About this file

This document appears to be an as-built drawing for a project at the Loch Raven Veterans Affairs Medical Center. It provides detailed information on the installation of several water and natural gas flow meters across multiple buildings on the campus. Key details include:

The drawing specifies the required meter manufacturer, model numbers, pipe sizes, flow rates, pressures, and locations for a total of 10 water meters and 3 natural gas meters. The water meters are primarily Spirax Sarco transit-time ultrasonic flow meters, while the gas meters are a mix of Spirax Sarco insertion turbine and Magnetrol thermal mass flow meters. The drawing also includes instructions for meter maintenance and calibration. Additional documentation related to the project, such as photos and procedures, is referenced but not included in this file.

View the file

Other files

File Type Posted
Loch Raven Boiler Plant Standard Operating Procedure.pdf PDF
36C24524Q0777 0002_1.docx DOCX document
B2.jpg JPG image
1810_D_2023-01-04 Update.pdf PDF
B1.jpg JPG image
Baltimore MD Loch Raven Boiler Assessment Report BEI 2020.pdf PDF
36C24524Q0777 0002.pdf PDF
36C24524Q0777 0001.pdf PDF
36C24524Q0777 0001_1.docx DOCX document
36C24524Q0777_1.docx DOCX document
36C24524Q0777 RFQ.pdf PDF
WAGE DETERMINATION.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPSTREAM DOWNSTREAM

ONE 90° ELBOW BEFORE THE METER 10 D 5 D

TWO 90° ELBOWS BEFORE THE METER 15 D 5 D

TWO 90° ELBOWS OUT OF PLANE BEFORE THE METER 30 D 5 D

REDUCTION BEFORE THE METER 10 D 5 D

REGULATOR OR VALVE PARTIALLY CLOSED BEFORE THE METER 30 D 5 D

STRAIGHT RUN PIPING REQUIREMENTS

IF THERE IS NOT SUFFICIENT STRAIGHT RUN OF PIPE, A FLOW RECTIFIER CAN BE USED TO

REDUCE THE ABOVE LENGTHS. CONSULT YOUR LOCAL REPRESENTATIVE OR THE FACTORY

D IS EQUAL TO THE INTERNAL DIAMETER OF THE PIPE.

ESTIMATED

FLOW RATE FLUID TEMP LINE

PRESSURE PIPE SIZE PIPE

ORIENTATION

PIPE

INSULATION?

METER

LOCATION AMBIENT TEMP METER SELECTION SHUTDOWN REQUIRED?

[GPM] [°F] [PSIG] [IN] HOR / VERT YES / NO IN / OUT

MIN

[°F]

MAX

[°F]

MFGR. DESCRIPTION MODEL NO.

SIZE

[IN]

ACCURACY [%] TURN DOWN

DIFF PRESS

[PSIG]

FLOW COMPUTER POWER DATA LOGGER YES / NO METHOD

BUILDING 1 - MECHANICAL ROOM & OUTDOOR CHILLERS

5-BLR-1-CW-1 5-BLR-1-RTU-1 1 OUTSIDE AT

CHILLER 1

CHILLED WATER

RETURN

(CHILLER #1)

800 55 44 STEEL 8 HORIZONTAL YES OUTDOORS 1 95 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC ENERGY METER

W/ STRAP-ON RTD

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-E-D-00-1

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: URTD-C-020

N/A +/- 1 40:1 N/A (BY UTM10

COMPUTER) 24VDC RTU NO STRAP-ON

MOUNT METER HEAD IN NEMA 4 ENCLOSURE IN

CHILLER PIT.

TRANSMIT MODBUS SIGNAL VIA WIRELESS DEVICE.

5-BLR-1-CW-2 5-BLR-1-RTU-1 1 OUTSIDE AT

CHILLER 2

CHILLED WATER

RETURN

(CHILLER #2)

600 55 44 STEEL 6 HORIZONTAL YES OUTDOORS 1 95 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC ENERGY METER

W/ STRAP-ON RTD

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-E-D-00-1

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: URTD-C-020

N/A +/- 1 40:1 N/A (BY UTM10

COMPUTER) 24VDC RTU NO STRAP-ON

MOUNT METER HEAD IN NEMA 4 ENCLOSURE IN

CHILLER PIT.

TRANSMIT MODBUS SIGNAL VIA WIRELESS DEVICE.

5-BLR-1-PW-1 5-BLR-1-RTU-1 1 MECHANICAL ROOM

(RM G-19)

DOMESTIC WATER TO

BLDG 250 60 60 STEEL 4 VERTICAL YES INDOORS 60 94 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC FLOW METER

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-S-D-00-0

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: N/A

N/A +/- 1 40:1 N/A (BY UTM10

COMPUTER) 24VDC RTU NO STRAP-ON

BUILDING 4 - STORAGE ROOM

5-BLR-4-PW-1 5-BLR-4-RTU-1 4 STORAGE ROOM

(RM G107)

DOMESTIC WATER TO

BLDG 80 60 60 COPPER 3 HORIZONTAL NO INDOORS 60 94 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC FLOW METER

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-S-D-00-0

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: N/A

N/A +/- 1 40:2 N/A (BY UTM10

COMPUTER) 24VDC RTU NO STRAP-ON

5-BLR-CAM-PW-1 5-BLR-4-RTU-1 N/A

UNDERGROUND

VAULT

(NEAR LOCH RAVEN

BLVD)

CAMPUS DOMESTIC

WATER 1000 60 60 STEEL 8 HORIZONTAL NO OUTDOORS 60 94 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC FLOW METER

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-S-D-00-0

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: N/A

N/A +/- 1 40:1 N/A (BY UTM10

COMPUTER) 24VDC RTU NO STRAP-ON PROPOSED METER VAULT.

TRANSMIT MODBUS SIGNAL VIA WIRELESS DEVICE.

BUILDING 5 - MECHANICAL / ELECTRICAL ROOM

5-BLR-5-PW-1 5-BLR-5-RTU-1 5 MECHANICAL ROOM

(RM 1B134)

DOMESTIC WATER TO

BLDG 80 60 60 COPPER 3 HORIZONTAL YES INDOORS 60 94 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC FLOW METER

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-S-D-00-0

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: N/A

N/A +/- 1 40:3 N/A (BY UTM10

COMPUTER) 24VDC RTU YES

REWORK PIPING;

INSTALL STRAP-

ON

REWORK PIPING TO PROVIDE ADEQUATE LENGTH

OF PIPE.

5-BLR-CAM-PW-2 5-BLR-5-RTU-1 N/A

UNDERGROUND

VAULT

(NEAR THE

ALAMEDA)

CAMPUS DOMESTIC

WATER 1000 60 60 STEEL 8 HORIZONTAL NO OUTDOORS 60 94 SPIRAX

SARCO

TRANSIT-TIME ULTRASONIC FLOW METER

(SPEC. SECT. 25.10.10,

PARA. 2.6.F)

METER: UTM10-S-D-00-0

T'DUCER: UTT10-050SX-020-N000S

RTD KIT: N/A

N/A +/- 1 40:1 N/A (BY UTM10

COMPUTER) 24VDC RTU NO STRAP-ON PROPOSED METER VAULT.

NOTES:

1. METER COMPONENTS TO BE ORDERED AND INSTALLED WITH NO CABLE. CABLE LENGTH TO BE FIELD DETERMINED.

2. ULTRASONIC METER MAINTENANCE:

ONCE PER YEAR, VERIFY THAT WIRING CONNECTIONS ARE TIGHT.

EVERY 24-36 MONTHS, CHECK TRANSDUCER AND RTD SENSORS FOR TIGHTNESS AND CLEANLINESS.

ON-SITE CALIBRATION CAN BE PERFORMED EVERY 24-36 MONTHS AS DESCRIBED IN THE INSTALLATION AND MAINTENANCE MANUAL. ALTERNATIVELY, THE METER CAN BE SENT TO A CALIBRATION TESTING FACILITY.

3. ION 7550 RTU MAINTENANCE:

ONCE PER YEAR, VERIFY THAT CONNECTIONS ARE TIGHT.

BLOW DUST OUT OF PANEL AND WIPE DOWN.

CHECK OPERATION REFERENCE SECTION 9 OF THE ION RTU 7550 OPERATION MANUAL.

4. LIMITED INFORMATION AVAILABLE. FLOW RATES ARE ESTIMATED BASED ON PIPE SIZE.

REMARKSMETER NUMBER LOCATION SERVICE PIPE

MATERIALBLDG.RTU NO.

WATER FLOWMETER SCHEDULE

ESTIMATED

FLOW RATE

LINE

PRESSURE PIPE SIZE PIPE

ORIENTATION

PIPE

INSULATION?

METER

LOCATION AMBIENT TEMP METER SELECTION SHUTDOWN REQUIRED?

[CFH] [PSIG] [IN] HOR / VERT YES / NO IN / OUT

MIN

[°F]

MAX

[°F]

MFGR. DESCRIPTION MODEL NO.

SIZE

[IN]

ACCURACY [%] TURN DOWN

DIFF PRESS

[PSIG]

FLOW COMPUTER POWER DATA LOGGER YES / NO METHOD

BUILDING 1 - MECHANICAL ROOM

5-BLR-1-NG-3 5-BLR-1-RTU-1 1 MECHANICAL ROOM

(RM G-19) NATURAL GAS TO BLDG 1460-10,165 5 BLACK IRON 3 HORIZONTAL NO INDOORS 60 94 SPIRAX SARCO

INSERTION TURBINE MASS FLOW

METER

(SPEC. SECT. 25.10.10,

PARA. 2.6.D)

METER: M-TMP-900-2F150-XX-50-RMT

ROTOR: G1B

(2" FLANGED WELD-O-LET & 2" DOUBLE

FLANGED, FULL PORT GATE VALVE PROVIDED

BY MECHANICAL CONTRACTOR)

3 +/- 1 7:1 NEGLIGIBLE (M-TMP

COMPUTER) 24VDC (BY M-TMP

COMPUTER) YES

REWORK PIPING;

HOT TAP;

PURGE REQUIRED

REWORK PIPING TO PROVIDE ADEQUATE LENGTH

OF PIPE.

BUILDING 4 - STORAGE ROOM

5-BLR-4-NG-1 5-BLR-4-RTU-1 4 STORAGE ROOM

(RM G107) NATURAL GAS TO BLDG 0 - 340 5 BLACK IRON 3 HORIZONTAL NO INDOORS 60 94

MAGNETROL

(PARTNER W/

SPIRAX SARCO)

THERMAL MASS FLOW METER -

INLINE

METER: TFT-A53B-000

TRANSMITTER: TA2-A4B0-E40

CABLE: 037-3313-020

4-20mA-TO-MODBUS CONVERTER:

OBVIUS A8332-8F2D

3 +/- 1 100:1 NEGLIGIBLE (BY TA2

COMPUTER) 24VDC RTU YES INSTALL INLINE;

PURGE

BUILDING 5 - MECHANICAL / ELECTRICAL ROOM

5-BLR-5-NG-2 5-BLR-5-RTU-1 5 STORAGE ROOM

(RM 1B138) NATURAL GAS TO BLDG 0 - 350 5 BLACK IRON 2 HORIZONTAL NO INDOORS 60 94

MAGNETROL

(PARTNER W/

SPIRAX SARCO)

THERMAL MASS FLOW METER -

INLINE

METER: TFT-A43B-000

TRANSMITTER: TA2-A4B0-E40

CABLE: 037-3313-020

4-20mA-TO-MODBUS CONVERTER:

OBVIUS A8332-8F2D

2 +/- 1 100:1 NEGLIGIBLE (BY TA2

COMPUTER) 24VDC RTU YES INSTALL INLINE;

PURGE

REROUTE PIPING TO PROVIDE ADEQUATE LENGTH

OF PIPE.

NOTES:

1. METER COMPONENTS TO BE ORDERED AND INSTALLED WITH NO CABLE. CABLE LENGTH TO BE FIELD DETERMINED.

2. M-TMP TURBINE METERS:

- ROTOR MAINTENANCE SHOULD BE PERFORMED BY VISUAL INSPECTION EVERY 12 TO 14 MONTHS.

- ENSURE DEPTH SCALE HAS BEEN MARKED PRIOR TO REMOVING METER FOR INSPECTION.

- CAREFULLY REMOVE METER AFTER SECURING ISOLATION VALVE.

- CHECK THE ROTOR FOR BEARING DRAG OR SEIZURE. CHECK BY HOLDING THE ROTOR ASSEMBLY BETWEEN THE THUMB AND FOREFINGER, WHILE BLOWING ON THE ROTOR. IF THE BEARINGS ARE WORN, THE ROTOR MAY SEIZE OR SPIN POORLY.

- CHECK THE ROTOR FOR CONTAMINATION. LOOK FOR DEBRIS STICKING TO THE ROTOR BLADES. IF THE ROTOR STOPS SPINNING, THE BLADES MAY BECOME UNBALANCED. A CONTAMINATED BLADE WILL ALWAYS STOP OR UNBALANCE THE ROTOR. TO REMOVE HEAVY CONTAMINANTS FROM THE R

- ADDITIONAL MAINTENANCE INFORMATION CAN BE FOUND IN THE M-TMP METER INSTALLATION AND MAINTENANCE MANUAL.

- CALIBRATION SHOULD BE SCHEDULED EVERY 18 TO 24 MONTHS. THIS CAN BE DONE ON-SITE AS DESCRIBED IN THE M-TMP INSTALLATION AND MAINTENANCE MANUAL. ALTERNATIVELY, THE METER CAN BE SENT TO A CALIBRATION TESTING FACILITY.

3. LIMITED INFORMATION AVAILABLE. FLOW RATES ARE ESTIMATED BASED ON PIPE SIZE.

- CHECK THE ROTOR FOR BENT BLADES OR BENT YOKE. ALL TURBINE BLADES ARE PROFILED FOR DIFFERENT FLOW CONDITIONS. LOOK FOR THE BLADE(S) WHICH VARY FROM THE FACTORY PROFILED BLADES. THE YOKE, WHICH HOUSES THE TURBINE, IS USUALLY DAMAGED WHEN THE GATE V

BLDG.RTU NO.

NATURAL GAS FLOWMETER SCHEDULE

METER NUMBER LOCATION SERVICE PIPE

MATERIAL REMARKS

01_512GD.0038.GEN.GI001.pdf
02_512GD.0038.GEN.MH001
03_512GD.0038.001.MH002
04_512GD.0038.001.MH003
05_512GD.0038.004.MH004
06_512GD.0038.004.MH005
07_512GD.0038.005.MH006
08_512GD.0038.005.MH007
09_512GD.0038.GEN.MH008
10_512GD.0038.GEN.MH009
11_512GD.0038.GEN.MH010
12_512GD.0038.GEN.MH011
13_512GD.0038.GEN.MH012

File details come from the government source that posted it. Updated .