This document is an amendment to Solicitation 36C24524B0014 for Project 512-23-904 4B Water Damage Repair Part 2 at the VA Maryland Health Care System in Baltimore. The amendment adds answers to RFI questions related to the scope of work, which includes replacing drywall, ceilings, and flooring, as well as performing a Legionella flush on the water system. The contractor will be responsible for all materials, labor, and supervision to complete the project within 60 calendar days. Key details include approximately 2,000 sq ft of drywall replacement, 1,000 ft of cove base, 2,000 sq ft of vinyl flooring, and 3,100 sq ft of acoustic ceiling tile replacement. The contractor will also be required to reconnect any sinks or medical equipment within the project area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24524B0014 00001.docx | DOCX document | |
| RFI 02.docx | DOCX document | |
| 36C24524B0014_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 512-23-904 Department of Veterans Affairs
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg
WV
25405 Department of Veterans Affairs
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 308B Martinsburg
WV
25405 To all Offerors/Bidders
36C24524B0014
X X X
X This modification adds the answers to RFI questions. All other terms and conditions remain unchanged.
Brandon Parker BT 4B Water Damage RFIs – Received May 07, 2024 VA Response – Sent May 10, 2024, by Mikaela Kaufman
1. For the acoustic tile on floor 3: Is it ONLY the tiles to be replaced, or the grid and tiles? Is it ALL the tile, or only the tiles that have been removed during phase 1?
It is only the acoustic ceiling tile to be replaced on the third floor. It will be all the tiles, any tiles currently remaining in the area are to be disposed of.
2. The main halls have lower and mid-section cart bumpers, for hospital bed. Does this area scope of work receive cart bumpers? This area does not appear to have patient rooms, so most likely not?
The corridors within the area of scope will have the lower wall bumpers and corner guards to match existing wall protections within the laboratory spaces of the VA.
3. Is the plumbing sectioned in such a way to perform the legionella flush in limited areas? Does the entire wing need the flush? Or is the flush to be more "local" by creating access where available and doing ONLY the area inside the scope. Is there a 3rd party legionella test to be performed before or after the flush.
The legionella flush is to be done to the disturbed spaces within the project’s scope. Testing for the legionella flush is an expectation of the contractor per the water distribution specifications.
4. Do you have the specs available for the existing approved laminate tile? If not, what is the process for getting an alternative approved?
The specs for the tiling should be available in the “Section 09 65 19 Resilient Tile Flooring” portion of this project’s specifications. Contractors can find tiles that matches the specifications listed, color match it to what is currently in place in the corridor and submit options to the VA for approval from Interior Design.
5. There is a number of sink and equipment on floor 3. Who is responsible for those reconnections. Sink faucets will often have internal corroding from lack of use. What happens if the faucets need to be replaced? What about the specialized medical equipment? Who is responsible for specialty equipment good working order?
The contractor will be expected to handle the reconnection of all water and gas lines within the spaces covered by the scope. No new equipment is included in the scope of this project. If equipment is found to be incapable of being reconnected, it will be considered a change in site conditions.
6. I saw loose phone wires, sockets, and data lines, if those are re-installed there is no way to know if they will work, or if they have been in working order before; Is there a plan in place to resolve that issue? Is the expectation to test and repair all electric etc. before installation? Judging by the condition and age, I am sure many of those telephone wires have not worked for years.
There is no expectation for the electrical system to be tested within the scope of this project.