This is a Sources Sought Notice issued by the Department of Veterans Affairs for market research purposes regarding the removal of abandoned telecommunications equipment. The notice is not a solicitation or request for proposals and does not obligate the Government to award a contract.
The project involves the safe disconnection, removal, and proper disposal of abandoned telecommunications equipment, cabling, conduit, and cable pressurization systems located in the MER-3 (Main Equipment Room) of the Main Hospital Building at the Washington DC VA Medical Center. The contractor must furnish all labor, supervision, materials, equipment, tools, permits, transportation, testing, and disposal services while maintaining the operational status of active telecommunications, life safety, security, and other critical building systems throughout the project duration. Work must conform to VA Master Construction Specifications, NFPA 70 (NEC), OSHA requirements, ANSI/TIA Telecommunications Standards, BICSI Telecommunications Distribution Methods Manual, and applicable Federal, State, Local, EPA, and VA requirements. Key deliverables include a demolition work plan, project schedule, safety plan, Lockout/Tagout procedures, disposal plan, restoration materials, and waste documentation. The contractor must provide three quality assurance hold points (initial demolition area, mid-project inspection, and final acceptance walkthrough), maintain a minimum one-year workmanship warranty on all patching and restoration work, and coordinate any required shutdowns or after-hours work with the VA Contracting Officer's Representative and VA Telecommunications Department at least seventy-two hours in advance. Interested parties must submit responses by email to jameel.gordon@va.gov no later than 11:00 AM EST on September 28, 2026, including company information, capability statement, SAM Unique Entity ID, CAGE code, tax ID, business type classification, Federal Supply Schedule contract number if applicable, and general pricing. The solicitation number is 36C24526Q0853, the product service code is Z1AA, and the NAICS code is 238210.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24526Q0853.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought Notice
*= Required Field Sources Sought Notice
SUBJECT* Removal of Abandoned Telecommunications Equipment
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE* 21902
SOLICITATION NUMBER* 36C24526Q0853
RESPONSE DATE/TIME/ZONE 09-24-2026 3:00PM EASTERN TIME, NEW
YORK, USA
ARCHIVE 60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS N
SET-ASIDE
PRODUCT SERVICE CODE* Z1AA
NAICS CODE* 238210
CONTRACTING OFFICE ADDRESS Department of Veterans Affairs
Perry Point VA Medical Center
361 Boiler House Rd, Building 101C
Perry Point, MD 21902
POINT OF CONTACT*
Contracting Officer
Jameel Gordon and Mike Wilson jameelgordon@va.gov, Michael.wilson37@va.gov
410-642-2411 ext 26911
PLACE OF PERFORMANCE
ADDRESS Department of Veterans Affairs
Washington DC VA Medical Center
50 Irving Street NW
Washington, DC 20422
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL https://www.va.gov/
URL DESCRIPTION Department of Veteran Affairs
AGENCY CONTACT’S EMAIL ADDRESS https://www.va.gov/plo/about/saos.asp
EMAIL DESCRIPTION VHA Procurement & Logistics Office
DESCRIPTION
SOURCES SOUGHT ANNOUNCEMENT: This is a “SOURCES SOUGHT ANNOUNCEMENT
ONLY”, it is neither a solicitation announcement nor a request for proposals or quotes and does not obligate the Government to award a contract. Requests for a solicitation will not receive a response. Responses to this sources-sought must be in writing. The purpose of this SOURCES
SOUGHT ANNOUNCEMENT is for market research to make appropriate acquisition decisions and to gain knowledge of potential sources capable of providing the services described below.
Documentation on technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition. Responses to this notice shall include the following:
(a) Company name:
(b) Address:
(c) Point of Contact:
(d) Phone, Fax (if applicable), and Email:
(e) SAM Unique Entity ID:
(f) Cage Code:
(g) Tax ID Number:
(h) Type of business, SDVOSB; VOSB, WOSB, small, large, etc., as appropriate:
(i) Must provide a Capability Statement that addresses the organization’s qualifications and ability to perform as a contractor for the statement of work described below.
Failure to provide sufficient information may result in the Government’s inability to determine whether the respondent is capable. GENERAL STATEMENTS OF
CAPABILITY ARE NOT ACCEPTABLE.
(j) Federal Supply Schedule Contracting # if applicable
(k) General Pricing
All interested parties should submit information by email only to jameel.gordon@va.gov. All emails must have as the subject line, Notice ID No. 36C24526Q0853 - Removal of
Abandoned Telecommunications Equipment. All submissions must be received no later than 11:00 AM (EST) on September 28, 2026.
Removal of Abandoned Telecommunications Equipment, Cabling, Conduit, and Cable Pressurization System
Department of Veterans Affairs Medical Center Location: Washington, DC
Project Description
The Contractor shall furnish all labor, supervision, materials, equipment, tools, permits, transportation, testing, disposal, and all incidental services necessary to safely disconnect, remove, and properly dispose of abandoned telecommunications equipment, cabling, conduit, cable pressurization systems, and associated accessories located within the MER-3 (Main
Equipment Room) of the Main Hospital Building at the Department of Veterans Affairs Medical
Center, Washington, DC. All work shall be performed in close coordination with the VA
Contracting Officer's Representative (COR) and VA Telecommunications personnel to verify that all equipment identified for removal is abandoned and to ensure that active telecommunications systems remain fully operational throughout the duration of the project. The
Contractor shall take all necessary precautions to prevent interruption of existing telecommunications, life safety, security, and other critical building systems. The Contractor shall perform all work in accordance with applicable VA standards and industry best practices.
APPLICABLE STANDARDS
Work shall conform to the latest adopted editions of the following:
• VA Master Construction Specifications
• NFPA 70 (NEC)
• OSHA Requirements
• ANSI/TIA Telecommunications Standards (where applicable)
• BICSI Telecommunications Distribution Methods Manual (TDMM)
• Applicable Federal, State, Local, EPA, and VA requirements
EXISTING CONDITIONS AND CONTRACTOR RESPONSIBILITY
Contractor shall field verify existing conditions prior to bidding and report discrepancies to the
VA COR. Active systems shall remain operational unless approved otherwise.
SUBMITTALS
• Demolition work plan
• Project schedule/phasing plan
• Safety plan
• Lockout/Tagout procedures
• Disposal plan
• Restoration materials
• Waste documentation (if applicable)
DEMOLITION
• Verify with the VA COR that all equipment identified for removal is abandoned.
• Remove abandoned telecommunications equipment including cabinets, racks, Motorola cabinets, control panels, power supplies, and mounting hardware.
• Remove abandoned copper, fiber optic, coaxial, communication, control, and low-voltage cabling.
• Remove abandoned exposed conduit. Concealed conduit may remain only with written
COR approval.
• Remove abandoned junction boxes, pull boxes, cable trays, wireways, supports, hangers, brackets, and hardware.
• Remove abandoned cable pressurization systems including tanks, regulators, manifolds, valves, tubing, piping, fittings, supports, wiring, and accessories.
• Disconnect equipment from electrical and communication systems prior to demolition.
• Protect active electrical, fire alarm, security, nurse call, BAS, paging, and telecommunications systems.
• Patch wall penetrations and restore disturbed finishes to match adjacent surfaces.
• Dispose of removed materials off-site in accordance with all regulations.
• Submit waste manifest(s) and disposal documentation to VA COR upon completion of the project as evidence of proper disposal.
• Clean work areas daily and upon project completion.
PROTECTION OF EXISTING SYSTEMS
The Contractor shall protect all existing systems that are to remain in service, including:
• Fire Alarm
• Nurse Call
• Security
• Access Control
• Building Automation System (BAS)
• Public Address/Paging
• Fiber Backbone
• Active Data Networks
• Any damage to active systems shall be immediately repaired or replaced by the
Contractor at no additional cost to the Government.
FIELD VERIFICATION
Investigate all telecommunications infrastructure before demolition. Equipment of uncertain operational status shall remain until written direction is received from the VA COR.
QUALITY ASSURANCE AND HOLD POINTS
• Daily quality inspections
• Hold Point 1 – Initial demolition area
• Hold Point 2 – Mid-project inspection
• Hold Point 3 – Final acceptance walkthrough
SAFETY, ACCESS, AND PHASING
• Coordinate outages with VA Engineering.
• Maintain emergency access.
• Provide barricades and dust control.
• Follow Lockout/Tagout procedures.
• Comply with applicable VA Interim Life Safety Measures (ILSM) and Infection Control
Risk Assessment (ICRA) requirements when directed by the VA.
• Minimize disruption to hospital operations.
CLEANUP AND CLOSEOUT
• Remove all debris, abandoned cabling, conduit, equipment, dust, and miscellaneous materials daily.
• Leave MER-3 in broom-clean condition.
• Restore disturbed finishes.
• Provide disposal documentation (if required).
• Provide before-and-after photographs.
• Complete final punch list and final walkthrough with the VA COR.
WARRANTY
Provide a minimum one (1) year workmanship warranty on all patching, restoration, and repair work associated with this project.
WORK HOURS AND COORDINATION
Work shall be performed during normal VA business hours unless otherwise approved by the
VA COR. Any required shutdowns, outages, or after-hours work shall be coordinated with the
VA COR and VA Telecommunications Department a minimum of seventy-two (72) hours in advance.
END OF STATEMENT OF WORK