36C24520Q0201-0003000.docx
DOCX document Posted
- Solicitation number
- 36C24520Q0201
About this file
This solicitation seeks pest management services for the Department of Veterans Affairs Medical Center located in Martinsburg, West Virginia. The services include monthly integrated pest control, termite colony elimination systems, bed bug treatments, and canine inspections. The period of performance for the base year is February 21, 2020 through February 20, 2021 with four one-year option periods. Offers are due by February 14, 2020 and the solicitation is set aside for small businesses. The contractor must be licensed for integrated pest management in West Virginia and comply with EPA, DOT, and OSHA regulations. The statement of work specifies response times, reporting requirements, personnel policies, and safety factors.
36C24520Q0201 0003 36C24520Q0201 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24520Q0201-0005000.docx | DOCX document | |
| 36C24520Q0201-0004000.docx | DOCX document | |
| 36C24520Q0201-0002001.docx | DOCX document | |
| 36C24520Q0201-0001000.docx | DOCX document | |
| 36C24520Q0201-002.docx | DOCX document | |
| 36C24520Q0201-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) n/a Department of Veterans Affairs
VAMC
(613) VISN 5 Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg WV 25405 Department of Veterans Affairs
VAMC (613)
VISN 5 Contract Satellite Office 510 Butler Avenue, Building 306A Martinsburg WV 25405 To all Offerors/Bidders
36C24520Q0201 02-13-2020
X X X
The purpose of amendment is to post a revised price/cost schedule and revised statement of work.
All other terms and conditions remain changed.
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide Monthly Integrated Pest Control Services in accordance with the SOW.
Contract Period: Base POP Begin: 02-21-2020 POP End: 02-20-2021 PRODUCT/SERVICE CODE: S207 - Housekeeping- Insect/Rodent Control
| 12.00 |
| MO |
| __________________ |
| __________________ |
Maintenance Termite Colony Elimination Sytem Chapel, #203, CPOD, #217, Baker House and Building 501
POP Begin: 02-21-2020 POP End: 01-20-2021
| 41.00 |
| EA |
| __________________ |
| __________________ |
Bed Bug Treatment thermal remediation to single room. All work shall be in accordance with the Statement of Work.
POP Begin: 02-21-2020
| 20.00 |
| HR |
| __________________ |
| __________________ |
Canine inspection services. All work shall be in accordance with the statement of work.
POP Begin: 02-21-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide Monthly Integrated Pest Control Services in accordance with the SOW, Baker House and Building 501 Contract Period: Option 2 POP Begin: 02-21-2022 POP End: 01-20-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Maintenance Termite Colony Elimination Sytem Chapel, #203, CPOD, #217, Baker House and Building 501 Contract Period: Option 1 POP Begin: 02-21-2021 POP End: 01-20-2022
| 41.00 |
| EA |
| __________________ |
| __________________ |
Bed Bug Treatment thermal remediation to single room. All work shall be in accordance with the Statement of Work.
POP Begin: 02-21-2021 POP End: 02-20-2022
| 20.00 |
| HR |
| __________________ |
| __________________ |
Canine inspection services. All work shall be in accordance with the statement of work.
POP Begin: 02-21-2021 POP End: 02-20-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide Monthly Integrated Pest Control Services in accordance with the SOW Contract Period: Option 2 POP Begin: 02-21-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
Maintenance Termite Colony Elimination Sytem Chapel, #203, CPOD, #217, Baker House and Building 501
POP Begin: 02-21-2022
| 20.00 |
| HR |
| __________________ |
| __________________ |
Canine inspection services. All work shall be in accordance with the statement of work.
POP Begin: 02-21-2022 POP End: 02-20-2023
| 41.00 |
| EA |
| __________________ |
| __________________ |
Bed Bug Treatment thermal remediation to single room. All work shall be in accordance with the Statement of Work.
POP Begin: 02-21-2022 POP End: 02-20-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Maintenance Termite Colony Elimination System Chapel, #203, CPOD, #217, Baker House and Building 501
POP Begin: 02-21-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
Maintenance Termite Colony Elimination Sytem Chapel, #203, CPOD, #217, Baker House and Building 501 Contract Period: Option 3 POP Begin: 02-21-2023 POP End: 02-20-2024
| 12.00 |
| MO |
| __________________ |
| __________________ |
Provide Monthly Integrated Pest Control Services in accordance with the SOW.
Contract Period: Option 4 POP Begin: 02-21-2024 POP End: 02-20-2025
| 20.00 |
| HR |
| __________________ |
| __________________ |
Canine inspection services. All work shall be in accordance with the statement of work.
POP Begin: 02-21-2023
| 41.00 |
| EA |
| __________________ |
| __________________ |
Bed Bug Treatment thermal remediation to single room. All work shall be in accordance with the Statement of Work.
POP Begin: 02-21-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Maintenance Termite Colony Elimination Sytem Chapel, #203, CPOD, #217, Baker House and Building 501
POP Begin: 02-21-2024
| 41.00 |
| EA |
| __________________ |
| __________________ |
Bed Bug Treatment thermal remediation to single room. All work shall be in accordance with the Statement of Work.
POP Begin: 02-21-2024
| 20.00 |
| HR |
| __________________ |
| __________________ |
Canine inspection services. All work shall be in accordance with the statement of work.
POP Begin: 02-21-2024 POP End: 02-21-2025
| GRAND TOTAL |
| __________________ |
Page 1 of
Page 1 of Page 1 of
A.2 STATEMENT OF WORK
Qualification: Vendor must be licensed/ permitted in the State of West Virginia for Integrated Pest Management (IPM).
1. GENERAL REQUIREMENTS
1.1 The contractor shall furnish all labor, equipment, supplies, transportation, developing and implementing an integrated pest management plan consistent of the integrated pest management guide (IPM)1850.2, including both the interior and exterior of the Veterans Affairs Medical Center (henceforth referred to as the VA) medical facilities during the period of for the Martinsburg VAMC, 510 Butler Avenue, Martinsburg, WV 25405.
1.2 Work Hours: The Environmental Management Service (EMS) reserves the right to set normal work hours, including on call scheduling with the contractor and CO/ COR prior to any services provided.
1.3 National Holidays: The Federal Government has observed the ten following holidays:
a. New Years
b. Martin Luther King
c. President’s day, Memorial Day
d. Independence Day
e. Labor Day
f. Columbus Day
g. Veteran’s Day
h. Thanksgiving Day
i. Christmas Day Note: Other days specifically declared by the President of the United States to be a national holiday.
2. SPECIFICATION
2.1 The contractor shall conform to all federal, state, and local regulations governing examining and licensing of pest control operators, performance of pest control, use of approved pest control chemicals and equipment, and proper disposal methods for all products/containers, which may be in effect for the area where the work under the contract will be performed.
2. SPECIFICATION (Continued)
2.2 The IPM plan requires approval by the CO/ COR prior to implementation.
2.3 Contractors IPM plan requires following tasks:
a. Must be able to furnish and operate Heat Unit(s) and fan(s) equipment’s to raise room temperature above 120 degree Fahrenheit and hold temperatures at that rate for minimum of five hours.
b. Inspect to determine pest management measures are appropriate and required.
c. Recommend and communicate to the CO/ COR environmental sanitation practices that restrict or eliminate food, water or harborage for pests and recommend engineering practices that limit entry of pests.
d. Selection and utilization of non-chemical control methods, which eliminate, exclude or repel pests, i.e. insect electrocution devices, traps, caulking, air screens, etc.
e. Collection and disposal of all pests.
f. Selection and use of the most environmentally sound pesticide(s) to affect control when chemical control methods are necessary.
g. Control general structural arthropod pests (i.e., cockroaches, ants, carpet beetles, spiders, carpenter ants, carpenter bees, etc.).
h. Control flying insect pests (i.e., housefly, stable fly, blow flies, etc.).
i. Control predatory pests (i.e., lice, bedbugs, fleas, mites, ticks, bees, wasps, mosquitoes, scorpions, etc.)
j. Control stored product pests (i.e., saw tooth grain beetle, red confused flour beetle, trogoderma beetles, grain moths etc.)
k. Control mice and rats (i.e., house mouse, field mouse, roof rat, Norway rats, etc.)
l. Control pest birds (i.e., pigeons, sparrows, blackbirds, etc.)
m. Control other vertebrate pests (i.e., dogs, cats, bats, squirrels, gophers, moles, skunks, snakes, rabbits, raccoons, etc.).
n. Control wood destroying organisms (i.e., subterranean termites, dry wood termites, fungi, wood boring beetles, etc.).
o. Control aquatic pests (i.e., mosquito larva/pupae, algae etc.).
p. Provide annual Termite Colony Elimination system in Chapel #203, CPOD, #217, Baker House, and Building 501.
3. CALL BACKS
3.1 EMERGENCY CALL BACK: The Contractor shall within two hours after receipt of notification by the CO/ COR or designee, perform Integrated Pest Management (IPM) Services to correct the emergent condition. This call back service shall be accomplished at no additional charge to the Government.
3.1.1
a. Bed bug inspection by Pest Technician or K-9. K-9 services will be utilized on a as need basis.
b. Other pest emergencies as identified by COR
3.2 NON-EMERGENT CALLS: Contractor shall report within mutually agreed upon time with CO/ COR for non-scheduled services without additional charge to the Government.
4. REPORTING FOR SCHEDULED SERVICES
4.1 The Contractor shall report to GA-137 D in building 500 of the Martinsburg VHA facility, on scheduled days or on demand, for any instructions for location of infestation. The contractor will maintain daily log/ written reports of type activities and visits.
5. COMPLIANCE/ REGULATIONS
2. Contractor must obey all Environmental Protection Agency (EPA) regulations.
a. Every pesticide bought, sold, or used in the United States must, by law, be registered by the U.S. EPA and in each of the sates. EPA approves not only the product itself, but also each separate use for which it is intended, and the product label. Contractor is responsible for applying only those pesticides that are registered.
3. Contractor must obey all Department of Transportation (DOT) regulations.
a. Shipment of pesticides and other dangerous substances across state lines is regulated by the federal DOT.
4. Contractor must obey all Occupational Safety and Health Administration (OSHA) regulations.
6. SAFETY FACTORS
5.1 All rodenticides or traps shall be placed only at times and in areas approved by the CO/ COR or his/her designee. Rodenticides and/ or traps shall be placed as necessary and per manufacturer recommendations. No pest control material or trap shall be placed where it may be recovered by patients, nor shall such material be allowed to contact food or cooking utensils.
7. STORAGE OF PEST CONTROL MATERIALS
6.1 Storage of pest control materials or equipment is prohibited without the written approval of the CO/ COR.
6.2 Guidelines within the integrated pest management plan IPM 1850.2 of the VHA program guide will be maintained during any approval of the CO/COR.
8. QUALITY ASSURANCE
7.1 Emergency complaints will be addressed and corrected within twenty four hours or less. Non-emergent complaints will be addressed and corrected within seventy two hours.
7.2 Failure to meet prescribed timeframes shall not exceed two times per month.
9. REPORTS
9.1 After each service (scheduled or non-scheduled) contractor personnel will submit documentation including but not limited to:
a. The name and address of the individual who applied the pesticide.
b. The location, by building and room number where each pesticide was applied.
c. The pest or pests against which the pesticide was applied.
d. The date and time of application.
e. The brand name of the pesticide applied.
f. The name of the pesticide manufacturer, or the federal environmental protection agency registration number of the pesticide.
g. The rate of application or amount of the pesticide applied, and the total area treated.
| 9.2 | The contractor is responsible for supplying, completing and submitting all reports required or requested by Federal, State or local ordinances, which pertain to any duties contained in the contract. |
| 9.3 | The Contractor will furnish the COR office, prior to initial application the trade names (if any), and the chemical names of all approved pesticides/chemicals along with appropriate antidote information and current –Safety Data Sheet (SDS). The Contractor shall supply this information as new products are submitted for approval to the CO/COR |
10. VENDORS PERSONNEL BADGES AND PARKING
10.1 The vendor shall provide the CO/ COR with a list of employees expected to enter the buildings to pick up confidential documents. While on VA premises, all contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.
10.2 An access badge will be given to the vendor’s employee upon entrance into VA buildings. The contractor employee must safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the CO/ COR. All contract personnel must properly display their access badges. Access badges must be worn at or above the waist (facing forward.). The contractor’s employees must return the access badge(s) to the COTR or designee at the end of each pick up process.
10.3 The contractor shall be required to comply with all security policies/requirements of (your facility). All security policies/requirements must be met and employees cleared prior to the contractor performing work under this contract. Employees that cannot meet the security and clearance requirements shall not be allowed to perform work under this contract.
10.4 It is the responsibility of the contractor’s personnel to park in the appropriate designated parking areas. Parking information shall be coordinated with each facility COTR.
10.5 Martinsburg VAMC does not validate or make reimbursement for parking violations of the contractor’s personnel under any circumstance.
11. INTERFERENCE TO NORMAL FUNCTION
11.1Contractor may be required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment and carts.
11.2In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the government.
12. INTERFERENCE TO NORMAL FUNCTION (Continued)
10.3 Contractor personnel shall inform the CO/ COR or the designee of the need to gain access to secured areas. If access is required to secure areas, prearranged scheduling will be made with CO/ COR or designee.