Statement of Work-Arc Flash Hazard Analysis Services.pdf

PDF 174 KB Posted

Download PDF, 174 KB

Attached to
Arc Flash Hazard Analysis Services
Solicitation number
36C24527Q0073
Issued by

About this file

This is a Statement of Work (SOW) for Arc Flash Hazard Analysis Services at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. The contractor must perform a complete arc flash hazard analysis and short circuit study of the facility's electrical distribution system, including field data collection, development of computer models and one-line diagrams, short circuit calculations, arc flash hazard analysis, and installation of arc flash and shock hazard warning labels on all analyzed equipment. The scope encompasses all buildings and systems at the medical center located at 1 Med Center Drive.

Work must comply with NFPA 70, 70E, 70B, and 99; IEEE 1584; ANSI/IEEE short circuit standards; ANSI Z535.4; OSHA regulations; and VA specifications. The study shall be performed under the direct supervision of and sealed by a licensed professional engineer, with field personnel qualified as per NFPA 70E standards and experienced in occupied healthcare facilities. The contractor must use commercially available power system analysis software recognized for IEEE 1584-2018 calculations. Key deliverables include a work plan due 10 business days after kickoff, field-verified diagrams in CAD/PDF format, a draft report due 60 calendar days after work plan approval (with 14-day government review), a final report due 10 business days after government comments, electronic model files, arc flash label samples with a complete label schedule, installed labels within 30 days of final report approval, an equipment deficiency list, and staff training/briefing within 15 business days after label installation. The contract includes a base period for the initial study and four twelve-month option periods for model and label updates following facility changes, studies for new equipment, post-mitigation analysis, annual verification of at least 15 percent of equipment, annual training, and a five-year comprehensive review. All deliverables must be submitted electronically in PDF and native format with one hard-bound copy of the final report. Drawings and reports are marked Sensitive but Unclassified—Critical Infrastructure Information, and all electronic transmissions must use VA-approved secure means without personally identifiable information or protected health information.

View the file

Other files

File Type Posted
36C24527Q0073.pdf PDF

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work:

Arc Flash Hazard Analysis Services

1. Background/Purpose

The Louis A Johnson VA Medical Center operates an electrical distribution system serving patient care, life-safety, and critical support areas. NFPA 70E and NFPA 70 (NEC) require that electrical equipment that is likely to require examination, servicing, or maintenance while energized, be field marked with arc flash and shock hazard information. The facility's existing arc flash analysis is outdated and must be performed.

2. Scope

The Contractor shall furnish all labor, supervision, engineering, software, equipment, materials, and travel necessary to perform a complete arc flash hazard analysis and short circuit study of the VAMC's electrical distribution system, and to furnish and install arc flash warning labels on all analyzed equipment. Work includes:

• Field data collection and verification of the as-built electrical system

• Development of a computer model and one-line diagrams

• Short circuit study

• Arc flash hazard analysis

• Contractor-installed arc flash and shock hazard warning labels

• Written reports and recommendations

The study shall include all buildings and systems located at the Louis A. Johnson VA Medical Center, 1 Med Center Drive Clarksburg, WV 26301.

3. Applicable Documents

Work shall comply with the most current standards, codes, and regulations; together with any additional VA requirements in the contract, including:

• NFPA 70, National Electrical Code (including Article 110.16 on arc flash hazard warning)

• NFPA 70E, Standard for Electrical Safety in the Workplace (including 130.5 and 130.5(H) on labeling)

• NFPA 70B, Recommended Practice for Electrical Equipment Maintenance

• NFPA 99, Health Care Facilities Code

• IEEE 1584, Guide for Performing Arc-Flash Hazard Calculations

• ANSI/IEEE short circuit and system study standards (e.g., IEEE 141, 242, 399, and the C37 series)

• ANSI Z535.4, Product Safety Signs and Labels

• OSHA 29 CFR 1910 Subpart S and 1926 Subpart K

• VA Master Specification Section 26 05 73, Overcurrent Protective Device

Coordination Study (applicable provisions)

• VA Electrical Design Manual and VA Barrier-Free and Infection Control requirements, as applicable

This list is not exclusive. The Contractor shall also comply with all other applicable federal, state, and local laws, codes, and regulations, and with nationally recognized consensus standards and industry-accepted practice relevant to arc flash hazard analysis, short circuit studies, and electrical safety, whether listed above or not. An applicable standard that is not listed does not excuse the contractor from complying with it. Where requirements conflict, the more stringent requirement applies, and VA requirements take precedence over general industry practice. The contractor shall notify the COR in writing of any conflict before proceeding.

4. Qualifications

• The study shall be performed under the direct supervision of, and sealed by, a licensed professional engineer.

• Field personnel shall be qualified persons per NFPA 70E, trained in electrical safety, and experienced at working in occupied healthcare facilities.

• The contractor shall use commercially available power system analysis software recognized by the industry for IEEE 1584-2018 calculations. Software name and version shall be identified in the report.

5. Requirements

5.1 Project Coordination

The Contractor shall attend an initial kickoff meeting with the contracting officer's representative (COR) and Facilities Management/Engineering staff to confirm scope, equipment lists, access, schedule, and outage constraints. The contractor shall submit a written work plan and schedule before beginning field work.

5.2 Data Collection

• Collect all data needed to model the system, including utility service data, generator data, transformers, conductors, switchgear, switchboards, panelboards, motor control centers, automatic transfer switches, motors, variable frequency drives, and overcurrent protective devices.

• Verify existing diagrams against field conditions and document discrepancies. Where drawings are missing or inaccurate, the contractor shall develop field-verified diagrams.

• Obtain utility available fault current and X/R data, minimum and maximum, from the serving utility. The government will assist with the request.

• Equipment shall be photographed (nameplate and overcurrent device settings) and documented by unique equipment ID (EE #).

• The government will furnish available drawings, previous studies, and equipment lists. The government does not guarantee accuracy.

5.3 Short Circuit Study

The Contractor shall perform a short circuit study to determine available fault current at each point in the system, including:

• Calculation of three-phase bolted faults, and line-to-ground faults, where applicable, at each bus and piece of equipment.

• Evaluation of maximum and minimum utility contribution and of normal and generator operating modes.

• Inclusion of motor contribution.

• Comparison of calculated fault current to equipment short circuit and interrupting ratings, with any deficiency identified in the report.

5.4 Arc Flash Hazard Analysis

The contractor shall perform an arc flash hazard analysis in accordance with IEEE 1584 and NFPA 70E and shall:

• Calculate incident energy, arc flash boundary, and working distance for each piece of equipment, using the arcing current and protective device clearing times at each location.

• Evaluate all credible operating scenarios, including normal source, emergency/generator source, tiebreaker closed/open, and maintenance modes where applicable, and report the worst-case result on the label.

• Identify equipment where incident energy exceeds [40] cal/cm² and provide recommendations to reduce the hazard.

• Identify the shock hazard (voltage, limited approach boundary, restricted approach boundary) for each piece of equipment.

• Provide a recommended PPE selection or category per NFPA 70E for each location.

• Provide recommendations for reducing incident energy. Any proposed change to protective device settings shall be documented in the report and shall not be implemented by the contractor without written approval.

5.5 Arc Flash Warning Labels

• The Contractor shall furnish and install a field-applied label on each piece of analyzed equipment likely to be serviced while energized, including switchgear, switchboards, panelboards, motor control centers, industrial control panels, automatic transfer switches, disconnects, and other equipment identified during data collection.

• Each label shall include, at a minimum, per NFPA 70E 130.5(H): nominal system voltage, arc flash boundary, available incident energy and the corresponding working distance (or the required arc flash PPE category), limited and restricted approach boundaries, equipment identification, and the date of the analysis.

• Labels shall be durable, UV- and moisture-resistant, with a permanent adhesive suitable for the equipment’s surface and environment, compliant with ANSI Z535.4, and in a VA-approved format and size. The contractor shall submit a sample label for approval before printing.

• Labels shall be placed so they are clearly visible and shall not obscure existing nameplates, ratings, or other required markings. Existing outdated arc flash labels shall be removed or covered.

• A label schedule listing every label, equipment ID, and location shall be provided.

5.6 Working within/around the facility

• All work shall be coordinated through the COR and Facilities Management/Engineering. Work shall not interrupt patient care, critical systems, or life-safety systems.

• Data collection and label installation shall be performed with equipment de-energized only when approved in advance by the COR. Any required outage shall be requested in advance, in writing, and shall be scheduled at times and durations that the VAMC approves, in accordance with its established procedures.

• Energized work shall not be performed unless approved in writing by the COR and performed in accordance with NFPA 70E, including an energized electrical work permit where required.

• The Contractor shall follow VAMC infection control risk assessment (ICRA) requirements, badging and escort requirements, and contractor safety policies, and shall restore all panels and enclosures to their original condition and securely closed.

• The Contractor shall be responsible for repairing any damage caused by its work.

• Work shall be conducted within normal business hours Monday-Friday 8am-4:30pm.

Work outside of these hours, where needed for outages, shall be coordinated with the

COR.

5.7 Records Management Obligations

A. Applicability

This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.

B. Definitions

“Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.

The term Federal record:

1. includes VA records.

2. does not include personal materials.

3. applies to records created, received, or maintained by Contractors pursuant to their VA contract.

4. may include deliverables and documentation associated with deliverables.

C. Requirements

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. VA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation.

Records may not be removed from the legal custody of VA or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity.

Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to VA. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract.

Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VA policy.

8. The Contractor shall not create or maintain any records containing any non-public VA information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The VA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S.

Government for which VA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]

D. Flow down of requirements to subcontractors

1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

• All electronic deliverables transmitted by VA-approved secure means;

PII/PHI shall not appear in any deliverable.

• Drawings and reports marked Sensitive but Unclassified (SBU) – Critical Infrastructure Information.

6. Base Period Deliverables

All deliverables shall be submitted electronically in PDF and, where applicable, in native format, with one hard-bound copy of the final report.

• Work plan and schedule - Due 10 business days after initial kickoff meeting.

• Field-verified diagrams - Editable CAD/PDF.

• Draft report - Due 60 calendar days after work plan approval. Report shall contain the study scope, methodology and assumptions, input data, short circuit results, arc flash results, equipment-rating deficiencies, scenarios evaluated, recommendations, and any other relevant information. The Government will review within 14 business days.

• Final report - Due 10 business days after receiving Government comments.

• Electronic model files - The complete power system model in native software format, with a viewer or export if the Government does not own the software, and a spreadsheet of results by equipment ID (EE#).

• Arc flash label sample and label schedule - See section 5.5.

• Installed labels - Complete installation of all labels within 30 calendar days after final report approval, followed by a written completion notice.

• Equipment deficiency list - a prioritized list of equipment with insufficient interrupting rating, or incident energy exceeding [40] cal/cm², with recommended corrective actions.

• Training/briefing - A briefing for VAMC engineering staff on the results, how to read the labels, and how to maintain the model. To be held within 15 business days after label installation.

7. Acceptance Criteria

The COR will accept deliverables when they are complete, comply with the referenced standards, reflect field conditions, and are provided by the licensed Professional Engineer.

The contractor shall correct deficiencies at no additional cost. Label installation is accepted after a COR walk-through of a sample of at least 15 percent of the installed labels and confirmation that labels match the final report.

8. Option periods

This contract consists of a base period (the initial study, labels, and deliverables in Sections 5 and 6) and four twelve-month option periods. The Government may exercise each option at its sole discretion under the contract's option clauses. The purpose of the options is to keep the arc flash analysis, model, and labels current as the facility changes, and as required by NFPA 70E.

8.1 Option Period Tasks

The following tasks may be ordered in any option period:

• Model and label updates after facility changes: Update the model, short circuit results, arc flash results, and affected labels after construction, equipment replacement or additions, generator or ATS changes, utility changes, or changes to protective device settings.

• Studies for new equipment: Add new equipment to the model, perform short circuit and arc flash analysis, furnish and install labels.

• Post-mitigation analysis. Re-run the analysis after approved incident-energy reduction work or equipment upgrades and replace affected labels.

• Annual verification. Verify in the field at least 15 percent of the equipment in the model (selected by the COR) against the model and labels, correct discrepancies, and report the results.

• Annual training. Provide a briefing to VAMC Engineering staff on the current results, label interpretation, and model maintenance.

• Five-year review (Option Year 4 or as directed). Perform a complete review of the arc flash hazard analysis, including field re-verification of the system, update of the model and diagrams, recalculation of all results, and replacement of labels where results have changed. This review shall be completed no later than five years after the date of the base-period final report.