S02 36C24519R0111.pdf

PDF 1 MB Posted

Attached to
NCO 5 Asbestos Lead Mold IDIQ Federal contract opportunity
Solicitation number
36C24519R0111
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5

About this file

This document provides details for a future solicitation seeking asbestos, mold, and lead abatement services. Key information includes the following:

The Department of Veterans Affairs intends to award multiple Indefinite Delivery, Indefinite Quantity contracts to provide abatement services at medical facilities within Veterans Integrated Service Network 5. The contracts will have a one-year base period and four one-year options, with an overall value not to exceed $15 million. Individual task orders will have a minimum value of $2,000 and maximum of $500,000. As a 100% set-aside, the solicitation is only open to Service-Disabled Veteran-Owned Small Businesses. The North American Industry Classification Code is 562910 for remediation services. The solicitation package is expected to be available for download on or around January 6, 2020, with questions due by email to the point of contact by a specified date.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 108

36C24519R0111

X

01/27/2020

613-19-119

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199

Department of Veterans Affairs Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199

Shawn E. Shafer 304-623-3461 x4146

THIS SOLICITATION IS 100% SET-ASIDE FOR SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) IAW Public Law 109-461.

A. Asbestos, Mold, Lead Abatement Indefinite Delivery-Indefinite Quantity (IDIQ), for abatement services at locations within the Network Contracting Office (NCO) 5 area of responsibility. Contractors are to provide asbestos, mold, and lead abatement services that includes all labor, tools, materials, equipment, supplies, and supervision to perform work as required by individual Task Orders (TO) as assigned under the resulting contract from this solicitation. Task Orders will involve, but will not be limited to, infection control precautions, asbestos abatement, mold abatement, lead abatement, and accompanying demolition. All work inside contaminated areas shall be performed by an asbestos abatement firm licensed to perform asbestos, mold, and lead abatement in the states of Maryland, West Virginia, and the District of Columbia. The area and final air testing inside the work areas shall be performed by a third party, independent, licensed air monitoring firm procured separately by the VA. Informal shop drawings, incidental to the job reflecting the plan of action and completed project, may be required.

B. The Government anticipates award of 2-8 contracts to SDVOSB concerns for each geographic area. Geographic areas are defined as: Maryland, Western West Virginia, Washington D.C., and Central/Eastern West Virginia (See Attachment 1).

C. Primary NAICS Code: 562910 Size Standard: $19.0 Million

D. Project performance period is scheduled for a Base Year plus four (4) one-year Option Periods.

E. Minimum Task Order amount: $2,000.00. Maximum Task Order amount: $500,000.00. The maximum contract value shall not exceed $15,000,000.00. The minimum guarantee is $2,000.00. Contract awards will be made based on the best value to the Government.

F. Companies intending to submit a proposal must ensure they have a current SAM Registration and are registered in VETBIZ.GOV at (https://www.vip.vetbiz.gov/). Validation in VETBIZ is MANDATORY and will be considered non-responsive if not CVE Verified at the time proposals are submitted and due.

G. Request for Information questions related to this solicitation must be submitted in writing via e-mail to shawn.shafer2@va.gov no later than 1:00 PM EST, 03/02/2020.

H. See attachment 3 Bid Price Schedule to complete pricing for the base and option years.

I. Deliver Offers to: Department of Veterans Affairs, 1 Med Center Drive, Rosebud Contracting Office, Clarksburg, WV 26301 prior to the specified offer due date and time listed in block 13.

10 Per Order

X 52.211-10

X Per Task Order

4 Copies 1:00 PM EST

03-12-2020

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

SEE ATTACHMENT 3 - BID PRICE SCHEDULE

Louis A Johnson, VAMC Contracting Office (90C) 1 Med Center DR Clarksburg WV 26301-4199

PAYMENT WILL BE MADE BY

FSC e-Invoice Payment Invoice must be submitted electronically http://www.fsc.va.gov/einvoice.asp Invoice Setup Information 1-877-489-6135

Angela L. Burger

TABLE OF CONTENTS

PART I - THE SCHEDULE………………………………………………..…………………………………..………………………………..1

SECTION A - SOLICITATION/CONTRACT FORM…………………………………………………………………………………….1

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)…………….1

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)–

BACK…………………………………………………………………………………………………………………………………………..2

BID PRICE SCHEDULE…………………………………...………………..………………………………………………..…………………5

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS……………………………..26

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)…………………………………………………………………………..36

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK

(MAY 2014)……………………………………………………………………………………………………………………………….36

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)………………………………………………..37

2.4 52.228-1 BID GUARANTEE (SEP 1996)……………………………………………………………………………….38

2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)………………………………………………………………………..38

2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)…………….39

2.7 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED

SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)……………………………………………………………..39

2.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)…..40

2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)………………………………………40

REPRESENTATIONS AND CERTIFICATIONS………………………………………………………………………………………….41

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)………………………….41

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2019)……………………………………………………………..45

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)……………………..46

3.4 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION

(JUN 2018)………………………………………………………………………………………………………………………………..47

GENERAL CONDITIONS………………………………………………………………………………………………………………………49

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)………………………………………………………………………………………………………………………………..76

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)………76

4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (OCT 2018)………………………………………………………………………………………………………………..78

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

4.5 52.216-19 ORDER LIMITATIONS (OCT 1995)……………………………………………………………………….79

4.6 52.216-22 INDEFINITE QUANTITY (OCT 1995)…………………………………………………………………….80

4.7 52.216-32 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (SEP 2019)………………………….80

4.8 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)………………………….81

4.9 52.217-9 OPTION TO EXTEND SERVICES (NOV 1999)………………………………………….……………...81

4.10 52.219-13 NOTICE OF SET-ASIDE OF ORDERS (NOV 2011)………………………………………………..81

4.11 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)…..82

4.12 52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS—PRICE ADJUSTMENT (NONE OR

SEPARATELY SPECIFIED METHOD) (AUG 2018)………………………………………………………………………….83

4.13 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)……………………………………………83

4.14 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (DEC 2010)…………………………………………………………………………………………………………………………84

4.15 SUPPLEMENTAL INSURANCE REQUIREMENTS…………………………………………………………………85

4.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)……………………………………….86

4.17 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)………………89

4.18 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)………………………………….90

4.19 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL

BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)……………………………………………………………………………90

4.20 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE

(JUL 2018)…………………………………………………………………………………………………………………………………92

4.21 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)…………………………………………93

4.22 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)………….93

4.23 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)……94

4.24 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)…………………………………95

4.25 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)……………………95

4.26 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR

2019)…………………………………………………………………………………………………………………………………………96

4.27 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)……..97

4.28 MANDATORY WRITTEN DISCLOSURES……………………………………………………………………………….98

4.29 IT CONTRACT SECURITY…………………..……………………………………………………………………………….98

CONTINUATION (BLOCK 17 OF SF1442): SCHEDULE SUPPLIES/SERVICES

This is a Firm-Fixed Price, Indefinite Delivery- Indefinite Quantity (IDIQ) type contract which encompasses removal of asbestos, mold, and lead paint materials located at the VA Medical Center Martinsburg, VA Maryland Health Care System, VA Medical Center Washington DC, VA Medical Center Beckley, WV, Louis A. Johnson Medical Center Clarksburg, WV, and Hershel “Woody” Williams VA Medical Center Huntington, WV. Task Orders shall be based on individual projects and may be issued for a base period of one (1) calendar year and 4 one (1) year options from date of award.

AWARD STATEMENT: The award will be made based on best value source selection conducted in accordance with Federal Acquisition Regulation 15.3, Source Selection.

BASE YEAR: DOA- 12/31/2020

PROPOSAL ITEM #1

ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

(Attachment 3)

Note Quantities are for evaluation purposes only, submitted pricing shall become the accepted rates upon award of contract for all follow-on Task Orders.

No.

0A

Work Description Units Qty $/Unit Total 0A1* Mobilization on projects. Work area isolation EA 12

0A2* Mobilization on projects. No work area isolation EA 3

0A3 Emergency Response EA 5

0A4* Work Plan EA 20

0A5* Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency Response

EA 60

0A6 Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency Response

EA 60

0A7 Elevated Work Surfaces. Fixed scaffolding (per SF floor area)

Per SF Floor Area

0A8 Elevated Work Surfaces. Rolling scaffolding Per SF Floor Area

0A9 Elevated Work Surfaces. Motorized scaffolding Per SF Floor Area

0A10 Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wiping

SF 79200

0A11 Cleaning of Surfaces. Special cleaning of contaminated surfaces

SF 7920

0A12 Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with h

EA 10

0A13 Decontamination System. Disposable 3-stage decontamination system including shower

EA 10

0A14 Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheeting

SF 2000

0A15 Sealing and Protecting the Work Area — Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF 79200

0A16 Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywood

SF 9900

0A17 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 8 ft. high SF 2000

0A18 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 12 ft. high SF 2000

0A19 Containment Wall (5/8" plywood), 2' x 4" @ 16" —16 ft. high SF 2000

0A20* Roll-Off Container. Enclosed, 20 CY Capacity Per/Day 60

0A21 Remove asbestos ductwork SF 17146.8

0A22 Remove asbestos from fittings and valves, up to 4" diameter pipe, Iron Pipe Size (IPS)

EA 396

0A23 Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPS

EA 396

0A24 Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

0A25 Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

0A26 Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

0A27 Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

0A28 Bulk Asbestos Removal — Remove fireproofing from flat surface SF 7920

0A29 Bulk Asbestos Removal — Remove fireproofing from irregular surface

SF 3960

0A30 Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & lathe

SF 3960

0A31 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe up to 3" IPS)

LF 792

0A32 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe 3.5" to 8" diameter, IPS) LF 495

0A33 Remove Asbestos from Fittings and Valves via Glove Bag (up to 8", IPS)

EA 49.5

0A34 Remove Asbestos Cement Board SF 396

0A35* Disposal in Certified Landfill CY 400

0A36 Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPS

LF 792

0A37 Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPS

LF 792

0A38 Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPS

LF 495

0A39 Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe/Iron Pipe Size IPS

LF 495

0A40 Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPS

LF 396

0A41 Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPS

LF 198

0A42 Remove Asbestos Built-Up Roofing Material SF 396

0A43 Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)

SF 1715

0A44 Removal of Batting insulation SF 396

0A45 Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remains

EA 396

0A46 Apply penetrating encapsulant on ceiling and other structural surfaces

SF 3960

0A47 Seals exposed ends of asbestos at wall openings EA 198

0A48 Seals exposed ends of asbestos at fittings, elbows and valves

EA 198

0A49 Spray apply one (1) coat of penetrating encapsulant — Flat surface

SF 3960

0A50 Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanks

SF 3960

0A51 Repair pipe and duct lagging SF 17147

0A52 Remove Floor Tiles — Tile removal by hand SF 14850

0A53 Floor Tiles 12x12 SF 14850 0A54 Remove Floor Tiles — Tile removal by machine SF 7425

0A55 Remove floor tiles — Removal of 2 tile layers, by hand SF 3713

0A56 Remove floor tiles — Removal of 2 tile layers, by machine SF 3713

0A57 Remove floor tiles — Removal of floor tile mastic (chemical solvent)

SF 29700

0A58 Excavate and remove contaminated dirt, by hand — Crawl Space

CU. FT. 3960

0A59* Bulk Removal — 55-gallon sealed container Per CN. 20

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

(insert multiplier)

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

LEAD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING BASE YEAR

No.0B Work Description Units Qty $/Unit Total

0B1 Abrasive Blasting SF 990

0B2 Chemical Stripping SF 990

0B3 Power Tool Cleaning SF 990

0B4 Encapsulation SF 990

0B5 Removal of material- Trim LF 396

0B6 Removal of material- Drywall SF 792

0B7 Removal of material - Pipe or conduit ≥ 4” dia LF 396

0B8 Removal of material - Pipe or conduit < 4” dia LF 198

Note to Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm).

_________________(insert multiplier)

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING BASE YEAR

No.0C Work Description Units Qty $/Unit Total

0C1 Removal of Material-Drywall SF 7920

0C2 Drywall, 5/8" Finished, 3Ct Paint SF 7920

0C3 Removal of Material-Carpet SF 990

0C4 Carpet Tile, 24 x 24 SF 990

0C5 Removal of Material-VCT SF 2772

0C6 Removal of Material-Ceramic Tile SF 198

0C7 Removal of Material- ¾” Plywood SF 1980

0C8 Removal of Material- Fiberglass Insulation SF 1980

0C9 Fiberglass Insulation up to 12" thick SF 1980

0C10 Mold Remediation on Concrete Wall or Floor SF 1980

0C11 Mold Remediation on Drywall SF 3960

Note To Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm)

_______________(insert multiplier)

Grand Total Base Year $

OPTION YEAR 1: 1/01/2021- 12/31/2021

PROPOSAL ITEM #1

ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

00A

Work Description Units Qty $/Unit Total 00A1* Mobilization on projects. Work area isolation EA 12

00A2* Mobilization on projects. No work area isolation EA 3

00A3 Emergency Response EA 5

00A4* Work Plan EA 20

00A5* Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency Response

EA 60

00A6 Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency Response

EA 60

00A7 Elevated Work Surfaces. Fixed scaffolding (per SF floor area) Per SF Floor Area

00A8 Elevated Work Surfaces. Rolling scaffolding Per SF Floor Area

00A9 Elevated Work Surfaces. Motorized scaffolding Per SF Floor Area

00A10 Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wiping SF 79200

00A11 Cleaning of Surfaces. Special cleaning of contaminated surfaces SF 7920

00A12 Decontamination System. 2" x 4" @ 16", 5/8" plywood each side

— 3 Stage Personal Decontamination Chamber with shower

EA 10

00A13 Decontamination System. Disposable 3-stage decontamination system including shower

EA 10

00A14 Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheeting

SF 2000

00A15 Sealing and Protecting the Work Area — Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF 79200

00A16 Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywood

SF 9900

00A17 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 8 ft. high SF 2000

00A18 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 12 ft. high SF 2000

00A19 Containment Wall (5/8" plywood), 2' x 4" @ 16" —16 ft. high SF 2000

00A20* Roll-Off Container. Enclosed, 20 CY Capacity Per/Day 60

00A21 Remove asbestos ductwork SF 17146.8

00A22 Remove asbestos from fittings and valves, up to 4" diameter pipe, Iron Pipe Size (IPS)

EA 396

00A23 Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPS

EA 396

00A24 Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

00A25 Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

00A26 Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

00A27 Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

00A28 Bulk Asbestos Removal — Remove fireproofing from flat surface SF 7920

00A29 Bulk Asbestos Removal — Remove fireproofing from irregular surface

SF 3960

00A30 Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & lathe

SF 3960

00A31 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe up to 3")

LF 792

00A32 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe 3.5" to 8" diameter, IPS)

LF 495

00A33 Remove Asbestos from Fittings and Valves via Glove Bag (up to 8" diameter, IPS) EA 49.5

00A34 Remove Asbestos Cement Board SF 396

00A35* Disposal in Certified Landfill CY 400

00A36 Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPS

LF 792

00A37 Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPS LF 792

00A38 Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPS

LF 495

00A39 Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe, IPS LF 495

00A40 Remove Asbestos from pipe in containment, 10" to 12" diameter pipe, IPS

LF 396

00A41 Remove Asbestos from pipe in containment, 14" to 16" diameter pipe, IPS

LF 198

00A42 Remove Asbestos Built-Up Roofing Material SF 396

00A43 Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)

SF 1715

00A44 Removal of Batting insulation SF 396

00A45 Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remains

EA 396

00A46 Apply penetrating encapsulant on ceiling and other structural surfaces

SF 3960

00A47 Seals exposed ends of asbestos at wall openings EA 198

00A48 Seals exposed ends of asbestos at fittings, elbows and valves EA 198

00A49 Spray apply one (1) coat of penetrating encapsulant — Flat surface SF 3960

00A50 Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanks

SF 3960

00A51 Repair pipe and duct lagging SF 17147

00A52 Remove Floor Tiles — Tile removal by hand SF 14850

00A53 Floor Tiles 12x12 SF 14850

00A54 Remove Floor Tiles — Tile removal by machine SF 7425

00A55 Remove floor tiles — Removal of 2 tile layers, by hand SF 3713

00A56 Remove floor tiles — Removal of 2 tile layers, by machine SF 3713

00A57 Remove floor tiles — Removal of floor tile mastic (chemical solvent)

SF 29700

00A58 Excavate and remove contaminated dirt, by hand — Crawl Space CU. FT. 3960

00A59* Bulk Removal — 55-gallon sealed container Per CN. 20

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

(insert multiplier)

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

LEAD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 1

No.00B Work Description Units Qty $/Unit Total

00B1 Abrasive Blasting SF 990

00B2 Chemical Stripping SF 990

00B3 Power Tool Cleaning SF 990

00B4 Encapsulation SF 990

00B5 Removal of material- Trim LF 396

00B6 Removal of material- Drywall SF 792

00B7 Removal of material - Pipe or conduit ≥ 4” dia LF 396

00B8 Removal of material - Pipe or conduit < 4” dia LF 198

Note to Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm).

_______________ (insert multiplier)

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 1

No.00C Work Description Units Qty $/Unit Total

00C1 Removal of Material-Drywall SF 7920

00C2 Drywall, 5/8" Finished, 3Ct Paint SF 7920

00C3 Removal of Material-Carpet SF 990

00C4 Carpet Tile, 24 x 24 SF 990

00C5 Removal of Material-VCT SF 2772

00C6 Removal of Material-Ceramic Tile SF 198

00C7 Removal of Material- ¾” Plywood SF 1980

00C8 Removal of Material- Fiberglass Insulation SF 1980

00C9 Fiberglass Insulation up to 12" thick SF 1980

00C10 Mold Remediation on Concrete Wall or Floor SF 1980

00C11 Mold Remediation on Drywall SF 3960

Note To Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm)

__________________(insert multiplier)

Grand Total Option Year 1 $

OPTION YEAR 2: 1/01/2022- 12/31/2022

PROPOSAL ITEM #1

ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No.

000A

Work Description

Units

Qty

$/Unit

Total 000A1* Mobilization on projects. Work area isolation EA 12

000A2* Mobilization on projects. No work area isolation EA 3

000A3 Emergency Response EA 5

000A4* Work Plan EA 20

000A5* Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency Response

EA 60

000A6 Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency Response

EA 60

000A7 Elevated Work Surfaces. Fixed scaffolding (per SF floor area) Per SF Floor Area

000A8 Elevated Work Surfaces. Rolling scaffolding Per SF Floor Area

000A9 Elevated Work Surfaces. Motorized scaffolding Per SF Floor Area

000A10 Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wiping SF 79200

000A11 Cleaning of Surfaces. Special cleaning of contaminated surfaces SF 7920

000A12 Decontamination System. 2" x 4" @ 16", 5/8" plywood each side

— 3 Stage Personal Decontamination Chamber with shower

EA 10

000A13 Decontamination System. Disposable 3-stage decontamination system including shower

EA 10

000A14 Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheeting

SF 2000

000A15 Sealing and Protecting the Work Area — Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF 79200

000A16 Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywood

SF 9900

000A17 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 8 ft. high SF 2000

000A18 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 12 ft. high SF 2000 000A19 Containment Wall (5/8" plywood), 2' x 4" @ 16" —16 ft. high SF 2000

000A20* Roll-Off Container. Enclosed, 20 CY Capacity Per/Day 60

000A21 Remove asbestos ductwork SF 17146.8

000A22 Remove asbestos from fittings and valves, up to 4" diameter pipe, Iron Pipe Size (IPS)

EA 396

000A23 Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPS

EA 396

000A24 Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

000A25 Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

000A26 Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

000A27 Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

000A28 Bulk Asbestos Removal — Remove fireproofing from flat surface

SF 7920

000A29 Bulk Asbestos Removal — Remove fireproofing from irregular surface

SF 3960

000A30 Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & lathe

SF 3960

000A31 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe up to 3" diameter, IPS)

LF 792

000A32 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe 3.5" to 8" diameter)

LF 495

000A33 Remove Asbestos from Fittings and Valves via Glove Bag (up to 8" diameter, IPS)

EA 49.5

000A34 Remove Asbestos Cement Board SF 396

000A35* Disposal in Certified Landfill CY 400

000A36 Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPS

LF 792

000A37 Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPS LF 792

000A38 Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPS

LF 495

000A39 Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe, IPS LF 495

000A40 Remove Asbestos from pipe in containment, 10" to 12" diameter pipe, IPS

LF 396

000A41 Remove Asbestos from pipe in containment, 14" to 16" diameter pipe, IPS

LF 198

000A42 Remove Asbestos Built-Up Roofing Material SF 396

000A43 Remove/Replace Asbestos Flexible Duct Connection (up to

SF 1715

000A44 Removal of Batting insulation SF 396

000A45 Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remains

EA 396

000A46 Apply penetrating encapsulant on ceiling and other structural surfaces

SF 3960

000A47 Seals exposed ends of asbestos at wall openings EA 198

000A48 Seals exposed ends of asbestos at fittings, elbows and valves EA 198

000A49 Spray apply one (1) coat of penetrating encapsulant — Flat surface

SF 3960

000A50 Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanks

SF 3960

000A51 Repair pipe and duct lagging SF 17147

000A52 Remove Floor Tiles — Tile removal by hand SF 14850

000A53 Floor Tiles 12x12 SF 14850

000A54 Remove Floor Tiles — Tile removal by machine SF 7425

000A55 Remove floor tiles — Removal of 2 tile layers, by hand SF 3713

000A56 Remove floor tiles — Removal of 2 tile layers, by machine SF 3713

000A57 Remove floor tiles — Removal of floor tile mastic (chemical solvent)

SF 29700

000A58 Excavate and remove contaminated dirt, by hand — Crawl Space CU. FT. 3960

000A59* Bulk Removal — 55-gallon sealed container Per CN. 20

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

(insert multiplier)

* Line items that do not require time and one half have been identified via asterisks on the rate sc schedule.

LEAD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 2

No.

000B Work Description Units Qty $/Unit Total 000B1 Abrasive Blasting SF 990

000B2 Chemical Stripping SF 990

000B3 Power Tool Cleaning SF 990

000B4 Encapsulation SF 990

000B5 Removal of material- Trim LF 396

000B6 Removal of material- Drywall SF 792

000B7 Removal of material - Pipe or conduit ≥ 4” diameter LF 396

000B8 Removal of material - Pipe or conduit < 4” diameter LF 198

Note to Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm).

_______________(insert multiplier)

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 2

000C

Work Description

Units

Qty

$/Unit

Total

000C1 Removal of Material-Drywall SF 7920 000C2 Drywall, 5/8" Finished, 3Ct Paint SF 7920

000C3 Removal of Material-Carpet SF 990

000C4 Carpet Tile, 24 x 24 SF 990 000C5 Removal of Material-VCT SF 2772

000C6 Removal of Material-Ceramic Tile SF 198

000C7 Removal of Material- ¾” Plywood SF 1980

000C8 Removal of Material- Fiberglass Insulation SF 1980

000C9 Fiberglass Insulation up to 12" thick SF 1980

000C1

Mold Remediation on Concrete Wall or Floor SF 1980

000C1

Mold Remediation on Drywall SF 3960

Note To Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm)

___________________(insert multiplier)

Grand Total Option Year 2 $

OPTION YEAR 3: 1/01/2023- 12/31/2023

PROPOSAL ITEM #1

ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No.

0000A Work Description Units Qty $/Unit Total

0000A1* Mobilization on projects. Work area isolation EA 12

0000A2* Mobilization on projects. No work area isolation EA 3

0000A3 Emergency Response EA 5

0000A4* Work Plan EA 20

0000A5* Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency Response

EA 60

0000A6 Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency Response

EA 60

0000A7 Elevated Work Surfaces. Fixed scaffolding (per SF floor area) Per SF Floor Area

0000A8 Elevated Work Surfaces. Rolling scaffolding Per SF Floor Area

0000A9 Elevated Work Surfaces. Motorized scaffolding Per SF Floor Area

0000A10 Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wiping

SF 79200

0000A11 Cleaning of Surfaces. Special cleaning of contaminated surfaces

SF 7920

0000A12 Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with shower

EA 10

0000A13 Decontamination System. Disposable 3-stage decontamination system including shower

EA 10

0000A14 Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheeting

SF 2000

0000A15 Sealing and Protecting the Work Area — Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF 79200

0000A16 Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywood

SF 9900

0000A17 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 8 ft. high SF 2000

0000A18 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 12 ft. high SF 2000

0000A19 Containment Wall (5/8" plywood), 2' x 4" @ 16" —16 ft. high SF 2000

0000A20* Roll-Off Container. Enclosed, 20 CY Capacity Per/Day 60

0000A21 Remove asbestos ductwork SF 17146.8

0000A22 Remove asbestos from fittings and valves, up to 4" diameter pipe, Iron Pipe Size (IPS)

EA 396

0000A23 Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPS

EA 396

0000A24 Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

0000A25 Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

0000A26 Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

0000A27 Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

0000A28 Bulk Asbestos Removal — Remove fireproofing from flat surface

SF 7920

0000A29 Bulk Asbestos Removal — Remove fireproofing from irregular surface

SF 3960

0000A30 Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & lathe

SF 3960

0000A31 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe up to 3" diameter/ IPS)

LF 792

0000A32 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe 3.5" to 8" diameter, IPS)

LF 495

0000A33 Remove Asbestos from Fittings and Valves via Glove Bag (up to 8" diameter, IPS) EA 49.5

0000A34 Remove Asbestos Cement Board SF 396

0000A35* Disposal in Certified Landfill CY 400

0000A36 Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPS

LF 792

0000A37 Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPS

LF 792

0000A38 Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPS

LF 495

0000A39 Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe, IPS

LF 495

0000A40 Remove Asbestos from pipe in containment, 10" to 12" diameter pipe, IPS

LF 396

0000A41 Remove Asbestos from pipe in containment, 14" to 16" diameter pipe, IPS

LF 198

0000A42 Remove Asbestos Built-Up Roofing Material SF 396

0000A43 Remove/Replace Asbestos Flexible Duct Connection (up to

0000A44 Removal of Batting insulation SF 396

0000A45 Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remains

EA 396

0000A46 Apply penetrating encapsulant on ceiling and other structural surfaces

SF 3960

0000A47 Seals exposed ends of asbestos at wall openings EA 198

0000A48 Seals exposed ends of asbestos at fittings, elbows and valves EA 198

0000A49 Spray apply one (1) coat of penetrating encapsulant — Flat surface

SF 3960

0000A50 Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanks

SF 3960

0000A51 Repair pipe and duct lagging SF 17147

0000A52 Remove Floor Tiles — Tile removal by hand SF 14850

0000A53 Floor Tiles 12x12 SF 14850

0000A54 Remove Floor Tiles — Tile removal by machine SF 7425

0000A55 Remove floor tiles — Removal of 2 tile layers, by hand SF 3713

0000A56 Remove floor tiles — Removal of 2 tile layers, by machine SF 3713

0000A57 Remove floor tiles — Removal of floor tile mastic (chemical solvent)

SF 29700

0000A58 Excavate and remove contaminated dirt, by hand — Crawl Space

CU. FT. 3960

0000A59* Bulk Removal — 55-gallon sealed container Per CN. 20

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

(insert multiplier)

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

LEAD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 3

No.

0000B Work Description Units Qty $/Unit Total 0000B1 Abrasive Blasting SF 990

0000B2 Chemical Stripping SF 990

0000B3 Power Tool Cleaning SF 990

0000B4 Encapsulation SF 990

0000B5 Removal of material- Trim LF 396

0000B6 Removal of material- Drywall SF 792

0000B7 Removal of material - Pipe or conduit ≥ 4” dia LF 396

0000B8 Removal of material - Pipe or conduit < 4” dia LF 198

Note to Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm).

_______________(insert multiplier)

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 3

No.

0000C Work Description Units Qty $/Unit Total 0000C1 Removal of Material-Drywall SF 7920

0000C2 Drywall, 5/8" Finished, 3Ct Paint SF 7920

0000C3 Removal of Material-Carpet SF 990

0000C4 Carpet Tile, 24 x 24 SF 990

0000C5 Removal of Material-VCT SF 2772

0000C6 Removal of Material-Ceramic Tile SF 198

0000C7 Removal of Material- ¾” Plywood SF 1980

0000C8 Removal of Material- Fiberglass Insulation SF 1980

0000C9 Fiberglass Insulation up to 12" thick SF 1980

0000C10 Mold Remediation on Concrete Wall or Floor SF 1980

0000C11 Mold Remediation on Drywall SF 3960

Note To Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm)

______________(insert multiplier)

Grand Total Option Year 3 $

OPTION YEAR 4: 1/01/2024- 12/31/2024

PROPOSAL ITEM #1

ASBESTOS ABATEMENT MATERIALS/EQUIPMENT — UNIT PRICING

No.

00000A Work Description Units Qty $/Unit Total

00000A1* Mobilization on projects. Work area isolation EA 12

00000A2* Mobilization on projects. No work area isolation EA 3

00000A3 Emergency Response EA 5

00000A4* Work Plan EA 20

00000A5* Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency Response

EA 60

00000A6 Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency Response

EA 60

00000A7 Elevated Work Surfaces. Fixed scaffolding (per SF floor area) Per SF Floor Area

00000A8 Elevated Work Surfaces. Rolling scaffolding Per SF Floor Area

00000A9 Elevated Work Surfaces. Motorized scaffolding Per SF Floor Area

00000A10 Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wiping

SF 79200

00000A11 Cleaning of Surfaces. Special cleaning of contaminated surfaces

SF 7920

00000A12 Decontamination System. 2" x 4" @ 16", 5/8" plywood each side — 3 Stage Personal Decontamination Chamber with shower

EA 10

00000A13 Decontamination System. Disposable 3-stage decontamination system including shower

EA 10

00000A14 Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheeting

SF 2000

00000A15 Sealing and Protecting the Work Area — Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF 79200

00000A16 Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywood

SF 9900

00000A17 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 8 ft. high SF 2000

00000A18 Containment Wall (5/8" plywood), 2' x 4" @ 16" — 12 ft.

high

SF 2000

00000A19 Containment Wall (5/8" plywood), 2' x 4" @ 16" —16 ft. high SF 2000

00000A20* Roll-Off Container. Enclosed, 20 CY Capacity Per/Day 60

00000A21 Remove asbestos ductwork SF 17146.8

00000A22 Remove asbestos from fittings and valves, up to 4" diameter pipe, Iron Pipe Size (IPS)

EA 396

00000A23 Insulate F.G. w/ PVC Jacket fittings and valves, up to 4" diameter pipe, IPS

EA 396

00000A24 Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

00000A25 Insulate F.G. w/ PVC Jacket fittings and valves, 6" to 8" diameter pipe, IPS

EA 198

00000A26 Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

00000A27 Insulate F.G. w/ PVC Jacket fittings and valves, 10" — 12" diameter pipe, IPS

EA 158.4

00000A28 Bulk Asbestos Removal — Remove fireproofing from flat surface

SF 7920

00000A29 Bulk Asbestos Removal — Remove fireproofing from irregular surface

SF 3960

00000A30 Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & lathe

SF 3960

00000A31 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe up to 3" diameter, IPS)

LF 792

00000A32 Remove Asbestos from Pipe and Apply Tack Coat via Glove Bag (pipe 3.5" to 8" diameter, IPS)

LF 495

00000A33 Remove Asbestos from Fittings and Valves via Glove Bag (up to 8" diameter, IPS)

EA 49.5

00000A34 Remove Asbestos Cement Board SF 396

00000A35* Disposal in Certified Landfill CY 400

00000A36 Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPS

LF 792

00000A37 Insulate 2" F.G. w/ PVC Jacket Pipe, up to 4" diameter pipe, IPS

LF 792

00000A38 Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPS

LF 495

00000A39 Insulate 2" F.G. w/ PVC Jacket Pipe, 5" to 8" diameter pipe, IPS

LF 495

00000A40 Remove Asbestos from pipe in containment, 10" to 12" diameter pipe, IPS

LF 396

00000A41 Remove Asbestos from pipe in containment, 14" to 16" diameter pipe, IPS

LF 198

00000A42 Remove Asbestos Built-Up Roofing Material SF 396

00000A43 Remove/Replace Asbestos Flexible Duct Connection (up to

00000A44 Removal of Batting insulation SF 396

00000A45 Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remains

EA 396

00000A46 Apply penetrating encapsulant on ceiling and other structural surfaces

SF 3960

00000A47 Seals exposed ends of asbestos at wall openings EA 198

00000A48 Seals exposed ends of asbestos at fittings, elbows and valves EA 198

00000A49 Spray apply one (1) coat of penetrating encapsulant — Flat surface

SF 3960

00000A50 Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanks

SF 3960

00000A51 Repair pipe and duct lagging SF 17147

00000A52 Remove Floor Tiles — Tile removal by hand SF 14850

00000A53 Floor Tiles 12x12 SF 14850

00000A54 Remove Floor Tiles — Tile removal by machine SF 7425

00000A55 Remove floor tiles — Removal of 2 tile layers, by hand SF 3713

00000A56 Remove floor tiles — Removal of 2 tile layers, by machine SF 3713

00000A57 Remove floor tiles — Removal of floor tile mastic (chemical solvent)

SF 29700

00000A58 Excavate and remove contaminated dirt, by hand — Crawl Space

CU. FT. 3960

00000A59* Bulk Removal — 55-gallon sealed container Per CN. 20

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

(insert multiplier)

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

LEAD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 4

No.

00000B Work Description Units Qty $/Unit Total

00000B1 Abrasive Blasting SF 990

00000B2 Chemical Stripping SF 990

00000B3 Power Tool Cleaning SF 990

00000B4 Encapsulation SF 990

00000B5 Removal of material- Trim LF 396

00000B6 Removal of material- Drywall SF 792

00000B7 Removal of material - Pipe or conduit ≥ 4” dia LF 396 00000B8 Removal of material - Pipe or conduit < 4” dia LF 198

Note to Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm).

_______________(insert multiplier)

MOLD ABATEMENT MATERIALS/EQUIPMENT- UNIT PRICING OPTION YEAR 4

No.

00000C Work Description Units Qty $/Unit Total

00000C1 Removal of Material-Drywall SF 7920

00000C2 Drywall, 5/8" Finished, 3Ct Paint SF 7920

00000C3 Removal of Material-Carpet SF 990

00000C4 Carpet Tile, 24 x 24 SF 990

00000C5 Removal of Material-VCT SF 2772

00000C6 Removal of Material-Ceramic Tile SF 198

00000C7 Removal of Material- ¾” Plywood SF 1980

00000C8 Removal of Material- Fiberglass Insulation SF 1980

00000C9 Fiberglass Insulation up to 12" thick SF 1980

00000C1

Mold Remediation on Concrete Wall or Floor SF 1980

00000C1

Mold Remediation on Drywall SF 3960

Note To Contractor- Identify multiplier (if any) to be applied to the base unit prices for work beyond normal hours (8am-4:30pm)

_______________(insert multiplier)

Grand Total Option Year 4 $

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

STATEMENT OF WORK

The Louis A. Johnson VA Medical Center Clarksburg WV, Beckley VA Medical Center Beckley WV, Hershel “Woody” Williams VA Medical Center Huntington WV, Martinsburg VA Medical Center Martinsburg WV, Washington VA Medical Center Washington DC, and the Maryland Health Care System have a requirement for a general contractor to provide asbestos/mold/lead abatement services and furnish all labor, tools, materials, equipment, supplies and supervision to perform work as required by individual Task Orders (TO) as assigned under the resulting Indefinite-Delivery/Indefinite Quantity (IDIQ) contract from this solicitation. Minimum Task Order limitation is $2,000.00, maximum Task Order limitation is $500,000.00. Construction is required by independent contractors.

Conditions effecting this acquisition are the geographic separation of WV, MD, and DC facilities. As a result, to minimize geographic barriers for services required, the proposed solicitation will result in a minimum of 2 and a maximum of 8 contract awards, as the Contracting Officer deems to be in the best interest of the Government, for geographic area’s (Maryland, Washington D.C., Eastern and Central West Virginia, and Western West Virginia). The offerors will choose one and/or a combination of geographic areas to be considered for award.

Task orders issued will be for any VA facility located at the following eight campuses:

Louis A. Johnson VA Medical Center 1 Med Center Drive Clarksburg, WV 26301 304-623-3461

Martinsburg VA Medical Center 510 Butler Avenue Martinsburg, WV 25405 304-263-0811

Hershel “Woody” Williams VA Medical Center 1540 Spring Valley Drive Huntington, WV 25704 304-429-6755

Beckley VA Medical Center 200 Veterans Avenue Beckley, WV 25801 304-255-2121

Washington DC VA Medical Center 50 Irving Street, NW Washington, DC 20422 202-745-8000

VA Maryland Health Care System

Baltimore VA Medical Center 10 North Greene Street Baltimore, MD 21201

Perry Point VA Medical Center VA Medical Center Perry Point, MD 21902 410-642-2411

Loch Raven VA Community Living & Rehabilitation Center 3900 Loch Raven Boulevard Baltimore, MD 21218 410-605-7000

CONTRACTOR CERTIFICATION

The Contractor certifies that the Contractor shall comply with any and all legal provisions contained in the Immigration and Nationality Act of 1952, As Amended; its related laws and regulations that are enforced by Homeland Security, Immigration and Customs Enforcement and the U.S Department of Labor as these may relate to non-immigrant foreign nationals working under contract or subcontract for the Contractor while providing services to Department of Veterans Affairs patient referrals;

While performing services for the Department of Veterans Affairs, the Contractor shall not knowingly employ, contract or subcontract with an illegal alien; foreign national non-immigrant who is in violation their status, as a result of their failure to maintain or comply with the terms and conditions of their admission into the United States. Additionally, the Contractor is required to comply with all “E-Verify” requirements consistent with “Executive Order 12989” and any related pertinent Amendments, as well as applicable Federal Acquisition Regulations.

If the Contractor fails to comply with any requirements outlined in the preceding paragraphs or its Agency regulations, the Department of Veterans Affairs may, at its discretion, require that the foreign national who failed to maintain their legal status in the United States or otherwise failed to comply with the requirements of the laws administered by Homeland Security, Immigration and Customs Enforcement and the U.S Department of Labor, shall be prohibited from working at the Contractor’s place of business that services Department of Veterans Affairs patient referrals; or other place where the Contractor provides services to veterans who have been referred by the Department of Veterans Affairs; and shall form the basis for termination of this contract for breach.

The Contractor agrees to obtain a similar certification from its subcontractors.

Signature: _____________________________________________

Date: _________________________________________________

Typed Name and Title: ___________________________________

Company Name: _______________________________________

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent…