36C24519Q0587-003.docx
DOCX document Posted
- Solicitation number
- 36C24519Q0587
About this file
36C24519Q0587 36C24519Q0587_1.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24520C0025-000.docx | DOCX document | |
| 36C24519Q0587-004.doc | DOC document | |
| 36C24519Q0587-003.docx | DOCX document | |
| 36C24519Q0587-004.doc | DOC document | |
| 36C24519Q0587-001.docx | DOCX document | |
| 36C24519Q0587-000.docx | DOCX document | |
| 36C24519Q0587-002.docx | DOCX document | |
| 36C24519Q0587-002.docx | DOCX document | |
| 36C24519Q0587-001.docx | DOCX document | |
| 36C24519Q0587-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FedBizOpps Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE
DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 H
AMENDMENT TO SOLICITATION 36C24519Q0587
This is to answer the submitted questions and also to provide attached Past Performace Questionnaire (PPQ).
25405 36C24519Q0587 09-19-2019 N 221310 Department of Veterans Affairs Network Contracting Office 5 (NCO 5) 90C
NCO 5
510 Butler Avenue Martinsburg WV 25405 Phillip.Duba@va.gov Beckley VA Medical Centeer 200 Veterans Drive Beckley, WV 25801 Phillip.Duba@va.gov Questions for Solicitation 36C24519Q0587
1) Does the facility have an existing WMP for the potable water system?
-Yes.
2) Please confirm that the risk assessment, flow diagrams, and WMP formation is only for the utility cooling water system?
-No potable and non-potable water as described in the statement of work.
3) Which laboratory is currently providing the required legionella testing?
-Phigenics.
4) Is the facility utilizing any other data management system currently other than the VA legionella data archive spreadsheet system?
-No.
5) Describe the current water purification arrangement – for example: filter, softener, SDI or RO, etc.
-Boiler plant has a water softener and SPD utilizes a RO system.
6) Who provides the ongoing maintenance and servicing of this equipment?
-Inhouse staff.
7) Is the facility currently conducting the required AAMI testing particularly the TIR 34 testing?
-No
8) Legionella lab analysis is typically a 10-14 day window of time. Will this be sufficient or does the result have to be within 10 days?
-10 days from time the sample is received at the lab.
See attached document: PPQ 36C24519Q0587.
File details come from the government source that posted it. Updated .