DECK ABOVE.

11. INFILL BELOW EXISTING BULLNOSE (4'-0"A.F.F.) HIDDEN BEHIND WALL CONSTRUCTION WITH BLOWN

INSULATION, PATCH HOLES AND FINISH TO MATCH.

12. PREP CMU WALLS AS NECESSARY AND PROVIDE NEW WALL PAINT. PAINT STAIR RAILS AND RISERS.

13. NOT USED.

14. PROVIDE NEW LOUVER TO FIT INSIDE EXISTING OPENING.

15. PROVIDE NEW STAIR TREADS AND LANDING FINISHES.

16. BOX OUT FULL HEIGHT VERTICAL PIPING WITH GYPSUM BOARD WHERE INDICATED. CONTRACTOR TO

FIELD VERIFY USE AND PROVIDE ACCESS PANELS WHERE NECCESARY.

17. PREP, PATCH AND REPAIR SUBSTRATE AS NECCESARY TO RECEIVE NEW FLOOR FINISHES AS

SCHEDULED.

18. PROVIDE NEW WATER COOLER AT THIS LOCATION. CLEAR FLOOR SPACE OF 30" X 48". SEE PLUMBING

DRAWINGS FOR EXTENT OF WORK.

19. PAINT INTERIOR GLASS BLACK. EXTEND WALL IN FRONT OF WINDOW TO DECK ABOVE.

20. INFILL EXISTING WALL TO MAKE FLUSH WITH REMAINING.

21. INSTALL DRAIN CLEANLY AROUND SHEET VINYL. SEE DETAIL 4/66-201. SEE PLUMBING DRAWINGS FOR

EXTENT OF WORK.

22. PROVIDE NEW MAG LOCK POWER SUPPLY AND REQUEST TO EXIT BUTTON. CARD READER BY OWNER.

NEW WORK NOTES

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-A111

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102New Work Plan - First and Second Floor

1/8" = 1'-0"

NEW WORK PLAN - FIRST FLOOR

1/8" = 1'-0"

NEW WORK PLAN - SECOND FLOOR

ROOM LEGEND

NUMBER NAME

100 WAITING AREA

100A CONFERENCE ROOM

100C MECH CLOSET

101 LOBBY

101A FOYER

101B RECEPTION CHECK-IN

101C OFFICE

102 ANTE ROOM

102A OFFICE

102B OFFICE

102C OFFICE

102D CHIEF OFFICE

102E OFFICE

102F OFFICE

102G OFFICE

102H OFFICE

102L MECHANICAL ROOM

103 STAIRWELL

103E JANITOR

103F VESTIBULE

103G MEN'S TOILET

104 ANTI-ROOM CORRIDOR

104A AFGE OFFICE

104B MECHANICAL ROOM

104C NAGE OFFICE

104D NAGE OFFICE

104E NAGE OFFICE

104F AFGE OFFICE

104G STORAGE ROOM

104H AFGE OFFICE

104I AFGE OFFICE

104J AFGE OFFICE

104L OFFICE

104M OFFICE

104N OFFICE

104O OFFICE

104P OFFICE

104Q NAGE OFFICE

105 STAIRWELL

106 DATA CLOSET

107 VESTIBULE

107A WOMEN'S TOILET

108 STAIRWELL

201 VESTIBULE

201A RECEPTION / WAITING

201B FILE ROOM

201C EXAM ROOM

201D OFFICE

202 OFFICE

202B OFFICE

202C OFFICE

202D OFFICE

202E OFFICE

202F OFFICE

202G OFFICE

202H OFFICE

202J MECHANICAL ROOM

203 WOMEN'S RESTROOM

203C JANITOR

203D MEN'S RESTROOM

203E STAIRWELL

204 CUBICALS

204A OFFICE

204B MECHANICAL ROOM

204K SUPERVISOR OFFICE

204Q OFFICE

205 STAIRWELL

208 STAIRWELL

C-1 CORRIDOR

C-2 CORRIDOR

C-3 CORRIDOR

EG-1 ELEVATOR

EG-2 ELEVATOR

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

• ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL

CODES AND ORDINANCES.

• CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF

CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT FOR A RESOLUTION.

• EACH SUB CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENTS AND EVALUATE THE SCOPE OF WORK REQUIRED BY THEIR RESPECTIVE TRADE AND ANY CONFLICTS WITH OTHER TRADES. ANY CONFLICTS WILL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT FOR A RESOLUTION.

• PROVIDE SHALL MEAN TO SUPPLY, TO FURNISH AND TO INSTALL COMPLETE WITH ALL ACCESSORIES, PARTS AND/OR SERVICES TO BE READY FOR ITS INTENDED USE.

• CONTRACTOR SHALL COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR OWNER

FURNISHED OWNER INSTALLED EQUIPMENT WITH THE OWNER.

• CONTRACTOR SHALL COORDINATE WITH WORK BEING PERFORMED UNDER SEPARATE CONTRACT BY

OWNER.

• SEE FIRE PLAN FOR FIRE WALL AND SMOKE PARTITION LOCATIONS.

• ALL ABUTTING DISSIMILAR MATERIALS ARE TO BE SEALED. COLOR TO MATCH ADJACENT MATERIALS.

• ALL NOTES, REMARKS AND/OR SCHEDULES ON THIS SHEET ARE FOR THIS SHEET ONLY UNLESS

OTHERWISE NOTED.

• REMOVE ALL EXISTING ACCESSORY / EQUIPMENT ITEMS: SECURITY CAMERAS, WIRELESS CONNECTION BOXES, EMERGENCY LIGHT FIXTURES, WINDOW COVERINGS, CEILING AND WALL MOUNTED SPEAKERS, THERMOSTAT CONTROLS, RAISED OUTETS ON CMU WALLS, PUSH BUTTON CONTROL BOXES, FIRE PULLS AND FIRE EXTINGUISHERS SHALL BE FIELD VERIFIED BY THE CONTRACTOR FOR WORKING CAPACITY, LOCATION AND TYPE. RETAIN ITEMS FOR INSTALLATION IN EXISTING LOCATION UNLESS OTHER WISE NOTED. REPAIR AND REPLACE ITEMS AS NECCESARY; MATCH EXISTING. SEE M.E.P. DRAWINGS FOR

EXTENT OF WORK.

• ALL EXISTING LIGHT FIXTURE AND EXISTING ACCESSORY / EQUIPMENT ITEMS LOCATIONS MUST BE FIELD

VERIFIED BY THE CONTRACTOR DURING BIDDING.

1. REMOVE EXISTING CEILING GRID SYSTEM, ACOUSTIC TILE, AND LIGHT FIXTURES AS REQUIRED TO INSTALL NEW WORK. RETAIN FOR RE-INSTALLATION. REPLACE ALL DAMAGED OR SOILED ACOUSTIC

TILES ; MATCH EXISTING.

2. PROVIDE NEW CEILING GRID SYSTEM, ACOUSTIC TILE [ACT#1]. SEE ELECTRICAL DRAWINGS FOR

EXTENT OF WORK.

3. PROVIDE GYPSUM BOARD SOFFIT AT THIS LOCATION. SEE DETAIL 1/66-A201.

4. CLEAN, REPAIR AND RE-PAINT GYPSUM BOARD CEILING COMPLETE. CEILING HEIGHT VARIES; FIELD

VERIFY.

5. PROVIDE GYPSUM BOARD SOFFIT AT THIS LOCATION. SEE DETAIL 2/66-A201.

6. CLEAN, REPAIR AND RE-PAINT EXPOSED CEILING COMPLETE.

7. REMOVE EXISTING PATIENT CURTAIN TRACK. RETAIN FOR RE-INSTALLATION IN EXISTING LOCATION.

8. REMOVE EXISTING LIGHT FIXTURES, WINDOW COVERINGS, SECURITY CAMERAS, WIRELESS

CONNECTION BOXES, AND EMERGENCY LIGHTING AS NECCESSARY TO COMPLETE NEW WORK. SEE

M.E.P. DRAWINGS FOR EXTENT OF WORK. REPAIR WOODEN PANELING AS NECCESARY; MATCH EXISTNG.

REPLACE ANY ITEMS AS NECCESARY; MATCH EXISTING.

CEILING NOTES

GENERAL CEILING NOTES

2' X 2' RECESSED

LED LIGHT FIXTURE

CEILING LEGEND

EXHAUST AIR DIFFUSER

RETURN AIR DIFFUSER

SUPPLY AIR DIFFUSER

2' X 4 RECESSED

LED LIGHT FIXTURE

EXIT SIGN

SUSPENDED LED STRIP LIGHT

RECESSED LED LINEAR LIGHT

W/ UTILITY MODULES

NOTE: SEE M.E.P. DRAWINGS FOR ADDITIONAL INFORMATION.

DECORATIVE SUSPENDED

GLASS LIGHT FIXTURE

2 3 4 5

6 7

8 9 10 11

B

D

A

C

E

TYP

107A

103G

103F

103E

C-1

6 6

104B102L

1 1 1

1 1 1

TYP

8 1

11 1 1 1

1 1 1

102H102G102F102E102A

102B 102C 102D

100 100A

101C

EG-1

101B

104C 104D 104E 104F

104Q

104P 104O 104N 104M 104L

104J

104I104H

104A

104G

100C

2' - 0" 2' - 0"

TYP

EQ

EQ

EQ EQ

EQ

EQ

EQ EQ

66-A811

TYP.

66-A811

TYP.

TYP

PROJECT LIMITS

1st FLOOR - KEY PLAN

2.1 2.2 2.3

2.A

204B202J

203E

203 203D

205208

202F

202E

202D 202C 202B

201B

202H202G

204A

204Q

204K

2.4

2.B

2.5 2.6

201A

EG-2

201C

TYP

2' - 0"

2' - 0"

6 6

C-3

TYP

TYP

TYP

EQ

EQ

EQ EQ

EQ

EQ

EQEQ

EQ

EQ

66-A811

TYP.

1'

6" 2'

PROJECT LIMITS

2nd FLOOR - KEY PLAN

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-A200

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102Reflected Ceiling Plan - First and Second Floor

1/8" = 1'-0"

REFLECTED CEILING PLAN - FIRST FLOOR

ROOM LEGEND

NUMBER NAME

100 WAITING AREA

100A CONFERENCE ROOM

100C MECH CLOSET

101 LOBBY

101A FOYER

101B RECEPTION CHECK-IN

101C OFFICE

102 ANTE ROOM

102A OFFICE

102B OFFICE

102C OFFICE

102D CHIEF OFFICE

102E OFFICE

102F OFFICE

102G OFFICE

102H OFFICE

102L MECHANICAL ROOM

103 STAIRWELL

103E JANITOR

103F VESTIBULE

103G MEN'S TOILET

104 ANTI-ROOM CORRIDOR

104A AFGE OFFICE

104B MECHANICAL ROOM

104C NAGE OFFICE

104D NAGE OFFICE

104E NAGE OFFICE

104F AFGE OFFICE

104G STORAGE ROOM

104H AFGE OFFICE

104I AFGE OFFICE

104J AFGE OFFICE

104L OFFICE

104M OFFICE

104N OFFICE

104O OFFICE

104P OFFICE

104Q NAGE OFFICE

105 STAIRWELL

106 DATA CLOSET

107 VESTIBULE

107A WOMEN'S TOILET

108 STAIRWELL

201 VESTIBULE

201A RECEPTION / WAITING

201B FILE ROOM

201C EXAM ROOM

201D OFFICE

202 OFFICE

202B OFFICE

202C OFFICE

202D OFFICE

202E OFFICE

202F OFFICE

202G OFFICE

202H OFFICE

202J MECHANICAL ROOM

203 WOMEN'S RESTROOM

203C JANITOR

203D MEN'S RESTROOM

203E STAIRWELL

204 CUBICALS

204A OFFICE

204B MECHANICAL ROOM

204K SUPERVISOR OFFICE

204Q OFFICE

205 STAIRWELL

208 STAIRWELL

C-1 CORRIDOR

C-2 CORRIDOR

C-3 CORRIDOR

EG-1 ELEVATOR

EG-2 ELEVATOR

1/8" = 1'-0"

REFLECTED CEILING PLAN - SECOND FLOOR

NOTE: HALF-TONE GRID INDICATES EXISTING.

NOTE: HALF-TONE GRID INDICATES EXISTING.

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

DOOR

DOOR FRAME AS SCHEDULED

PORCELAIN TILE AS SCHEDULED

FLASH PATCH TRANSITION

METAL DIVIDER EDGE

FLUSH WITH ADJACENT FINISH

CPT AS SCHEDULED

METAL EDGE TRIM [TR #1]

TYPICAL PORCELAIN TILE TO CARPET TRANSITION

2"

3'

0"

3"

4'

2" WT#1, TYP.

WT#2, TYP.

TR#4, TYP.

MT#1, TYP.

CB#1, TYP.

6" 4"

3"

1' - 0"

PAINTED GYP. ABOVE, TYP.

VA

R

IE

S

SV COVE BASE DETAIL

VINYL COVE CAP

WALL AS SCHEDULED

SHEET VINYL RESILIENT

FLOORING TURNED UP

TO FORM BASE

RUBBER FILLET STRIP

SHEET VINYL

RESILIENT FLOORING

FINISH FLOOR

6"

COLORED CAULK TO MATCH SHEET VINYL

2"

3'

0"

3"

4'

2"

4" 6"

1'

0"

VA

R

IE

S

3"

WT#1, TYP.

WT#2, TYP.

TR#4, TYP.

MT#1, TYP.

CB#1, TYP.

WT#3, TYP.

1' - 0"

2' - 0"

TYPICAL LVT / SVT TO CARPET REDUCER

DOOR AS

SCHEDULED

DOOR FRAME

BEYOND

SOLID VINYL TILE

AS SCHEDULED

2 1/2" WHEELED

TRAFFIC REDUCER

[TR#2]

(FIELD VERIFY STYLE)

CARPET AS

SCHEDULED

NOTE: INSTALL T-MOLD REDUCER STRIP

SUCH THAT IT IS CONCEALED FROM VIEW

WHEN DOOR IS IN CLOSED POSITION.

GENERAL FINISH NOTES

• PROVIDE FLOOR TRANSITIONS AS NOTED WHERE ALL FLOOR FINISH CHANGE MATERIALS.

CONTRACTOR TO VERIFY TRANSITION AND REDUCER STYLE PRIOR TO INSTALLATION.

• ALL FLOOR FINISH TRANSITIONS SHALL BE CONCEALED BY A CLOSED DOOR. TRANSITIONS

SHALL CLEAR DOORS IN THE OPEN POSITION.

• ALL FINISHES LISTED ARE NEW UNLESS SPECIFIALLY NOTED AS EXISTING.

• WALL BASE SHALL BE RUBBER ROLL GOODS, UNLESS OTHERWISE NOTED.

• WHERE PAINTED GWB ARE INDICATED, PAINTING INCLUDES ALL PREVIOUSLY PAINTED

SURFACES AND TRIM.

• HATCH PATTERNS ON FINISH PLANS ARE REPRESENTATIONAL ONLY TO DISTINGUISH COLOR

CHANGES, UNLESS OTHERWISE NOTED.

• ALL WALLS TO BE PAINTED PNT #2, EGGSHELL, UNLESS OTHERWISE NOTED. SEE FINISH

COLORS FOR INFORMATION.

• ALL DOORS AND DOOR TRIM TO BE PAINTED PNT #5, SEMI-GLOSS, UNLESS OTHERWISE

NOTED. SEE FINISH COLORS FOR INFORMATION.

• ALL VINYL COMPOSITION TILE TO BE INSTALLED MONOLITHIC.

• ALL CARPET TILE TO BE INSTALLED QUARTER TURNED.

• ALL RUBBER WALL BASE SHALL BE INSTALLED WITH FORMED CORNERS.

• INSTALL [TR#1] (METAL TRANSITION STRIP) WHERE TILE MEETS CARPET TILE. CONTRACTOR

TO VERIFY STYLE PROFILE PRIOR TO INSTALLATION.

• INSTALL [TR#2] (VINYL REDUCER STRIP) WHERE RESILIENT MEETS CARPET TILE. COLOR TO

MATCH RESILIENT MATERIAL.

• REFER TO SHEET 66-A200 FOR CEILING DETAILS.

• SEE NEW WORK NOTES ON SHEET 66-A110 FOR ACCENT PAINT LOCATIONS.

FINISH REMARKS

1. PROVIDE METAL EDGE TRIM [TR#3] AT ALL OUTSIDE EDGES OF TILE WAINSCOTING IN TOILETS.

PROVIDE MATCHING INSIDE / OUTSIDE CORNER PCS.

2. INSTALLED PORCELAIN TILE [WT#1 / WT#2 / WT#3] WITH ALIGNED GROUT JOINTS. USE 3/16"

GROUT JOINT MINIMUM.

3. INSTALL [GRT#1] FOR WALL TILE ; INSTALL [GRT#2] FOR FLOOR TILE.

4. INSTALL TILE PATTERN 1/2" HEIGHT ON ALL WALLS, LESS PLUMBING WALL. SEE DETAIL 5/66- A600.

5. INSTALL TILE PATTERN FULL HEIGHT ON PLUMBING WALL ONLY. SEE DETAIL 6/66-A600.

6. INSTALL [LVT#1] ON DIAGONAL. AT PATTERN EDGE, PROVIDE [LVT#2] FOR LINEAR BANDING.

7. PROVIDE 6" SHEET VINYL INTEGRAL COVE BASE. SEE DETAIL 3/66-A600. PROVIDE HEAT

WELDED SEAMS WITH WELDING ROD COLOR TO MATCH ADJACENT FIELD COLOR OF SHEET VINYL

AS NOTED.

8. INSTALL [MB#1] MILLWORK BASE AND [QR#1] QUARTER ROUND AT THIS LOCATION. MITER ALL

CORNER CLEANLY AND PROVIDE CUSTOM COLOR MATCHED CAULK FOR ALL CUT / EXPOSED

EDGES.

9. PROVIDE PAINT [PNT#6] FOR STAIR RAILINGS AND HAND RAILS.

10. PROVIDE [CG#1] CORNER GUARD ALL OUTSIDE CORNER LOCATIONS.

11. PROVIDE [CG#2] CUSTOM WIDTH, FLUSH MOUNT CORNER GUARD AT LAVATORY WALL. SEE

DETAIL 4/66-A600. FINISH TO JOIN CLEANLY TO EDGES. PROVIDE CUSTOM COLOR MATCHED

CAULK ALONG JOINTS.

12. PROVIDE ACCENT PAINT [ PNT#5] AT ALL FULL AND RECESSED COLUMN LOCATIONS. SEE

FINISH SCHEDULE FOR DETAILS.

FINISH COLORS

FLOOR

SV#1: (JANITOR) SPECKLED TAN

CPT#1 (FIELD) SAGE / TAN / PURPLE MULTI-TONE BLOCK PRINT

LVT#1 (NATURAL STONE) TAUPE TRAVERTINE, 18" X 18"

LVT#2 (NATURAL STONE) TAUPE TRAVERTINE, 4" X 36"

SVT#1 (MECHANICAL) DARK GRAY - MARBELIZED

RST#1: (STAIR TREAD) HEAVY DUTY RUBBER; SQUARE NOSE TREAD WITH

ABRASIVE STRIP [COLOR: “SAFETY YELLOW”]; RAISED SQUARE TREAD

TEXTURE; COLOR: MEDIUM TAUPE WITH MIN. 10% RECYLED CORK

CONTENT.

RT#1: (STAIR LANDING) RUBBER TILE; RAISED CIRCULAR DESIGN;

COLOR: DARK BLUE / GRAY WITH MIN. 10% RECYLED CORK CONTENT.

PT#1: (MOSAIC FLOOR TILE) 3" SLATE; BLUE / GRAY WITH PURPLE FLECKS

TR#1: (METAL TRANSITION STRIP) SATIN ANNODIZED ALUMINUM

TR#2: (VINYL REDUCER STRIP) 2 1/2" WHEELED TRAFFIC

TRANSITION

WALL AND CEILING

ACT#1 (STANDARD) ANGLED TEGULAR; WHITE

WT#1: (WALL TILE) UNPOLISHED; BEIGE; 6" X 12"

WT#2: (WALL TILE) UNPOLISHED; BEIGE; 3" X 24"

WT#3: (WALL TILE) UNPOLISHED; BEIGE; 12" X 24"

MT#1: (MOSAIC TILE) 5/8" X 5/8" SQUARE MOSAIC; MIXED TUMBLED STONE /

GLASS

CB#1: (COVE BASE) UNPOLISHED; BEIGE; 2" X 12"; PROVIDE MATCHING INSIDE

AND OUTSIDE CORNERS.

CB#2 (BULLNOSE TRIM) UNPOLISHED; BEIGE; 4" X 12"BN

CG#1 (CORNER GUARD) 3 1/2" STAINLESS STEEL WITH #4 SATIN FINISH;

SURFACE MOUNTED.

CG#2 (CORNER GUARD) CUSTOM WIDTH FLUSH MOUNT CORNER GUARD;

COLOR: FAWN

PNT#1 (CEILINGS) OFF-WHITE

PNT#2 (CREAM) CREAM

PNT#3 (BEIGE) YELLOW TONED BEIGE

PNT#4 (CELERY) LIGHT SAGE

PNT#5 (COLUMN ACCENT) MEDIUM SAGE

PNT#6 (STAIR-RAILS / DOOR-FRAMES) MEDIUM GRAY

PNT#7 (TAUPE) RED TONED BEIGE

RB#1 (RUBBER WALL BASE) 6" THERMOSET RUBBER WALL BASE; 1/8" THICK; TOE;

COLOR: FAWN

MB#1 (PROFILED BASE) 6" MILLWORK RESILIENT WALL BASE; COLOR: FAWN;

MITER CORNERS. CAULK ALL CUT / EXPOSED EDGES WITH CUSTOM

COLOR MATCHED CAULK.

QR#1 (QUARTER ROUND) 1/2" X 1/2" HIGH RADIUS WITH ADHESIVE BACKING

TO MATCH MILLWOR BASE. PROVIDE ADDITIONAL ADHESIVE TO

SECURE FIRMLY ALONG ALL MILLWORK BASE. CAULK ALL CUT /

EXPOSED EDGES WITH CUSTOM COLOR MATCHED CAULK.

(FIELD VERIFY)

TR#3: (METAL EDGE TRIM) SATIN ANNODIZED NICKEL; EXTRUDED SQUARE

PROFILE; PROVIDE MATCHING INSIDE AND OUTSIDE CORNERS.

TR#4: (DECORATIVE METAL TRIM LINER) SATIN ANNODIZED NICKEL;

[1" wide X 1/4" thick]

TR#5: (METAL EDGE TRIM) SATIN ANNODIZED NICKEL; LINEAR PROFILE;

PROVIDE MATCHING INSIDE AND OUTSIDE CORNERS.

CASEWORK

SS#1: (LAVATORY COUNTERTOP) QUARTZ: BLACK BASE WITH PEARL CHIPS

SS#2: (WINDOW SILLS) SOLID SURFACE: CREAM WITH BEIGE FLECKS

ACCESSORIES

GRT#1: (WALL GROUT) PREMIUM EPOXY GROUT; MEDIUM BEIGE

GRT#2: (FLOOR GROUT) PREMIUM EPOXY GROUT; DARK GREY

TP#1: (TOILET PARTITION) ROTARY BRUSHED; METALLIC NICKEL

FINISHED WALL WIDTH

5 /8"

GWB

1 5/8"

EX

TR

U D

ED

P

LA

ST

IC

C

O

VE

R

3/4" FOAM TAPE

ALUMINUM RETAINER

#6 X 1 15/8"

BUGLE HG SMS

METAL STUD

D R

Y W

A

LL

S

ET

BA

C

K

FEATHER WALL FINISH

TO TAPER INTO ADJACENT

FINISH; PROVIDE COLOR MATCHED CAULK AT

EXPOSED GAPS.

[CG#2] CORNER GUARD

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-A600

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102Finish Schedule, Details and Notes

FINISH SCHEDULE

NUMBER Name

FLOOR

Floor Color

BASE

Base Color

WALL

Wall Color CEILING Ceiling

Color Height REMARKSMTL MTL MTL MTL

100 WAITING AREA CPT CPT#1 MB / QR MB#1 / QR#1 PTD GWB PNT#2 ACT ACT#1 TME 8,10

100A CONFERENCE ROOM EXIST ETR EXIST TME PTD GWB ETR EXIST ETR EXIST -

100C MECH CLOSET EXIST ETR EXIST TME PTD GWB ETR EXIST ETR EXIST -

101 LOBBY CPT CPT#1 MB / QR MB#1 / QR#1 PTD GWB PNT#2 / PNT#5 EXIST ETR TME 8,10,12

101A FOYER CPT CPT#1 MB / QR MB#1 / QR#1 PTD GWB PNT#2 EXIST ETR TME 8,10

101B RECEPTION CHECK-IN EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

101C OFFICE EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

102 ANTE ROOM EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

102A OFFICE EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

102B OFFICE EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

102C OFFICE EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

102D CHIEF OFFICE EXIST ETR EXIST TME PTD GWB ETR EXIST ETR TME -

102E OFFICE EXIST ETR EXIST TME PTD GWB / CMU ETR EXIST ETR TME -

102F OFFICE EXIST ETR EXIST TME PTD GWB / CMU ETR EXIST ETR TME -

102G OFFICE EXIST ETR EXIST TME PTD GWB / CMU ETR EXIST ETR TME -

102H OFFICE EXIST ETR EXIST TME PTD GWB / CMU ETR EXIST ETR TME -

102L MECHANICAL ROOM SVT SVT#1 RB RB#1 PTD GWB / CMU PNT#3 EXP - - -

103 STAIRWELL RST / RT RST#1 / RT#1 RB RB#1 PTD GWB / CMU PNT#3 PTD GWB - VARIES 9,10

103E JANITOR SV SV#1 SV SV#1 EPOXY PTD GWB/CMU PNT#2 ACT ACT#1 9'-0" 7

103F VESTIBULE LVT LVT#1 MB / QR MB#1 / QR#1 PTD GWB PNT#2 ACT ACT#1 TME 6, 8, 10 103G MEN'S TOILET PT PT#1 CB / BN CB#1 / BN#1 WT / MT / TR / MR GWB WT#1,2,3 / MT#1 / TR#4 / TR#5 / PNT#7 ACT / PTD GWB ACT#1 / PNT#1 VARIES 1,2,3,4, 5, 11 104 ANTI-ROOM CORRIDOR CPT CPT#1 RB RB#1 PTD GWB PNT#4 / PNT#5 EXIST ETR EXIST 10,12

104A AFGE OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR TME 10

104B MECHANICAL ROOM SVT SVT#1 RB RB#1 PTD GWB / CMU PNT#3 EXP - - -

104C NAGE OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10,12

104D NAGE OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10,12

104E NAGE OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10,12

104F AFGE OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10,12

104G STORAGE ROOM CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

104H AFGE OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR TME 10,12

104I AFGE OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR TME 10,12

104J AFGE OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR TME 10

104L OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

104M OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

104N OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

104O OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

104P OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

104Q NAGE OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 EXIST ETR TME 10

105 STAIRWELL RST / RT RST#1 / RT#1 RB RB#1 PTD GWB / CMU PNT#3 PTD GWB - VARIES 9,10

106 DATA CLOSET EXIST ETR EXIST TME PTD GWB ETR EXIST ETR EXIST -

107 VESTIBULE LVT LVT#1 RB RB#1 PTD GWB PNT#2 ACT ACT#1 TME 6, 8, 10

107A WOMEN'S TOILET PT PT#1 CB / BN CB#1 / BN#1 WT / MT / TR / MR GWB WT#1,2,3 / MT#1 / TR#4 / TR#5 / PNT#7 ACT / PTD GWB ACT#1 / PNT#1 VARIES 1,2,3,4, 5, 11 108 STAIRWELL RST / RT RST#1 / RT#1 RB RB#1 PTD GWB / CMU PNT#3 PTD GWB - VARIES 9,10 201 VESTIBULE CPT CPT#1 MB / QR MB#1 / QR#1 PTD GWB / CMU PNT#2 EXIST ETR EXIST 8,10

201A RECEPTION / WAITING EXIST ETR EXIST TME PTD GWB / CMU ETR EXP ETR EXIST -

201B FILE ROOM EXIST ETR EXIST TME PTD GWB ETR EXIST ETR EXIST -

201C EXAM ROOM EXIST ETR EXIST TME PTD GWB / CMU ETR EXIST ETR EXIST -

201D OFFICE EXIST ETR EXIST TME PTD GWB / CMU ETR EXIST ETR EXIST 8,10

202 OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#4 / PNT#5 EXIST ETR EXIST 12

202B OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202C OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202D OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202E OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202F OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202G OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202H OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 EXIST ETR EXIST 8,10

202J MECHANICAL ROOM SVT SVT#1 RB RB#1 PTD GWB / CMU PNT#3 EXP - TME -

203 WOMEN'S RESTROOM PT PT#1 CB / BN CB#1 / BN#1 WT / MT / TR / MR GWB WT#1,2,3 / MT#1 / TR#4 / TR#5 / PNT#7 ACT / PTD GWB ACT#1 / PNT#1 VARIES 1,2,3,4, 5, 11

203C JANITOR SV SV#1 SV SV#1 EPOXY PTD GWB/CMU PNT#2 ACT ACT#1 9'-0" 7

203D MEN'S RESTROOM PT PT#1 CB / BN CB#1 / BN#1 WT / MT / TR / MR GWB WT#1,2,3 / MT#1 / TR#4 / TR#5 / PNT#7 ACT / PTD GWB ACT#1 / PNT#1 VARIES 1,2,3,4, 5, 11 203E STAIRWELL RST / RT RST#1 / RT#1 RB RB#1 PTD GWB / CMU PNT#3 PTD GWB - VARIES 9,10

204 CUBICALS CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#4 / PNT#5 ACT ACT#1 TME 12

204A OFFICE CPT CPT#1 RB RB#1 PTD GWB PNT#2 ACT ACT#1 TME -

204B MECHANICAL ROOM SVT SVT#1 RB RB#1 PTD GWB / CMU PNT#3 EXP - TME -

204K SUPERVISOR OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 ACT ACT#1 TME 10

204Q OFFICE CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 ACT ACT#1 TME 10

205 STAIRWELL RST / RT RST#1 / RT#1 RB RB#1 PTD GWB / CMU PNT#3 PTD GWB - VARIES 9,10 208 STAIRWELL RST / RT RST#1 / RT#1 RB RB#1 PTD GWB / CMU PNT#3 PTD GWB - VARIES 9,10 C-1 CORRIDOR CPT / LVT CPT#1 / LVT#1 MB / QR MB#1 / QR#1 PTD GWB / CMU PNT#2 ACT / PTD GWB ACT#1 / PNT#1 TME 8,10

C-2 CORRIDOR CPT CPT#1 RB RB#1 PTD GWB / CMU PNT#2 ACT ACT#1 TME 10,12

C-3 CORRIDOR CPT / SVT CPT#1 / LVT#1 MB / QR MB#1 / QR#1 PTD GWB / CMU PNT#2 ACT / PTD GWB ACT#1 / PNT#1 TME 8,10

EG-1 ELEVATOR EXIST ETR EXIST TME - PNT#2 MFTR STD ETR TME -

EG-2 ELEVATOR EXIST ETR EXIST TME - PNT#2 MFTR STD ETR TME -

66-A600 1 1/2" = 1'-0"

1 THRESHOLD DETAIL

66-A600 1/2" = 1'-0"

5 TYPICAL TILE PATTERN - 1/2 HEIGHT

66-A600 3" = 1'-0"

3 SV DETAIL

66-A600 1/2" = 1'-0"

6 TYPICAL TILE PATTERN - FULL HEIGHT

66-A600 1 1/2" = 1'-0"

2 TRANSITION DETAIL

NTS66-A600

4 FLUSH MOUNT CORNER GUARD - FULL HEIGHT

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

66-A810

66-A810

6' - 0 1/2"

5' - 0 1/2"

TP1

TP1 TP1

GB3

GB2

GB2

GB3

GB1

GB2

GB1

GB2

6" 6"

PTR1PTR1

MR1

M1B M1B

M1B

M3

M1B

M3

M3

M3

TP1

GB2

GB2

TP1 GB2

M1B M1B

M1B

M1B

M1B

M1B

M1B M1B

M1BM1B

M1B

M1B

M1B

M1B

M3B M3B 6' - 0 1/2"

STAIRWELL

CORRIDOR

C-1

VESTIBULE

VESTIBULE

103F

JANITOR

103E

MEN'S TOILET

103G

WOMEN'S TOILET

107A

1'

/8

2'

5'

6" 1'

6"

M6

1'

/8

2'

5'

6" 1'

6"

4' - 6"

5'

7/

8" 4'

1/ 2"

5'

7/

8"

/4

5'

7/

8"

/4

37' - 11 3/8"

M1B

M3B

MR1

5' - 0 1/2"

11' - 6" 11' - 6"

PIPING

M1B

HD1 HD1

SD1

SD1

3'

1/

2" 2'

5'

1/ 2"

2'

6" 2'

6"

2'

6" 2'

6"

SD1

SD1

MR1

MR1

LVTY1 LVTY1

SN1

SN1

SN1

HD1 HD1

RH1

RH1

RH1

RH1

RH1

GB2

FA

C

E O

F

FI

N

IS

H

5'

1/

2" 2'

FA

C

E O

F

FI

N

IS

H

3'

1/

2"

5'

2"

3' - 8 7/8"

5'

3/

4"

4'

1/

2" 5'

2"

1 FA

C

E O

F

FI

N

IS

H

FA

C E

O F

FI

N

IS

H

FA

C

E O

F

FI

N

IS

H

FA

C E

O F

FI

N

IS

H

FACE OF FINISH

5' - 2 1/8"

66-A810

66-A811

6' - 0 1/2"

TP1

TP1

TP1

1"

TP1

1"

TP1

6"

GB2

GB1

GB3 GB2

GB1

GB3

GB2

GB2

GB2

GB2

6"

GB2

GB2

MR1

M1B M3

M6 M1B

M1B

M1B

M1B

PTR1 PTR1

1' - 10 3/4"

M1B

M1B

M1B

M1B

M1B

M3B

M1B

M1B

M1B

M3B

M1B

STAIRWELL

203E

CORRIDOR

C-3

MEN'S

RESTROOM

203D

WOMEN'S

RESTROOM

1'

6"

5' - 0 1/2"

5'

7" 2'

5'

7" 3'

1"

3'

1"

5'

/1 6"

5'

1/

4"

/8

MR1

6'

1/

4"

M1B

M1B

M1B

M1B

M3

M3

M1B

3' - 1 1/2"

5' - 6 3/8"

5'

9/

JANITOR

203C

/2

5'

1/

2" 2'

3'

1/ 2"

M3

SD1

SD1

SD1

SD1

HD1

HD1

MR1

LVTY1

LVTY1

SN1

SN1

SN1

HD1

2'

6" 2'

6"

2'

6" 2'

6"

MR1

3'

1" 3'

1"

5'

1/

2" 3'

1/ 8"

/4

RH1

RH1

RH1

M1B

FA

C

E O

F

FI

N

IS

H

FA

C

E O

F

FI

N

IS

H

FA

C

E O

F

FI

N

IS

H

1'

6"

FA

C

E O

F

FI

N

IS

H

5' - 3 3/8" M3

4' - 2 3/4"

M3

M1B

6' - 7 5/16"

PROJECT LIMITS

1st FLOOR - KEY PLAN

PROJECT LIMITS

2nd FLOOR - KEY PLAN

1. HOLD WALL AS TIGHT TO PIPING AS POSSIBLE.

REMARKS

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-A700

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht ljh12-19-2014

590-14-102Enlarged Floor Plans

1/4" = 1'-0"

ENLARGED PLAN - FIRST FLOOR

1/4" = 1'-0"

ENLARGED PLAN - SECOND FLOOR

TOILET ACCESSORY SCHEDULE

MARK DESCRIPTION MOUNTING HEIGHT REMARKS

GB1 36" HORIZONTAL GRAB BAR 34" TO BOTTOM A.F.F.; 6" FROM WALL CFCI

GB2 42" HORIZONTAL GRAB BAR 34" TO BOTTOM A.F.F.; 12" FROM WALL CFCI

GB3 18" VERTICAL GRAB BAR 40" A.F.F. TO TOP OF GRAB BAR; 40" FROM WALL VERTICAL MOUNT HD1 AUTOMATIC HAND DRYER 42" A.F.F TO TOP; 42" FROM WALL; 24"-42" TO CENTERLINE OF ADJACENT FIXTURE CFCI

LVTY1 PREMOLDED QUARTZ LAVATORY UNIT 33.5" TO COUNTER BASIN A.F.F; 60" WIDE CFCI

MR1 CHANNEL FRAMED MIRROR / SHELF COMBINATION 40" TO SHELF BOTTOM A.F.F.; 36" HIGH; EQUAL SPACING ON ALL SIDES CFCI; (1) UNIT OVER EACH FAUCET PTR1 SEMI-RECESSED CONVERTIBLE PAPER TOWEL DISPSENSER / WASTE RECEPTACLE 34" TO TOP OF OPENING; 18" FROM WALL EDGE; CFCI; PROVIDE TRASH LINER INSERT ADD-ON TO UNIT

RH1 CLOTHES HOOK WITH BUMPER 40" A.F.F. TO CENTERLINE OF DOOR. CFCI

SD1 SURFACE MOUNTED SOAP DISPENSER 40" TO CONTROLS A.F.F.; 11.25"" TO CENTERLINE OF SINK OFOI SN1 SURFACE MOUNTED SANITARY NAPKIN DISPSENSER 30" A.F.F. TO TOP OF CABINET; 30" TO CENTERLINE; CFCI;

TP1 TOILET PAPER DISPENSER 19" A.F.F.; 19" TO CENTERLINE OFOI; DOUBLE ROLL UNIT

WALL TYPE SCHEDULE

TYPE STC DESCRIPTION FIRE RATING UL REMARKS

M1B N/A 1 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB ONE SIDE. EXTEND

GWB 4" ABOVE CEILING. FASTEN STUD TO UNDERSIDE OF DECK.

- - AT EXTERIOR WALLS, SEE

NOTE #9 ON SHEET 66-A111

M3 N/A 3 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB BOTH SIDES.

EXTEND GWB TO 4" ABOVE FINISHED CEILING. ANCHOR STUDS TO

UNDERSIDE OF DECK OR STRUCTURE ABOVE AT 48" O.C. MAX

M3B N/A 3 5/8" METAL STUDS AT 16" O.C. MAX. 5/8" GWB ONE SIDE. EXTEND

WALL ASSEMBLY TO 4" ABOVE FINISHED CEILING.

M6 N/A 6" METAL STUDS AT 16" O.C. MAX. 5/8" GWB BOTH SIDES. EXTEND

GWB TO 4" ABOVE FINISHED CEILING. ANCHOR STUDS TO

UNDERSIDE OF DECK OR STRUCTURE ABOVE AT 48" O.C. MAX

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

HMV

HOLLOW METAL VISION

F

FLUSH WOOD

SC

H

ED

U

LE

D

H

EI

G H

T

SCHEDULED WIDTH

VISION

PANEL

SC

H

ED

U

LE

D

H

EI

G H

T

SCHEDULED WIDTH

SC

H

ED

U

LE

D

H

EI

G H

T

SCHEDULED WIDTH

HMPD

HOLLOW METAL

2" 2"VARIES

2"

VA

R

IE

S

2 3/4" 2 3/4"FIELD VERIFY

1'

0"

VA

R

IE

S

3'

3/

4"

3'

- 0

1. EXISTING FRAME TO REMAIN. FIELD VERIFY PRIOR TO ORDERING DOOR.

2. REMOVE EXISTING WOOD WITHIN HEADER. PROVIDE TEMPERED WINDOW

GLAZING TO FIT WITHIN EXISTING FRAME. REMOVED EXISTING DOOR. FIELD

VERIFY. PROVIDE NEW DOOR AND HARDWARE.

3. EXISTING DOOR AND FRAME TO REMAIN. REMOVE EXISTING HARDWARE AND

RETURN TO OWNER. INSTALL NEW HARDWARE. REPAIR DOOR AS

NECCESARY.

4. REMOVED EXISTING DOOR, FRAME AND HARDWARE; RETURN TO OWNER.

PROVIDE NEW DOOR, FRAME AND HARDWARE.

5. PROVIDE NEW DOOR, FRAME AND HARDWARE.

6. PROVIDE DOOR HARDWARE AT THIS LOCATION AS AN ADDITIVE BID ITEM.

CONTRACTOR TO FIELD VERIFY.

DOOR REMARKS

2"

1/2"

HOLLOW METAL

FRAME, (PTD)

CAULK BOTH SIDES (TYP)

METAL STUDS

SEE WALL TYPES

SEE WALL TYPE

PROVIDE MINIMUM OF 3

JAMB ANCHORS PER JAMB

GWB - SEE WALL TYPE

SCHEDULE

FRAME BEYOND

ALUMINUM THRESHOLD SET IN

3 BEADS CONT. SEALANT

PREMOLDED EXPANSION JOINT

EXIST CONCRETE SLAB

7 3/4" 2 3/4"

EXISTING WALL

CAULK

WOOD BRICK MOULD

HOLLOW METAL FRAME

PTD WHITE

1" INSULATED GLASS

ARCHED

1/ 2"

2"

APPLIED METAL STOP

AL

IG

N W

IT

H

B

LD

B

AN

D

DOOR

2 3/4"

EXISTING WALL

CAULK

WOOD BRICK MOULD

PTD WHITE

HOLLOW METAL FRAME

PTD WHITE

1/ 2"

2"

JAMB ANCHOR PROVIDE 4

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Date

Project No.Drawing Title

Building No.

Location

Drawn by:Checked by:

Project Title

SHEET OF

Drawing No.APPROVED: PROJECT DIRECTOR www.pfa-architect.com

ARCHITECTURE, PLANNING, INTERIORS

World Trade Center 101 West Main Street, Suite 7000 Norfolk, VA 23510

Phone: 757-471-0537 Fax: 757-471-4205

PF&A DESIGN

1010 Kings Highway South Building One - 1st Floor Cherry Hill, NJ 08034 Tel (856) 429-4000 Fax (856) 429-5002

F

E

D

C

E

B

A th re e-ei gh th s in ch o ne fo ot on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot on e-ha lf in ch on e fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

Building 66

/1

9/

:5 8:

A

M

66-A800

HAMPTON, VIRGINIA

Renovate Administrative Bldg.

jht…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.