This document appears to be an as-built drawing for a project at the Loch Raven Veterans Affairs Medical Center. It provides detailed information on the installation of several water and natural gas flow meters across multiple buildings on the campus. Key details include:
The drawing specifies the required meter manufacturer, model numbers, pipe sizes, flow rates, pressures, and locations for a total of 10 water meters and 3 natural gas meters. The water meters are primarily Spirax Sarco transit-time ultrasonic flow meters, while the gas meters are a mix of Spirax Sarco insertion turbine and Magnetrol thermal mass flow meters. The drawing also includes instructions for meter maintenance and calibration. Additional documentation related to the project, such as photos and procedures, is referenced but not included in this file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Loch Raven Boiler Plant Standard Operating Procedure.pdf | ||
| 36C24524Q0777 0002_1.docx | DOCX document | |
| B2.jpg | JPG image | |
| 1810_D_2023-01-04 Update.pdf | ||
| B1.jpg | JPG image | |
| Baltimore MD Loch Raven Boiler Assessment Report BEI 2020.pdf | ||
| 36C24524Q0777 0002.pdf | ||
| 36C24524Q0777 0001.pdf | ||
| 36C24524Q0777 0001_1.docx | DOCX document | |
| 36C24524Q0777_1.docx | DOCX document | |
| 36C24524Q0777 RFQ.pdf | ||
| WAGE DETERMINATION.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPSTREAM DOWNSTREAM
ONE 90° ELBOW BEFORE THE METER 10 D 5 D
TWO 90° ELBOWS BEFORE THE METER 15 D 5 D
TWO 90° ELBOWS OUT OF PLANE BEFORE THE METER 30 D 5 D
REDUCTION BEFORE THE METER 10 D 5 D
REGULATOR OR VALVE PARTIALLY CLOSED BEFORE THE METER 30 D 5 D
STRAIGHT RUN PIPING REQUIREMENTS
IF THERE IS NOT SUFFICIENT STRAIGHT RUN OF PIPE, A FLOW RECTIFIER CAN BE USED TO
REDUCE THE ABOVE LENGTHS. CONSULT YOUR LOCAL REPRESENTATIVE OR THE FACTORY
D IS EQUAL TO THE INTERNAL DIAMETER OF THE PIPE.
ESTIMATED
FLOW RATE FLUID TEMP LINE
PRESSURE PIPE SIZE PIPE
ORIENTATION
PIPE
INSULATION?
METER
LOCATION AMBIENT TEMP METER SELECTION SHUTDOWN REQUIRED?
[GPM] [°F] [PSIG] [IN] HOR / VERT YES / NO IN / OUT
MIN
[°F]
MAX
[°F]
MFGR. DESCRIPTION MODEL NO.
SIZE
[IN]
ACCURACY [%] TURN DOWN
DIFF PRESS
[PSIG]
FLOW COMPUTER POWER DATA LOGGER YES / NO METHOD
BUILDING 1 - MECHANICAL ROOM & OUTDOOR CHILLERS
5-BLR-1-CW-1 5-BLR-1-RTU-1 1 OUTSIDE AT
CHILLER 1
CHILLED WATER
RETURN
(CHILLER #1)
800 55 44 STEEL 8 HORIZONTAL YES OUTDOORS 1 95 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC ENERGY METER
W/ STRAP-ON RTD
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-E-D-00-1
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: URTD-C-020
N/A +/- 1 40:1 N/A (BY UTM10
COMPUTER) 24VDC RTU NO STRAP-ON
MOUNT METER HEAD IN NEMA 4 ENCLOSURE IN
CHILLER PIT.
TRANSMIT MODBUS SIGNAL VIA WIRELESS DEVICE.
5-BLR-1-CW-2 5-BLR-1-RTU-1 1 OUTSIDE AT
CHILLER 2
CHILLED WATER
RETURN
(CHILLER #2)
600 55 44 STEEL 6 HORIZONTAL YES OUTDOORS 1 95 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC ENERGY METER
W/ STRAP-ON RTD
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-E-D-00-1
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: URTD-C-020
N/A +/- 1 40:1 N/A (BY UTM10
COMPUTER) 24VDC RTU NO STRAP-ON
MOUNT METER HEAD IN NEMA 4 ENCLOSURE IN
CHILLER PIT.
TRANSMIT MODBUS SIGNAL VIA WIRELESS DEVICE.
5-BLR-1-PW-1 5-BLR-1-RTU-1 1 MECHANICAL ROOM
(RM G-19)
DOMESTIC WATER TO
BLDG 250 60 60 STEEL 4 VERTICAL YES INDOORS 60 94 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC FLOW METER
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-S-D-00-0
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: N/A
N/A +/- 1 40:1 N/A (BY UTM10
COMPUTER) 24VDC RTU NO STRAP-ON
BUILDING 4 - STORAGE ROOM
5-BLR-4-PW-1 5-BLR-4-RTU-1 4 STORAGE ROOM
(RM G107)
DOMESTIC WATER TO
BLDG 80 60 60 COPPER 3 HORIZONTAL NO INDOORS 60 94 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC FLOW METER
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-S-D-00-0
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: N/A
N/A +/- 1 40:2 N/A (BY UTM10
COMPUTER) 24VDC RTU NO STRAP-ON
5-BLR-CAM-PW-1 5-BLR-4-RTU-1 N/A
UNDERGROUND
VAULT
(NEAR LOCH RAVEN
BLVD)
CAMPUS DOMESTIC
WATER 1000 60 60 STEEL 8 HORIZONTAL NO OUTDOORS 60 94 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC FLOW METER
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-S-D-00-0
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: N/A
N/A +/- 1 40:1 N/A (BY UTM10
COMPUTER) 24VDC RTU NO STRAP-ON PROPOSED METER VAULT.
TRANSMIT MODBUS SIGNAL VIA WIRELESS DEVICE.
BUILDING 5 - MECHANICAL / ELECTRICAL ROOM
5-BLR-5-PW-1 5-BLR-5-RTU-1 5 MECHANICAL ROOM
(RM 1B134)
DOMESTIC WATER TO
BLDG 80 60 60 COPPER 3 HORIZONTAL YES INDOORS 60 94 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC FLOW METER
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-S-D-00-0
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: N/A
N/A +/- 1 40:3 N/A (BY UTM10
COMPUTER) 24VDC RTU YES
REWORK PIPING;
INSTALL STRAP-
ON
REWORK PIPING TO PROVIDE ADEQUATE LENGTH
OF PIPE.
5-BLR-CAM-PW-2 5-BLR-5-RTU-1 N/A
UNDERGROUND
VAULT
(NEAR THE
ALAMEDA)
CAMPUS DOMESTIC
WATER 1000 60 60 STEEL 8 HORIZONTAL NO OUTDOORS 60 94 SPIRAX
SARCO
TRANSIT-TIME ULTRASONIC FLOW METER
(SPEC. SECT. 25.10.10,
PARA. 2.6.F)
METER: UTM10-S-D-00-0
T'DUCER: UTT10-050SX-020-N000S
RTD KIT: N/A
N/A +/- 1 40:1 N/A (BY UTM10
COMPUTER) 24VDC RTU NO STRAP-ON PROPOSED METER VAULT.
NOTES:
1. METER COMPONENTS TO BE ORDERED AND INSTALLED WITH NO CABLE. CABLE LENGTH TO BE FIELD DETERMINED.
2. ULTRASONIC METER MAINTENANCE:
ONCE PER YEAR, VERIFY THAT WIRING CONNECTIONS ARE TIGHT.
EVERY 24-36 MONTHS, CHECK TRANSDUCER AND RTD SENSORS FOR TIGHTNESS AND CLEANLINESS.
ON-SITE CALIBRATION CAN BE PERFORMED EVERY 24-36 MONTHS AS DESCRIBED IN THE INSTALLATION AND MAINTENANCE MANUAL. ALTERNATIVELY, THE METER CAN BE SENT TO A CALIBRATION TESTING FACILITY.
3. ION 7550 RTU MAINTENANCE:
ONCE PER YEAR, VERIFY THAT CONNECTIONS ARE TIGHT.
BLOW DUST OUT OF PANEL AND WIPE DOWN.
CHECK OPERATION REFERENCE SECTION 9 OF THE ION RTU 7550 OPERATION MANUAL.
4. LIMITED INFORMATION AVAILABLE. FLOW RATES ARE ESTIMATED BASED ON PIPE SIZE.
REMARKSMETER NUMBER LOCATION SERVICE PIPE
MATERIALBLDG.RTU NO.
WATER FLOWMETER SCHEDULE
ESTIMATED
FLOW RATE
LINE
PRESSURE PIPE SIZE PIPE
ORIENTATION
PIPE
INSULATION?
METER
LOCATION AMBIENT TEMP METER SELECTION SHUTDOWN REQUIRED?
[CFH] [PSIG] [IN] HOR / VERT YES / NO IN / OUT
MIN
[°F]
MAX
[°F]
MFGR. DESCRIPTION MODEL NO.
SIZE
[IN]
ACCURACY [%] TURN DOWN
DIFF PRESS
[PSIG]
FLOW COMPUTER POWER DATA LOGGER YES / NO METHOD
BUILDING 1 - MECHANICAL ROOM
5-BLR-1-NG-3 5-BLR-1-RTU-1 1 MECHANICAL ROOM
(RM G-19) NATURAL GAS TO BLDG 1460-10,165 5 BLACK IRON 3 HORIZONTAL NO INDOORS 60 94 SPIRAX SARCO
INSERTION TURBINE MASS FLOW
METER
(SPEC. SECT. 25.10.10,
PARA. 2.6.D)
METER: M-TMP-900-2F150-XX-50-RMT
ROTOR: G1B
(2" FLANGED WELD-O-LET & 2" DOUBLE
FLANGED, FULL PORT GATE VALVE PROVIDED
BY MECHANICAL CONTRACTOR)
3 +/- 1 7:1 NEGLIGIBLE (M-TMP
COMPUTER) 24VDC (BY M-TMP
COMPUTER) YES
REWORK PIPING;
HOT TAP;
PURGE REQUIRED
REWORK PIPING TO PROVIDE ADEQUATE LENGTH
OF PIPE.
BUILDING 4 - STORAGE ROOM
5-BLR-4-NG-1 5-BLR-4-RTU-1 4 STORAGE ROOM
(RM G107) NATURAL GAS TO BLDG 0 - 340 5 BLACK IRON 3 HORIZONTAL NO INDOORS 60 94
MAGNETROL
(PARTNER W/
SPIRAX SARCO)
THERMAL MASS FLOW METER -
INLINE
METER: TFT-A53B-000
TRANSMITTER: TA2-A4B0-E40
CABLE: 037-3313-020
4-20mA-TO-MODBUS CONVERTER:
OBVIUS A8332-8F2D
3 +/- 1 100:1 NEGLIGIBLE (BY TA2
COMPUTER) 24VDC RTU YES INSTALL INLINE;
PURGE
BUILDING 5 - MECHANICAL / ELECTRICAL ROOM
5-BLR-5-NG-2 5-BLR-5-RTU-1 5 STORAGE ROOM
(RM 1B138) NATURAL GAS TO BLDG 0 - 350 5 BLACK IRON 2 HORIZONTAL NO INDOORS 60 94
MAGNETROL
(PARTNER W/
SPIRAX SARCO)
THERMAL MASS FLOW METER -
INLINE
METER: TFT-A43B-000
TRANSMITTER: TA2-A4B0-E40
CABLE: 037-3313-020
4-20mA-TO-MODBUS CONVERTER:
OBVIUS A8332-8F2D
2 +/- 1 100:1 NEGLIGIBLE (BY TA2
COMPUTER) 24VDC RTU YES INSTALL INLINE;
PURGE
REROUTE PIPING TO PROVIDE ADEQUATE LENGTH
OF PIPE.
NOTES:
1. METER COMPONENTS TO BE ORDERED AND INSTALLED WITH NO CABLE. CABLE LENGTH TO BE FIELD DETERMINED.
2. M-TMP TURBINE METERS:
- ROTOR MAINTENANCE SHOULD BE PERFORMED BY VISUAL INSPECTION EVERY 12 TO 14 MONTHS.
- ENSURE DEPTH SCALE HAS BEEN MARKED PRIOR TO REMOVING METER FOR INSPECTION.
- CAREFULLY REMOVE METER AFTER SECURING ISOLATION VALVE.
- CHECK THE ROTOR FOR BEARING DRAG OR SEIZURE. CHECK BY HOLDING THE ROTOR ASSEMBLY BETWEEN THE THUMB AND FOREFINGER, WHILE BLOWING ON THE ROTOR. IF THE BEARINGS ARE WORN, THE ROTOR MAY SEIZE OR SPIN POORLY.
- CHECK THE ROTOR FOR CONTAMINATION. LOOK FOR DEBRIS STICKING TO THE ROTOR BLADES. IF THE ROTOR STOPS SPINNING, THE BLADES MAY BECOME UNBALANCED. A CONTAMINATED BLADE WILL ALWAYS STOP OR UNBALANCE THE ROTOR. TO REMOVE HEAVY CONTAMINANTS FROM THE R
- ADDITIONAL MAINTENANCE INFORMATION CAN BE FOUND IN THE M-TMP METER INSTALLATION AND MAINTENANCE MANUAL.
- CALIBRATION SHOULD BE SCHEDULED EVERY 18 TO 24 MONTHS. THIS CAN BE DONE ON-SITE AS DESCRIBED IN THE M-TMP INSTALLATION AND MAINTENANCE MANUAL. ALTERNATIVELY, THE METER CAN BE SENT TO A CALIBRATION TESTING FACILITY.
3. LIMITED INFORMATION AVAILABLE. FLOW RATES ARE ESTIMATED BASED ON PIPE SIZE.
- CHECK THE ROTOR FOR BENT BLADES OR BENT YOKE. ALL TURBINE BLADES ARE PROFILED FOR DIFFERENT FLOW CONDITIONS. LOOK FOR THE BLADE(S) WHICH VARY FROM THE FACTORY PROFILED BLADES. THE YOKE, WHICH HOUSES THE TURBINE, IS USUALLY DAMAGED WHEN THE GATE V
BLDG.RTU NO.
NATURAL GAS FLOWMETER SCHEDULE
METER NUMBER LOCATION SERVICE PIPE
MATERIAL REMARKS
| 01_512GD.0038.GEN.GI001.pdf |
| 02_512GD.0038.GEN.MH001 |
| 03_512GD.0038.001.MH002 |
| 04_512GD.0038.001.MH003 |
| 05_512GD.0038.004.MH004 |
| 06_512GD.0038.004.MH005 |
| 07_512GD.0038.005.MH006 |
| 08_512GD.0038.005.MH007 |
| 09_512GD.0038.GEN.MH008 |
| 10_512GD.0038.GEN.MH009 |
| 11_512GD.0038.GEN.MH010 |
| 12_512GD.0038.GEN.MH011 |
| 13_512GD.0038.GEN.MH012 |
File details come from the government source that posted it. Updated .