36C24519B0004-0002001.pdf

PDF 99 KB Posted

Attached to
Construct Outpatient Addition & New Handicapped Staff Entrance (VA-18-00154852)
Solicitation number
36C24519B0004
Issued by

About this file

36C24519B0004 0002 613-122_Outpatient Addition_RFI-Log_19-0530.pdf

View the file

Other files

File Type Posted
36C24519B0004-0005021.pdf PDF
36C24519B0004-0005023.pdf PDF
36C24519B0004-0005019.pdf PDF
36C24519B0004-0005018.pdf PDF
36C24519B0004-0005022.pdf PDF
36C24519B0004-0005017.pdf PDF
36C24519B0004-0005016.docx DOCX document
36C24519B0004-0005020.pdf PDF
36C24519B0004-0004000.docx DOCX document
36C24519B0004-0003002.pdf PDF
36C24519B0004-0003000.docx DOCX document
36C24519B0004-0003001.pdf PDF
36C24519B0004-0003003.pdf PDF
36C24519B0004-0002000.docx DOCX document
36C24519B0004-0002002.pdf PDF
36C24519B0004-0002003.pdf PDF
36C24519B0004-0002006.pdf PDF
36C24519B0004-0002008.pdf PDF
36C24519B0004-0002011.pdf PDF
36C24519B0004-0002009.pdf PDF
36C24519B0004-0002010.pdf PDF
36C24519B0004-0002004.pdf PDF
36C24519B0004-0002007.pdf PDF
36C24519B0004-0002005.pdf PDF
36C24519B0004-0001001.pdf PDF
36C24519B0004-0001000.docx DOCX document
S02 613-122_Outpatient-4ARCHITECTURE_18-0917..pdf PDF
S02 613-122_Outpatient-5ARCHITECTURE_18-0917.pdf PDF
S02 613-122_Outpatient-3STRUCTURAL_18-0917.pdf PDF
S02 613-122_Outpatient-7PLUMBING_18-0917-3.pdf PDF
S02 613-122_Outpatient-2CIVIL_18-0917-2.pdf PDF
S02 613-122_Outpatient-4ARCHITECTURE_18-0917.pdf PDF
S02 613-122_Outpatient-6FIRE_18-0917.pdf PDF
S02 613-122_Outpatient-1GENERAL_18-0917.pdf PDF
S02 613-122_Outpatient-9ELECTRICAL_18-0917-2.pdf PDF
S02 613-122_Outpatient-10ELECTRICAL_18-0917-2.pdf PDF
S02 613-122_Outpatient-8MECHANICAL_18-0917.pdf PDF
36C24519B0004-043.docx DOCX document
36C24519B0004-040.docx DOCX document
36C24519B0004-044.docx DOCX document
36C24519B0004-042.pdf PDF
36C24519B0004-041.pdf PDF
36C24519B0004-000.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

613-118: Outpatient Addition Handicap Staff Entrance

PRE-BID RFI RESPONSE 5/30/19

RFI QUESTION AND RESPONSE

Can you offer clarification for the door types listed on sheet AE-601. For example, door type #1 shows a 4x25 window cutout and a bottom louver cutout. Does this mean that all type #1 doors get the window and louver cutout, or only specific door locations? If so, how is that determined? Same question for type #17 and #19 doors.

VA RESPONSE: On sheet AE601 refer to door notes and door schedule remarks. For example, under door notes, a dashed line indicates glass or louver by modification. A solid line indicates glass or louver by door elevation type.

The door schedule indicates openings 207.1, 203.1, and C2.1 are to receive hollow metal frames. Are these to be cased opening frames? If not, what door type and hardware set should be used for these three openings?

VA RESPONSE: For doors GD-203.1 and GC-207.1, use Pair Door Leaf "AL" with Hardware Set HW-SH- 12B. For Door GD-C2.1 1 use Door leaf type 9 with hardware set HW-SH-4B.

There are (3) “hatch doors” on the door schedule, but there is no information on door type, frame type, or hardware set. Please provide.

VA RESPONSE: Interstitial hatch doors B-S7.2, B-S8.2, GD-IF.2, ID-IF.2 (hatch door from cooridor to room ID-1F), and ID-S8.2 receive same door, frame, and hardware scheduled for hatch door 1D-S8.1.

On the door schedule omit door, frame, and hardware for door 1D-S8.1. For hatch door 1D-IF.2 change from access panel to same door, frame, hardware indicated for door 1D-S8.1.

The door schedule indicates opening 112.1 is to be lead-lined, but no door type or hardware set is listed.

Please provide.

VA RESPONSE: Door 1D-112.1 receives: 1) Door type 17 (Lead lined); 2) Hardware set HW-10H, with Lead lined glass kit in each door leaf.

The door schedule indicates 122B is to be lead-lined with aluminum door and frame. Please confirm that this is correct. Also, no hardware set is listed. Please provide.

VA RESPONSE: Door 1D-122B receives: 1) Door size SS; 2)Door type 17 (lead lined); 3) Frame Type (Lead lined); 4) Unrated; 5) HW set HW-10E.

The door schedule indicates openings 119.1 and 213.1 is to receive HW set SH-3C. We did not find this HW set listed in the Specifications. Please provide.

VA RESPONSE: Hardware set HW-SH-3C is in spec section 08 71 00.

613-118: Outpatient Addition Handicap Staff Entrance

PRE-BID RFI RESPONSE 5/30/19

I did not see anything that called a manufacturer for the video surveillance system. Is there an existing system and if so what manufacturer it is?

VA RESPONSE: The existing system is Lenel with OnSSI Occularis software. All new components for the VASS shall be an extension of the existing system and seamlessly integrated.

In the Outpatient Addition project, there is a problem with some of the Architectural drawings. In the first file of architecturals, called, "S02_612-122_Outpatient-4ARCHITECTURE_18-0917 Drawings Architecture.pdf," all 17 drawings are scaled to print as 8-1/2 x 11 documents. All other drawings are sized correctly. The problem is just with this single file of Architecturals. Could you please ask the architects or appropriate party for the full-scale drawings to replace that file? Our subcontractors are asking for them.

VA RESPONSE: PDF files may be scaled in the printer seetings box to 30"x42" sheet size.

On Drawing AE-302, Detail D1 shows the prefinished aluminum framed canopy. We are unable to determine the soffit finish material on the underside of this canopy. Can you specify this material?

VA RESPONSE: The soffit and fascia material is metal panel per spec section 07 40 00

On Drawing AF-601, on the Interior Finish Legend, it states WP-01 and WP-02 are TBD. Can you clarify this wall protection requirement?

VA RESPONSE: WP-01: use name brand C/S Acrovyn Handrail HRB10CN, or equal.

WP-02: use name brand CS Acrovyn Handrail HRB10CN and C/S Acrovyn Crashrail FR451N, or equal.

In reviewing plumbing drawings, there do not appear to be any floor drains in the bathrooms. Is this deliberate, or do you intend to add them?

VA RESPONSE: There are no floor drains in bathrooms and none will be added.

Sheet1