This document contains a bid price schedule and related federal contract opportunity notice. The bid price schedule outlines over 40 line items with units of measure and blank fields for quantities and unit pricing related to asbestos, lead, and mold abatement services. The services include removal of various materials, waste disposal, equipment rental, and related tasks. The federal contract opportunity is a pre-solicitation notice for an indefinite-delivery indefinite-quantity multiple award contract for asbestos, lead, and mold abatement services within medical facilities in Veterans Integrated Service Network 5. The contract has a one-year base period and four one-year options, with a maximum value of $15 million combined. Task orders will range between $2,000 to $500,000. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses and is expected to be available for download on January 6, 2020.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ITEM #1

No. 0A Work Description Units Qty $/Unit Total

0A1* Re-Mobilization to remove containment on project after TEM clearance results

EA $0.00

0A2*

Laboratory testing of bulk samples by PLM Method — Testing/ Estimating/Emergency Response

EA $0.00

0A3 Labor to take and deliver bulk samples - Testing/ Estimating/ Emergency Response

EA $0.00

0A4 Cleaning of Surfaces. Special cleaning of contaminated surfaces

SF $0.00

0A5 Remove asbestos insulation from ductwork

SF $0.00

0A6 Wrap and cut and remove insulated ductwork.

SF $0.00

0A7 Remove asbestos mastic from ductwork or pipe insulation

SF $0.00

0A8 Remove asbestos from fittings and valves, up to 4" diameter pipe

EA $0.00

0A9 Remove asbestos from fittings and valves, 6" to 8" diameter pipe, IPS

EA $0.00

0A10 Remove asbestos from fittings and valves, 10" — 12" diameter pipe, IPS

EA $0.00

0A11 Bulk Asbestos Removal — Remove fireproofing from flat surface

SF $0.00

0A12 Bulk Asbestos Removal — Remove fireproofing from irregular surface

SF $0.00

0A13

Bulk Asbestos Removal — Remove plaster ceiling, including suspension system, plaster & lathe

SF $0.00

0A14 Remove Asbestos from Pipe by Glove Bag (pipe up to 3" IPS) LF $0.00

0A15 Remove Asbestos from Pipe by Glove Bag (pipe 3.5" to 8" diameter, IPS)

LF $0.00

0A16 Remove Asbestos from Fittings and Valves by Glove Bag (up to

8", IPS)

EA $0.00

0A17 Remove Asbestos pipe support blocks, bottom half of pipe at supports.

EA $0.00

0A18 Remove Asbestos Cement Board

SF $0.00

0A19* Disposal asbestos waste in certified landfill loads less than 5

CY

CY $0.00

0A20* Disposal asbestos waste in certified landfill loads greater than 5 CY

TON $0.00

ASBESTOS ABATEMENT

MATERIALS/EQUIPMENT — UNIT

BASE YEAR:

0A21 Remove Asbestos from Pipe in containment, up to 4" diameter pipe, IPS

LF $0.00

0A22 Remove Asbestos from pipe in containment, 4" to 8" diameter pipe, IPS

LF $0.00

0A23 Remove Asbestos from pipe in containment, 10" to 12" diameter pipe/IPS

LF $0.00

0A24 Remove Asbestos from pipe in containment, 14" to 16" diameter pipe/IPS

LF $0.00

0A25 Remove/Replace Asbestos Flexible Duct Connection (up to 24"duct)

SF $0.00

0A26 Removal of fiberglass batt insulation up to 12" thick

SF $0.00

0A27 Removal of up to 12" thick fiberglass blown-in insulation in attic.

SF $0.00

0A28

Install ANSI/OSHA approved identification labels, tags and/or signs where asbestos remains EA $0.00

0A29 Apply penetrating encapsulant on ceiling and other structural surfaces

SF $0.00

0A30 Seal exposed ends of asbestos pipe insulation.

EA $0.00

0A31 Spray apply one (1) coat of penetrating encapsulant — Flat surface

SF $0.00

0A32 Spray apply one (1) coat of penetrating encapsulant — Pipes, beams, columns, tanks

SF $0.00

0A33 Remove of floor tiles or carpet and mastic

SF $0.00

0A34 Remove floor tiles — each additional layer

SF $0.00

0A35 Remove of linoleum and mastic

SF $0.00

0A36

Remove windows and perimeter sealant as asbestos & install temporary protection in opening with plywood and studs — Wrap, seal as asbestos and/or lead paint or both

SF of rough opng

$0.00

0A37 Remove asbestos containing caulking exterior of building first floor or on scaffolding

LF $0.00

0A38 Excavate and remove contaminated dirt, by hand — Crawl Space

CU. FT. $0.00

0A39

In a crawl space, remove debris, flatten contaminated earth, pour a fiber reinforced, 3" thick 3000 psi concrete slab, float finish. All equipment including concrete pump.

SF $0.00

0A40 Contaminated Waste: Bag, Remove from work area.

BAG $0.00

0A41 Contaminated Waste Wrapped Items Remove from work area

EA $0.00

0A42 Excavate and remove contaminated dirt, by hand — Crawl Space

CU. FT. $0.00

0A43 Remove vinyl wall base & asbestos glue

LF $0.00

No. 0B Work Description Units Qty $/Unit Total

0B1 Abrasive Blasting flat, round, shaped

SF 0.00

0B2 Chemical stripping larger areas not covered below

SF 0.00

0B3 Chemical Stripping - paint from Window Sash

SF 0.00

0B4 Chemical Stripping - paint from Window Sill

LF 0.00

0B5 Scrape & Encapsulate - paint on Window Sash

SF 0.00

0B6 Scrape & Encapsulate - paint on Window Sills

LF 0.00

0B7 Scrape & Encapsulate - paint on masonry

SF 0.00

0B8 Power Tool Cleaning SF 0.00 0B9 Encapsulation SF 0.00

0B10 Removal of material- Trim LF 0.00 0B11 Removal of material- Drywall SF 0.00

0B12

Remove windows with lead containing paint & install temporary protection in opening with plywood and studs — Wrap, seal as containing lead paint

SF of rough opng

$0.00

0B13 Removal of abandoned pipe or de-energized conduit > 4” dia

LF 0.00

0B14 Removal of abandoned pipe or de-energized conduit < 4” dia

LF 0.00

0B15 TCLP sampling of waste EA 0.00

0B16

Seal hazardous waste in DOT-standard 55 gal drums, store, transport, and disposal in a licensed landfill

DRUM 0.00

0B17 Loading for transport and disposal waste in a truck or dumpster

CY 0.00

No. 0C Work Description Units Qty $/Unit Total

0C1 Removal of Material-Drywall on studs or furring

SF 0.00

0C2 Removal of Material-Carpet & glue

SF 0.00

LEAD CONTAINING PAINT

MOLD ABATEMENT

Note to CONTRACTOR: Asbestos abatement in the medical center often occurs in the evenings and weekends to accommodate patients and staff. Identify a multiplier (if any) to be applied to base unit prices for work beyond normal hours (8 am. — 4:30 pm.).

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.

0C3 Removal of Material -Carpet Tile & glue

SF 0.00

0C4 Removal of Material-VCT & glue

SF 0.00

0C5 Removal of Material-Linoleum & glue

SF 0.00

0C6 Removal of Material-Ceramic Tile

SF 0.00

0C7 Removal of Material - Plywood on floor or wall

SF 0.00

0C8 Removal of Material- Contaminated Fiberglass Batt Insulation up to 6" thick

SF 0.00

0C9 Removal of Contaminated Fiberglass Insulation 7" up to 12" thick

SF 0.00

0C10 Removal of up to 12" thick fiberglass blown-in insulation in attic.

SF $0.00

0C11 Mold Remediation/Removal on Concrete Wall or Floor

SF 0.00

0C12 Mold Remediation/Removal on Drywall

SF 0.00

0C13 Multiplier for Off-Hours - Outside 8AM - 4:30PM

0.00

No. 0D Work Description Units Qty $/Unit Total

0D1* Mobilization on projects. Work area isolation

EA $0.00

0D2* Mobilization on projects. No work area isolation

EA $0.00

0D3* Emergency Response EA $0.00 0D4* Work Plan EA $0.00

0D5 Elevated Work Surfaces in containment. Scaffolding (per SF floor area)

Per SF Floor Area

$0.00

0D6 HEPA negative air machine (each)

Per WEEK $0.00

0D7 Cleaning of Surfaces. Pre-cleaning, HEPA vacuum & wet wiping

SF $0.00

0D8

Decontamination System. 2" x 4" @ 16", 5/8" plywood each side

— 3 Stage Personal Decontamination Chamber with shower

EA $0.00

0D9

Decontamination System.

Disposable 3-stage decontamination system including shower

EA $0.00

0D10 Install and Remove Temporary Partition with 2" x 4" @ 16" studs and plastic sheeting

SF of Partition

$0.00

ITEMS COMMON TO ASBESTOS, LEAD,

AND MOLD ABATEMENT

MATERIALS/EQUIPMENT- UNIT

PRICING

0D11

Install and Remove Temporary 1Hr. Fire Rated Partition with 2" x 4" @ 16" studs & 5/8" drywall on each side, joints taped and fire caulking, one self closing locking door

SF of Partition

$0.00

0D12

Sealing and Protecting the Work Area on existing wall surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF of Surface

ea. Layer $0.00

0D13

Sealing and Protecting the Work Area on existing ceiling surfaces— Masking and sealing surfaces, each layer, 6-mil poly sheeting.

SF of Surface

ea. Layer $0.00

0D14

Sealing and Protecting the Work Area — Protect carpeted area, 2 layers 6-mil poly on 3/4" plywood

SF $0.00

0D15 Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16"

— 8 ft. high

SF of Partition

$0.00

0D16 Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16"

— 12 ft. high

SF of Partition

$0.00

0D17 Containment Wall (5/8" plywood or drywall ea. side), 2' x 4" @ 16" —16 ft. high

SF of Partition

$0.00

0D18*

Exterior (or interior) 1/2 in. x 48

in. x 96 in. Cellular White PVC Panel on studs or furring (intended for transite replacement). Exterior grade caulking all joints and seams.

SF $0.00

0D19* General non-HAZMAT waste haul and disposal charges - Loads greater than 5 CY

Per Ton $0.00

0D20* General waste non-HAZMAT haul and disposal charges - Loads less than 5 CY

Per CY $0.00

0D21 Truck and temporary storage of small quanties of hazardous waste in a secure location.

Per CY $0.00

0D22 Install new commercial carpet tile, 24 x 24

SY 0.00

0D23 Install new commercial carpet SY 0.00

0D24 Install new commercial floor tile, 12" x 12"

SF 0.00

0D25 Install new 5/8" drywall over studs or furring (not incl.), tape and finish.

SF of D.W.

0.00

0D26 Install new 3 1/2" metal or wood studs @ 16" o.c. for walls up to 10' high.

SF of Wall

0.00

0D27 Painting, new, on drywall or masonry, 3 coats.

SF of Wall

0.00

0D28 Patching drywall damaged in abatement or removing base, ready for Paint

SF of patch

0.00

0D29 Insulate 3" thick F.G. w/ PVC Jacket fittings and valves, up to <4" diameter pipe, IPS

EA $0.00

0D30

Insulate 4.5" thick F.G. w/ PVC Jacket fittings and valves, 4" to <8" diameter pipe, IPS EA $0.00

0D31 Insulate 5" thick F.G. w/ PVC Jacket fittings and valves, =/>8" diameter pipe, IPS

EA $0.00

0D32 Insulate 3" F.G. w/ PVC Jacket Pipe, up to <4" diameter pipe, IPS

LF $0.00

0D33

Insulate 4.5" thick F.G. w/ PVC Jacket Pipe, 4" to <8" diameter pipe/Iron Pipe Size IPS LF $0.00

0D34 Insulate 5" thick F.G. w/ PVC Jacket pipe, =/>8" diameter pipe, IPS

EA $0.00

0D35 Replacement Material- Fiberglass Batt Insulation up to 6" thick

SF 0.00

0D36 Replacement Material Fiberglass Insulation 7" up to 12" thick SF 0.00

0D37 Replacement Material up to 12" thick fiberglass blown-in insulation in attic.

SF $0.00

0D38

New pipe support blocks, bottom half of pipe at supports, and new pipe insulation shields. Nominal pipe size 6".

EA $0.00

* Line items that do not require time and one half have been identified via asterisks on the rate schedule.