36C24522R0006 0003.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C24522R0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24522R0006 0001.docx | DOCX document | |
| 36C24522R0006.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 688-22-1-459-0005 None Department of Veterans Affairs
VAMC
10 N Greene St Baltimore
MD
21201 Department of Veterans Affairs
VAMC
10 N Greene St Baltimore
MD
21201 To all Offerors/Bidders
36C24522R0006 11-29-2021
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
12/20/21 2:00 PM EST
See CONTINUATION Page x Amendment to grant time extension and clarify line items.
Use the attached schedule for pricing.
Quotes Due 12/20/21 @ 2:00 PM EST
Email quotes to: Amy.Walter1@va.gov
BRADLEY DAVIS
CONTRACTOR OFFICER
VA-VHA-2020-8952A45B
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Ton Truck and Plow, Snow Removal. Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022 PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping
| 1.00 |
| HR |
| __________________ |
| __________________ |
Front End Loader/ I Cubic Yard Bucket, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Sand. 1 EA Per Ton Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Mix. 1 EA Per Ton
POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| EA |
| __________________ |
| __________________ |
Potassium Chloride (Snow Melt*) 50 lbs. Potassium Chloride provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| HR |
| __________________ |
| __________________ |
Shovel-Side walks and entrances Per Hr. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| HR |
| __________________ |
| __________________ |
Snow Blower. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Hyundai Loader, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| HR |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL
Tree maintenance will be performed on an as needed basis to include:
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| HR |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE
1) Removal of dead and/or dying branches
2) Removal of branches that present a hazard to buildings and personnel Contract Period: Base POP Begin: 12-21-2021 POP End: 12-20-2022
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Ton Truck and Plow, Snow Removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
Front End Loader/ I Cubic Yard Bucket, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Sand. 1 EA Per Ton Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Mix. 1 EA Per Ton
POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| EA |
| __________________ |
| __________________ |
Potassium Chloride (Snow Melt*) 50 lbs. Potassium Chloride provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
Shovel-Side walks and entrances Per Hr. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
Snow Blower. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Hyundai Loader, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE
2) Removal of branches that present a hazard to buildings and personnel Contract Period: Option 1 POP Begin: 12-21-2022 POP End: 12-20-2023
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Ton Truck and Plow, Snow Removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
Front End Loader/ I Cubic Yard Bucket, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Sand. 1 EA Per Ton Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Mix. 1 EA Per Ton
POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| EA |
| __________________ |
| __________________ |
Potassium Chloride (Snow Melt*) 50 lbs. Potassium Chloride provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
Shovel-Side walks and entrances Per Hr. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
Snow Blower. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Hyundai Loader, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE
2) Removal of branches that present a hazard to buildings and personnel Contract Period: Option 2 POP Begin: 12-21-2023 POP End: 12-20-2024
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Ton Truck and Plow, Snow Removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
Front End Loader/ I Cubic Yard Bucket, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Sand. 1 EA Per Ton Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Mix. 1 EA Per Ton
POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| EA |
| __________________ |
| __________________ |
Potassium Chloride (Snow Melt*) 50 lbs. Potassium Chloride provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
Shovel-Side walks and entrances Per Hr. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
Snow Blower. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Hyundai Loader, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE
2) Removal of branches that present a hazard to buildings and personnel Contract Period: Option 3 POP Begin: 12-21-2024 POP End: 12-20-2025
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Ton Truck and Plow, Snow Removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| HR |
| __________________ |
| __________________ |
Front End Loader/ I Cubic Yard Bucket, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Sand. 1 EA Per Ton Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| EA |
| __________________ |
| __________________ |
Bulk Mix. 1 EA Per Ton
POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| EA |
| __________________ |
| __________________ |
Potassium Chloride (Snow Melt*) 50 lbs. Potassium Chloride provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| HR |
| __________________ |
| __________________ |
Shovel-Side walks and entrances Per Hr. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| HR |
| __________________ |
| __________________ |
Snow Blower. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| HR |
| __________________ |
| __________________ |
1 Hyundai Loader, Snow removal. Locations, all roads and parking lots and walking areas, to include:
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| HR |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| 1.00 |
| HR |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE
2) Removal of branches that present a hazard to buildings and personnel Contract Period: Option 4 POP Begin: 12-21-2025 POP End: 12-20-2026
| GRAND TOTAL |
| __________________ |
Amendment #2 to extend deadline and restructure line items.
File details come from the government source that posted it. Updated .