Site Visit 2-14-2025.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 36C24525Q0285_
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24525P0451_1.pdf | ||
| 23H XFMR Connections inside 23H.JPG | JPG image | |
| 23H XFMR Nameplate 3.JPG | JPG image | |
| 23H XFMR Namplate 2.JPG | JPG image | |
| 23H XFMR Pri-Sec Connections.jpg | JPG image | |
| 23H XMFR Nameplate 1.JPG | JPG image | |
| WAGE DETERMINATION 2015-4215_PP.pdf | ||
| VA1028_D_2020-02-24.pdf | ||
| Perry Point VA Medical Center MAP.pdf | ||
| 36C24525Q0285_1.docx | DOCX document | |
| VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING - Must Complete.pdf | ||
| 36C24525Q0285 RFQ-.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI # | QUESTION | VA RESPONSE |
| TC-1 | Can you confirm whether the transformer replacement is intended as a permanent installation or a temporary rental solution? This will determine the method of how the cable can be run | Proposals should include pricing and lead time for each of the possible options. |
-Installation of aluminum wound transformer -Installation of rental copper wound transformer -Installation of new copper wound transformer
| TC-2 | Are there any site-specific restrictions or requirements that we should be aware of before mobilizing for the work? | Any restrictions or requirements are defined in the SOW. If anything out of the ordinary arises, the situation can be discussed with the CO/COR. |
| TC-3 | What is the preferred date for the 10-hour shutdown, and are there any critical operations that could be impacted during this period? | The date of the shutdown will be estalished once contract is awarded and the shutdown has been coordinated within the VA. The shutdown will most likely happen on a weekend. |
| TC-4 | Is there a backup date in case of unforeseen delays or material availability issues? | The date of the shutdown will be estalished once contract is awarded and the shutdown has been coordinated within the VA. The shutdown will most likely happen on a weekend. |
| TC-5 | Can you supply a picture of the existing transformers nameplate | Nameplate photos will be included. |
| TC-6 | Are there any specific manufacturer preferences for the transformer or components used in the installation? | The manufacterer will be selected by the Construction team and will be approved by the VA via submittals. |
| ZM-1 | Can we get additional pictures on the primary side of the transformer and cable connections? | Available photos will be included. |
| ZM-2 | Can we also get nameplate information? | Nameplate photos will be included. |