36C24618B0613-00003001.pdf
PDF 162 KB Posted
- Solicitation number
- 36C24618B0613
About this file
36C24618B0613 00003 SAW Pre-Bid RFI's - VA Response.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24618B0613-00003000.docx | DOCX document | |
| 36C24618B0613-00003002.pdf | ||
| 36C24618B0613-00002000.docx | DOCX document | |
| 36C24618B0613-00001000.docx | DOCX document | |
| 36C24618B0613-001.docx | DOCX document | |
| 36C24618B0613-004.pdf | ||
| 36C24618B0613-003.pdf | ||
| 36C24618B0613-002.pdf | ||
| 36C24618B0613-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAW Contracting, Inc.
2625 Production Rd A Virginia Beach, Virginia 23454 Phone: (757) 486-1580 Fax: (757) 486-2532
Project: 18014 - Building 66 Renovation 100 Emancipation Drive
Hampton, Virginia 23667
Pre -Bid RFI's TO: Chris Carawan (SAW Contracting, Inc.)
FROM: Chris Carawan (SAW Contracting, Inc.)
DATE INITIATED: 05/04/2018 STATUS: Open
LOCATION: DUE DATE: 05/07/2018
COST CODE: REFERENCE:
COST IMPACT: SCHEDULE IMPACT:
DRAWING NUMBER: SPEC SECTION:
LINKED DRAWINGS:
RECEIVED FROM:
COPIES TO:
Question from Chris Carawan (SAW Contracting, Inc.) at 01:35 PM on 05/04/2018
1. Bid Deducts Item 1 indicates two 24’x 60’ double wide modular office complex, Alternate 1 indicates one 24’x 60’ double wide modular office complex, please confirm if this is a scope requirement.
2. Spec Section 10 00 00 paragraph 1.4.C.1, provide unarmed guards at the project site after construction hours, please confirm requirements.
3. Spec Section 10 00 00 paragraph 1.6.H.1 before construction operations begin, contractor shall provide a chain link fence, this is not identified on contract drawings, please confirm.
4. Spec Section 10 00 00 paragraph 1.17.A-Q COR’s field office, is this required? Please confirm.
5. Spec Section 01 35 26 paragraph 1.7.C SSHO has to be a separate qualified individual from the Prime Contractor's Superintendent and/or
Quality Control Manager with the duties only as the SSHO. Please confirm this project requires a separate Superintendent & SSHO.
Awaiting an Official Response
All Replies:
BY DATE COPIES TO
SAW Contracting, Inc. Page 1 of 1 Printed On: 05/04/2018 01:38 PM
RFI #1
VHALOMMEEHAC
Text Box
1. Yes. This is a scope requirement.
2. Guards are not required.
3. Fence not required. However, construction equipment and materials must be secured and unaccessible to the public at all times.
4. COR field office is not required.
5. Superintendent and SSHO can be the same person.
File details come from the government source that posted it.