This document contains a log of pre-bid questions and responses for a VA feeder relocation project. Key details include questions received between March 3rd and March 23rd pertaining to civil, electrical, and general project aspects. Responses addressed acceptable routing deviations, conduit material specifications, manhole pump requirements, air switch component information, duct bank configuration, and substation component responsibilities. Clarification was also provided regarding past performance documentation requirements and the placement of price proposal documents. The log indicates the project involves relocating electrical feeders to achieve physical security compliance at a VA facility.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| VAMC Feeder Relocation Pre-Bid RFI Log | ||||||
| RFI# | Discipline | Information Requested | Date Created | Date Responded | Engineer Response to Owner | |
| 1 | Civil | Is it acceptable to extend route further North when coming out of the ATSs to avoid going through impound yard? | 3/3/2022 | 3/13/2022 | We do not believe this is acceptable. The intention is to stay out of the fencing in this area however going further north would likely impead on the wetlands area and this must be avoided. | |
| 2 | Electrical | On Sheet EJ101 (Duct bank detail), it states to provide 6” Schedule-80 PVC conduit. However, the conduit will be encased in concrete. | ||||
| Can we use Schedule-40 PVC instead, which will save costs? | 3/3/2022 | 3/13/2022 | Schedule 40 PVC where encased in concrete is acceptable. Any direct bury should still be schedule 80 PVC where indicated. | |||
| 3 | Electrical | On Sheet EJ101 (Manhole construction detail #2), it states to provide a sump pump in the manhole. |
Does each manhole receive its own sump pump, or is there one sump pump to be shared among them?
| Where does the water get discharged from the sump pump? | 3/3/2022 | 3/13/2022 | Each manhole will have a sump per the detail. The intent is to discharge the sump into the nearest storm structure or ditch. | |||
| 4 | Electrical | On Sheet EK101, Construction Note #1, it states that the contractor should install an owner-provided air switch. | ||||
| Can we get a submittal or catalog number for this air switch? | 3/3/2022 | 3/13/2022 | Switch is an Eaton Type MVS Medium Voltage Switchgear Assembly. Master P.L.: G18P3DK-P. GO & It: SLY0945605-001. | |||
| 5 | Electrical | On Sheet ES101, it shows long distances where the (2) duct banks run parallel to each other. | ||||
| Could we install (1) eight-way duct bank where convenient? This would save costs. | 3/3/2022 | 3/13/2022 | We do not believe this is acceptable. During design it was the direction of the owner to keep them separate for protection (i.e. in the event of an excavating event that damaged the ductbank). | |||
| 6 | Electrical | On Sheet ES103, it shows Substation East site plan (the fenced area). | ||||
| Can you confirm all fencing is provided by the utility company, and not by the contractor? | 3/3/2022 | 3/13/2022 | All components of the substation (including fencing) to be designed and provided by the power company. Contractor responsible for the air switch components and fencing as shown. | |||
| 7 | General | Factor 3 - Past Performance: RFP page 14 states "a minimum of 5 CPARS reports and/or PPQs shall be provided" and "no less than 3 of the required past performance docments must be on projects provided in Factor 1 - Technical Capacbility", however, RFP page 14 states "a minimum of 5 past performace submissions MUST be for projects listed under Factor 1". Please confirm how many past performance documents must directly match the pojects provided in Factor 1. | 3/23/2022 | 4/4/2022 | A minimum of three (3) past performance questionairres must be submitted on the projects submitted for Factor 1 | |
| 8 | General | Factor 3 - Past Performance: RFP page 14 states (as it pertains to Past Performance) "relevancy is defined as condtruction work completed or ongoing during the 3 year prior to the issuance of this solicitation…" Would the Government please consider revising the timeframe to the last 5 years in order to match the corporate project experience provided in Factor 1? This will allow the Offeror to align Factor 1 projects with Factor 3 Past Performance. | 3/23/2022 | 4/4/2022 | Projects must be within the past five (5) years in accordorance with Factor 1 requirements | |
| 9 | General | Factor 3 - Past Performance: RFP page 14 indicates that a template PPQ is attached to the solicitation. We are unable to locate this PPQ within the documents provided on SAM.gov. Would the Government please provide? | 3/23/2022 | 4/4/2022 | Past performance questionairre has been attached | |
| 10 | General | In which part (Technical, Past Performance, or Price) should the SF 1442 be placed? | 3/23/2022 | 4/4/2022 | The price proposal should be included with the Price Proposal | |
| 11 | General | In which part (Technical, Past Performance, or Price) should the Offer Guarantee be placed? | 3/23/2022 | 4/4/2022 | The offer guarantee should be included with the Price Proposal | |
| 12 | General | In which part (Technical, Past Performance, or Price) should the Representations and Certifications be placed? | 3/23/2022 | 4/4/2022 | The Reps and Certs should be included with the Price Proposal | |
| 13 | General | In which part (Technical, Past Performance, or Price) should the EMR and OSHA Safety Information be placed? | 3/23/2022 | 4/4/2022 | The EMR and OSHA Safety should be included with the Price Proposal | |
| 14 | General | In which part (Technical, Past Performance, or Price) should the Contractor Certification be placed? | 3/23/2022 | 4/4/2022 | The Contractor Certification should be included with the Price Proposal | |
| 15 | General | Confirm Drawing G100 is meant to represent G001. The detailed plan legend on the cover sheet of plans lists the cover sheet as G001. | 3/23/2022 | 3/24/2022 | Yes, G100 and G001 are one in the same. | |
| 16 | Electrical | The detailed plan legend on cover sheet of plans lists MK102D and EK102 that are not included in these set of plans. | 3/23/2022 | 3/24/2022 | There is no MK102D listed, assume this was meant to say EK102D. EK102D and EK102 are no longer a part of the set which is why they are not indicated with an 'X' on the drawing list for the bid resubmission drawings dated 07/22/2021. | |
| 17 | Civil | What type of Barbed wire will be required to be placed temporarily noted on sheet CU105. | 3/23/2022 | 3/24/2022 | Barbed wire shall be traditional twist barbed wire meeting standards of the VA. A submittal will be required during construction for review and approval of the A/E and owner |