This document package includes an invitation for bids for construction services and related project details. The Department of Veterans Affairs intends to award a firm fixed price contract to replace the HVAC unit serving the Purple Firm at the Louis A. Johnson VAMC in Clarksburg, WV. The project number is 540-20-502 and performance period is 180 days. The solicitation will be issued as a 100% SDVOSB set-aside with a NAICS code of 236220 and estimated value between $500,000-$1,000,000. The document provides responses to contractor questions, site visit notes, drawings, and specifications for replacing the HVAC unit on the roof while also installing pressure sensors in each exam room connected to the building automation system. Bidders must register in SAM and Vets 4212 and obtain any amendments from the FedBizOpps website.

View the file

Other files

File Type Posted
AB-4.pdf PDF
IC-1 12.11.2020.pdf PDF
FIGURE 1 Golden Seal Total Roofing System Warranty.pdf PDF
S-2.pdf PDF
AB-2.pdf PDF
AB-1.pdf PDF
ICRA Form Blank FIGURE 2.pdf PDF
S-1.pdf PDF
AB-3.pdf PDF
Record of Attendance - Pre-bid Site Visit 12-3-2020.pdf PDF
36C24521B0001 0001.docx DOCX document
36C24521B0001_1.docx DOCX document
Drawings.pdf PDF
Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-16-2020 540-20-502 Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg

WV

26301-4199 Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg

WV

26301-4199 To all Offerors/Bidders

36C24521B0001 11-22-2020

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

December 29, 2020 at 3:00 p.m.

The purpose of this amendment is to provide responses and clarifications to questions that were received during the RFI period. To allow for review and communication, an additional RFI period is being provided. Any further questions must be received by 4:00 p.m. EST, December 18, 2020. An additional amendment will be posted if necessary.

The bid due date has been extended to Tuesday December 29, 2020 at 3:00 p.m. EST. A public bid opening will be conducted in the Contracting Offices at 513 Rosebud Plaza, Clarksburg, WV 26301

All other terms and conditions remain unchanged.

Rebecca Besten Contracting Officer V414L2-1491

CONTINUATION PAGE

Solicitation: 36C24521B0001 Project#: 540-20-5050 - Purple Firm HVAC Replacement

Document Changes:

1. AD-1

Add Plan Note 5 Edit Coded Note 2

2. ME-1

Edit General Note 1 New General Note 2 with revised numbering New General Note 3 with revised numbering

3. Specification Deletion Delete 26 08 00 Commissioning of Electrical Systems

4. Add ICRA Sheet IC-1

Notes from Site Visit Conducted on December 3, 2020

1. Special COVID Funded Project – Post award funding for changes is very limited at best.

2. COVID 19 Safety Plan – Requires submittal

· Screening – Daily Use of VA Screening / Job site protocol

· Training

· Exposure Plan

· Monitoring

· Masks – Always use in the hospital

3. Flu Vaccinations

· Signed document from Contractor regarding the requirement

4. TB Requirements – Signed document from Contractor regarding requirement.

5. Project Description

· Delegated Design – Complete Project

· Performance Based – Based on Ambulatory and Emergency Care (Pandemic)

· Two Modes of Operation - Ambulatory and Emergency Care

· Variable Speed Drive

· Controls

· Deductive Alternate – Roof Coating

· No Energy Recovery

6. Work Hours: 7 am to 4:30 pm unless work activities disrupt patient care

7. No Demo until Replacement AHU and supporting equipment are ready for installation to minimize impact to patient care.

8. Storage of Salvaged AHU – Behind Building 6 - Walked to location. VA will clean prepare space for storage.

9. ICRA will be dependent upon work activities – Presently classified as a Class III. See attached ICRA documents.

10. Commissioning – Present documents have commissioning requirements. Documents will be changed to TAB for both modes with a demonstration test for changing modes.

Training will be required for VA personnel prior to acceptance. No Commissioning will be required.

11. Waste Management / Dumpster Location if needed on the west side of the Clinical Addition.

12. Crane set up and staging area for lifting only

· Lift Plan Required

· No Fencing before lift to allow continued use during the pandemic.

13. Toured the two electrical rooms for possible 208V and 480V services.

Questions During Site Visit:

1. QUESTION: What manufacturer is the roof?

VA RESPONSE: Carlisle / Please see attached document (Figure 1). Use a certified installer to ensure the warranty remains intact.

2. QUESTION: Is the roof coating and walkway both included in the deductive alternate?

VA RESPONSE: The roof coating is the deductive alternate. The walkway is part of the base bid.

3. QUESTION: Are there as built drawings for the duct work?

VA RESPONSE: HVAC As Built drawings are included in Addendum Number 1. See AB-1, AB-2, AB-3 and AB-4.

Responses to Questions Received and Clarifications

1. QUESTION: Can you provide full load amperage for the AHU-34 unit power feed locations?

VA RESPONSE: AHU-34 is fed from 2HNB (400A) shown below and is in Room 1241A. Room 1241A is located on the opposite side of the main entrance hallway, from the Purple Firm, and was the first electrical room on the site visit.

2. QUESTION: Referring to Print #ME-1

a. Coded notes #7 & #8 Can you provide full amperage for the (2) VFD drives?

VA RESPONSE: The project is delegated design. However, the anticipated sizing of the VFD’s would likely be based on the full load of the supply and exhaust fans plus spare capacity (20%) needed to achieve the performance perimeters for the two modes of service.

b. Can you provide location of room 1356?

VA RESPONSE: This is the electrical room in the basement below the Purple Firm and was shown at the end of the site visit. See ME-1 – Basement Level. Room numbers on the plans changed prior to activation.

c. Code note #10. Can you provide the location of the main fire panel?

VA RESPONSE: The Purple Firm is routed through the annunciator panel near the Main Entrance. This panel is intended to be a slave to the main fire panel located in the basement of Building 1 (Main Hospital) across from the south elevators. This room does not have a number.

d. Can you provide location of the METASYS panel?

VA RESPONSE: Room 1249a connects to METASYS and is within the Purple Firm.

e. Will the cable for the pressure sensors need to be installed in EMT conduit or can it be installed in data hooks above the drop ceiling?

VA RESPONSE: Installation will require EMT.

3. QUESTION: Would an existing roof framing plan be made available to assist in determining structural framing requirements as per equipment stand (pipe) detail on Drawing AE-1?

VA RESPONSE: Yes, please find attached as S-1 and S-2. Sheets were labeled as S3-3 and S5-2 in original construction plan set.

4. QUESTION: It is our understanding the requested scope of work is limited to providing a DOAS HVAC unit to replace AH-34, that enables unit operation to have the ability to provide 6ACH in normal mode, and 12 ACH in emergency mode.

VA RESPONSE: While the replacement of the unit is major part of the delegated design there is also a requirement that each exam room have a pressure-sensor installed connected to METASYS for remote monitoring including any duct work modifications, control wiring and programming is included in the base bid.

QUESTION: It is our further understanding that all work related to the unit replacement is limited the roof, with no work within the actual patient room areas.

VA RESPONSE: While the replacement of the unit is major part of the delegated design/construction there is also a requirement that each exam room have a pressure-sensors installed and connected to METASYS for remote monitoring including any ductwork modifications, control wiring and programming is included in the base bid.

QUESTION: We are concerned that in emergency mode (12 ACH) existing ductwork, VAV boxes, and GRDs may be undersized. Further, to achieve desired results additional airflow equipment and devices may be required within the space for proper airflow balancing and control.

VA RESPONSE: When in pandemic mode the ACH will be driven by the exhaust.

5. QUESTION: Referencing specification 01-00-00-6.1 G2 Is construction fence required on this project?

VA RESPONSE: No, a construction fence in accordance with referenced specification is not required.

6. QUESTION: Referencing specification 01-00-00 12-1 8.D Is a National Pollutant Discharge Elimination System (NPDES) permit required for this project?

VA RESPONSE: No, an NPDES permit is not required for this project.

7. QUESTION: Submittals must be submitted by Contractor only and shipped prepaid. Contracting Officer assumes no responsibility for checking quantities or exact numbers included in such submittals. Can submittals be sent electronically via email or platform such as ProCore?

VA RESPONSE: Yes, for this project submittals can be submitted electronically or via an electronic platform such as ProCore, Submittal Exchange etc.

8. QUESTION: What class level of ICRA will be required for this project?

VA RESPONSE: Class III

9. QUESTION: Is the anti-slip path part of the alternate bid item?

VA RESPONSE: No.

10. QUESTION: Under General Requirements it says in the specifications that the contractor will not be allowed the use of the existing elevators. Outside type hoist to be used by contractor for transporting material and equipment. Please advise?

VA RESPONSE: That is correct. The adjacent stair tower may be used to access the roof and the remainder of the work will be interior. There is no elevator access to the roof.

11. QUESTION: Under the Safety Requirements, Is a Certified Safety Professional or a Certified Construction Safety and Health Technician required to perform safety inspections on this project, or is the contractor’s SSHO/Superintendent acceptable to perform the safety inspections?

VA RESPONSE: Yes

12. QUESTION: Who is the manufacturer of the existing roof membrane?

VA RESPONSE: Carlisle. (See Figure 1)

13. QUESTION: Is there an existing manufacturer’s warranty?

VA RESPONSE: Yes. (See Figure 1)

14. QUESTION: What are the power requirements for new AHU?

VA RESPONSE: See question 1 regarding available power.

15. QUESTION: HP Rating for new AHU for sizing of VFD?

VA RESPONSE: Power requirements are not given since this is delegated design.

16. QUESTION: Is the Power requirements for 208 V exhaust fan marked on drawings? I didn’t see them.

VA RESPONSE: There are two VFD’s one for supply and one for exhaust. Power requirements are not given since this is a delegated design project.

17. QUESTION: What are the power requirements for EF-1 if applicable?

18. QUESTION: What are the power requirements for ECU-1/CU-1 if applicable?

19. QUESTION: What are the power requirements for ECU-2/CU-2 if applicable?

20. QUESTION: It is our understanding the requested scope of work is limited to providing a DOAS HVAC unit to replace AH-34, that enables unit operation to have the ability to provide 6ACH in normal mode, and 12 ACH in emergency mode. It is our further understanding that all work related to the unit replacement is limited the roof, with no work within the actual patient room areas.

VA RESPONSE: See Question #4 Response.

21. QUESTION: We are concerned that in emergency mode (12 ACH) existing ductwork, VAV boxes, and GRDs may be undersized. Further, to achieve desired results additional airflow equipment and devices may be required within the space for proper airflow balancing and control. Please confirm that this work is outside this project’s scope, and responsibility of others.

VA RESPONSE: See Question #4 Response

22. QUESTION: On Drawing ME-1 are the panelboard designations noted within Electrical Room 1356 Basement Level correct?

VA RESPONSE: The panel designations are as shown.

23. QUESTION: As per coded Note #3 on Drawing AD-1, a new 480V feeder originating from the same distribution panel serving existing AHU #34 shall address the new rooftop 480-volt feeder requirements. Please advise if this is correct?

VA RESPONSE: Yes.

24. QUESTION: As per coded Note #7 on Drawing ME-1, a new 208V feeder originating from Electrical Room 1356 shall address new rooftop exhaust fan requirements. Does an existing distribution panel, fed from the hospital’s essential equipment 208V distribution system, exist within Electrical Room 1356?

VA RESPONSE: Yes, there is a 208V CC or LS panel in 1356.

Panel AA-BCCF is fed from XFMR AA-TCC1 - Panel AA-BLCCG is fed from AA-BLCCF Panel AA-BLLSC is fed from XFMR AA-TBLS1 -Panel AA BLLSD is fed from AA-BLLSC

25. QUESTION: Is the DOAS unit supposed to be like the original heat pump with electric heat? If not, what type of is in the unit?

VA RESPONSE: The replacement unit can function similarly to the existing unit.

26. QUESTION: What is the CFM of the DOAS unit?

VA RESPONSE: This is a delegated design project

27. QUESTION: The DOAS unit note #6 on ME-1 calls for 480V on the unit; and note # 7 has 208V for the exhaust fan? Is the exhaust fan separate from the DOAS unit? If not, which voltage is required for the DOAS unit?

VA RESPONSE: This is a delegated design project.

28. QUESTION: Can you provide full load amperage for the AHU-34 unit power feed location?

VA RESPONSE: This is a delegated design. Please see response for Question 1.

29. QUESTION: Print # ME-1 – Coded notes #7 & #8 Can you provide full load amperage for the (2) CFD drives?

VA RESPONSE: This is a delegated design project.

30. QUESTION: Print # ME-1 – Can you provide the location of room 1356?

VA RESPONSE: See response for Question 2(b).

31. QUESTION: Print # ME-1 – Coded note # 10 can you provide the location of the main fire panel?

VA RESPONSE: See response for Question 2(c).

32. QUESTION: Can you provide type of cable/wire needed for the (12) pressure sensors?

VA RESPONSE: The project is delegated design project please refer to VA design guides.

33. QUESTION: Print # ME-1 - Can you provide location of the METASYS panel?

VA RESPONSE: Room 1249a connects to METASYS and is within the Purple Firm.

34. QUESTION: Print # ME-1 - Will the cable for the pressure sensors need to be installed in EMT conduit or can it be installed in data hooks above the drop ceiling?

VA RESPONSE: Yes, the installation will require EMT.

35. QUESTION: It is our understanding the requested scope of work is limited to providing a DOAS HVAC unit to replace AH-34, that enables unit operation to have the ability to provide 6ACH in normal mode, and 12 ACH in emergency mode.

VA RESPONSE: See Question #4 response.

36. QUESTION: It is our further understanding that all work related to the unit replacement is limited the roof, with no work within the actual patient room areas. Please confirm that this work is outside this project’s scope, and responsibility of others.

VA RESPONSE: See Question #4 response.

Pressure sensors, cabling and programming for the 12 pressure sensors are in the base contract.

37. QUESTION: Clarification: We are concerned that in emergency mode (12 ACH) existing ductwork, VAV boxes, and GRDs may be undersized. Further, to achieve desired results additional airflow equipment and devices may be required within the space for proper airflow balancing and control. Please confirm that this work is outside this project’s scope, and responsibility of others.

VA RESPONSE: This work is not outside of the scope. Please see Question #4 response.

38. QUESTION: Per Spec 01 35 26 1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) AND “COMPETENT PERSON (CP): Can this person be one in the same performing both roles of responsibility?

VA RESPONSE: Yes, these functions can be performed by the same person.

39. QUESTION: As spec 01 35 26 1.12 B. states An AHA associated with infection control will be performed by VA personnel in accordance with FGI Guidelines (i.e. Infection Control Risk Assessment (ICRA)). What risk assessment will be utilized as part of this project?

VA RESPONSE: A blank ICRA permit will be attached as FIGURE 2. The work for this project is Class III as stated in the pre bid site visit.

40. QUESTION: Will an ante room be required? If so what rating or requirements will the construction of the room need to meet?

VA RESPONSE: A blank ICRA permit will be attached as FIGURE 2. No ante room is required.

41. QUESTION: Will all personnel be required to have a Tuberculosis Screening for this project.

VA RESPONSE: A document from the contractor will be required. See earlier response. No testing results will be submitted to the VA.

42. QUESTION: Sheet AD-1 PLAN NOTES 4. APPROPRIATE ICRA CONTAINMENT MEASURES WLL BE USED THROUGHOUT THE DURATION OF THE PROJECT. Does the VA’s Safety dept have differing ICRA procedures available or are we to follow American Society for Healthcare Engineering (ASHE) only?

VA RESPONSE: A blank ICRA permit will be included as FIGURE 2. Please see IC-1.

43. QUESTION: Sheet AD-1 CODED NOTES 1. REMOVE AHU 34 AND SALVAGE FOR OWNER. AHU 34 WILL BE TRANSPORTED AND PLACED BEHIND THE HOSPITAL AT A LOCATION ESTABLISHED DURING THE PREBID MEETING. THE UNIT SHALL BE WRAPPED IN A MANNER THAT IT IS PROTECTED FROM THE ELEMENTS. Is 6 Mil. plastic wrapped be acceptable? Will a pallet be required?

VA RESPONSE: Yes and Yes, if no lifting points are on the unit.

44. QUESTION: Does a web-based submittal Exchange service need to be supplied by GC for this project?

VA RESPONSE: A web-based submittal exchange can be used or the submittals and contract correspondence can be done by via email.

45. QUESTION: The photo documentation spec isn’t included as part of this solicitation. Will Photo documentation be required to be provided by GC?

VA RESPONSE: No photo documentation. As Built Documentation will be required.

46. QUESTION: What performance period is each bid item? It’s listed as 180 days on the beta.gov website however it’s not listed on the bid schedule.

VA RESPONSE: It is expected that all work will be completed within 180 days after the notice to procced is issued.

47. QUESTION: Is there liquidated damages as part of this solicitation?

VA RESPONSE: Liquidated damages are not included in this solicitation.

48. QUESTION: Previous projects with very similar scopes of work have required BIM or some type of engineered coordination drawings in the recent past. With this being said, the following group of questions pertain to this comment.

a.Will BIM coordination be required on the project?
b.If BIM coordination is required will existing Revit Models (Architectural, Mechanical, Electrical, Plumbing, Structural) be made available to the successful contractor for modification?
c.Will a specification be released that outlines the scope of BIM coordination requirements?
d.What software version will the BIM coordination deliverable be required in?
e.Who will be the point of contact for BIM coordination at the VA for submittals and can their contact information be made available?

VA RESPONSE: No BIM specific software is required for coordination drawings.

Coordination Drawings will be required as a submittal.

See attached document: AB-1.

See attached document: AB-2.

See attached document: AB-3.

See attached document: AB-4.

See attached document: FIGURE 1 Golden Seal Total Roofing System Warranty.

See attached document: IC-1 12.11.2020.

See attached document: ICRA Form Blank FIGURE 2.

See attached document: S-1.

See attached document: S-2.