5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 688-22-1-459-0005 None 90C Department of Veterans Affairs
BALTIMORE VAMC
ATTN:
AMY.WALTER1@VA.GOV
10 N Greene St Baltimore MD 21201 90C Department of Veterans Affairs
BALTIMORE VAMC
ATTN:
AMY.WALTER1@VA.GOV
10 N Greene St Baltimore MD 21201 To all Offerors/Bidders
36C24522R0006 12-09-2021
X X X
12/14/2021 2:00 PM EST
See CONTINUATION Page X
THE PURPOSE OF THIS AMENDMENT IS TO UPDATE TWO ITEMS.
1. THE LINE ITEM THAT CONTAINED "TRUCKING AWAY THE SNOW" HAS BEEN REMOVED.
2. IN THE STATEMENT OF WORK (SOW), THE SECTION THAT STATES TO "TRUCK" AWAY SNOW, HAS BEEN REMOVED AND REPLACED WT
IH
"MOUND".
QUOTES ARE DUE DECEMBER 14, 2021 AT 2:00 PM EST.
SUBMIT PROPOSALS TO
AMY.WALTER1@VA.GOV
NO OTHER CONTRACT TERMS HAVE BEEN CHANGED.
BRADLEY DAVIS
CONTRACTING OFFICER
VA-VHA-2020-8952A45B
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6.00 |
| JB |
| __________________ |
| __________________ |
SNOW AND/OR ICE REMOVAL JOB
Once the snow and/or ice accumulation is a minimum of 2 inches, the COR will notify the contractor to start the snow and/or ice removal job. The contractor will supply all materials, equipment, and labor to remove / clear. After which, if another snow and/or ice event happens, it will be considered a new event.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-15-2021 POP End: 12-14-2022 PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping
| 15.00 |
| JB |
| __________________ |
| __________________ |
Appling Ice Melt the Medical Center grounds. Martials and Labor included.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: Base POP Begin: 12-15-2021 POP End: 12-14-2022
| 25.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: Base POP Begin: 12-15-2021 POP End: 12-14-2022
| 3.00 |
| JB |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL-All labor, equipment included Tree maintenance will be performed on an as needed basis to include:
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: Base POP Begin: 12-15-2021 POP End: 12-14-2022
| 3.00 |
| JB |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE-Labor and equipment included.
1) Removal of dead and/or dying branches
2) Removal of branches that present a hazard to buildings and personnel Contract Period: Base POP Begin: 12-15-2021 POP End: 12-14-2022
| 3.00 |
| JB |
| __________________ |
| __________________ |
STUMP GRINDING AND REMOVAL-Labor and Equipment Included
1) Grinding and removal of tree roots and trunk Contract Period: Base POP Begin: 12-15-2021 POP End: 12-14-2022
| 6.00 |
| JB |
| __________________ |
| __________________ |
SNOW AND/OR ICE REMOVAL JOB
Once the snow and/or ice accumulation is a minimum of 2 inches, the COR will notify the contractor to start the snow and/or ice removal job. The contractor will supply all materials, equipment, and labor to remove / clear. After which, if another snow and/or ice event happens, it will be considered a new event.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 1 POP Begin: 12-15-2022 POP End: 12-14-2023
| 15.00 |
| JB |
| __________________ |
| __________________ |
Appling Ice Melt the Medical Center grounds. Martials and Labor included.
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 1 POP Begin: 12-15-2022 POP End: 12-14-2023
| 25.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: OPTION 1 POP Begin: 12-15-2022 POP End: 12-14-2023
| 3.00 |
| JB |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL-All labor, equipment included
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: OPTION 1 POP Begin: 12-15-2022 POP End: 12-14-2023
| 3.00 |
| JB |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE-Labor and equipment included.
2) Removal of branches that present a hazard to buildings and personnel Contract Period: OPTION 1 POP Begin: 12-15-2022 POP End: 12-14-2023
| 3.00 |
| JB |
| __________________ |
| __________________ |
STUMP GRINDING AND REMOVAL-Labor and Equipment Included
Contract Period: OPTION 1 POP Begin: 12-15-2022 POP End: 12-14-2023
| 6.00 |
| JB |
| __________________ |
| __________________ |
SNOW AND/OR ICE REMOVAL JOB
Once the snow and/or ice accumulation is a minimum of 2 inches, the COR will notify the contractor to start the snow and/or ice removal job. The contractor will supply all materials, equipment, and labor to remove / clear. After which, if another snow and/or ice event happens, it will be considered a new event.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 2 POP Begin: 12-15-2023 POP End: 12-14-2024
| 15.00 |
| JB |
| __________________ |
| __________________ |
Appling Ice Melt the Medical Center grounds. Martials and Labor included.
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 2 POP Begin: 12-15-2023 POP End: 12-14-2024
| 25.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: OPTION 2 POP Begin: 12-15-2023 POP End: 12-14-2024
| 3.00 |
| JB |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL-All labor, equipment included
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: OPTION 2 POP Begin: 12-15-2023 POP End: 12-14-2024
| 3.00 |
| JB |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE-Labor and equipment included.
2) Removal of branches that present a hazard to buildings and personnel Contract Period: OPTION 2 POP Begin: 12-15-2023 POP End: 12-14-2024
| 3.00 |
| JB |
| __________________ |
| __________________ |
STUMP GRINDING AND REMOVAL-Labor and Equipment Included
Contract Period: OPTION 2 POP Begin: 12-15-2023 POP End: 12-14-2024
| 6.00 |
| JB |
| __________________ |
| __________________ |
SNOW AND/OR ICE REMOVAL JOB
Once the snow and/or ice accumulation is a minimum of 2 inches, the COR will notify the contractor to start the snow and/or ice removal job. The contractor will supply all materials, equipment, and labor to remove / clear. After which, if another snow and/or ice event happens, it will be considered a new event.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 3 POP Begin: 12-15-2024 POP End: 12-14-2025
| 15.00 |
| JB |
| __________________ |
| __________________ |
Appling Ice Melt the Medical Center grounds. Martials and Labor included.
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 3 POP Begin: 12-15-2024 POP End: 12-14-2025
| 25.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: OPTION 3 POP Begin: 12-15-2024 POP End: 12-14-2025
| 3.00 |
| JB |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL-All labor, equipment included
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: OPTION 3 POP Begin: 12-15-2024 POP End: 12-14-2025
| 3.00 |
| JB |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE-Labor and equipment included.
2) Removal of branches that present a hazard to buildings and personnel Contract Period: OPTION 3 POP Begin: 12-15-2024 POP End: 12-14-2025
| 3.00 |
| JB |
| __________________ |
| __________________ |
STUMP GRINDING AND REMOVAL-Labor and Equipment Included
Contract Period: OPTION 3 POP Begin: 12-15-2024 POP End: 12-14-2025
| 6.00 |
| JB |
| __________________ |
| __________________ |
SNOW AND/OR ICE REMOVAL JOB
Once the snow and/or ice accumulation is a minimum of 2 inches, the COR will notify the contractor to start the snow and/or ice removal job. The contractor will supply all materials, equipment, and labor to remove / clear. After which, if another snow and/or ice event happens, it will be considered a new event.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 4 POP Begin: 12-15-2025 POP End: 12-14-2026
| 15.00 |
| JB |
| __________________ |
| __________________ |
Appling Ice Melt the Medical Center grounds. Martials and Labor included.
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus Contract Period: OPTION 4 POP Begin: 12-15-2025 POP End: 12-14-2026
| 25.00 |
| EA |
| __________________ |
| __________________ |
50 lbs. bags of salt.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only.
Contract Period: OPTION 4 POP Begin: 12-15-2025 POP End: 12-14-2026
| 3.00 |
| JB |
| __________________ |
| __________________ |
TOTAL TREE REMOVAL-All labor, equipment included
1) Removal of dead and/or dying trees
2) Stump grinding and/or removal
3) Removal and/or of trees fallen and/or damaged by storms Contract Period: OPTION 4 POP Begin: 12-15-2025 POP End: 12-14-2026
| 3.00 |
| JB |
| __________________ |
| __________________ |
TRIMMING OF TREES/MAINTENANCE-Labor and equipment included.
2) Removal of branches that present a hazard to buildings and personnel Contract Period: OPTION 4 POP Begin: 12-15-2025 POP End: 12-14-2026
| 3.00 |
| JB |
| __________________ |
| __________________ |
STUMP GRINDING AND REMOVAL-Labor and Equipment Included
Contract Period: OPTION 4 POP Begin: 12-15-2025 POP End: 12-14-2026
| GRAND TOTAL |
| __________________ |
B.3 STATEMENT OF WORK
SNOW AND ICE REMOVAL
NOTE: CONTRACTOR SHALL NOT TO SHOW UP ON STATION UNTIL CONTACTED BY VAMC DC PESONNEL. CONTRACTOR SHALL SUPPLY THE VA WITH 24 HOUR EMERGENCY PHONE NUMBER.
Scope: Contractor shall provide all labor, personnel, supervision, equipment, tools, salt, calcium, and all materials necessary to remove snow and ice from the streets, parking lots, sidewalks, steps and ramps on an on-call, as-needed basis.
Salt provided by Contractor shall be stored inside the back of Building 6, employee parking lot. Salt shall be provided in bags only. No bulk salt shall be delivered to site.
Frequency: Contractor shall be on-call, as-needed, in the months of October thru April. Invoices shall be submitted no later than (NLT) 30 days after services are performed and will be paid within 30 days, After Receipt of Order (ARO). All services performed will be by the job.
Hours of Work: On-call, as-needed (24 Hours Per Day / 7 Days Per Week), as determined by Contracting Officer Representative (COR).
Reports: Following each visit for snow and/or ice removal services, Contractor shall provide a copy of service report to the COR. Service reports shall be signed by both Contractor and COR at completion of work. An electronic version of the same shall be sent to the COR. Report for snow and ice removal shall include a list of all equipment, materials and manpower used for the event along with hours expended.
PM (Nighttime) Procedures:
Snow fall from zero to two inches shall be removed by in-house personnel and/or Contractor personnel if needed. Snow fall two inches and above shall become part of the Contractor obligation, which activates a snow and/or ice removal job. However, only the COR can activate job commencement. The contractor shall wait for the CORs authorization to start any jobs.
In the event of snow piles being created from plowing become so large that it becomes a hazard to VACHS personnel, patients and visitors, the Contractor shall, at the COR’s request, MOUND the snow away to a location ON CAMPUS provided by the COR.
Snow removal shall proceed continuously, and in the order as listed below, to include all roads, parking lots and sidewalks to the satisfaction of the COR, prior to being discontinued.
Locations, all roads and parking lots and walking areas, to include:
1) Parking lots 1 through 9 and all entries and exits to the facility entrance to Building 1, 6, 14
2) All entries and exits to the facility
3) All sidewalks, steps, and ramps throughout the facility
4) All sidewalks between perimeter fence and outer perimeter of the VA campus
SAMPLE Equipment/Supply List:
a) L8000 (or similar) Dump or equivalent
b) Ford F-250 4X4 or similar
c) Truck-mounted V-Box, 1.8-2.1 Cu Yd. Salt Spreaders
d) All other Trucks as needed
e) Front-End Loader
f) Snow blowers/throwers
g) Snow shovels
h) Snow shoveling personnel, plus truck operators
i) Manual walk behind salt spreaders
j) Salt
k) Potassium Chloride (ex. Ice-melt)
l) Sand
m) Bulk-mix
Site Map:
SNOW REMOVAL GUIDELINES
1. Contractor shall provide its own employees, equipment, and supplies necessary to complete the Services described hereunder which include clearing all drive lanes, fire lanes, parking areas, sidewalks adjacent to buildings and public sidewalks.
2. Contractor will comply with all federal, state, and local governmental laws, regulations, codes, and ordinances.
3. Contractor will begin plowing at the Property as soon as the snow or ice reaches a depth of two (2) inches, regardless of the time of day or night or the day of the week.
4. Contractor shall supply and mechanically spread deicing rock salt at Contractor's own discretion. Contractor shall spread calcium chloride on concrete walkways. Calcium chloride will not harm concrete and landscaping.
5. For snowfalls of 2"-6" depth, all snow shall be plowed away from the buildings and pushed to the farthest end of the parking lot. No snow shall be piled up and stacked around light posts, or onto islands or landscaping.
6. For snowfalls of more than 6" depth, all snow shall be plowed away from the buildings. Contractor may windrow snow to each island or light post, upon request; windrows will be removed at no additional cost. Contractor will relocate snow that has accumulated during the Term, if such accumulation begins to impair access to the Property entrance, fire lanes, interior roadways, or designated parking stalls.
7. Contractor shall return during the day to plow vacant parking stalls, if a majority of the parking stalls are still occupied. Contractor shall return the next day before 8 a.m. to plow as many stalls as possible.
8. All fire hydrants must be kept free from snow and easily accessible in case of emergencies.
9. When snow begins to fall with heavy and rapid accumulations, shortly before or during business hours, Contractor will begin plowing the snow from the parking lot, using the fastest method possible. In some cases, this means to push the snow close to the concrete islands or even light posts and it is understood that the snow will be removed from such places upon request. Stacking snow onto island may also be necessary, depending upon snowfall accumulation and time limitations.
10. Contractor shall not create drifts in front of dumpster enclosures, fire lanes, or entrances, on sidewalks or blocking walkways and agrees to remove Contractor-created drifts at no additional cost. If Contractor does not remove the drifts in front of the fire lanes and dumpster enclosures, Contractor agrees to pay any expenses incurred by Government for removal of said drifts.
11. Contractor shall be responsible for damage to the Property caused by snow removal operations including, but not limited to, buildings, curbs, parking blocks, islands, sidewalks, light poles, signs, landscaping, paving, or striping of the Property or equipment used in connection therewith.
GROUNDS MAINTENANCE: TREE MANTENACE AN REMOVAL
COR: Upon arrival to perform service, Contractor shall report to the Grounds and Transportation Foreman.
Scope: Provide all labor, equipment, supervision, supplies, and all other materials necessary to provide maintenance, care, and housekeeping pertaining to tree trimming and removal in the VAMC DC Campus, as defined in preventive maintenance procedures below. Work to include a tree management program.
Frequency: Varied - See PM Procedures below. Invoices billed monthly, from April thru November. Invoices shall be submitted no later than (NLT) 30 days after services are performed and will be paid within 30 days, After Receipt of Order (ARO). All services performed will be by the job.
Hours of Work: All work shall be performed during the hours of 8:00 AM to Sunset, Monday thru Saturday excluding Federal Holidays.
Reports: Contractor shall provide a copy of service report to the COR. Service reports shall be signed by both service provider and COR at completion of work. An electronic version of same shall be sent to the COR. Service reports shall areas worked on and work performed. Service reports shall be signed by both Contractor and COR, at completion of work. An electronic version of same shall be sent to the COR.
Tree maintenance will be performed on an as needed basis to include:
1) Removal of dead or dying trees
2) Removal of dead or dying branches
3) Removal of branches that present a hazard to buildings and personnel
4) Stump grinding and/or removal
5) Removal and/or trimming of trees fallen and/or damaged by storms
INSURANCE REQUIREMENTS
During the term of this Snow Removal Contract, Contractor shall comply with the insurance provisions set forth below. The insurance specified below shall be maintained by Contractor, at its expense, and certificates thereof shall be provided to the Government for this contract.
The insurance is as follows:
a. Workers’ Compensation in accordance with the laws of the state in which the Property is located;
b. Employer’s liability in an amount not less than $1,000,000.00;
c. Comprehensive general liability on an occurrence form for (i) bodily injury and (ii) property damage with limits of at least $1,000,000.00 combined single limit each occurrence, including but not limited to comprehensive form, premises – operation, explosion, collapse, underground hazard, products/completed operations hazard, blanket contractual coverage (including coverage for the indemnity provided under this Agreement), broad form property damage, independent vendors, personal injury (employee exclusion deleted).
d. Comprehensive Automobile Liability, comprehensive form covering owned, hired, and non-owned vehicles with limits of at least $1,000,000.00 combined single limit each occurrence.
e. Excess liability (umbrella) insurance with limits of at least $2,000,000.00.
f. THE CONTRACTOR SHALL HOLD HARMLESS THE DEPARTMENT OF THE VETERANS AFFAIRS.