ICRA Form Blank FIGURE 2.pdf
PDF 233 KB Posted
- Solicitation number
- 36C24521B0001
About this file
This document contains an Infection Control Risk Assessment (ICRA) form and instructions for its use in construction and renovation projects. The ICRA outlines a multi-step process for classifying a project's infection control risk level based on the type of construction activity and the patient risk groups affected. It provides descriptions of required precautions for each risk class, covering issues from containment barriers and ventilation controls to cleaning and waste removal requirements. The form is to be completed in collaboration with relevant safety, infection control, and facilities management teams. It establishes a permit system for monitoring compliance with infection control protocols throughout the duration of a project.
This federal contract opportunity notice seeks bids for HVAC upgrade construction services at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. The project is identified as number 540-20-502 and has an estimated value between $500,000 to $1 million. It is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220 for commercial and institutional building construction. The performance period is 180 calendar days from notice to proceed. The solicitation will be issued via Beta.SAM.gov as an Invitation for Bids governed by FAR Part 14. The bidding, award and administration of any resulting contract will be in accordance with the terms of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AB-4.pdf | ||
| 36C24521B0001 0002.docx | DOCX document | |
| IC-1 12.11.2020.pdf | ||
| FIGURE 1 Golden Seal Total Roofing System Warranty.pdf | ||
| S-2.pdf | ||
| AB-2.pdf | ||
| AB-1.pdf | ||
| S-1.pdf | ||
| AB-3.pdf | ||
| Record of Attendance - Pre-bid Site Visit 12-3-2020.pdf | ||
| 36C24521B0001 0001.docx | DOCX document | |
| 36C24521B0001_1.docx | DOCX document | |
| Drawings.pdf | ||
| Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIGURE 2
Infection Control Risk Assessment
Matrix of Precautions for Construction & Renovation Blank Form
Step One:
Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
Inspection and Non-Invasive Activities. Includes, but is not limited to:
• removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
• painting (but not sanding) wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
• installation of telephone and computer cabling
• access to chase spaces cutting of walls or ceiling where dust migration can be controlled.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
• sanding of walls for painting or wall covering
• removal of floor coverings, ceiling tiles and casework
• new wall construction
• minor duct work or electrical work above ceilings
• major cabling activities
• any activity which cannot be completed within a single work shift.
TYPE D
Major demolition and construction projects Includes, but is not limited to:
• activities which require consecutive work shifts
• requires heavy demolition or removal of a complete cabling system new construction.
T
STEP 1: _____
Step Two:
Using the following table, identify the Patient Risk Groups that will be affected.
If more than one risk group will be affected, select the higher risk group:
Low Risk Medium Risk High Risk Highest Risk
Office
Cardiology
CCU
Any area caring for areas
Echocardiography
Emergency Room immunocompromised
Endoscopy
Labor & Delivery patients
Nuclear Medicine
Laboratories • Burn Unit
Physical Therapy (specimen) • Cardiac Cath Lab
Radiology/MRI • Newborn Nursery • Central Sterile Supply
Respiratory • Outpatient Surgery • Intensive Care Units
Therapy
Pediatrics • Medical Unit
Patient check in Patent Corridor
Pharmacy Post Anesthesia Care
• Negative pressure isolation rooms
Unit • Oncology
• Surgical Units • Operating rooms including C-section rooms
Step 2_Medium Risk – Ambulatory Care Exam Rooms Surrounding____
Step Three: Match the Patient Risk Group (Low, Medium, High, Highest) with the planned Construction Project Type (A, B, C, D) on the following matrix, to find the Class of Precautions (I, II, III or IV) or level of infection control activities required.
Class I-IV or Color-Coded Precautions are delineated on the following page.
IC Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type
Step 3
Patient Risk Group TYPE A TYPE B TYPE C TYPE D LOW Risk Group I II II III/IV MEDIUM Risk Group I II III IV HIGH Risk Group I II III/IV IV HIGHEST Risk Group II III/IV III/IV IV
Description of Required Infection Control Precaution by Class Class During Construction Project Upon Completion of Project
I
INI
date
1. Execute work by methods to minimize raising dust form construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
II
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area.
6. Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
III
1. Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within worksite utilizing HEPA equipped air filtration units.
4. Contain construction waste before transport in tightly covered containers.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and are thoroughly cleaned by the Environmental Management Service (EMS).
2. Remove barrier materials carefully to minimize spreading of direct and debris associated with construction.
3. Vacuum work area with HEPA filtered vacuums.
4. Wet mop area with disinfectant.
5. Remove isolation of HVAC system in areas where work is being performed.
6. Legionella Mitigation Plan (see Step 6 next page)
IV
1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Control Department and are thoroughly cleaned by the Environmental Management Service
(EMS).
2. When Removing barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
7. Legionella Mitigation Plan (see Step 6 next page)
Step 4: Identify the areas surrounding the project area, assessing potential impact Unit Below Unit Above Lateral-East Lateral-West North South
Step 5: Identification of specific site of activity (patient rooms, medication room, etc.) ____________
Step 6: Identify issues related to probable outages for:
Ventilation?
Electrical?
Plumbing?
o Flush shower heads and sinks first with cold water for five or more minutes followed with hot water for five or more minutes. Clean any debris, scale or deposits associated with the flush:
YES / NO / N/A
o Hyper chlorinate or Administer Chlorine Dioxide prior to use. YES / NO / N/A o Other:
Step 7: Identify containment measures expected:
Type of Barrier (plastic, solid, etc)
Negative Pressure Required with HEPA filtration?
Note: Renovation/construction area shall be isolated from the occupied areas during construction and shall be negative with respect to surrounding areas
Step 8: Is there a risk of water damage due to compromising structural integrity? YES / NO
Step 9: Will the noise level interfere with patient care activities? YES / NO
If yes, can or will the work be done during non-patient care hours? YES / NO.
Step 10: Does the plan allow for adequate numbers of:
Isolation/negative airflow rooms? YES / NO or N/A Hand washing sinks? YES / NO or N/A
Step 11: Does the plan allow for proper plans for the clean and soiled utility rooms? YES / NO or N/A
Step 12: Expectation for containment of:
Traffic flow:
EMS Clean-up:
Debris Removal:
Step 13: Is there a risk to the Construction Worker to have contact with or have shared air space with a patient with TB disease or a clinical specimen that might contain M. tuberculosis? YES / NO
a. If YES, what PPE is required? ______________________________________________________
b. If YES, has the contractor provided written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the worksite and been found have negative TB screening reactions. YES / NO / N/A Appendix: Identify and communicate the responsibility for project monitoring that includes infection control concerns and risks.
The ICRA may be modified throughout the project. Revisions must be communicated to the Project Manager.
Clarksburg VAMC Infection Control Construction Permit
Project: Permit No:
Location of Construction: Project Start Project Coordinator: Estimated Duration:
Contractor Performing Work: Permit Expiration Date:
Supervisor: Telephone:
YES NO CONSTRUCTION ACTIVITY YES NO INFECTION CONTROL RISK GROUP
TYPE A: Inspection, non-invasive activity GROUP 1: Least Risk
TYPE B: Small scale, short duration, moderate to high levels GROUP 2: Medium Risk
TYPE C: Activity generates moderate to high levels of dust, requires more than 1 work shift for completion.
GROUP 3: Medium/High Risk
TYPE D: Major duration and construction activities, requiring consecutive work shifts.
GROUP 4: Highest Risk
CLASS I 1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace any ceiling tile displaced for visual inspection
3. Minor Demolition for Remodeling
CLASS II
Date
Initials
1. Provides active means to prevent air-borne dust from dispersing into atmosphere
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Wipe surfaces with disinfectant.
6. Contain construction waste in tightly covered containers prior to transport.
7. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
8. Place dust mat at entrance and exit of work area.
9. Remove or isolate HVAC system in areas where work is being performed.
CLASS III
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of the duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Do not remove barriers from work area until complete project is thoroughly cleaned by Environmental Management Service (EMS).
7. Vacuum work with HEPA filtered vacuums.
8. Wet mop with disinfectant
9. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
10. Contain construction waste before transport in tightly covered containers. Container must be free of dust and debris on the outside (including wheels).
11. Cover transport receptacles or carts. Tape covering.
12. Remove or isolate HVAC system in areas where work is being performed.
CLASS
IV
1. Obtain infection control permit before construction begins.
2. Isolate HVAC system in area where work is being done to prevent contamination of duct system.
3. Complete all critical barriers or implement control cube method before construction begins.
4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Seal holes, pipes, conduits, and punctures appropriately.
6. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
7. All personnel entering work site are required to wear shoe covers
8. Do not remove barriers from work area until completed project is thoroughly cleaned by Environmental Management Service (EMS).
9. Vacuum work area with HEPA filtered vacuums.
10. Wet mop with disinfectant.
11. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
12. Contain construction waste before transport in tightly covered containers. Container must be free of dust and debris on the outside (including wheels).
13. Cover transport receptacles or carts. Tape covering.
14. Remove or isolate HVAC system in areas where is being done.
ALL
CLASSES
Safety Data Sheets (SDS) will be provided to VAMHCS Safety Office no less than 10-days in advance of the onset of work for all materials/chemicals
(ie. Paint, flooring compound/adhesive, carpet glue) that will be brought into the VAMHCS facility for use during this project.
Has Safety been contacted to determine if asbestos-containing material is a consideration? Yes _______No.
Work may not commence without prior documentation of location, type and amount of ACBM.
*Legionella mitigation for stagnant water necessary:
Yes ___ No If yes, see page 4 step 6 for plan.
TB risk assessment: Is there a risk to the Construction Worker to have contact with or have shared air space with a patient with TB disease or a clinical specimen that might contain M. tuberculosis? YES / NO If YES, has the contractor provided written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment to the worksite and been found have negative TB screening reactions. YES / NO / N/A
Does this project require walk through monitoring Yes ___ No (If yes, specific time frame)
Daily_____Weekly ____Bi Weekly_____
Monthly______Other_(specify)________
Summary Description of Project:
Permit Authorized By:
Date _______________________________________
Signature ___________________________________